BRYAN CONSTRUCTION, INC. | B= | C | 11/30/2016 | | NICK | NICK | | B= | C | 5356576 |
BRYAN CONSTRUCTION, INC. | BFR | C | 11/30/2016 | | NICK | NICK | | BFR | C | 5356575 |
BRYAN CONSTRUCTION, INC. | BSP | P | 11/08/2016 | through penetrations on 3rd floor corridor walls fire caulked ok | BERTW | BERTW | | BSP | P | 5339277 |
BRYAN CONSTRUCTION, INC. | BSP | P | 11/07/2016 | Walls and through penetrations for 2nd floor walls OK / Per listing W-L-7096 for mechanical OK | NICK | NICK | | BSP | P | 5337620 |
BRYAN CONSTRUCTION, INC. | BSP | P | 11/04/2016 | PLAN SPLICE: (No Fee) by: DANM for Construction: Firestopping detail as requested by inspector | DANM | DANM | | BSP | P | 5337041 |
BRYAN CONSTRUCTION, INC. | BSP | P | 11/04/2016 | contractor called in firestopping on 2nd floor for pipes and ducts/2nd floor only corridor pipes and restroom walls corridors ok/firedampers retaining angles have been sprayed with FS 1 firecaulking product-I let Mech inspector Jerry know and told contractor/need listing for 10x10 -24 gauge duct through penetration at mech shafts to restrooms and restroom corridor walls and reinspection/need firetaping of all joints and exposed fastners | BERTW | BERTW | | BSP | P | 5336705 |
BRYAN CONSTRUCTION, INC. | BSP | P | 11/02/2016 | 1st level U465 wall and head wall D-0106 OK / 3rd floor interior rock for mechanical shaft OK | NICK | NICK | | BSP | P | 5333991 |
BRYAN CONSTRUCTION, INC. | BFR | P | 11/01/2016 | Frame for 3rd level bathrooms OK / Penetrations through horizontal OK on 3rd level / Need to inspect all rated wall assemblies and penetrations, reviewed with contractor | NICK | NICK | | BFR | P | 5332785 |
BRYAN CONSTRUCTION, INC. | BFR | P | 10/27/2016 | Frame for 2nd floor restrooms OK / fire caulking for through penetrations OK at 2nd floor / Still need to inspect 3rd floor | NICK | NICK | | BFR | P | 5329270 |
BRYAN CONSTRUCTION, INC. | BSP | P | 10/24/2016 | PLAN SPLICE: (No Fee) by: DANM for Construction: Add head wall detail UL rating | DANM | DANM | | BSP | P | 5326091 |
BRYAN CONSTRUCTION, INC. | BSP | P | 10/19/2016 | PLAN SPLICE: (No Fee) by: DANM for Construction: Adding firestopping details | DANM | DANM | | BSP | P | 5322840 |
BRYAN CONSTRUCTION, INC. | BFR | P | 10/18/2016 | 1st floor framing inspection only / Need UL listings for through penetrations for plumbing through horizontal type AIII construction / Reviewed accessible elements with contractor / Roll in showers being used for project / Need UL U465 for rated wall at corridor for file | NICK | NICK | | BFR | P | 5321147 |
BRYAN CONSTRUCTION, INC. | BFR | R | 10/17/2016 | No call ahead provided, do not know where to go on site for inspection / Please recall inspection and provide call ahead to meet on site | NICK | NICK | | BFR | R | 5319964 |
GREINER ELECTRIC, LLC. | BSP | P | 09/27/2016 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Added fire smoke dampers. | BERTHA | BERTHA | | BSP | P | 5303392 |
BRYAN CONSTRUCTION, INC. | BSP | T | 09/20/2016 | PAID (REC#1365414) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 1 | DALEH | DALEH | | BSP | T | 5297966 |
GREINER ELECTRIC, LLC. | E= | C | 11/29/2016 | | CRAIGS | CRAIGS | | E= | C | 5354575 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 11/29/2016 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | E= | C | 5354573 |
GREINER ELECTRIC, LLC. | E= | P | 11/28/2016 | Inspected two roof top exhaust fans. -----------Second floor showers ok. ----------Third floor men's and women's showers missing light switches. -----------Craig S. needs to sign red card for fire alarm inspection. | JOSEPH | JOSEPH | | E= | P | 5353417 |
GREINER ELECTRIC, LLC. | ER | C | 11/23/2016 | 2nd and 3rd floor corridor lights terminated in a box and ceiling wires and screwed to the grid OK | CRAIGS | CRAIGS | | ER | C | 5352221 |
SPECIAL SYSTEMS DESIGN,LLC | E= | P | 11/15/2016 | FIRE ALARM INSPECTION: see rough notes | CRAIGS | CRAIGS | | E= | P | 5344728 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 11/15/2016 | FIRE ALARM INSPECTION: before any more inspections can take place this permit needs to be transferred to the building permit --- open j box third floor hall way | CRAIGS | CRAIGS | | ER | P | 5344727 |
GREINER ELECTRIC, LLC. | ER | P | 11/15/2016 | unsafe existing wiring in the hall ways of second and third floor -- open splices at the lights -- must be fixed before final | CRAIGS | CRAIGS | | ER | P | 5344433 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 11/07/2016 | FIRE ALARM INSPECTION: first floor -- need ceiling wires back to the structure on the ceiling mounted smokes --- this permit should be attached to the building permit | CRAIGS | CRAIGS | | ER | P | 5344726 |
