HOMEOWNER | B= | C | 11/05/2018 | BFR and BIN complete | LONNYS | LONNYS | | B= | C | 6015263 |
HOMEOWNER | BIN | C | 11/05/2018 | 3rd party energy cert on file | LONNYS | LONNYS | | BIN | C | 6015262 |
HOMEOWNER | BFR | C | 10/29/2018 | engineer letter for omitted TBEs in garage on file | LONNYS | LONNYS | | BFR | C | 6008343 |
HOMEOWNER | B= | P | 10/26/2018 | need to complete BFR / need to complete BIN / all other building final aspects OK -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | LONNYS | LONNYS | | B= | P | 6007191 |
HOMEOWNER | BE | C | 12/28/2017 | | RITA | RITA | | BE | C | 5724606 |
HOMEOWNER | BFR | P | 07/11/2017 | Corrections made / NOTE: need stamped engineer letter for as built condition of garage wall missing TBE's by final | JUSTINL | JUSTINL | | BFR | P | 5560512 |
HOMEOWNER | BFR | P | 06/29/2017 | still need to complete repairs for cut top flange of floor joist at plumbing drain by crawl space opening / still missing TBEs at all garage trusses or provide engineering letter for as built condition / still need to tie all balloon walls together at kitchen / Other corrections made | JUSTINL | JUSTINL | | BFR | P | 5550678 |
HOMEOWNER | BIN | P | 06/29/2017 | Still need to complete frame / Insulations OK | JUSTINL | JUSTINL | | BIN | P | 5550674 |
HOMEOWNER | BSP | P | 06/23/2017 | letter for rear deck piers received | BRIANB | BRIANB | | BSP | P | 5545502 |
HOMEOWNER | BFR | P | 06/23/2017 | still need to complete repairs for cut top flange of floor joist at plumbing drain by crawl space opening / still missing TBEs at all garage trusses or provide engineering letter for as built condition / still need to tie all balloon walls together in mbr, great room and kitchen / letter for framing modifications and cut floor joist received / other corrections okay / okay to insulate | BRIANB | BRIANB | | BFR | P | 5545501 |
HOMEOWNER | BFR | P | 06/05/2017 | Fireblock garage door brackets -- Garage door header calls for (4) kings on each end -- All garage trusses call for TBE4's at each end -- Tie walls together at rear garage corners where top plates don't overlap -- Strap top plate in bedroom 2 at closet and outside closet -- Tie all balloon framed walls together at master bedroom, great room, and at kitchen -- Rear master window calls for continuous (2) 2x12 header, will need engineer letter for current build -- Both sliding glass door headers at great room call for (4) kings each end -- All lateral braces on trusses required to overlap 24" -- Need engineer letter for damaged top cord of floor joist at plumbing by crawl space opening | DAKOTAB | DAKOTAB | | BFR | P | 5525534 |
HOMEOWNER | BLA | C | 12/21/2016 | | DAKOTAB | DAKOTAB | | BLA | C | 5373470 |
HOMEOWNER | BE | C | 11/22/2016 | | GITA | GITA | | BE | C | 5350777 |
HOMEOWNER | BSP | R | 07/25/2016 | need engineering letter for piers changed to 12" and not fully bearing on footing | SCOTTS | SCOTTS | | BSP | R | 5253092 |
HOMEOWNER | BFN | C | 07/11/2016 | | SCOTTS | SCOTTS | | BFN | C | 5241457 |
HOMEOWNER | BFN | R | 07/08/2016 | not complete | SCOTTS | SCOTTS | | BFN | R | 5240796 |
HOMEOWNER | BFT | C | 06/30/2016 | Open hole and soils received -- Footing reinforcement OK -- Pads at foundation | DAKOTAB | DAKOTAB | | BFT | C | 5235581 |
BUDCO ELECTRIC, INC. | E= | C | 05/09/2018 | | CRAIG | CRAIG | | E= | C | 5840402 |
BUDCO ELECTRIC, INC. | ES | C | 05/09/2018 | Residential Underground: 200 - amp 3 Wire new service, ok to seal meter / | CRAIG | CRAIG | | ES | C | 5840401 |
BUDCO ELECTRIC, INC. | EP | C | 04/26/2018 | 100 amp 4/w to sub ok | CRAIG | CRAIG | | EP | C | 5828944 |
