HORIZON RETAIL CONSTRUCTION, INC | B= | C | 07/06/2017 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5556360 |
HORIZON RETAIL CONSTRUCTION, INC | B= | P | 09/26/2016 | final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), REEVES SPECIALTY SERVICES, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5302224 |
REEVES SPECIALTY SERVICES, INC. | BSP | T | 09/19/2016 | PAID (REC#1362136) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised ef-4 routing - dressing rooms to have transom above door open at all times | JUSTINC | JUSTINC | | BSP | T | 5296199 |
HORIZON RETAIL CONSTRUCTION, INC | BSP | R | 09/08/2016 | left phone message for contractor telling him that the mechanical plan that was uploaded needed to be spliced into the plans per Nancy. | DANE | DANE | | BSP | R | 5287571 |
HORIZON RETAIL CONSTRUCTION, INC | BFR | P | 08/12/2016 | hard lids and catwalk over dressing rooms and grid-x under catwalk at sales floor OK pending other rough inspections / this concludes the framing | DANE | DANE | | BFR | P | 5268144 |
HORIZON RETAIL CONSTRUCTION, INC | BSP | P | 08/09/2016 | catwalk and hard lids over dressing rooms are not ready yet and still nee to inspect grid-X under catwalk over sales floor | DANE | DANE | | BSP | P | 5264593 |
HORIZON RETAIL CONSTRUCTION, INC | BSP | P | 08/09/2016 | catwalk design on file | DANE | DANE | | BSP | P | 5264442 |
HORIZON RETAIL CONSTRUCTION, INC | BFR | P | 08/08/2016 | storefront light gauge framing and catwalk under HVAC units over sales floor OK pending other roughs | DANE | DANE | | BFR | P | 5263559 |
HORIZON RETAIL CONSTRUCTION, INC | BFR | P | 08/01/2016 | remainder of wall framing and hard lid framing OK pending other roughs except over west dressing rooms where hard lids are still to be installed but walls are OK / need stamped copy of cat walk design for over west dressing rooms | DANE | DANE | | BFR | P | 5258485 |
HORIZON RETAIL CONSTRUCTION, INC | BFR | P | 07/27/2016 | sales floor area walls and ceiling cloud with steel column in it OK / grid-x system over sales floor are OK pending other roughs / both men's and women's restroom walls OK pending other roughs / discussed accessible elements with contractor | DANE | DANE | | BFR | P | 5255426 |
FRONT RANGE ELECTRIC, INC. | E= | C | 09/21/2016 | All RTU's existing | GARYL | GARYL | | E= | C | 5299173 |
FRONT RANGE ELECTRIC, INC. | E= | P | 09/20/2016 | panels not labeled | GARYL | GARYL | | E= | P | 5297928 |
FRONT RANGE ELECTRIC, INC. | E= | P | 09/19/2016 | all lighting okay, still need all walls inspected for final, check all panels etc | GARYL | GARYL | | E= | P | 5296813 |
FRONT RANGE ELECTRIC, INC. | ER | P | 08/12/2016 | REST OF HARDLIDS | MIKEC | MIKEC | | ER | P | 5268491 |
FRONT RANGE ELECTRIC, INC. | E= | R | 08/05/2016 | not ready for final | BRET | BRET | | E= | R | 5262906 |
FRONT RANGE ELECTRIC, INC. | ER | P | 08/05/2016 | office, hall and entry show window walls, hard lid ok in office hall and sales area only | BRET | BRET | | ER | P | 5262902 |
FRONT RANGE ELECTRIC, INC. | ER | P | 08/01/2016 | SEE PLANS | MIKEC | MIKEC | | ER | P | 5258928 |
FRONT RANGE ELECTRIC, INC. | ER | P | 07/26/2016 | walls see plans for locations | BRET | BRET | | ER | P | 5254035 |
FRONT RANGE ELECTRIC, INC. | EUG | P | 07/20/2016 | 13 floor boxes-----5- 3/4" and 1-1" pvc for registers | RANDY | RANDY | | EUG | P | 5249749 |
REEVES SPECIALTY SERVICES, INC. | H= | C | 09/27/2016 | TEST AND BALANCE REPORT GOOD... | LUKE | LUKE | | H= | C | 5303225 |
REEVES SPECIALTY SERVICES, INC. | H= | P | 09/26/2016 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5302629 |
REEVES SPECIALTY SERVICES, INC. | H= | P | 09/22/2016 | NEED ALL MATERIAL IN PLENUM CEILING RETURN RATED OR ISOLATED, NEED TO USE THE CORRECT FACTORY 2X3 REDUCERS FOR VENTS ON NEW 90% FURNACE, NEED TEST AND BALANCE REPORT AND STILL NEED TO SEE ROOF.( REST OK).. | LUKE | LUKE | | H= | P | 5300477 |
GREEN PLUMBING | H= | C | 09/21/2016 | GAS COMPLETE | LUKE | LUKE | | H= | C | 5299168 |
GREEN PLUMBING | HC | C | 08/17/2016 | ADDED 65,000 TO LOAD. | LUKE | LUKE | | HC | C | 5271544 |
GREEN PLUMBING | HI | C | 08/17/2016 | 10 LB GAS TEST GOOD RAN PER PLANS. | LUKE | LUKE | | HI | C | 5271537 |
REEVES SPECIALTY SERVICES, INC. | HD | P | 08/12/2016 | NEED CONTRACTOR INSTALLING NEW GAS TO ATTACH TO PERMIT OR ADD GAS TO SCOPE OF WORK. PROVIDE INSTALLATION INSTRUCTIONS FOR EXISTING DUCT HEATER, NEED TO VERIFY VENTING CAN BE IN A PLENUM CEILING. NEED REVISED/APPROVED PRINTS DELETING EXHAUST IN FITTING ROOMS. ROUGH DUCTS ABOVE CEILING OK, OK TO CLOSE UP WRAP. REPAIR EXISTING TORN WRAP ON TRUNK LINES. STILL NEED INSPECTION OF AIR HANDLERS. | NANCY | NANCY | | HD | P | 5268670 |
GREEN PLUMBING | P= | C | 09/23/2016 | NOTE : ALL TEMPERING VERIFIED , CORRECTIONS MADE | GABE | GABE | | P= | C | 5301726 |
GREEN PLUMBING | P= | P | 09/21/2016 | NEED TO VERIFY TEMPERING AT PUBLIC LAVS , WATER HEATER NEEDS VAC BREAKER PER PLAN , REST OK . OK FOR TCO | GABE | GABE | | P= | P | 5299513 |
GREEN PLUMBING | PTO | C | 07/21/2016 | NOTE : PAN DRAIN INSTALLED AND ON TEST , TOP OUT COMPLETE | GABE | GABE | | PTO | C | 5251222 |
GREEN PLUMBING | PTO | P | 07/19/2016 | DWV AND WATER ON TEST TO PLAN , NEED TO INSTALL WATER HEATER PAN DRAIN AND TEST | GABE | GABE | | PTO | P | 5249033 |
GREEN PLUMBING | PB | C | 06/28/2016 | DWV ON TEST TO PLAN | GABE | GABE | | PB | C | 5233405 |