RAINE BUILDING LLC. | B= | C | 06/30/2016 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 5235272 |
RAINE BUILDING LLC. | B= | P | 06/24/2016 | Building final OK pending mechanical and plumbing finals complete. Additional Inspections Required (computer generated): JOHNSON BROTHERS PLUMBING & HEATING Plumbing Final Inspection is not Completed yet, NIELSEN MECHANICAL CONTRACTORS, INC. Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5230584 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | BSP | T | 06/14/2016 | PAID (REC#1335334) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 6-14-16 | TCRIPPEN | TCRIPPEN | | BSP | T | 5222183 |
RAINE BUILDING LLC. | BFR | P | 05/11/2016 | All framing OK / Still need to attach plumbing / Need all MEP's complete | NICK | NICK | | BFR | P | 5196552 |
RAINE BUILDING LLC. | BFR | P | 05/06/2016 | Need to see bulk head framing for conference room 2 / Need to see knee wall framing for copy room area / Need to attach plumbing / Need all MEP's complete / Reviewed accessible elements with contractor / Reviewed exit signs and doors with contractor / All other wall and bulk head framing OK | NICK | NICK | | BFR | P | 5193318 |
GREINER ELECTRIC, LLC. | E= | C | 06/23/2016 | | BRET | BRET | | E= | C | 5229208 |
GREINER ELECTRIC, LLC. | E= | P | 06/21/2016 | BATHROOMS AND MOP CLOSET--------WATER HEATER NEEDS #8 CU--12000 WATTS | BRIAN | BRIAN | | E= | P | 5226881 |
GREINER ELECTRIC, LLC. | ER | C | 06/09/2016 | | BRET | BRET | | ER | C | 5218413 |
GREINER ELECTRIC, LLC. | ER | P | 06/03/2016 | bath rooms hard lid and walls---ok | BRIAN | BRIAN | | ER | P | 5214006 |
GREINER ELECTRIC, LLC. | ER | P | 06/02/2016 | office ceilings, cans in cove and hard lid in reception area | MATTHEW | MATTHEW | | ER | P | 5212972 |
GREINER ELECTRIC, LLC. | ER | P | 05/06/2016 | walls | BRET | BRET | | ER | P | 5193260 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 06/30/2016 | ALL CORRECTIONS MADE | JERRYF | JERRYF | | H= | C | 5235271 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 06/30/2016 | TAB REPORT | JERRYF | JERRYF | | H= | P | 5234574 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 06/09/2016 | NEED WOOD WATER HEATER PLATFORM REMOVED FROM PLENUM RETURN AND PAN DRAIN PROTECTED TO 25/50 FLAME SPREAD AND TAB REPORT - REST OK | JERRYF | JERRYF | | HD | P | 5219052 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 06/08/2016 | ABOVE CEILING SA/RA GRILLES OK IN THE FOLLOWING AREA HIGH LIGHTED ON NIELSEN PLAN - STILL NEED THE FOLLOWING ALL F/D REMOVED PER PREVIOUS NOTES - REMOVE PLYWOOD PLATFORM FROM RA PLENUM FOR WATER HEATER - TAB REPORT - ALL BATHROOMS | JERRYF | JERRYF | | HD | P | 5217324 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 05/16/2016 | NEED PLUMBING CONTRACTOR ATTACHED TO PERMIT. REMOVE ALL EXISTING FIRE DAMPERS THAT NO LONGER HAVE WALLS SUPPORTING THEM. ROUGH SUPPLIES ABOVE CEILING OK. NO DIFFUSERS YET. NO BATHROOMS YET. | NANCY | NANCY | | HD | P | 5199904 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | P= | C | 06/27/2016 | | JOEL | JOEL | | P= | C | 5231701 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | P= | P | 06/22/2016 | relocate wh pan drain to proper location | JOEL | JOEL | | P= | P | 5228767 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | PTO | C | 06/14/2016 | correction made | TED | TED | | PTO | C | 5221451 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | PTO | P | 06/01/2016 | need shower valve installed, design and test ok hall bathrooms | TED | TED | | PTO | P | 5211998 |