KOELSCH CONSTRUCTION INC. | B= | C | 08/03/2018 | | JANE | JANE | | B= | C | 5922967 |
KOELSCH CONSTRUCTION INC. | B= | P | 06/28/2018 | Temp CO: pending finals ( Expires: 7/28/2018 12:00:00 AM) | RITA | RITA | | B= | P | 5888184 |
KOELSCH CONSTRUCTION INC. | B= | P | 06/21/2018 | Building final complete pending all other final inspections. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), EXPERT ELECTRIC INC. Electrical Final Inspection is not Completed yet, NORTH WIND MECHANICAL LLC Mechanical Final Inspection is not Completed yet, RAPID PLUMBING SERVICES, LLC Plumbing Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5882210 |
KOELSCH CONSTRUCTION INC. | BFI | C | 05/23/2018 | Observation letter on file for all foundation and footing components and foundation insulation | BERTW | BERTW | | BFI | C | 5854035 |
KOELSCH CONSTRUCTION INC. | BFN | C | 05/23/2018 | | BERTW | BERTW | | BFN | C | 5854033 |
KOELSCH CONSTRUCTION INC. | BFT | C | 05/23/2018 | | BERTW | BERTW | | BFT | C | 5854031 |
KOELSCH CONSTRUCTION INC. | B16 | P | 04/17/2018 | Stopped on-site to observe stage of construction as there have been no inspections called in since 1/10/2018. Building is fully stocked with furniture. There is an active fire watch posted and controlling access to the building. Per Fire Inspector Ken Sharkey, approval was granted for the fire watch and for stocking. The GC says no people other than construction personnel are allowed intot he building. Neither this building nor any of the cottages on this property have CO or TCO. Sales personnel was observed walking into the cottage at 3387. There is also evidence that there has been more than construction personnel in the main building as there are active computers, stationary on desks and room charts in various locations throughout the building. GC has been made aware that NO PUBLIC shall be in the building until at least a TCO is issued for the business and all final inspections have at least been partialed. | JEREMYA | JEREMYA | | B16 | P | 5818892 |
KOELSCH CONSTRUCTION INC. | BSP | P | 01/10/2018 | Need contractor to re-visit all his permits and unlock any that have locked. Also need contractor to complete all mechanical requirements | JEREMYA | JEREMYA | | BSP | P | 5734316 |
KOELSCH CONSTRUCTION INC. | BSP | P | 11/01/2017 | Drywall scew at all units and accessory rooms OK | JEREMYA | JEREMYA | | BSP | P | 5673585 |
KOELSCH CONSTRUCTION INC. | BSP | P | 10/23/2017 | Drywall nailing at units in north corridor and east corridor OK // RC channel at all units complete | JEREMYA | JEREMYA | | BSP | P | 5663882 |
KOELSCH CONSTRUCTION INC. | BSP | P | 10/19/2017 | Drywall screw at all units on the north and west ends OK | JEREMYA | JEREMYA | | BSP | P | 5660682 |
KOELSCH CONSTRUCTION INC. | BSP | P | 10/13/2017 | Drywall screws OK at West corridor, center smoke compartment rooms | JEREMYA | JEREMYA | | BSP | P | 5654840 |
KOELSCH CONSTRUCTION INC. | BSP | P | 10/06/2017 | Column wraps at entry canopy OK | JEREMYA | JEREMYA | | BSP | P | 5647351 |
KOELSCH CONSTRUCTION INC. | BSP | P | 10/04/2017 | RC channel OK at lids through all units and ancillary rooms in west corridor from north entrance to sunroom // RC channel OK at north corridor from the west corridor to the Rose Living room | JEREMYA | JEREMYA | | BSP | P | 5645319 |
KOELSCH CONSTRUCTION INC. | BIN | P | 09/28/2017 | Exterior thermal at units in west, north and east corridors OK | JEREMYA | JEREMYA | | BIN | P | 5639441 |
KOELSCH CONSTRUCTION INC. | BFR | P | 09/25/2017 | All framing and fire caulk in north and east corridors and units OK // Missing roof jacks // Will need to do some research on Carlon electric boxes used for the low volt ceiling penetrations. | JEREMYA | JEREMYA | | BFR | P | 5636138 |
KOELSCH CONSTRUCTION INC. | BFR | P | 09/22/2017 | Framing in west corridor from north door to south door OK // Still missing fire caulk at penetrations in units A4, A11, A15, A32, A108, A116, A152, B24, D6, E17 & E19 // Missing roof jasck at east side of corridor in center office area | JEREMYA | JEREMYA | | BFR | P | 5634103 |
KOELSCH CONSTRUCTION INC. | BFR | R | 09/21/2017 | Missing fire penetrations all over the building // Complete these and recall this inspection | JEREMYA | JEREMYA | | BFR | R | 5632989 |
