THOMAS GENERAL CONTRACTORS, INC. | B= | C | 06/23/2016 | All other required Final inspections are complete. (This is a computer generated result) | ERICR | ERICR | | B= | C | 5229019 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 06/15/2016 | pending mechanical final. Additional Inspections Required (computer generated): ENVIRONMENTAL HTG & AIR COND Mechanical Final Inspection is not Completed yet. | ERICR | ERICR | | B= | P | 5223073 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | C | 06/15/2016 | corrections completed | ERICR | ERICR | | BFR | C | 5223058 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 05/24/2016 | Need other rough inspections completed / need to attach mechanical / framing ok per Nick M | ERICR | ERICR | | BFR | P | 5207165 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 05/20/2016 | Frame OK pending all MEP's complete / Reviewed accessible elements ( Need 34" break room sink at final ) | NICK | NICK | | BFR | P | 5204870 |
SYSTEMS ELECTRIC, INC. | E= | C | 06/14/2016 | | MIKEC | MIKEC | | E= | C | 5222591 |
SYSTEMS ELECTRIC, INC. | ER | C | 06/08/2016 | CEILINGS | MIKEC | MIKEC | | ER | C | 5217548 |
SYSTEMS ELECTRIC, INC. | ER | P | 05/24/2016 | REST OF WALLS | MIKEC | MIKEC | | ER | P | 5206804 |
SYSTEMS ELECTRIC, INC. | ER | P | 05/19/2016 | walls only bath hardlid not ready | BRET | BRET | | ER | P | 5203833 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | C | 06/23/2016 | MECHANICAL FINAL OK. TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 5229018 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 06/15/2016 | PENDING TEST AND BALANCE REPORT.. | LUKE | LUKE | | H= | P | 5223182 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 06/14/2016 | BY FINAL NEED TO ISOLATE PLASTIC TO POLY DRAIN IN PLENUM CEILING FOR MINI SPLIT. NEED TO LABEL NEW EQUIPMENT ON ROOF..AND TEST AND BALANCE REPORT REQUIRED. NOTE: ABOVE CEILING OK DIFFUSERS AND FLEX COMPLETE EXHAUST FANS ARE INSTALLED. | LUKE | LUKE | | HD | P | 5222045 |
PRESTIGE MECHANICAL CONTRACTORS,INC | H= | C | 06/13/2016 | GAS COMPLETE. | LUKE | LUKE | | H= | C | 5220578 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HC | C | 06/13/2016 | ADDED 115,000 TO LOAD. | LUKE | LUKE | | HC | C | 5220574 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HI | C | 06/13/2016 | 10 LB TEST GOOD RAN PER PLANS. | LUKE | LUKE | | HI | C | 5220569 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 06/08/2016 | BY FINAL NEED ALL MATERIALS IN PLENUM CEILING RETURN TO BE ISOLATED. OR RATED. NEED TO LIFT FLEX RUN OFF GRID MAIN OFFICE. | LUKE | LUKE | | HD | P | 5217803 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | C | 06/13/2016 | | TAYLOR | TAYLOR | | P= | C | 5220779 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | C | 06/13/2016 | water service above ceiling ok. | TAYLOR | TAYLOR | | PTO | C | 5220775 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | P | 05/24/2016 | all H2O and DWV in walls and above ceiling ok, still need mechanical permit attached. | TAYLOR | TAYLOR | | PTO | P | 5206958 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PB | C | 05/17/2016 | per plan, need mechanical permit attached by PTO inspection. | TAYLOR | TAYLOR | | PB | C | 5200780 |