GREINER ELECTRIC, LLC. | E= | P | 11/07/2016 | | CRAIGS | CRAIGS | | E= | P | 5337536 |
GREINER ELECTRIC, LLC. | ER | P | 10/31/2016 | 3rd floor shower rooms walls and ceilings OK | CRAIGS | CRAIGS | | ER | P | 5331582 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 10/31/2016 | FIRE ALARM INSPECTION: 3rd floor shower rooms wall and conduit stubs OK | CRAIGS | CRAIGS | | ER | P | 5344725 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 10/26/2016 | FIRE ALARM INSPECTION:2 nd floor wall conduit stubs OK | CRAIGS | CRAIGS | | ER | P | 5344724 |
GREINER ELECTRIC, LLC. | ER | P | 10/26/2016 | walls and hard ceiling OK | CRAIGS | CRAIGS | | ER | P | 5328031 |
GREINER ELECTRIC, LLC. | ER | P | 10/18/2016 | switches moved to as close to the door as possible and will have w/p covers and gfci protection | CRAIGS | CRAIGS | | ER | P | 5320989 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 10/14/2016 | FIRE ALARM INSPECTION: 1st floor shower rooms conduit sleeves OK | CRAIGS | CRAIGS | | ER | P | 5344723 |
GREINER ELECTRIC, LLC. | ER | R | 10/14/2016 | 1st floor shower rooms --- switches cant be in the shower area -- move to get them out of the 3'1" area , use ox sensors , move to door swing wall , if a shower curtain is used the switches have to be outside of the curtain hang ---- complete re inspection required | CRAIGS | CRAIGS | | ER | R | 5318724 |
COLORADO SHEET METAL CO., INC. | H= | C | 11/30/2016 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 5355789 |
HARMON - BONDED PLUMBING & HEATING, INC. | H= | C | 11/29/2016 | OK | JERRYF | JERRYF | | H= | C | 5355559 |
COLORADO SHEET METAL CO., INC. | H= | P | 11/22/2016 | PARTIAL FINAL PENDING TAB REPORT - REST OK | JERRYF | JERRYF | | H= | P | 5351849 |
HARMON - BONDED PLUMBING & HEATING, INC. | HWP | C | 11/16/2016 | PIPING PER PLAN | JERRYF | JERRYF | | HWP | C | 5346241 |
COLORADO SHEET METAL CO., INC. | H= | P | 11/08/2016 | PARTIAL FINAL ON 1ST FLOOR SHOWER AREAS ONLY - STILL NEED 2ND AND 3TD FLOORS AND TAB REPORT | JERRYF | JERRYF | | H= | P | 5339410 |
COLORADO SHEET METAL CO., INC. | HD | P | 11/01/2016 | NEED HOLES IN STUDS SEALED ON 2 SHAFT F/SD - ROOF INSPECTION FOR 2 FANS AND ABOVE CEILING OK | JERRYF | JERRYF | | HD | P | 5333357 |
COLORADO SHEET METAL CO., INC. | HD | P | 10/28/2016 | F/SD FRAMING IN THE FOLLOWING AREAS OK - 1ST FLOOR CORRIDOR X 2 - 2ND FLOOR CORRIDOR X 2 - 2ND FLOOR RESTROOMS X2 | JERRYF | JERRYF | | HD | P | 5330787 |
COLORADO SHEET METAL CO., INC. | HD | P | 10/19/2016 | 1ST FLOOR - NEED F/SD DAMPERS SECURED AT BLOCK WALL - 2ND FLOOR - NEED F/SD FRAMING COMPLETED AT HALLWAYS AND INSIDE RESTROOMS - REST OF ABOVE CEILING OK | JERRYF | JERRYF | | HD | P | 5322589 |
COLORADO SHEET METAL CO., INC. | HD | P | 10/14/2016 | REST ROOMS ABOVE HARD LID CEILING EXHAUST AND TRANSFER DUCT AND RUN OUTS - OK - STILL NEED TIE INS AND F/SD'S INSTALLED AND INSPECTED | JERRYF | JERRYF | | HD | P | 5319060 |
HARMON - BONDED PLUMBING & HEATING, INC. | P= | C | 11/28/2016 | 3rd floor ok. | TAYLOR | TAYLOR | | P= | C | 5353428 |
HARMON - BONDED PLUMBING & HEATING, INC. | P= | P | 11/16/2016 | 2nd floor bathrooms | TED | TED | | P= | P | 5345714 |
HARMON - BONDED PLUMBING & HEATING, INC. | P= | P | 11/07/2016 | 1st floor bathrooms | TED | TED | | P= | P | 5337505 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 10/28/2016 | 3rd floor walls and ceiling ok | TED | TED | | PTO | P | 5330414 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 10/27/2016 | 2nd floor walls and ceiling ok | TED | TED | | PTO | P | 5329282 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 10/26/2016 | showers on 2nd floor up thru 3rd o.k less one leak on 2'', h20 2nd floor showers walls only | JOEL | JOEL | | PTO | P | 5328100 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 10/18/2016 | east bathrooms o.k up thru 2nd floor | JOEL | JOEL | | PTO | P | 5320778 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | T | 10/17/2016 | PAID (REC#1372648) AFTER-HOURS INSPECTION: $200 From: TERRI 11/17/16 5:00 PM | TERRI | TERRI | | PTO | T | 5319808 |
HARMON - BONDED PLUMBING & HEATING, INC. | PB | P | 10/14/2016 | tunnel work ok | TED | TED | | PB | P | 5318686 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 10/14/2016 | 1st floor woman's room walls and ceiling ok, 2nd floor woman's under floor ok | TED | TED | | PTO | P | 5318683 |
HARMON - BONDED PLUMBING & HEATING, INC. | PB | P | 10/07/2016 | continuation of first floor bathroom remodel, less tunnel work | TED | TED | | PB | P | 5312829 |
HARMON - BONDED PLUMBING & HEATING, INC. | PB | P | 10/03/2016 | 4 showers on 1st floor o.k. verify accessible requirements for showers | JOEL | JOEL | | PB | P | 5308295 |