KOELSCH CONSTRUCTION INC. | BSP | P | 08/17/2017 | 2nd layer of drywall at all patio lids and porte cachere lid OK // Column wraps at rear patio and courtyard OK // Need to run sheet metal from listing up to top of post, to include saddle, per listed column wrap detail at Porte Cachere | JEREMYA | JEREMYA | | BSP | P | 5598645 |
KOELSCH CONSTRUCTION INC. | BSP | P | 08/14/2017 | All exterior canopy/patio lids OK // All exterior column wraps OK to cover with flashing // Need to verify termination of beam wraps at main entry canopy | JEREMYA | JEREMYA | | BSP | P | 5594856 |
KOELSCH CONSTRUCTION INC. | BSP | P | 08/04/2017 | All hold downs installed per plan throughout entire building | JEREMYA | JEREMYA | | BSP | P | 5586150 |
NORTH WIND MECHANICAL LLC | BSP | T | 07/26/2017 | PAID (REC#1443059) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 10 | DALEH | DALEH | | BSP | T | 5576902 |
KOELSCH CONSTRUCTION INC. | BSP | P | 07/26/2017 | Trusses in section 2 OK // Framer on site to complete any corrections during inspection // Need to complete all other rough inspections | JEREMYA | JEREMYA | | BSP | P | 5576613 |
KOELSCH CONSTRUCTION INC. | BSP | P | 07/18/2017 | Section 1 ONLY: Framer followed along fixing all issues. Trusses OK in Section 1 // NEED TO POST ADDRESS ON BUILDING | JEREMYA | JEREMYA | | BSP | P | 5567563 |
KOELSCH CONSTRUCTION INC. | BSP | P | 07/13/2017 | Trusses through section 3: Need ALL truss repairs throughout building in order to check them against field repair // Need wind bracing at 4' o.c. on all gable ends // Missing HTS 20's at BG3 and TG3 | JEREMYA | JEREMYA | | BSP | P | 5563189 |
KOELSCH CONSTRUCTION INC. | B16 | P | 07/12/2017 | spoke with Architect Masuda Yasmin about R value of roof attic insulation with regards to the required value per the IECC and the AHJ requirements @ ceiling dampers with ducts entering the side of the damper boxes,also mention Fire barrier continuity at soiled linen rooms per inspector comments/All correspondence for plan questions and field conditions will go through the contractor and the architect. | BERTW | BERTW | | B16 | P | 5562539 |
KOELSCH CONSTRUCTION INC. | BSP | R | 07/10/2017 | INSPECTION STOPPED - Missing all lateral bracing on trusses at south end of building in section 3 // Need roll blocks at tops of mono trusses // Verify no clips on hip trusses // FULL RE-INSPECT ONCE THE SECTION IS READY | JEREMYA | JEREMYA | | BSP | R | 5559192 |
NORTH WIND MECHANICAL LLC | BSP | T | 07/06/2017 | PAID (REC#1438362) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: revised duct design | JUSTINC | JUSTINC | | BSP | T | 5556378 |
KOELSCH CONSTRUCTION INC. | BSP | P | 06/22/2017 | Smoke walls above ceiling have bee corrected to the proper screw pattern per the approved drawings // First layer of drywall at corridor throughout building OK. Areas that have dampers have been left open and will remain so until mechanical inspector has cleared the damper framing. | JEREMYA | JEREMYA | | BSP | P | 5543998 |
KOELSCH CONSTRUCTION INC. | BSP | R | 06/21/2017 | Need to screw smoke walls per listing. Missing all screws at top edges | JEREMYA | JEREMYA | | BSP | R | 5542209 |
KOELSCH CONSTRUCTION INC. | BSP | P | 06/20/2017 | RC channel at North entry, NE corner and SW corner of main corridor ONLY OK // Discussed fire barrier continuity req. with GC at soiled linen room. As built, it does not work. | JEREMYA | JEREMYA | | BSP | P | 5541558 |
KOELSCH CONSTRUCTION INC. | BSP | P | 06/14/2017 | Corridor lids OK for RC throughout | JEREMYA | JEREMYA | | BSP | P | 5535226 |
KOELSCH CONSTRUCTION INC. | BSP | T | 06/12/2017 | PAID (REC#1431463) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | BSP | T | 5532861 |
KOELSCH CONSTRUCTION INC. | BSP | P | 06/07/2017 | TRUSSES PENDING // 2x10 framing at corridor ceilings OK per GA file RC 2601 for pre-rock | JEREMYA | JEREMYA | | BSP | P | 5528457 |
KOELSCH CONSTRUCTION INC. | BSP | P | 05/24/2017 | exterior drywall at outer side of walls OK / exterior drywall at courtyard OK / first layer of drywall at west and northeast porta cocharras columns only OK | DANE | DANE | | BSP | P | 5516279 |
KOELSCH CONSTRUCTION INC. | BSP | P | 05/04/2017 | Exterior shear OK around entire building // Discussed scheduling with GC. Discussed accessibility. Discussed TRUSSES PENDING. Went over rated assemblies and all approved listings for different areas of the building. Discussed the need to get all third party inspection reports in for foorting, foundation and open hole. | JEREMYA | JEREMYA | | BSP | P | 5496043 |
