RAINE BUILDING LLC. | B= | C | 08/02/2016 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5259171 |
RAINE BUILDING LLC. | B= | P | 07/28/2016 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), NIELSEN MECHANICAL CONTRACTORS, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5256453 |
RAINE BUILDING LLC. | BFR | P | 07/18/2016 | Hilti listing received for hole cored into floor for drain at break room / repair OK pending other roughs / this concludes the framing pending other rough inspections | DANE | DANE | | BFR | P | 5247051 |
RAINE BUILDING LLC. | BFR | P | 07/13/2016 | wall framing OK pending other rough inspections / need to attach plumbing permit and mechanical permit / will need listed assembly for cores in 2 hr floor for plumbing in break room | DANE | DANE | | BFR | P | 5243906 |
PROCOM ELECTRICAL SERVICES, INC. | E= | C | 07/27/2016 | | BRET | BRET | | E= | C | 5255396 |
PROCOM ELECTRICAL SERVICES, INC. | E= | P | 07/26/2016 | label circuits on panel schedule | BRET | BRET | | E= | P | 5253989 |
PROCOM ELECTRICAL SERVICES, INC. | ER | C | 07/26/2016 | | BRET | BRET | | ER | C | 5253988 |
PROCOM ELECTRICAL SERVICES, INC. | ER | C | 07/26/2016 | FIRE ALARM INSPECTION: | BRET | BRET | | ER | C | 5253986 |
PROCOM ELECTRICAL SERVICES, INC. | E= | C | 07/26/2016 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 5253987 |
PROCOM ELECTRICAL SERVICES, INC. | ER | P | 07/13/2016 | new walls. | BRET | BRET | | ER | P | 5243995 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 08/02/2016 | MECHANICAL FINAL OK. TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 5259170 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 07/26/2016 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5254247 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 07/18/2016 | ROUGH DUCTS ABOVE CEILING OK. FOR FINAL INSTALL VAV-1, RETURN AIR IN HALLWAY NEAR MAIN ENTRANCE DOOR, INSTALL T-STAT, PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | HD | P | 5247894 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | P= | C | 07/27/2016 | NOTE : CHECK INSTALLED AT WATER LINE ABOVE BREAK SINK , ALL TO PLAN | GABE | GABE | | P= | C | 5254878 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | PTO | C | 07/18/2016 | NOTE : SINK DWV AND WATER PIPING TO PLAN , ON TEST . WATER HEATER IN . CHECK INSTALLED IN CEILING ABOVE SINK AT FINAL FOR ALL WATER CONNECTED APPLIANCES | GABE | GABE | | PTO | C | 5247114 |