COLARELLI CONSTRUCTION, INC. | B= | C | 06/15/2016 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 5223129 |
COLARELLI CONSTRUCTION, INC. | B= | P | 06/15/2016 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | NICK | NICK | | B= | P | 5222845 |
COLARELLI CONSTRUCTION, INC. | BFR | C | 06/15/2016 | | NICK | NICK | | BFR | C | 5222841 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 04/19/2016 | Smoke stop at new plumbing stacks through floor ok. | BERTW | BERTW | | BSP | P | 5180010 |
COLARELLI CONSTRUCTION, INC. | BSP | T | 04/19/2016 | PAID (REC#1324530) ADDITIONAL PLAN REVIEW TIME: $50 From: BERTHA Water Heater Revision E1 - E5 | BERTHA | BERTHA | | BSP | T | 5179747 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 04/13/2016 | walls ok pending other roughs completed/reviewed accessible elements with job super Shuan/need smoke stop in new plumbing pipe floor penetrations inspected | BERTW | BERTW | | BFR | P | 5176000 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 04/04/2016 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Removed data | SHELBY | SHELBY | | BSP | P | 5169193 |
COLARELLI CONSTRUCTION, INC. | BSP | T | 04/04/2016 | PAID (REC#1321822) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: millwork modifications | SHELLEY | SHELLEY | | BSP | T | 5169155 |
RYBA ELECTRIC, INC. | E= | C | 06/14/2016 | | BRIAN | BRIAN | | E= | C | 5221711 |
RYBA ELECTRIC, INC. | ER | C | 06/02/2016 | remainder of drop ceiling ok------- contractor was finishing 2 exit signs in corridor by reception(leave tiles out to check on final) | MATTHEW | MATTHEW | | ER | C | 5212988 |
RYBA ELECTRIC, INC. | EP | P | 05/31/2016 | panel L2B ---OK water heater moved to a different panel | CRAIGS | CRAIGS | | EP | P | 5211101 |
RYBA ELECTRIC, INC. | ER | P | 05/31/2016 | corridor and lab above ceiling OK | CRAIGS | CRAIGS | | ER | P | 5211097 |
RYBA ELECTRIC, INC. | EMR | R | 05/27/2016 | L2B- 125 amp panel with 90 amp water heater load, plans indicate 200 amp panel without water heater? revise plans recalculate load | BRET | BRET | | EMR | R | 5209910 |
RYBA ELECTRIC, INC. | ER | P | 05/27/2016 | 3 south office ceilings. | BRET | BRET | | ER | P | 5209909 |
RYBA ELECTRIC, INC. | ER | P | 05/26/2016 | ceilings see plans for location, reception desk rough ok | BRET | BRET | | ER | P | 5208842 |
RYBA ELECTRIC, INC. | ER | P | 05/13/2016 | see plans for locations, ceilings | BRET | BRET | | ER | P | 5198630 |
RYBA ELECTRIC, INC. | ER | P | 04/22/2016 | hard lids---ok | BRIAN | BRIAN | | ER | P | 5182349 |
RYBA ELECTRIC, INC. | ER | P | 04/12/2016 | WALLS--OK | BRIAN | BRIAN | | ER | P | 5174995 |
BRUCE MECHANICAL INC | H= | C | 06/14/2016 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 5221453 |
BRUCE MECHANICAL INC | H= | P | 05/20/2016 | NEED BALANCE REPORT | JON | JON | | H= | P | 5204836 |
BRUCE MECHANICAL INC | H= | P | 05/18/2016 | ROOMS COMPLETE NEED CORRIDORS AND BALANCE REPORT WITH VENTILATION REQUIRED SHOWN ON REPORT AND ALL TO BE WITHIN 10% | JON | JON | | H= | P | 5203055 |
BRUCE MECHANICAL INC | HD | P | 05/03/2016 | Spoke with Mike and we need to have flex and diffusers installed with completion of the exhaust system. see all previous notes. will need balance report and roof inspection before final. Do not install ceiling tile. | JON | JON | | HD | P | 5190597 |
BRUCE MECHANICAL INC | HD | P | 04/28/2016 | ROUGH DUCT OK FOR INSULATION. STILL NEED NEW EXHAUST FAN, ROOF CURB AND NEW EXHAUST DUCT WITH INSPECTIONS. NEED ALL COMBUSTIBLES PROTECTED TO CODE IN RETURN AIR PLENUM. NEED PROPER TRANSFERS FOR RETURN AIR PATH BEFORE FINAL. | JON | JON | | HD | P | 5187247 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 06/09/2016 | remodel | TED | TED | | P= | C | 5218621 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 06/09/2016 | basement tie ins ok | TED | TED | | PTO | C | 5218620 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 05/11/2016 | under floor in 1st floor ceiling, dwv ok, water run down to basement for tie in ok, 4'' dwv run into stair well of 1st floor still to be piped into basement | TED | TED | | PTO | P | 5196407 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 04/21/2016 | walls and ceiling water and dwv, ok | TED | TED | | PTO | P | 5181337 |