JAPRQU INC. | BSP | T | 04/27/2017 | PAID (REC#1420556) PLAN SPLICE FEE: $50 by: SHELBY for Electrical | SHELBY | SHELBY | | BSP | T | 5489473 |
COMMERCIAL PLUMBING | BSP | T | 03/20/2017 | PAID (REC#1420553) PLAN SPLICE FEE: $75 by: TCRIPPEN for Plumbing: plumbing splice 3-20-17 | TCRIPPEN | TCRIPPEN | | BSP | T | 5446014 |
KOELSCH CONSTRUCTION INC. | BSP | P | 03/17/2017 | Met on-site with Dennis Cade, supt Koelsch Const. Discussed scheduling and inspections. Discussed using third party for all concrete and masonry. Will be calling for shear at the beginning of next week. | JEREMYA | JEREMYA | | BSP | P | 5444346 |
KOELSCH CONSTRUCTION INC. | BSP | T | 01/17/2017 | PAID (REC#1420552) PLAN SPLICE FEE: $137.5 by: DANM for Construction: Revised smoke barriers; revised plans and elevations | DANM | DANM | | BSP | T | 5390784 |
EXPERT ELECTRIC INC. | E= | C | 07/12/2018 | labels placed at MDP and Generator / | MIGUEL | MIGUEL | | E= | C | 5900629 |
EXPERT ELECTRIC INC. | E= | R | 06/29/2018 | @ the disconnect in the electric room need a label stating 1 of 2 --- 2 of 2 located at the generator --- @ the generator need a label stating 2 of 2 --1 of 2 located in the electric room | CRAIGS | CRAIGS | | E= | R | 5889487 |
EXPERT ELECTRIC INC. | E= | P | 05/10/2018 | still need labels on the generator and utility --- power source 1 of 2 and where 2 of 2 is located -- needs comply with 110.21 | CRAIGS | CRAIGS | | E= | P | 5840922 |
EXPERT ELECTRIC INC. | E= | P | 05/09/2018 | A/C's 1-7 white conductor being used as a grounded conductor in seal tight from unit to disconnect, replace with appropriate colored conductor----west exterior gfci's need to be WR / | MIGUEL | MIGUEL | | E= | P | 5840262 |
EXPERT ELECTRIC INC. | E= | P | 04/23/2018 | generator needs a ground rod w/ electrode conductor to frame per 250.112----mdp, transfer switch, and panels fed from transfer switch need labeled per 702.7(B) and multiple power sources----need to isolate neutrals and equipment grounds in generator disconnect switch / | MIGUEL | MIGUEL | | E= | P | 5824688 |
EXPERT ELECTRIC INC. | E= | P | 04/23/2018 | panels need series rated labels and aic rating labels / | MIGUEL | MIGUEL | | E= | P | 5824687 |
EXPERT ELECTRIC INC. | E= | P | 04/20/2018 | kitchen ok-- looked at panels nk, c1, L1 need series rating info----cooler max 15, freezer20, and small split system max 15 are all over mocp required for each unit /-----mech rm 127 receptacle still w/out power | MIGUEL | MIGUEL | | E= | P | 5822800 |
EXPERT ELECTRIC INC. | E= | R | 04/10/2018 | still need high lighted series rating uploaded to this permit | CRAIGS | CRAIGS | | E= | R | 5812288 |
EXPERT ELECTRIC INC. | E= | P | 03/15/2018 | rms 138,136,135,131,130,122,126,119A,119B,153,117 OK---RM 133 RECEPTACLE BY BACK DOOR W/ NO POWER AND 208V RECEPTACLE NOT INSTALLED FOR DRYER YET---MECH 127 RECEPTACLE W/ NO POWER---LAUNDRY 132 DRYER NAMEPLATE REQUIRES 15A MAX FUSE, CURRENTLY 30A NON FUSED DISCONNECT ON 20A 3P BREAKER--- | MIGUEL | MIGUEL | | E= | P | 5789629 |
EXPERT ELECTRIC INC. | E= | P | 03/13/2018 | still need series rating up loaded -- areas 139 , 142 , 143 , 145 , 148 , 140 , 157 , 146 , 160 , 159 , 149 , 156 , 150 , 151 | CRAIGS | CRAIGS | | E= | P | 5787033 |
EXPERT ELECTRIC INC. | E= | P | 03/12/2018 | areas 114 , 115 , 116 , 118 , 152 , 105 , 108 , 107 , 106 , 110 , 113 , 104 , 103 , 102 OK NOTE gfci cant go behind the tubs or in the drinking fountains | CRAIGS | CRAIGS | | E= | P | 5785880 |
EXPERT ELECTRIC INC. | EUG | P | 03/07/2018 | SIDE WALK LIGHTS---FROM MAIN ENTRY SOUTH ON THE WAST AND EAST SIDE OF THE BUILDING TO THE NORTH CORNER--OK -- PVC ONLY NO WIRE | BRIAN | BRIAN | | EUG | P | 5782135 |
EXPERT ELECTRIC INC. | E= | P | 02/23/2018 | attic lights caged --OK ---- remove bond screws from all sub fed panels --- need series rated paper work high lighted what breakers were used and what is rated with them --- needs to be uploaded to this permit and a copy on site for a panel inspection --- talked about labeling required for series rated panels | CRAIGS | CRAIGS | | E= | P | 5772400 |
