HAMMER HOMES, INC. | B= | C | 02/02/2017 | corrections complete | ERICR | ERICR | | B= | C | 5404951 | HAMMER HOMES, INC. | B= | P | 12/08/2016 | Temp CO: pending building and fire finals ( Expires: 1/7/2017 12:00:00 AM) | MINDY | MINDY | | B= | P | 5363446 | HAMMER HOMES, INC. | B= | P | 12/08/2016 | Complete other inspection finals / rest ok. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | LINDSEY | LINDSEY | | B= | P | 5363362 | HAMMER HOMES, INC. | BLA | P | 09/27/2016 | need to lathe front columns unless they are having masonry installed on them / need raise weep screed on back columns to 1/2 above patio on lower level | ERICR | ERICR | | BLA | P | 5303979 | HAMMER HOMES, INC. | BSP | P | 09/22/2016 | corrections made on rear porch | ERICR | ERICR | | BSP | P | 5299984 | HAMMER HOMES, INC. | BIN | C | 09/20/2016 | | ERICR | ERICR | | BIN | C | 5297783 | HAMMER HOMES, INC. | BSP | P | 09/20/2016 | all post and beam connections front and rear porch ok / still need to nail double joist hangers on double 2x12's rear deck at house / need to inspect stairs at rear deck | ERICR | ERICR | | BSP | P | 5297772 | HAMMER HOMES, INC. | BFR | C | 09/20/2016 | corrections complete | ERICR | ERICR | | BFR | C | 5297765 | HAMMER HOMES, INC. | BSP | R | 09/16/2016 | Need to inspect all post bases and caps for front and back porch / Need to see all beams for front and back porch / Trusses for front and back porch OK / Need to finish nailing hanger for 3 2x12 joist at back deck / All other deck frame OK / Still need to see stairs for deck | NICK | NICK | | BSP | R | 5295442 | HAMMER HOMES, INC. | BFR | P | 09/16/2016 | Portal frame at garage OK / Need lateral bracing for H28, H18, H17, and H16 / Need 3 2x6 post under HM01 in garage / Need to install ST12 strap each end of header at stairs / Need to finish nailing hangers for stair stringers / Roof dried in / OK to insulate | NICK | NICK | | BFR | P | 5295435 | HAMMER HOMES, INC. | BTR | C | 09/15/2016 | | SCOTTS | SCOTTS | | BTR | C | 5294859 | HAMMER HOMES, INC. | BSP | T | 09/07/2016 | PAID (REC#1357795) PLAN SPLICE FEE: $0.00 by: JUSTINC for Mechanical: Added bath and bedroom to unfinished basement | JUSTINC | JUSTINC | | BSP | T | 5286584 | HAMMER HOMES, INC. | BSP | T | 09/07/2016 | PAID (REC#1357795) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: added bed and bath in basement | SHELLEY | SHELLEY | | BSP | T | 5286569 | HAMMER HOMES, INC. | BFD | C | 06/28/2016 | Soils report on file | BERTW | BERTW | | BFD | C | 5233216 | HAMMER HOMES, INC. | BFN | C | 06/28/2016 | | BERTW | BERTW | | BFN | C | 5233213 | HAMMER HOMES, INC. | BFT | C | 06/28/2016 | | BERTW | BERTW | | BFT | C | 5233211 | HAMMER HOMES, INC. | BFI | C | 06/24/2016 | | LINDSEY | LINDSEY | | BFI | C | 5230649 | HAMMER HOMES, INC. | BFD | P | 06/24/2016 | Drain okay pending soils report | LINDSEY | LINDSEY | | BFD | P | 5230648 | HAMMER HOMES, INC. | BFD | P | 06/23/2016 | Pending stamped Soils Report // Engineers observation Letter on file // Sump pits in north and south west corner of foundation | LINDSEY | LINDSEY | | BFD | P | 5229436 | HAMMER HOMES, INC. | BFN | P | 06/23/2016 | Pending stamped Soils Report // Engineers observation Letter on file | LINDSEY | LINDSEY | | BFN | P | 5229433 | HAMMER HOMES, INC. | BFT | P | 06/23/2016 | Pending stamped Soils Report // Engineers observation Letter on file | LINDSEY | LINDSEY | | BFT | P | 5229431 | HAMMER HOMES, INC. | BIN | R | 06/23/2016 | No insulation installed | LINDSEY | LINDSEY | | BIN | R | 5229376 | HAMMER