HENNING COMPANIES, LLC | B= | C | 02/07/2017 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5408725 |
HENNING COMPANIES, LLC | B= | P | 01/04/2017 | grab bars OK / final OK pending all other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | DANE | DANE | | B= | P | 5381834 |
HENNING COMPANIES, LLC | B= | P | 12/23/2016 | Temp CO: pending building finals ( Expires: 1/22/2017 12:00:00 AM) | MINDY | MINDY | | B= | P | 5376099 |
HENNING COMPANIES, LLC | B= | P | 12/22/2016 | rear and vertical grab bars in mens restroom are not in correct locations / need to complete all MEP finals / need to complete all outside agency finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), HUSSMANN CORPORATION Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5374672 |
HENNING COMPANIES, LLC | BFN | C | 12/22/2016 | Engineers observation Letter received for foundation open hole and welding and bolting | DANE | DANE | | BFN | C | 5374387 |
HENNING COMPANIES, LLC | B= | R | 12/16/2016 | need to complete BFN - still need engineer observation and open hole / need to complete all other finals / not ready for final yet / need to complete canopy final / need full re-inspect / complete parapet caps / post address / install restroom signs / toilet seat cover dispensers in both restrooms are in the clear floor space for the accessible toilets. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, HUSSMANN CORPORATION Mechanical Final Inspection is not Completed yet, PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 5370212 |
HENNING COMPANIES, LLC | BFN | C | 10/04/2016 | trash enclosure foundation reinforcement is per plan / walls will be less than 6' tall per plan and does not need a permit / discussed need for engineer observations and open hole with super | DANE | DANE | | BFN | C | 5310058 |
HENNING COMPANIES, LLC | BIN | P | 10/03/2016 | remainder of exterior wall insulation complete | DANE | DANE | | BIN | P | 5308601 |
HENNING COMPANIES, LLC | BFR | P | 10/03/2016 | interior framing OK pending other rough inspections / discussed accessibility with framer and measured restrooms for clearances / need all stamped welding and bolting observation letters / still need all foundation observations and open hole | DANE | DANE | | BFR | P | 5308598 |
HENNING COMPANIES, LLC | BIN | P | 09/30/2016 | exterior wall insulation at east wall complete, north wall complete from east corner to door and south wall complete from east corner to west end of storefront openings / rest still need inspection | DANE | DANE | | BIN | P | 5307578 |
HENNING COMPANIES, LLC | BIN | R | 09/29/2016 | not ready | DANE | DANE | | BIN | R | 5305935 |
HENNING COMPANIES, LLC | BFR | P | 09/27/2016 | exterior wall light gauge framing OK pending other roughs / discussed need for engineer observation letters at next inspection for foundation, open hole, and welding and bolting / discussed accessibility with super | DANE | DANE | | BFR | P | 5303516 |
HENNING COMPANIES, LLC | BFR | P | 08/25/2016 | remainder of light gauge framing attachment to red iron at exterior of main building OK / discussed need to pre-insulate headers and gang studs / discussed welding and bolting letter from engineer after all engineer observations are completed | DANE | DANE | | BFR | P | 5278017 |
HENNING COMPANIES, LLC | BFR | P | 08/16/2016 | exterior wall attachment at red iron to light gauge OK all except west wall still needs to be inspected | DANE | DANE | | BFR | P | 5270016 |