EXPERT ELECTRIC INC. | E= | R | 02/02/2018 | So wing needs exit support, recpt not working, 2-chandeliers, sconce lamps, rm 101 needs plate, rm .103 needs floor box, rm. 106 needs lamps, corr. 112 need access to water cooler GF recpts, rm 116 needs sconce lamps, rm 136 needs plate by door and exit, rms. 104,110, 138 ok / | ROB | ROB | | E= | R | 5755812 |
EXPERT ELECTRIC INC. | E= | P | 01/31/2018 | South Wing on the west side of building: Exits need support, south end room needs plates, switch for Sconces needs installed, and 1 recpt. not working / Main Lobby area ceilings complete / | ROB | ROB | | E= | P | 5753111 |
EXPERT ELECTRIC INC. | ER | P | 01/30/2018 | All fixtures in lobby area need support wires / | ROB | ROB | | ER | P | 5751459 |
EXPERT ELECTRIC INC. | E= | P | 01/30/2018 | All timers and plates complete in Units 40-60--Unit 8 complete / | ROB | ROB | | E= | P | 5751457 |
EXPERT ELECTRIC INC. | E= | P | 01/29/2018 | Corrections complete in1,2,3,4,5,13,21,48,55,58, and 49 complete / | ROB | ROB | | E= | P | 5750360 |
EXPERT ELECTRIC INC. | E= | P | 01/26/2018 | Bathroom bracket ground problems in 1,2,3,4,5,13,21--Unit 8 missing bathroom bracket--Unit 17 need total check--Re-checked timers and ok Units 1-39 / | ROB | ROB | | E= | P | 5748706 |
EXPERT ELECTRIC INC. | EUG | P | 01/25/2018 | West side of building north half and across main drive EUG ok / | ROB | ROB | | EUG | P | 5747997 |
EXPERT ELECTRIC INC. | E= | P | 01/25/2018 | Bath fixture not grounded in 48,55,58--Re-check 49--Final complete in50,51,52,53,54,56,57,60, and 153 / | ROB | ROB | | E= | P | 5747993 |
EXPERT ELECTRIC INC. | E= | P | 01/24/2018 | Bathroom bracket fixture not grounded in Units 38,43,46--Timer in bathroom missing in Unit 37---Final complete or Units 33,34,35,36,39,40,41,42,44,45,47 | ROB | ROB | | E= | P | 5745953 |
EXPERT ELECTRIC INC. | E= | P | 01/23/2018 | Bathroom bracket fixture not grounded in Units 13,16,21,31--Bathroom timer missing in Unit 16--Final cmplete for Units 9,10,11,12,14,15,18,22,23,24,25,27,28,29,30,32 / | ROB | ROB | | E= | P | 5744815 |
EXPERT ELECTRIC INC. | E= | P | 01/22/2018 | Final complete Units 1,2,3,4,5,6,7,8 except for timer plates in bathrooms / | ROB | ROB | | E= | P | 5744143 |
EXPERT ELECTRIC INC. | ER | P | 01/08/2018 | Ceiling rough in ok for Corridors 114,134,139,140,149,150,154 with the exceptions of Exit Light locations / | ROB | ROB | | ER | P | 5731303 |
EXPERT ELECTRIC INC. | ER | P | 12/20/2017 | North/South corridor ceiling rough: Need to support recess cans in nurse station area ,complete wall washers and exits / | ROB | ROB | | ER | P | 5719103 |
EXPERT ELECTRIC INC. | EUG | P | 12/19/2017 | Balance of underground for pole lights / | ROB | ROB | | EUG | P | 5717564 |
EXPERT ELECTRIC INC. | ES | C | 12/12/2017 | Commercial Service: 1600 amp UG COMM NEW Ok to energize / | ROB | ROB | | ES | C | 5710360 |
EXPERT ELECTRIC INC. | EUG | P | 12/12/2017 | Site lighting ok for south and southeast areas / | ROB | ROB | | EUG | P | 5710359 |
EXPERT ELECTRIC INC. | ER | P | 10/05/2017 | Completed rough in inspection for attic catwalk area// | ROB | ROB | | ER | P | 5646711 |
EXPERT ELECTRIC INC. | ER | P | 10/04/2017 | Partial attic/catwalk rough in inspection ok / | ROB | ROB | | ER | P | 5645410 |
EXPERT ELECTRIC INC. | ER | R | 09/13/2017 | Expert Electric does not have valid license for Fire Alarm / | ROB | ROB | | ER | R | 5624545 |
JAPRQU INC. | ER | C | 09/13/2017 | Rough in ok for rooms 117,121,122,123,126 / | ROB | ROB | | ER | C | 5624543 |
EXPERT ELECTRIC INC. | ER | P | 09/12/2017 | Fire Alarm rough in ok for rooms 33,34,35,36,37,38,39,147,148,149 / | ROB | ROB | | ER | P | 5622829 |
JAPRQU INC. | ER | P | 09/12/2017 | Rough in ok for rooms 54,127,128,129,130,131,132,133,136,137,138 / | ROB | ROB | | ER | P | 5622822 |
JAPRQU INC. | ER | P | 09/11/2017 | Rough in ok for rooms 55,56,58,59,60,153 | ROB | ROB | | ER | P | 5621491 |
EXPERT ELECTRIC INC. | ER | P | 09/11/2017 | Fire Alarm rough in ok rooms14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32, 102,104,106,107,110,111,113 and 152 / | ROB | ROB | | ER | P | 5621481 |
JAPRQU INC. | ER | P | 09/08/2017 | Rough in ok for rooms 42,44,46,47,4849,50,51,52 / | ROB | ROB | | ER | P | 5619896 |
JAPRQU INC. | ER | P | 09/07/2017 | Rough in ok for rooms 40,41,43,45,141,142,143,144,145,148,156,160 / | ROB | ROB | | ER | P | 5619036 |
JAPRQU INC. | ER | P | 09/06/2017 | Rough in ok for rooms 33,34,35,36,37,38,146,147,157,158,159 / | ROB | ROB | | ER | P | 5617661 |