BUDCO ELECTRIC, INC. | E= | R | 04/26/2018 | gfi boiler plugs --------- afci / gfi laundry circuit ----------- install 250.94 -------- afci crawl fan ------ no power to smokes ------- 100 amp 4/w to sub ok ----------- note no light above tub in master bath room | CRAIG | CRAIG | | E= | R | 5828942 |
BUDCO ELECTRIC, INC. | ES | C | 04/26/2018 | Residential Underground: 200 - amp 3 Wire service, ok to seal meter / | CRAIG | CRAIG | | ES | C | 5828938 |
BUDCO ELECTRIC, INC. | ER | C | 05/03/2017 | | JOSEPH | JOSEPH | | ER | C | 5495145 |
BUDCO ELECTRIC, INC. | ER | R | 04/19/2017 | ground all light boxes, spa requires 20 amp for heater | MATTHEW | MATTHEW | | ER | R | 5480333 |
BUDCO ELECTRIC, INC. | ER | R | 04/14/2017 | make up grounds at all light boxes and outlet in boiler room (need crimps or wirenuts and land on ground screws in light boxes), verify spacing at kitchen countertops, island and peninsulas---- add outlet right of fireplace, need dedicated circuit for master bath outlets (feeding lights in guest bath), verify circuits at spa (can light controller and heater be on same 20 amp circuit), need to land whips for future circuits in boxes------------ crawler, no mcc's, 100 amp sub-panel, no vac, non-ir ufer at this time (check at re-inspect) | MATTHEW | MATTHEW | | ER | R | 5475268 |
D & J QUALITY ELECTRIC INC | EUG | C | 10/27/2016 | 3/w 4/0 al -------- 10/3 uf to well head | CRAIG | CRAIG | | EUG | C | 5330030 |
HOMEOWNER | H= | C | 04/30/2018 | NOTE: No A/C, direct vent boiler, bi-fold louver door to mechanical room, louver door to laundry room. | DUSTINS | DUSTINS | | H= | C | 5830952 |
HOMEOWNER | HC | C | 06/02/2017 | RELEASE METER | PAULO | PAULO | | HC | C | 5524319 |
HOMEOWNER | HRR | C | 06/02/2017 | correction made. NEEDED BY FINAL-- MECHANICAL EXHAUST TO CRAWL SPACE, PROPER VENT TERMINATION FOR BOILER PER MANUFACTURES INSTALLATIONS. note: direct vent boiler, no a/c. | PAULO | PAULO | | HRR | C | 5524308 |
HOMEOWNER | HRR | P | 06/01/2017 | Need nail plates on dryer vent at ceiling. NOTES: Homeowner advised that recirculation hood will be installed. | ACE | ACE | | HRR | P | 5522404 |
HOMEOWNER | HRR | P | 05/11/2017 | need the following-- complete range hood exhaust duct (400cfm) and termination, complete dryer exhaust duct and termination, can not use flex on dryer vent, rest ok. NEEDED BY FINAL-- MECHANICAL EXHAUST TO CRAWL SPACE, PROPER VENT TERMINATION PER MANUFACTURES INSTALLATIONS. note: direct vent boiler, no a/c. | DUSTINS | DUSTINS | | HRR | P | 5503236 |
HOMEOWNER | HRR | P | 04/19/2017 | need the following-- complete range hood exhaust duct (400cfm) and termination, complete dryer exhaust duct and termination, proper vent material to boiler per manufactures installations, proper support to thermal expansion tank. rest ok. NEEDED BY FINAL-- MECHANICAL EXHAUST TO CRAWL SPACE, PROPER VENT TERMINATION FOR BOILER PER MANUFACTURES INSTALLATIONS. note: direct vent boiler, no a/c. | PAULO | PAULO | | HRR | P | 5480118 |
J & J MECHANICAL, INC | HWP | P | 12/21/2016 | Pressure test ok. Notes-- Main level stapled up. | JEFFL | JEFFL | | HWP | P | 5373704 |
J & J MECHANICAL, INC | HI | C | 12/21/2016 | 10# test ok. Notes-- 1 1/4'' main.. 1 furnace.. 1 boiler.. 2 fp.. | JEFFL | JEFFL | | HI | C | 5373698 |
HOMEOWNER | P= | C | 05/01/2018 | corrections made, potable water certification to scanning | JOSEPHD | JOSEPHD | | P= | C | 5832309 |
HOMEOWNER | P= | P | 04/02/2018 | need potable water certification, need to set tempering at all shower and tub valves, leak under hall bathroom lav, note: back flow for yard hydrant at well pit | JOSEPHD | JOSEPHD | | P= | P | 5805112 |
J & J MECHANICAL, INC | PTO | C | 12/21/2016 | by final move ice maker box out of outside wall | TIM | TIM | | PTO | C | 5373608 |
HOMEOWNER | PWO | C | 10/18/2016 | yard hydrant existing | TIM | TIM | | PWO | C | 5321311 |