BOB MCGRATH CONSTRUCTION LLC | B= | C | 05/30/2017 | HCDA letter on file | NICK | NICK | | B= | C | 5519436 |
BOB MCGRATH CONSTRUCTION LLC | B= | P | 05/24/2017 | Still need HCDA report from previous inspections for steel reinforcement / Final for structure OK -- Schedule a new Building Final when above items are complete. | NICK | NICK | | B= | P | 5515961 |
BOB MCGRATH CONSTRUCTION LLC | BSP | P | 02/28/2017 | Open hole on file / #2500psf / Still need stamped letter for reinforcing steel report | NICK | NICK | | BSP | P | 5426519 |
BOB MCGRATH CONSTRUCTION LLC | BFR | P | 02/27/2017 | Trusses and beams for new built pavilion OK / Need electrical complete / Need all Eng on file | NICK | NICK | | BFR | P | 5426154 |
BOB MCGRATH CONSTRUCTION LLC | BSP | P | 02/27/2017 | Eng letter on file from CTL thompson for excavation observation / Need letter from HCDA referenced in letter / Still need open hole report | NICK | NICK | | BSP | P | 5426152 |
BOB MCGRATH CONSTRUCTION LLC | BE | L | 02/21/2017 | Renewed online for 1/2 Fee at 2/21/2017 3:00:56 PM (RECEIPT #: 1404127) | WEBSITE | WEBSITE | | BE | L | 5420506 |
BOB MCGRATH CONSTRUCTION LLC | BSP | T | 12/16/2016 | PAID (REC#1401434) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added electrical to scope. | BERTHA | BERTHA | | BSP | T | 5370811 |
BOB MCGRATH CONSTRUCTION LLC | BSP | T | 12/16/2016 | PAID (REC#1401434) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: TRUSSES | SHELLEY | SHELLEY | | BSP | T | 5370303 |
BOB MCGRATH CONSTRUCTION LLC | BSP | T | 12/05/2016 | PAID (REC#1401434) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: REDUCED SIZE OF PAVILION. TRUSSES PENDING. | SHELLEY | SHELLEY | | BSP | T | 5360440 |
BOB MCGRATH CONSTRUCTION LLC | BFR | P | 08/09/2016 | Still need to see floor framing / Need to finish installing all steel brackets for beams / Need to finish installing bolts for all post to beam connection / Plans call for double 2x12 for hips, only one 2x12 installed / All other roof framing OK | NICK | NICK | | BFR | P | 5265162 |
BOB MCGRATH CONSTRUCTION LLC | BFT | P | 07/11/2016 | Pads for new pavilion and stage OK / Need copy of open hole, was able to see one on contractors phone / Poor at own risk | NICK | NICK | | BFT | P | 5242049 |
THE CORE ELECTRIC GROUP, LLC | E= | C | 05/22/2017 | | JOHNN | JOHNN | | E= | C | 5512590 |
THE CORE ELECTRIC GROUP, LLC | E= | R | 05/08/2017 | need cb hold down clip on sub panel main,need grd rod | JOHNN | JOHNN | | E= | R | 5499650 |
THE CORE ELECTRIC GROUP, LLC | ER | C | 03/01/2017 | | BRIAN | BRIAN | | ER | C | 5427739 |
THE CORE ELECTRIC GROUP, LLC | ER | R | 02/27/2017 | NEED THE BOXES INSTALLED FOR THE LIGHTS--OK TO SEND PIC | BRIAN | BRIAN | | ER | R | 5425724 |