JAPRQU INC. | ER | P | 09/05/2017 | Wall rough in ok for corridors 105,114,149, and 150 / | ROB | ROB | | ER | P | 5616462 |
JAPRQU INC. | ER | P | 09/01/2017 | Rough in ok for rooms 104,106,107,108,110,111,112,113, and reception desk / | ROB | ROB | | ER | P | 5614171 |
JAPRQU INC. | ER | P | 08/31/2017 | rooms 32 , 31 , 29 , 27 , 23 , 21 , 19 , 151 , 17 , 15 ---OK --- no fire alarm | CRAIGS | CRAIGS | | ER | P | 5613201 |
JAPRQU INC. | ER | P | 08/30/2017 | Rough in ok for rooms 14,16,18,20,22,24,26,28,30 and 152--Advised contractor no other FA inspections will be done without permit / | ROB | ROB | | ER | P | 5611803 |
JAPRQU INC. | EUG | R | 08/15/2017 | Installing primary pipe--Told contractor to contact CSU for inspection / | ROB | ROB | | EUG | R | 5595649 |
JAPRQU INC. | EUG | R | 08/14/2017 | Csu inspects Underground form CT location to Transformer / | ROB | ROB | | EUG | R | 5594921 |
JAPRQU INC. | ER | P | 07/28/2017 | West Porta Cachere rough ok---- NE soffit lights and fan boxes ok--- | ROB | ROB | | ER | P | 5579034 |
JAPRQU INC. | ER | P | 07/26/2017 | NE outside soffit rough--Lights ok but need Ceiling rated fan boxes--- | ROB | ROB | | ER | P | 5576605 |
JAPRQU INC. | ER | P | 07/12/2017 | Rough in for interior courtyard soffitts ok | ROB | ROB | | ER | P | 5561729 |
JAPRQU INC. | ER | P | 06/20/2017 | All exterior soffits--Need 2- ceiling fan rated boxes at NE corner overhang--Excludes Porta-Cachere soffit---Home run stubbed into attic near catwalk--- | ROB | ROB | | ER | P | 5541543 |
JAPRQU INC. | ESL | C | 02/09/2017 | remainder of sub-panel feeders and main electrical room ok | MATTHEW | MATTHEW | | ESL | C | 5410656 |
JAPRQU INC. | EUG | P | 01/20/2017 | (3) 2 1/2" and (1) 2" pvc feeders from MDP to panels on north end | MATTHEW | MATTHEW | | EUG | P | 5393810 |
JAPRQU INC. | EUG | P | 12/15/2016 | (3) 2" pvc feeders from west electrical room to 80' out towards main electrical room | MATTHEW | MATTHEW | | EUG | P | 5368743 |
JAPRQU INC. | EUG | P | 12/05/2016 | 5 conduits for service from xfrmer okay, POC is Kyle 720-281-2465..... | GARYL | GARYL | | EUG | P | 5359787 |
JAPRQU INC. | EUG | P | 10/27/2016 | rebar ufer south end of building ok | MATTHEW | MATTHEW | | EUG | P | 5329496 |
NORTH WIND MECHANICAL LLC | H= | C | 08/01/2018 | Items addressed by engineer see images | MARKB | MARKB | | H= | C | 5920105 |
NORTH WIND MECHANICAL LLC | HSP | C | 06/29/2018 | TAB REPORT RECEIVED | MARKB | MARKB | | HSP | C | 5889348 |
NORTH WIND MECHANICAL LLC | H= | P | 06/28/2018 | FINAL PENDING - APPROVED PLAN SPLICE DELETING SNOW MELT AND ADDRESSING APPLIANCE CHANGE UNDER HOOD AND INCREASED CFM. DISHWASHER INTERLOCKS CONFIRMED. | MARKB | MARKB | | H= | P | 5888828 |
NORTH WIND MECHANICAL LLC | H= | P | 06/27/2018 | Still need items from previous inspection notes - received revised Test And Balance Report and will go over in the morning. | MARKB | MARKB | | H= | P | 5887731 |
NORTH WIND MECHANICAL LLC | HD | C | 06/26/2018 | FOR FINAL PARTIAL - NEED TO CONFIRM DISHWASHER INTERLOCK WITH HOOD - OTHER INTERLOCKS OK - F6 DOES NOT NEED TO BE INTERLOCKED. FOR FINAL - FOUND REVISED AIR BALANCE SCHEDULE ON M3.1 - NEED TO ADDRESS EF-5 & EF-6. WILL NEED A PLAN SPLICE DELETING SNOW MELT AND ADDRESSING CHANGED TYPE 1 HOOD EXHAUST RATE AND CHANGED COOK LINE EQUIPMENT. | MARKB | MARKB | | HD | C | 5886026 |
NORTH WIND MECHANICAL LLC | HD | P | 06/25/2018 | FOR FINAL - NEED TO SUPPORT FAN EXTENSIONS FROM WIND SHEER, STILL NEED TO CONFIRM DISHWASHER HOOD AND F-6 INTERLOCK. TAB REPORT RECEIVED, STILL NEED TO VERIFY READINGS. Note Added: After review of the revised TAB report, Readings still are not within 10% of air balance Schedule in permit plans. Design numbers on TAB do not match air balance schedule in permit. Can not find a splice with a different air balance schedule. What is going on? CONFIRMED TYPE 1 HOOD IS INTERLOCKED WITH MAU | MARKB | MARKB | | HD | P | 5884726 |
NORTH WIND MECHANICAL LLC | HD | P | 06/20/2018 | 1. Can not accept Test And Balance Report - All outside air and exhaust values need to be within 10% of air balance submitted with plans. No readings provided for EF-10, EF-11 and MAU. 2. Still need to confirm kitchen interlocks: F-6 & MUA with EF-10 & EF-11 3. Still Need to extend grease fan outlet above roof. 4. Still need protection for regulator behind cooking equipment. ----OTHER ITEMS FROM PREVIOUS NOTES ADDRESSED---- | MARKB | MARKB | | HD | P | 5880708 |