HOMES, INC. | BFT | P | 05/11/2016 | AUTHORIZED INSPECTION BY ENGINEER | REBECCA | REBECCA | REBECCA | BFT | P | 5196758 | HAMMER HOMES, INC. | BFN | P | 05/11/2016 | AUTHORIZED INSPECTION BY ENGINEER | REBECCA | REBECCA | REBECCA | BFN | P | 5196757 | J2D ELECTRIC, INC. | E= | C | 11/29/2016 | 40 amp a/c ok,garage heater installed,2nd island outlet abandoned, | JOHNN | JOHNN | | E= | C | 5354764 | J2D ELECTRIC, INC. | E= | R | 11/28/2016 | outdoor outlet behind garage needs gfci,garage heater not connected,outlet on island:open conductors hanging out,a/c unit not connected,------------------notes:basement:1 bed rm,1 bath rm wired only,rest is unfinished, | JOHNN | JOHNN | | E= | R | 5353738 | J2D ELECTRIC, INC. | ER | C | 09/14/2016 | | JOHNN | JOHNN | | ER | C | 5292645 | J2D ELECTRIC, INC. | ER | C | 09/12/2016 | garage fire wall:2 stud spaces with back to back boxes,master bd rm:need outlet near rear door,-------notes:200 amp ug,no cv,no mcc,ir ufer,1#10,4#6al,basement only partially wired,bath,all lights,utility,ok-------------pics received for firewall,ok | JOHNN | JOHNN | | ER | C | 5290359 | J2D ELECTRIC, INC. | ES | C | 09/12/2016 | Residential Underground: 200 amp ug,new res,ok to set meter and connect | JOHNN | JOHNN | | ES | C | 5290351 | MILLER HEATING & AIR CONDITIONING, INC. | H= | C | 12/05/2016 | corrections made. NOTE: UNFINISHED BASEMENT, DIRECT VENT FURNACE WITH ZONED SYSTEM AND MOTORIZED DAMPERS, NO OUTSIDE AIR TO RETURN, DIRECT VENT WATER HEATER, A/C COMPLETE, DOWN DRAFT COOK TOP, MANTEL OK, PARTIAL FINISHED BASEMENT (1-BEDROOM AND 1-BATHROOM) OK. | PAULO | PAULO | | H= | C | 5360693 | MILLER HEATING & AIR CONDITIONING, INC. | H= | P | 11/28/2016 | need to have installation manual for fire place on site for inspection, need to complete termination to down draft range exhaust. WHAT IS THE CFM TO SOWN DRAFT RANGE EXHAUST. rest ok. NOTE: PARTIAL FINISHED BASEMENT, DIRECT VENT FURNACE WITH ZONED SYSTEM AND MOTORIZED DAMPERS, NO OUTSIDE AIR TO RETURN, DIRECT VENT WATER HEATER, A/C COMPLETE, DOWN DRAFT COOK TOP. | PAULO | PAULO | | H= | P | 5353897 | MILLER HEATING & AIR CONDITIONING, INC. | HC | C | 09/15/2016 | RELEASE METER | PAULO | PAULO | | HC | C | 5294922 | MILLER HEATING & AIR CONDITIONING, INC. | HRR | C | 09/15/2016 | NEED TO SEAL ALL SUPPLY AIR JOINTS AND TAKE OFFS IN BASEMENT BY FINAL, WHAT IS THE CFM OF THE DOWN DRAFT COOK TOP? REST OK. NOTE: UNFINISHED BASEMENT, DIRECT VENT FURNACE WITH ZONED SYSTEM AND MOTORIZED DAMPERS, NO OUTSIDE AIR TO RETURN, DIRECT VENT WATER HEATER, A/C ROUGH AND LINE SET, DOWN DRAFT COOK TOP, DUCT DESIGN. | PAULO | PAULO | | HRR | C | 5294440 | MILLER HEATING & AIR CONDITIONING, INC. | HRR | R | 09/14/2016 | NOT READY. WAIVED TRIP FEE. NO PLANS ON SITE. RE INSPECT ALL. | PAULO | PAULO | | HRR | R | 5293564 | L & L GAS SHOP, LLC. | HI | C | 09/07/2016 | 10# TEST OK. 1 1/4" MAIN AT 50' TO FURNACE, WATER HEATER, COOK TOP, GARAGE HEATER, FIRE PLACE, DRYER AND BBQ. | PAULO | PAULO | | HI | C | 5286941 | B & L PLUMBING, INC. | P= | C | 12/08/2016 | correction made. | TAYLOR | TAYLOR | | P= | C | 5363085 | B & L PLUMBING, INC. | P= | P | 12/07/2016 | install pvb, rest ok, finished basement ( 1 bedroom and bathroom only ). | TAYLOR | TAYLOR | | P= | P | 5362445 | B & L PLUMBING, INC. | PTO | C | 09/09/2016 | finished basement (1 bathroom only ), aav at bar sink, mixing valve for master tub is in basement ceiling. | TAYLOR | TAYLOR | | PTO | C | 5289210 | B & L PLUMBING, INC. | PB | C | 07/01/2016 | ok | TED | TED | | PB | C | 5235966 |
|
|