CHARTERCRAFT HOMES INC | B= | C | 02/07/2017 | Rear deck / no AC / partially finished basement | RICHB | RICHB | | B= | C | 5408898 |
CHARTERCRAFT HOMES INC | BLA | C | 12/19/2016 | Training with Noah and Luke | SCOTTS | SCOTTS | | BLA | C | 5371302 |
CHARTERCRAFT HOMES INC | BIN | C | 11/18/2016 | | SCOTTS | SCOTTS | | BIN | C | 5348425 |
CHARTERCRAFT HOMES INC | BFR | C | 11/18/2016 | letter on file for hold downs | SCOTTS | SCOTTS | | BFR | C | 5348420 |
CHARTERCRAFT HOMES INC | BFR | P | 11/15/2016 | not dried in/missing garage doors and mechanical not stubbed through roof -- strap top plates on south wall main floor and in basement where breaks are less than 48" apart --missing nails in THJA26's -- received letter for hold downs/ wrong epoxy being used/ provide letter for acceptance of alternate epoxy | SCOTTS | SCOTTS | | BFR | P | 5344373 |
CHARTERCRAFT HOMES INC | BSP | R | 10/25/2016 | pending letter for hold downs at garage -- rest of shear walls ok | SCOTTS | SCOTTS | | BSP | R | 5326972 |
CHARTERCRAFT HOMES INC | BSP | R | 10/24/2016 | shear wall not stapled off per plan/sill plate nailing for shears also incorrect --- plan shows 2 hold downs each side of garage/provide clarification -- front porch lid/posts ok -- rear deck/porch lid/posts ok | SCOTTS | SCOTTS | | BSP | R | 5325917 |
CHARTERCRAFT HOMES INC | BSP | P | 10/06/2016 | 2 piers ok | SCOTTS | SCOTTS | | BSP | P | 5312053 |
CHARTERCRAFT HOMES INC | BSP | R | 10/05/2016 | missing reinforcement pet detail 11 on S3 of foundation plan | SCOTTS | SCOTTS | | BSP | R | 5310831 |
CHARTERCRAFT HOMES INC | BFD | C | 09/30/2016 | drain useable to sump -- damp proofing ok | SCOTTS | SCOTTS | | BFD | C | 5307411 |
CHARTERCRAFT HOMES INC | BFN | C | 09/30/2016 | fndn design on file | SCOTTS | SCOTTS | | BFN | C | 5307399 |
CHARTERCRAFT HOMES INC | BFT | C | 09/30/2016 | soils report/open ex on file -- footing/fndn/eufer observation on file | SCOTTS | SCOTTS | | BFT | C | 5307391 |
A N' M ELECTRIC | E= | C | 01/25/2017 | AC is pre roughed | JOSEPH | JOSEPH | | E= | C | 5398158 |
A N' M ELECTRIC | ER | C | 11/10/2016 | Photo accepted | JOSEPH | JOSEPH | | ER | C | 5341262 |
A N' M ELECTRIC | ES | C | 11/08/2016 | Residential Underground: 200 amp 3w service meter is in need to reseal | JOSEPH | JOSEPH | | ES | C | 5338861 |
A N' M ELECTRIC | ER | R | 11/08/2016 | Back to back boxes 2 locations in garage firewall. ----------Also in fire wall romex sheathing not run into box needs to be redo. ------------Notes: finished basement -------------2 - 6/3 cu ----------# 2 ser to sub panel --------- UFER is not ir -----------No vac ------- I will accept photos of these three corrections. | JOSEPH | JOSEPH | | ER | R | 5338854 |
A N' M ELECTRIC | EUG | C | 11/04/2016 | 4/0al | MATTHEW | MATTHEW | | EUG | C | 5336370 |
A & Z MECHANICAL, INC. | H= | C | 02/01/2017 | Notes-- No AC . Partially finished basement. | JEFFL | JEFFL | | H= | C | 5403741 |
A & Z MECHANICAL, INC. | H= | T | 01/27/2017 | PAID (REC#1398808) not ready, too many items to list, reinspect all, some but not all items--furnace venting not complete under deck-will need install paper work for clearance under deck, frame around dryer venting in garage-vent was relocated from through roof to garage side wall, basement rec. room return not panned in mech. room wall and wires not sealed through it, water heater venting not complete above roof and not 10 feet from or 2 feet above side wall, kitchen range hood not complete | TED | TED | | H= | T | 5400968 |
NASRALLAH PLUMBING & HEATING, INC. | HO | C | 11/21/2016 | Pressure test ok. Notes-- 20' of 1/2'' installed from tank to home. | JEFFL | JEFFL | | HO | C | 5349559 |
NASRALLAH PLUMBING & HEATING, INC. | HO | P | 11/16/2016 | UN BURY GAS LINE TO SEE DEPTH OF TRENCH. TRIP FEE WAIVED THIS TIME. 60 # TEST EXCEPTED THIS TIME ONLY NEEDS TO BE A 10# TEST ON A 30 # GAUGE. | LIDO | LIDO | | HO | P | 5345759 |
A & Z MECHANICAL, INC. | HRR | C | 11/14/2016 | CORRECTIONS MADE. | LIDO | LIDO | | HRR | C | 5342739 |
NASRALLAH PLUMBING & HEATING, INC. | HO | P | 11/14/2016 | NEED A 10# TEST ON A 30# GAUGE , GAS LINE COVERED WITH DIRT CANT SEE DEPTH OF TRENCH. NOTE: PROPANE . | LIDO | LIDO | | HO | P | 5342734 |
A & Z MECHANICAL, INC. | HRR | P | 11/10/2016 | NO R/A PLASTER STOPS INSTALLED ON MAIN LEVEL,COMPLETE B-VENT FOR WATER HEATER, CANT SEE WHERE B-VENT GOES THROUGH FLOOR. NOTES:DIRECT VENT FURNACE, AC LINE SET ROUGH. | LIDO | LIDO | | HRR | P | 5341393 |
PEAK VIEW PLUMBING, INC. | HI | C | 11/07/2016 | 1'' furnace, water heater | TED | TED | | HI | C | 5338510 |
PEAK VIEW PLUMBING, INC. | P= | C | 01/30/2017 | | TIM | TIM | | P= | C | 5401439 |
PEAK VIEW PLUMBING, INC. | P= | R | 01/27/2017 | install water hammer on dish washer supply, need certificate of potable water | TED | TED | | P= | R | 5400969 |
PEAK VIEW PLUMBING, INC. | PTO | C | 11/07/2016 | finished basement | TED | TED | | PTO | C | 5338506 |
PEAK VIEW PLUMBING, INC. | PB | C | 10/06/2016 | ok | TED | TED | | PB | C | 5312600 |
HOMEOWNER | PWO | C | 10/05/2016 | by final need certificate of potable water | TED | TED | | PWO | C | 5311494 |