NORTH WIND MECHANICAL LLC | HD | P | 05/30/2018 | NOTES CONTINUED: 10. Need engineer letter to address dampers above furnaces that do not match ceiling listing and are not dynamic - engineer to address in letter that furnaces are designed to shutdown in the event of a fire. 11. Sill need engineer to address how makeup air duct for dryers in laundry room is to be protected for rated ceiling penetration. 12. Need to confirm interlocks for Type 1 grease hood. 13. Need install instructions on site for PTEC units and PTEC inspections. 14. Provide Test And Balance Report. 15. Further research required on Access to attic and equipment well on roof. | MARKB | MARKB | | HD | P | 5858546 |
NORTH WIND MECHANICAL LLC | HD | P | 05/29/2018 | STILL NEED THESE ITEM ADDRESSED: 1. Makeup air gas regulator vent opening needs to be pointed down to keep out weather. 2. Grease fan outlet needs to be extended has high as any portion of building within 10' with factory supplied extensions to comply with IMC 506.3.12.3 3. Grease fan curb lacks its high temperature gasket to comply with IMC 506.3.2.3 4. Engineer to provide an approved plan splice showing manufactured grease duct installed and size instead of site built grease duct. 5. Manufactured grease duct lacks clearance to combustible per tag on duct. 6. Need to verify window seams on hood wall have been caulked in 18" zone. 7. Need to verify regulator on cook line has protection from equipment damage. 8. Engineer to address fan installed for soil room that does not match plans. 9. Air handler in attic lacks secondary protection - pan and primary drain are tee together in attic. -----MORE NOTES ON NEXT INSPECTION----- | MARKB | MARKB | | HD | P | 5858142 |
ALNOR INC. | H= | C | 04/20/2018 | No refrigeration alarms required per calc's provided by contractor - see images. | MARKB | MARKB | | H= | C | 5822385 |
NORTH WIND MECHANICAL LLC | HD | R | 04/17/2018 | TYPE 1 HOOD INSPECTION - HOOD HAS BEEN REPLACED WITH A ZERO-CLEARANCE HOOD. Still need seams on window/case in 18" zone sealed with clean able non absorbent silicone. GREASE DUCT INSPECTION - Manufactured grease duct lacks clearance to combustibles listed on tag. Need install instructions on site to check for proper support. Still need to inspect equipment well on roof. | MARKB | MARKB | | HD | R | 5819168 |
ALNOR INC. | H= | P | 04/16/2018 | CAN NOT FIND REFRIGERATION CALCULATIONS ON PLANS - NEED ENGINEER TO PROVIDE CALCULATIONS FOR WALK IN COOLER AND FREEZER TO DETERMINE IF ALARMS ARE REQUIRED PER CODE. REST OK. | MARKB | MARKB | | H= | P | 5817813 |
NORTH WIND MECHANICAL LLC | HSP | P | 03/22/2018 | After discussion with Captive Aire, Type 1 hood will need to either be replaced with a zero clearance hood or current hood sent back to Captive Aire to be modified for zero clearance. Modifications can not be made in field to reduce clearances for top of hood. Need engineer to address how ceiling penetration for type 2 hood will be protected. Called Dennis with Koelsch Construction. | MARKB | MARKB | | HSP | P | 5795976 |
ALNOR INC. | HRP | P | 03/20/2018 | 400 PSI PRESSURE TEST ON LINES TO WALK IN COOLER/FREEZER OK. Still need other inspections. | MARKB | MARKB | | HRP | P | 5794426 |
NORTH WIND MECHANICAL LLC | HV | C | 03/20/2018 | VENTING FOR WATER HEATERS CORRECTED | MARKB | MARKB | | HV | C | 5794425 |
NORTH WIND MECHANICAL LLC | HRP | C | 03/20/2018 | PRESSURE TEST AT ALL CONDENSERS OK - LINESETS WERE CONCEALED WITHOUT PROPER INSPECTIONS. | MARKB | MARKB | | HRP | C | 5794424 |
NORTH WIND MECHANICAL LLC | HV | P | 03/20/2018 | FURNACE VENTS INSTALLED PER MANUFACTURER INSTRUCTIONS AND PLANS. Need Correct PVC vent material on water heaters. | MARKB | MARKB | | HV | P | 5793179 |
NORTH WIND MECHANICAL LLC | HD | P | 03/16/2018 | ABOVE CEILING DUCT EXHAUST FANS AND ROOF PENETRATIONS COMPLETE FOR ALL EXHAUST FANS EXCEPT APPEARS SOIL ROOM DOES NOT HAVE PROPER FAN INSTALLED. DUCT CONNECTIONS TO FURNACES COMPLETE - Still need damper access labeled. OUTSIDE AIR AND MOTORIZED DAMPERS TO ALL FURNACES COMPLETE. Still need AHU in attic inspected. At next inspection will need damper instructions for CRD's in kitchen area. GREASE DUCT INSPECTION - CONNECTION TO HOOD PER MANUFACTURER INSTRUCTIONS - Still need all grease duct and support installed. Provide splice showing manufactured grease duct instead of site built. Further research required on clearance reduction above hood to ceiling. | MARKB | MARKB | | HD | P | 5791817 |
