KRAMER CONSTRUCTION, INC | B= | C | 02/09/2017 | | SCOTTS | SCOTTS | | B= | C | 5411451 |
KRAMER CONSTRUCTION, INC | B= | P | 02/09/2017 | complete H= | SCOTTS | SCOTTS | | B= | P | 5410813 |
KRAMER CONSTRUCTION, INC | B= | P | 02/08/2017 | All other required Final inspections are complete. (This is a computer generated result) changing to partial because other trade finals are pending | SCOTTS | SCOTTS | | B= | P | 5409806 |
KRAMER CONSTRUCTION, INC | B16 | P | 02/08/2017 | Met Larry the plumbing contractor at my desk and thoroughly explained the core-shell final inspection process as well as the TI TCO and final CO process,Larry is not the building permit holder just the attached plumbing contractor. Reviewed with Scott S building inspector and Scott has also informed Don Kramer of the same processes multiple times. | BERTW | BERTW | | B16 | P | 5409743 |
KRAMER CONSTRUCTION, INC | B= | P | 02/08/2017 | pending all other finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300). | SCOTTS | SCOTTS | | B= | P | 5409447 |
KRAMER CONSTRUCTION, INC | BSP | P | 02/07/2017 | PLAN SPLICE: (No Fee) by: BPHILLIPS for Construction: clarify suite locations | BPHILLIPS | BPHILLIPS | | BSP | P | 5408140 |
KRAMER CONSTRUCTION, INC | B= | P | 02/06/2017 | Cimmaron Hills Fire does not show as required inspection/need fire final -- still need to splice in demising wall locations/details -- enumeration on units does not match plan/splice in correct unit numbers -- walked a unit with superintendent prior to tenant finish for life safety issues/ reviewed grab bars/ guards on stairs/handrails on stairs -- complete all other finals/exterior agencies -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300). | SCOTTS | SCOTTS | | B= | P | 5407146 |
CL SHARPER ELECTRIC | BSP | T | 01/04/2017 | PAID (REC#1392926) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Changed service 2 of 2 from 800A to 1200A | BERTHA | BERTHA | | BSP | T | 5381649 |
RIDGEVIEW PLUMBING | BSP | T | 12/27/2016 | PAID (REC#1391670) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 12-27-16 | TCRIPPEN | TCRIPPEN | | BSP | T | 5377232 |
KRAMER CONSTRUCTION, INC | BSP | P | 12/01/2016 | demising wall framing ok -- splice plans showing deletion and location of demising walls prior to final | SCOTTS | SCOTTS | | BSP | P | 5358327 |
KRAMER CONSTRUCTION, INC | BFR | P | 11/14/2016 | complete all other inspections / weld cert on file / bolting ok | DALE | DALE | | BFR | P | 5343947 |
KRAMER CONSTRUCTION, INC | BLA | C | 11/14/2016 | | DALE | DALE | | BLA | C | 5343930 |
KRAMER CONSTRUCTION, INC | BIN | P | 10/24/2016 | 4ft of horizonal 1 1/2" | DALE | DALE | | BIN | P | 5326283 |
KRAMER CONSTRUCTION, INC | BFT | C | 10/18/2016 | interior pads ok | DALE | DALE | | BFT | C | 5321445 |
KRAMER CONSTRUCTION, INC | BSP | T | 10/11/2016 | PAID (REC#1370772) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revised interior pads for future work | SHELLEY | SHELLEY | | BSP | T | 5315174 |
KRAMER CONSTRUCTION, INC | BSP | T | 09/22/2016 | PAID (REC#1363992) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice adding under ground | TCRIPPEN | TCRIPPEN | | BSP | T | 5300535 |
KRAMER CONSTRUCTION, INC | BSP | P | 09/22/2016 | PLAN SPLICE: (No Fee) by: JUSTINC for Plumbing: Revised gas and added UH to suites | JUSTINC | JUSTINC | | BSP | P | 5300476 |
KRAMER CONSTRUCTION, INC | BFN | C | 09/21/2016 | ufer in | DALE | DALE | | BFN | C | 5299181 |
KRAMER CONSTRUCTION, INC | BFT | P | 09/16/2016 | exterior footings ok, no interior pads / open hole on file | DALE | DALE | | BFT | P | 5295450 |
CL SHARPER ELECTRIC | E= | C | 02/09/2017 | brass tags with unit numbers instaled | TOMC | TOMC | | E= | C | 5410746 |
CL SHARPER ELECTRIC | ES | P | 01/24/2017 | Commercial Service: 1200 amp - 120/208 ok to set meters and seal 7 meters | TOMC | TOMC | | ES | P | 5396455 |
CL SHARPER ELECTRIC | ES | R | 01/13/2017 | Commercial Service: 1200 amp 120/208 ---- need meter stack labeled with address of each unit | TOMC | TOMC | | ES | R | 5388541 |
RIDGEVIEW PLUMBING | H= | C | 02/09/2017 | ALL OK | JERRYF | JERRYF | | H= | C | 5411400 |
RIDGEVIEW PLUMBING | H= | P | 11/22/2016 | FOR FINAL YOU WILL NEED TO PROVIDE LABELS FOR MEDIUM GAS SYSTEM ON ALL GAS LINES. NOTE: GAS LINES ARE CAPPED FOR FUTURE F-1 ON ALL SEVEN SUITES. UNIT HEATERS ARE CONNECTED AND THEY HAVE REGULATORS INSTALLED. | LUKE | LUKE | | H= | P | 5351165 |
RIDGEVIEW PLUMBING | HC | C | 11/22/2016 | RELEASE METER FOR SUITES 100 105 110 115 120 125 130 CORE AND SHELL 2 LB SYSTEM. | LUKE | LUKE | | HC | C | 5351153 |
RIDGEVIEW PLUMBING | HI | C | 11/22/2016 | 10 LB GAS TEST GOOD. FOR CORE AND SHELL RAN PER PLANS GAS LINE FOR FUTURE F-1 IS CAPPED ON ALL SEVEN SUITES. | LUKE | LUKE | | HI | C | 5351146 |
RIDGEVIEW PLUMBING | P= | C | 02/08/2017 | underground piping only | JOEL | JOEL | | P= | C | 5409653 |
RIDGEVIEW PLUMBING | PB | C | 10/13/2016 | correction made, plan still needs to revised | TED | TED | | PB | C | 5318312 |
RIDGEVIEW PLUMBING | PB | P | 10/12/2016 | revise plans to show all restrooms and full scope of work, low test west side 2-spaces and 3rd space from east end | JOEL | JOEL | | PB | P | 5316754 |