COLARELLI CONSTRUCTION, INC. | B= | C | 10/05/2016 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5310700 |
COLARELLI CONSTRUCTION, INC. | B= | P | 10/04/2016 | meeting room OK / final OK pending other finals. Additional Inspections Required (computer generated): BRUNO'S MECHANICAL INC. Mechanical Final Inspection is not Completed yet, RYBA ELECTRIC, INC. Electrical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5309995 |
COLARELLI CONSTRUCTION, INC. | B= | P | 09/29/2016 | still need to inspect meeting room from corridor in / rest OK pending other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), BRUNO'S MECHANICAL INC. Mechanical Final Inspection is not Completed yet, RYBA ELECTRIC, INC. Electrical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5305979 |
BRUNO'S MECHANICAL INC. | BSP | T | 09/23/2016 | PAID (REC#1364309) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: changed a/c unit locations | DALEH | DALEH | | BSP | T | 5301007 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 09/22/2016 | no need to do above ceiling inspection for non-rated drop in tile ceiling | DANE | DANE | | BSP | P | 5300085 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 08/24/2016 | engineering received for hard lid in meeting room / framing at hard lid OK pending other roughs | DANE | DANE | | BFR | P | 5276858 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 08/03/2016 | wall framing for meeting room OK / need detail for how to frame hard lid in meeting room | DANE | DANE | | BFR | P | 5260491 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 07/29/2016 | wall framing OK pending other rough inspections / still need to inspect room 100 meeting room walls and hard lid | DANE | DANE | | BFR | P | 5257386 |
RYBA ELECTRIC, INC. | E= | C | 10/05/2016 | room 108 and split systems ok | RANDY | RANDY | | E= | C | 5310699 |
RYBA ELECTRIC, INC. | E= | P | 09/29/2016 | Partial final except the following: room 108, 4- split units | GARYL | GARYL | | E= | P | 5306409 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 09/19/2016 | FIRE ALARM INSPECTION: red card not on sight | GARYL | GARYL | | E= | C | 5296747 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 09/19/2016 | FIRE ALARM INSPECTION: all ceilings, red card not on sight | GARYL | GARYL | | ER | P | 5296738 |
RYBA ELECTRIC, INC. | ER | P | 09/19/2016 | all ceilings except: conferance room and storage # 108--all surface mount,,,,, | GARYL | GARYL | | ER | P | 5296737 |
RYBA ELECTRIC, INC. | ER | P | 08/05/2016 | walls except 108 left unfinished storage | BRET | BRET | | ER | P | 5262871 |
BRUNO'S MECHANICAL INC. | H= | C | 10/05/2016 | TEST AND BALANCE REPORT OK. ALL CORRECTIONS MADE. | LUKE | LUKE | | H= | C | 5310648 |
BRUNO'S MECHANICAL INC. | H= | P | 10/04/2016 | TEST AND BALANCE REPORT RECEIVED AND REVIEWED.. STILL NEED TO SEE SITE FOR FINAL.. | LUKE | LUKE | | H= | P | 5310115 |
BRUNO'S MECHANICAL INC. | H= | P | 09/28/2016 | LEFT TO SEE: ROOF, INDOOR MINI SPLITS, ROOM (119).AND TEST AND BALANCE REPORT. REST OK. | LUKE | LUKE | | H= | P | 5304899 |
BRUNO'S MECHANICAL INC. | HD | P | 08/19/2016 | NEED TO CORRECT MECHANICAL CONTRACTOR SCOPE OF WORK. NOTE: ROUGH DUCT OK FOR RTU- 8 AND RTU-10 MAIN TRUNKS AND LATERAL'S ARE INSTALLED. | LUKE | LUKE | | HD | P | 5273451 |