NORTH WIND MECHANICAL LLC | HC | C | 03/14/2018 | 2 PSI APPROVAL LETTER RECEIVED FROM CSU AND REGULATORS INSTALLED. | MARKB | MARKB | | HC | C | 5788790 |
NORTH WIND MECHANICAL LLC | HI | P | 03/14/2018 | RECEIVED 2 PSI APPROVAL LETTER FROM CSU, REGULATORS IN PLACE. Still need - support gas piping at equipment, provide regulator protection at cook line, need water heater and furnace vents inspected, install insect screens on regulator vent terminations and install medium pressure stickers on gas piping every 6'. | MARKB | MARKB | | HI | P | 5788789 |
NORTH WIND MECHANICAL LLC | HSP | P | 03/05/2018 | Spoke with Dennis on site about needing mechanical contractor to call in inspections. Walked kitchen with Dennis and looked at hung hood which lacks required clearances and stainless needs to cover 18" outside of hood print and behind. Will need more research on metal window in 18" zone. Still need makeup air, grease duct, hood, equipment in attic, equipment on roof, roof access and PTEC inspections as part of rough inspections before final inspections can be done. | MARKB | MARKB | | HSP | P | 5780118 |
NORTH WIND MECHANICAL LLC | HSP | P | 02/12/2018 | Stopped by job site today because mechanical inspections have not been called in a timely manor - Today's visit was focused mainly on kitchen area since there was no attic access. Will need to see FRP removed from hood wall within the combustible zone before stainless or hood are installed on wall - further research required on vinyl window installed in combustible zone. Still need to inspect duct for MAU unit, Type 2 hood, Type 1 hood and rated construction protection. | MARKB | MARKB | | HSP | P | 5763171 |
NORTH WIND MECHANICAL LLC | HD | P | 01/17/2018 | CORRIDOR DAMPERS - 4 SIDED ANGLES INSTALLED ON ALL CORRIDOR DAMPERS. FURNACE SUPPLY/RETURN DAMPERS - DUCT SUPPORT, DAMPERS, 4 SIDED ANGLES TOP AND BOTTOM FOR WEST, EAST AND SOUTH MECH ROOMS PER INSTALL INSTRUCTIONS. ---Had discussion with mech contractor and went over fire stop instructions for manufactured grease duct--- | MARKB | MARKB | | HD | P | 5740424 |
NORTH WIND MECHANICAL LLC | HD | P | 01/11/2018 | CORRIDOR BELOW MEMBRANE DAMPER INSPECTION - Either need approval letter from Greenheck for fire caulk around damper or remove fire caulk. Need 4 sided angle installed on all dampers per install instructions. FURNACE DAMPER INSPECTION - Contractor has cut a 2'x2' hole in each mechanical room ceiling to perform inspections - All dampers, need proper gauge duct support angles installed and all 4 sided angles need to be tight against drywall. All screw holes need to be sealed with UL listed mastic. UNLISTED SILICONE HAS BEEN REMOVED FROM AROUND DAMPERS. I TOLD MECHANICAL CONTRACTOR IF THEY HAVE INSTALL INSTRUCTIONS ON SITE FOR MANUFACTURED GREASE DUCT AT NEXT INSPECTION WE COULD GO OVER WHAT IS NEEDED FOR RATED CEILING PENETRATION BEFORE IT IS INSTALLED. | MARKB | MARKB | | HD | P | 5736092 |
NORTH WIND MECHANICAL LLC | HSP | P | 01/09/2018 | Stopped by job site today because mechanical inspections have not been called in a timely manor and items have been covered up without inspections. Have had multiple discussions with Dennis (Job super) about corrections and items that need to be addressed - All mechanical room ceilings have been drywalled without proper damper instructions, damper support, ceiling protection and RC channel all need to be inspected prior to drywall per damper instructions. mechanical contractor is using an unlisted duct seal inside duct around dampers. Corridor dampers have been fire caulked and need damper instructions to verify this is ok before cover up. Kitchen makeup air installed without inspections and may need to be in a shaft. kitchen hood wall is covered with FRP where hood will go. Type 2 hood duct installed without inspections. All refrigeration lines installed and concealed without inspections. Air handler in attic installed without inspections. No inspections on PTAC units. | MARKB | MARKB | | HSP | P | 5733228 |