LANDMARK PLUMBING AND HEATING, INC. | BSP | T | 08/08/2016 | PAID (REC#1358154): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 8-8-16 | TCRIPPEN | TCRIPPEN | | BSP | T | 5263994 |
HERRON ELECTRIC COMPANY | BSP | T | 08/04/2016 | PAID (REC#1365196): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Lighting changes, small kitchen circuit revisions | SHELBY | SHELBY | | BSP | T | 5261494 |
HUSSMANN CORPORATION | BSP | P | 07/25/2016 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: revised smoke detector for RTU's | JUSTINC | JUSTINC | | BSP | P | 5253341 |
HENNING COMPANIES, LLC | BSP | T | 07/25/2016 | PAID (REC#1350005) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Misc. detail and structural changes | SHELLEY | SHELLEY | | BSP | T | 5252859 |
HENNING COMPANIES, LLC | BFI | P | 07/05/2016 | ComCheck shows 0 value for foundation insulation but 2" R10 is installed | DANE | DANE | | BFI | P | 5236957 |
HENNING COMPANIES, LLC | BFT | P | 07/05/2016 | OK to use engineer for foundation engineer observation / need stamped observation letter and open hole at next inspection / spoke with site super and Olsen engineering is doing open hole and footing and foundation inspection for main building | DANE | DANE | | BFT | P | 5236946 |
HENNING COMPANIES, LLC | BFT | R | 07/01/2016 | need to clean out dirt that has fallen over rebar in several places / need correct clearances from earth forms on north side / need to raise chairs that have sunk into the soil / need stamped copy of open hole (no field copy on site either) / OK to use engineer for inspection if wanted / met with Super on site / Eufer installed at northwest corner | DANE | DANE | | BFT | R | 5236006 |
HERRON ELECTRIC COMPANY | E= | C | 12/15/2016 | sign lights not installed at this time | RANDY | RANDY | | E= | C | 5368819 |
B & T ELECTRIC, INC. | E= | C | 12/15/2016 | canopy and fuel ok | RANDY | RANDY | | E= | C | 5368781 |
B & T ELECTRIC, INC. | ER | P | 12/14/2016 | okay to close up gutter/junction box, this portion of the job is complete,,,,, | GARYL | GARYL | | ER | P | 5368019 |
B & T ELECTRIC, INC. | ER | P | 12/13/2016 | packing inspection on seal off's going into gutter | GARYL | GARYL | | ER | P | 5366920 |
B & T ELECTRIC, INC. | ER | P | 12/07/2016 | Packing inspection for seal offs in island, dispenser and pit | GARYL | GARYL | | ER | P | 5362775 |
HERRON ELECTRIC COMPANY | ER | P | 12/05/2016 | suspended ceilings ok | BRET | BRET | | ER | P | 5359705 |
HERRON ELECTRIC COMPANY | ES | P | 11/18/2016 | Commercial Service: 1200 amp,ok to connect/set meter---------------notes:all panels good except fire panel,not installed yet,ir ufer,steel,water ok,need to jump reg | JOHNN | JOHNN | | ES | P | 5348409 |
HERRON ELECTRIC COMPANY | ER | P | 10/31/2016 | outside soffits, patio, front kitchen soffits, | GARYL | GARYL | | ER | P | 5332121 |
HERRON ELECTRIC COMPANY | ER | P | 10/03/2016 | walls marked on stamped plans | RANDY | RANDY | | ER | P | 5308594 |
HERRON ELECTRIC COMPANY | ER | P | 09/27/2016 | inside exterrior walls, interrior walls marked and dated on Herron electric prints | GARYL | GARYL | | ER | P | 5303943 |
B & T ELECTRIC, INC. | EUG | P | 08/24/2016 | DISPENSER CONDUITS | MIKEC | MIKEC | | EUG | P | 5277141 |
B & T ELECTRIC, INC. | EUG | P | 08/11/2016 | CONDUITS TO GAS PUMPS | MIKEC | MIKEC | | EUG | P | 5267173 |
HERRON ELECTRIC COMPANY | ESL | P | 07/19/2016 | slab complete | RANDY | RANDY | | ESL | P | 5248424 |
