RIVERS DEVELOPMENT, INC. | B= | C | 06/19/2017 | knee and toe clearance with protection at kitchen sink okay | BOBF | BOBF | | B= | C | 5539343 |
RIVERS DEVELOPMENT, INC. | B= | P | 05/05/2017 | still need knee and toe clearance for a forward approach at the kitchen sink in the kitchenette and will need knee protection once knee and toe clearance is provided - currently have full cabinet under sink / stove with front controls and sink height now OK -- Schedule a new Building Final when above items are complete. | DANE | DANE | | B= | P | 5497093 |
RIVERS DEVELOPMENT, INC. | B= | P | 04/14/2017 | Temp CO: One extension for TCO ( Expires: 5/14/2017 12:00:00 AM) | MINDY | MINDY | | B= | P | 5475214 |
RIVERS DEVELOPMENT, INC. | B= | P | 03/30/2017 | Panic hardware not required per updated splice / previous items still remain from prior inspection: counter top in kitchen in break room needs to be 34" max above finished floor / need knee space under kitchen sink in break room kitchen / need stove/oven with front controls on it in break room kitchen / -- Schedule a new Building Final when above items are complete. | JOHN | JOHN | | B= | P | 5460891 |
RIVERS DEVELOPMENT, INC. | BSP | T | 03/30/2017 | PAID (REC#1413480) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revised door schedule to remove panic hardware | SHELLEY | SHELLEY | | BSP | T | 5460448 |
RIVERS DEVELOPMENT, INC. | B= | P | 03/09/2017 | Temp CO: All partial ( Expires: 4/8/2017 12:00:00 AM) | JANE | JANE | | B= | P | 5435808 |
RIVERS DEVELOPMENT, INC. | B= | P | 11/30/2016 | counter top in kitchen in break room needs to be 34" max above finished floor / need knee space under kitchen sink in break room kitchen / need stove/oven with front controls on it in break room kitchen / need panic hardware at main entry door per plan -- Schedule a new Building Final when above items are complete. | DANE | DANE | | B= | P | 5356435 |
RIVERS DEVELOPMENT, INC. | BFR | P | 11/30/2016 | light gauge framing OK | DANE | DANE | | BFR | P | 5356401 |
RIVERS DEVELOPMENT, INC. | BSP | P | 11/21/2016 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: remove range | SHELBY | SHELBY | | BSP | P | 5350418 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | BSP | P | 11/21/2016 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: revised duct layout / removed range hood from scope / revised demo | DALEH | DALEH | | BSP | P | 5350407 |
RIVERS DEVELOPMENT, INC. | B16 | C | 07/01/2016 | MECHANICAL CONTRACTOR NEEDS TO GET REMOVED FROM PERMIT K06106 AND ATTACHED TO THIS PERMIT. HAD TO PUT MECHANICAL INSPECTION COMMENTS UNDER B16 UNTIL MECHANICAL CONTRACTOR GETS ATTACHED TO PERMIT. NEED REVISED/APPROVED PRINTS FOR AREAS "N" TO "O" LINE AND "H" TO "J" LINE. ALSO NEED TO DELETE KITCHEN RANGE HOOD AND HOOD EXHAUST. COMPLETE SUPPLIES IN CONFERENCE 112. PATCH TRUNK LINE IN BREAK ROOM. OK TO CLOSE UP WRAP. | NANCY | NANCY | | B16 | C | 5236664 |
J2D ELECTRIC, INC. | E= | C | 07/12/2016 | | BRET | BRET | | E= | C | 5243024 |
J2D ELECTRIC, INC. | ER | C | 07/12/2016 | | BRET | BRET | | ER | C | 5243014 |
J2D ELECTRIC, INC. | ER | R | 07/11/2016 | clip fixtures, remove tiles. | BRET | BRET | | ER | R | 5241883 |
J2D ELECTRIC, INC. | E= | R | 07/11/2016 | remove tile on all ends of fixtures that were relocated, ( 2 screws 2 wires or 4 clips and 2 wires.) need panel schedules updated, see plans for areas that are finaled. | BRET | BRET | | E= | R | 5241876 |
J2D ELECTRIC, INC. | ER | P | 06/21/2016 | room 112,113 | BRET | BRET | | ER | P | 5227608 |
J2D ELECTRIC, INC. | ER | P | 06/15/2016 | EAST OFFICES WALLS | MIKEC | MIKEC | | ER | P | 5223558 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | C | 11/23/2016 | MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 5353044 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 10/19/2016 | STILL NEED REVISED PLANS, ON FUTURE INSPECTION ATTACH TEST AND BALANCE REPORT TO IMAGE ON INSPECTION REQUEST.. | LUKE | LUKE | | H= | P | 5322074 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H16 | C | 10/18/2016 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H16 | C | 5320824 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 07/12/2016 | NEED REVISED/APPROVED PRINTS. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5242415 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 07/07/2016 | ABOVE CEILING ALL OK. FOR FINAL NEED REVISED/APPROVED PRINTS, VAV-5 DID NOT GET RELOCATED, NO RANGE HOOD INSTALLED. RELOCATE T-STATS AS PER PRINTS. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | HD | P | 5239844 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 07/01/2016 | MECHANICAL CONTRACTOR NEEDS TO GET ATTACHED TO PERMIT K14572 AND GET REMOVED FROM THIS PERMIT. SEE B16 COMMENTS ON PERMIT K14572 FOR MECHANICAL INSPECTION NOTES. | NANCY | NANCY | | HD | P | 5238715 |
TEAM PLUMBING, INC. | P= | C | 07/12/2016 | CORRECTIONS MADE | GABE | GABE | | P= | C | 5243299 |
TEAM PLUMBING, INC. | P= | P | 07/11/2016 | FAR LEFT SINK IN MENS ROOM REVERSED , NEED TO REMOVE DISH WASHER STAND PIPE , HARD CAP AND RUN HI LOOP , LOCK DISPOSAL , REST OK , ALL HAND SINKS ARE TEMPERED AT WATER HEATER | GABE | GABE | | P= | P | 5242191 |
TEAM PLUMBING, INC. | PTO | C | 06/21/2016 | NOTE : ALL TO PLAN , NEED TEMPERING AT HAND SINKS , AND WATER HEATER BY FINAL | GABE | GABE | | PTO | C | 5227756 |
TEAM PLUMBING, INC. | PTO | L | 06/20/2016 | CANCELED BY CONTRACTOR | GABE | GABE | | PTO | L | 5226227 |
TEAM PLUMBING, INC. | PTO | R | 06/17/2016 | NO ONE ON SITE , NO PLANS FOUND , NO CONTACT INFO, ATTEMPTED TO REACH TEAM PLUMBING . SHOULD BE TRIP FEE , WAIVED THIS TIME ONLY | GABE | GABE | | PTO | R | 5225490 |