TRALON HOMES, LLC | B= | C | 01/11/2017 | | BOBF | BOBF | | B= | C | 5386992 | TRALON HOMES, LLC | B= | P | 01/10/2017 | Missing shingles on south slope of roof -- Unfinished basement - No deck (Rear deck on separate permit) -- Schedule a new Building Final when above items are complete. | DAKOTAB | DAKOTAB | | B= | P | 5385236 | TRALON HOMES, LLC | BIN | C | 12/02/2016 | | BOBF | BOBF | | BIN | C | 5359182 | TRALON HOMES, LLC | BFR | C | 12/02/2016 | | BOBF | BOBF | | BFR | C | 5359181 | TRALON HOMES, LLC | BFR | P | 12/01/2016 | missing laterals at TR-7 and tr-12 / okay to insulate | BOBF | BOBF | | BFR | P | 5358124 | TRALON HOMES, LLC | BSP | P | 11/16/2016 | porch frame and posts ok | DALE | DALE | | BSP | P | 5346255 | TRALON HOMES, LLC | BFD | C | 10/18/2016 | exterior / entire foundation | BOBF | BOBF | | BFD | C | 5321615 | TRALON HOMES, LLC | BFN | C | 10/18/2016 | letter for footing, steel and eufer on file | BOBF | BOBF | | BFN | C | 5320829 | TRALON HOMES, LLC | BFT | C | 10/18/2016 | open hole on file | BOBF | BOBF | | BFT | C | 5320828 | TRALON HOMES, LLC | BSP | P | 10/18/2016 | Design on file | BOBF | BOBF | | BSP | P | 5320827 | TRALON HOMES, LLC | BFT | P | 09/15/2016 | AUTHORIZED INSPECTION BY ENGINEER | REBECCA | REBECCA | REBECCA | BFT | P | 5294737 | TRALON HOMES, LLC | BFN | P | 09/15/2016 | AUTHORIZED INSPECTION BY ENGINEER | REBECCA | REBECCA | REBECCA | BFN | P | 5294736 | J2D ELECTRIC, INC. | E= | C | 01/09/2017 | | CRAIG | CRAIG | | E= | C | 5384806 | J2D ELECTRIC, INC. | E= | R | 01/05/2017 | no power to garage receptacles, gfci will not reset | BRET | BRET | | E= | R | 5383490 | J2D ELECTRIC, INC. | E= | R | 01/04/2017 | no power to all garage outlets ---------- 40 - amp A/C ok / | CRAIG | CRAIG | | E= | R | 5381905 | J2D ELECTRIC, INC. | ER | C | 11/29/2016 | no mcc 3 - 8/3 al to range / ac / dryer No Cent Vac / Unfinished Basement / Irreversible UFER connection / | CRAIG | CRAIG | | ER | C | 5355247 | J2D ELECTRIC, INC. | ES | C | 11/29/2016 | Residential Underground: 150-amp 3 Wire service, ok to set meter / | CRAIG | CRAIG | | ES | C | 5355238 | J2D ELECTRIC, INC. | EUG | C | 11/03/2016 | 3/w 2/0 al | CRAIG | CRAIG | | EUG | C | 5336024 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 01/05/2017 | Corrections made, final ok. | MARK | MARK | | H= | C | 5382756 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 01/04/2017 | Need to seal furnace vent termination at siding and gas penetration. Rest ok. Note: Unfinished basement, has a/c, 6" outside air. | MARK | MARK | | H= | P | 5382454 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 11/30/2016 | RELEASE METER | MARK | MARK | | HC | C | 5356945 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 11/30/2016 | Rough ok. Note: Unfinished basement, has a/c coil and line set, 6" outside air, 90K/93% matches plan. | MARK | MARK | | HRR | C | 5356932 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | R | 11/29/2016 | Not ready, still assembling system. | MARK | MARK | | HRR | R | 5355589 | BARRETT PLUMBING, INC. | HI | C | 11/28/2016 | Support added. Ok. | MARK | MARK | | HI | C | 5354451 | BARRETT PLUMBING, INC. | HI | P | 11/23/2016 | ADD SUPPORT ON 1" MAIN ON SOUTH WALL HORIZONTAL RUN IN BASEMENT , SPACING FOR 1" IS 8 FT MAXIMUM, 10 LBS TEST OK. NOTES: 1" MAIN, 1-WATER HEATER, 1-FURNACE. | LIDO | LIDO | | HI | P | 5353177 | KIMBEL MECHANICAL SYSTEMS, INC. | P= | C | 12/28/2016 | pvb installed, unfinished basement. | TAYLOR | TAYLOR | | P= | C | 5377714 | KIMBEL MECHANICAL SYSTEMS, INC. | PTO | C | 11/28/2016 | NOTE : UNFINISHED BASEMENT , IRRIGATION STUB , TEMPERING ABOVE WATER HEATER | GABE | GABE | | PTO | C | 5353388 | KIMBEL MECHANICAL SYSTEMS, INC. | PB | C | 10/24/2016 | COPPER RUN UNDER FOOTER | GABE | GABE | | PB | C | 5325817 |
|
|