HERRON ELECTRIC COMPANY | EUG | R | 07/07/2016 | north and west site lighting. ok to cover | BRET | BRET | | EUG | R | 5239378 |
HERRON ELECTRIC COMPANY | EUG | P | 07/05/2016 | secondaries disconnect to mdp---- south east sight lights | RANDY | RANDY | | EUG | P | 5237152 |
HERRON ELECTRIC COMPANY | EUG | P | 07/01/2016 | from building exterior for dispensers----reminded contractor this inspection is NOT for service laterals | SHELBY | SHELBY | | EUG | P | 5236388 |
HUSSMANN CORPORATION | H= | C | 12/27/2016 | HEAT FINAL COMPLETE | LUKE | LUKE | | H= | C | 5377281 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 12/22/2016 | TEST AND BALANCE REPORT RECEIVED HEAT FINAL COMPLETE FOR THIS CONTRACTOR.. | LUKE | LUKE | | H= | C | 5374405 |
HUSSMANN CORPORATION | H= | P | 12/21/2016 | Still need to see roof and condensate drains. | JACK | JACK | | H= | P | 5374006 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 12/21/2016 | PERMANENT LADDER NOT REQUIRED SERVICE SIDE OF BUILDING IS UNDER 16'... NOTE: STILL NEED TEST AND BALANCE REPORT.. | LUKE | LUKE | | H= | P | 5373856 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 12/20/2016 | STILL NEED TO INSTALL PERMANENT LADDER FOR FINAL INSPECTION, AND TEST AND BALANCE REPORT IS REQUIRED.. REST OK.. | LUKE | LUKE | | H= | P | 5372530 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 12/14/2016 | NEED TO INSTALL PERMANENT LADDER FOR EQUIPMENT ON ROOF NEED TO COMPLETE CONDENSATE DRAINS ON ROOF TOP UNITS AND LABEL UNITS TO AREA SERVED ALSO TEST AND BALANCE REPORT IS REQUIRED. REST OK. FOR FUTURE INSPECTION ONLY NEED TO SEE ROOF.. | LUKE | LUKE | | H= | P | 5368200 |
HUSSMANN CORPORATION | HRP | C | 11/02/2016 | 300 LB TEST OK ON ALL LOW AND MEDIUM TEMP SUPPLY AND RETURN LINES. OK TO INSULATE AND COMPLETE INSTALLATION OF HANGERS. FOR FINAL COMPLETE ROOF AND CONDENSATE DRAINS. NOTE: PER SHEET M-1 NO REFRIGERATION LEAKAGE ALARMS REQUIRED. | NANCY | NANCY | | HRP | C | 5334238 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 10/04/2016 | NEED TO FINISH ROUGH DUCT AND SEAL ALL. NEED ALL MATERIAL IN PLENUM CEILING RETURN RATED OR ISOLATED. STILL NEED TO SEE ROOF.. | LUKE | LUKE | | HD | P | 5310187 |
HUSSMANN CORPORATION | HRP | P | 07/21/2016 | 325 LB TEST OK ON UNDERGROUND REFRIGERATION LINES. LINES ARE SLEEVED. OK TO COVER. | NANCY | NANCY | | HRP | P | 5251114 |
HUSSMANN CORPORATION | HRP | P | 07/15/2016 | LOW TEST ON UNDER GROUND REFRIGERATION LINES. | NANCY | NANCY | | HRP | P | 5246362 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 12/14/2016 | ALL TO PLAN. CUTAND LABEL NON POTABLE LINE | GABE | GABE | | P= | C | 5368437 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 09/30/2016 | DWV AND WATER ON TEST , ALL TO PLAN , | GABE | GABE | | PTO | C | 5307900 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | C | 09/27/2016 | REAR DRAINS TO GUTTERS ON TEST TO PLAN | GABE | GABE | | PRD | C | 5304193 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 09/21/2016 | FRONT AND WEST SIDE CANOPY ROOF DRAINS ON TEST AND TO PLAN , REAR DRAINS NOT READY | GABE | GABE | | PRD | P | 5299471 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 09/08/2016 | 90's through footers to be covered ok | TED | TED | | PRD | P | 5288018 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 07/14/2016 | NOTE : DWV , GREASE AND SANITARY ON TEST TO PLAN , COPPER UNDER SLAB OK TO COVER | GABE | GABE | | PB | C | 5245432 |