STAN LEWIS, INC | B= | C | 08/22/2016 | | DALE | DALE | | B= | C | 5274840 |
LUMENOCITY ELECTRICAL DESIGN, LLC | BSP | T | 06/03/2016 | PAID (REC#1333459): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Changed fixture type G to Nanolux | BERTHA | BERTHA | | BSP | T | 5213880 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | BSP | T | 05/06/2016 | PAID (REC#1331337): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: revised gas plan added new gas sheet | JUSTINC | JUSTINC | | BSP | T | 5193806 |
STAN LEWIS, INC | BFR | P | 04/12/2016 | framing for walls and lid at lab room okay per approved plan splice on site / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 5175196 |
STAN LEWIS, INC | BSP | P | 03/28/2016 | after further review with plan reviewer - walls and ceiling at lab room can be built as per design, do not need continuity to deck above | BRIANB | BRIANB | | BSP | P | 5163544 |
STAN LEWIS, INC | BFR | R | 03/25/2016 | need to attach mechanical and plumbing to permit and complete inspections / 2x4 wood framed walls installed at the lab room are not approved per U419 design listed on the approved plans, and do not extend from the top of the floor to underside of a fire-reistance-rated ceiling above / need approved design for the horizontal fire rated assembly at the lab room / need framing details for the hard lid above the entry not on the approved plans / still need to re-inspect all lab room walls and lid / mech walls at flower room 2 and new restroom wall framing okay only after MEP inspections completed / reviewed accesible elements with site rep Tasha including turning space requirements in the restroom (ANSI.304) | BRIANB | BRIANB | | BFR | R | 5162612 |
LUMENOCITY ELECTRICAL DESIGN, LLC | E= | C | 06/06/2016 | | CRAIGS | CRAIGS | | E= | C | 5215145 |
LUMENOCITY ELECTRICAL DESIGN, LLC | EP | C | 06/06/2016 | | CRAIGS | CRAIGS | | EP | C | 5215143 |
LUMENOCITY ELECTRICAL DESIGN, LLC | E= | C | 06/06/2016 | mau -- max over current 15 -- ok ah 1 -20 , ah2-20 ,cu1-40, cu2-40 , cu3-40 , cu4-40 ----OK | CRAIGS | CRAIGS | | E= | C | 5215140 |
LUMENOCITY ELECTRICAL DESIGN, LLC | E= | P | 06/03/2016 | | CRAIGS | CRAIGS | | E= | P | 5214907 |
LUMENOCITY ELECTRICAL DESIGN, LLC | EP | R | 06/03/2016 | need to bond the nipple between cans and install lock nuts both sides of the nipple | CRAIGS | CRAIGS | | EP | R | 5214904 |
LUMENOCITY ELECTRICAL DESIGN, LLC | E= | P | 06/03/2016 | need to have a ladder tall enough to inspect the rtu's and ef | CRAIGS | CRAIGS | | E= | P | 5214900 |
LUMENOCITY ELECTRICAL DESIGN, LLC | ER | P | 03/15/2016 | all pipe work in ceilings and mc in walls ok------need the seal off in extraction room and rtus | BRIAN | BRIAN | | ER | P | 5155719 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | H= | C | 06/20/2016 | INTERLOCKS VERIFIED AND OTHER CORRECTIONS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 5226588 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | H= | L | 06/10/2016 | CANCELED BY CONTRACTOR AT CALL AHEAD | JERRYF | JERRYF | | H= | L | 5220079 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | H= | P | 06/10/2016 | TAB REPORT RECEIVED - STILL NEED OTHER ITEMS ADDRESSED | JERRYF | JERRYF | | H= | P | 5219295 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | H= | P | 06/06/2016 | UNABLE TO VERIFY INTERLOCKS AT MUA UNIT - NEED TAB REPORT - NEED REMOTE INDICATOR ON SMOKE SHUTDOWN - REST OK | JERRYF | JERRYF | | H= | P | 5215903 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | H= | P | 05/25/2016 | SEE HI AND HD NOTES. INSTALL ALL ALARMS IN MMIP ROOM. WILL NEED TEST AND BALANCE REPORT FOR MMIP ROOM ONLY. | NANCY | NANCY | | H= | P | 5207732 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | HC | C | 05/25/2016 | 320,000 BTU'S ADDED TO EXISTING METER. | NANCY | NANCY | | HC | C | 5207730 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | HI | C | 05/25/2016 | 10 LB TEST OK. INSTALLED AS PER PRINTS. FOR FINAL COMPLETE GAS CONNECTION TO ALL APPLIANCES. | NANCY | NANCY | | HI | C | 5207729 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | HD | P | 05/25/2016 | MMIP LAB: HOW IS THE HAZARDOUS EXHAUST BEING PROTECTED ONCE IT LEAVES THE MMIP ROOM? DUCT IS EXPOSED ABOVE THE MEZZANINE AREA. PROVIDE INSTALLATION INSTRUCTIONS FOR CEILING RADIATION DAMPERS. FURNACES: INSTALL 3 INCH VENT, 2 INCH NOT ALLOWED BY MANUFACTURER, SEE PAGE 15 OF INSTALLATION INSTRUCTIONS. INSTALL MOTORIZED OR MANUAL AND BACK DRAFT DAMPERS IN OUTSIDE AIR DUCTS. INCREASE CONDENSATE DRAIN LINE TO 1 1/4 INCH AFTER THE MANIFOLD. | NANCY | NANCY | | HD | P | 5207728 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | P= | C | 06/10/2016 | moved lav | TED | TED | | P= | C | 5219481 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | P= | P | 05/25/2016 | field cancel | TED | TED | | P= | P | 5207582 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | PTO | C | 04/08/2016 | moved lav | TED | TED | | PTO | C | 5172790 |