NORTH WIND MECHANICAL LLC | HSP | P | 12/21/2017 | SPOKE WITH DENNIS FROM KOELSCH CONSTRUCTION. AREAS AROUND FURNACE PLENUM PENETRATIONS WERE CONCEALED BEFORE INSPECTION. THE BUILDING INSPECTOR AND DENNIS WHERE AWARE THE THOSE AREAS WHERE NOT TO BE CONCEALED WITH OUT PROPER DAMPER INSPECTIONS BEING COMPLETED. AS OF YESTERDAY THE DAMPERS WHERE INSTALLED AND CONCEALED WITHOUT INSPECTION. DURING OUR CONVERSATION WE DISCUSSED THE LETTER FROM THE ENGINEER NOT ADDRESSING THE DYNAMIC ISSUE WITH A NON RATED DYNAMIC DAMPER ABOVE A FURNACE. DENNIS INDICATED THAT THE FURNACES ARE TO SHUT DOWN UPON GENERAL FIRE ALARM WHICH WOULD CHANGE THE HVAC SYSTEM TO A STATIC SYSTEM. THIS WILL HAVE TO EITHER BE ON THE APPROVED DRAWINGS OR ON ANOTHER STAMPED LETTER INDICATING THIS CHANGE. THE LAST PART TO ALL THIS IS THE DAMPERS PURCHASED FOR THIS PROJECT HAVE TO BE LISTED WITHIN UL-LISTING ITSELF THAT THEY WERE TESTED AS PART OF THOSE ASSEMBLY'S. IF THEY ARE NOT THAT WILL HAVE TO BE INCLUDED IN THE LETTER. ALSO THE DAMPERS ARE NOT INSTALLED TO INSTRUCTIONS. | JON | JON | | HSP | P | 5719491 |
NORTH WIND MECHANICAL LLC | HD | P | 12/20/2017 | DAMPER INSPECTIONS - SMOKE DAMPERS IN SMOKE WALLS IN ATTIC OK FOR ANULAR SPACE AND ANGLES ALL 3 WALLS. DAMPERS ABOVE FURNACES - LACK PROPER DUCT SUPPORT AND DRYWALL ANGLES, DAMPERS LACK PROPER SUPPORT AND CAN NOT CAULK DAMPER INSIDE DUCT AND ALL CAULK OR DUCT SEALANTS NEED TO BE UL 181-B LISTED. HAD CONSULT WITH DENNIS AND NEW MECHANICAL CONTACT - ARMONDO | MARKB | MARKB | | HD | P | 5719098 |
NORTH WIND MECHANICAL LLC | HD | P | 11/21/2017 | HOOD WALL INSPECTION - All combustibles have been removed from Type 1 hood wall | MARKB | MARKB | | HD | P | 5691743 |
NORTH WIND MECHANICAL LLC | HSP | P | 11/15/2017 | Type 1 hood wall has been drywall before plywood backing was removed. Had discussion with Dennis (super) about why the plywood is considered a combustible and needs to be removed. | MARKB | MARKB | | HSP | P | 5686769 |
NORTH WIND MECHANICAL LLC | HC | C | 11/15/2017 | RELEASE METER | MARKB | MARKB | | HC | C | 5686768 |
NORTH WIND MECHANICAL LLC | HI | P | 11/15/2017 | 10 PSI PRESSURE TEST OK FOR WHOLE BUILDING. At Final - need all stickers and regulators installed | MARKB | MARKB | | HI | P | 5686758 |
NORTH WIND MECHANICAL LLC | HI | P | 11/14/2017 | 10 PSI PRESSURE TEST OK ON HOOD WALL ONLY - Still need 10 psi pressure test on 30 psi gauge for rest of building. Finish installing medium pressure stickers on gas piping every 6'. BUILDING STUB HAS BEEN MOVED TO CSU APPROVED LOCATION. Still need regulators installed. | MARKB | MARKB | | HI | P | 5685212 |
NORTH WIND MECHANICAL LLC | HSP | P | 10/11/2017 | CHANGED INSPECTION TO "HSP". HAD CONSULT WITH DENNIS AND JOSE ABOUT NEW DYNAMIC DAMPERS CALLED OUT ON PLAN SPLICE FOR FURNACE'S. APPEARS RUSKIN DAMPERS ARE DESIGNED AND ONLY HAVE AN INSTALLATION SUPPLEMENT FOR A CONCRETE FLOOR ASSEMBLY AND NOT FOR A WOOD ROOF/CEILING ASSEMBLY. CONTACTED RUSKIN REP WHO COULD NOT PROVIDE AN ANSWER AT THE TIME OF CALL. | MARKB | MARKB | | HSP | P | 5652281 |
NORTH WIND MECHANICAL LLC | HD | P | 10/06/2017 | DAMPER OPENINGS FOR SMOKE DAMPERS IN ATTIC OK TO INSTALL DAMPERS AND ANGLES. | MARKB | MARKB | | HD | P | 5647879 |
NORTH WIND MECHANICAL LLC | HD | P | 09/18/2017 | DUCT INSULATION IN ATTIC - NORTH AND EAST CORRIDORS FOR SUPPLY/RETURN PIPING COMPLETE TO EAST SMOKE WALL. Still need flex and diffusers | MARKB | MARKB | | HD | P | 5629043 |
NORTH WIND MECHANICAL LLC | HD | P | 09/14/2017 | DAMPER INSTALLATION AND SUPPORT OK FOR ROOMS # 116,117,120,121, 123, 133, 122, 129, 158, 157, 142, 143, 148, 146 & 156. Still need flex installed to dampers | MARKB | MARKB | | HD | P | 5626388 |
NORTH WIND MECHANICAL LLC | HI | P | 09/11/2017 | Meter location needs to be verified with CSU - current location too close to windows or doors and meter would go across a door way. Need gas piping installed in hood wall. Need elevated pressure stickers installed every 6' on exposed piping. Other piping per plan | MARKB | MARKB | | HI | P | 5622317 |
NORTH WIND MECHANICAL LLC | HSP | P | 08/31/2017 | FURTHER RESEARCH REQUIRED ON EXHAUST DAMPER IN SOIL ROOM. | MARKB | MARKB | | HSP | P | 5613202 |
NORTH WIND MECHANICAL LLC | HD | P | 08/31/2017 | S/F DAMPER FRAMING IN ATTIC ABOVE WEST CORRIDOR OK. CRD DAMPER INSTALLATION FOR NORTH AND EAST CORRIDORS AND BATH EXHAUST ON BOTH SIDES OF CORRIDORS OK. | MARKB | MARKB | | HD | P | 5613199 |
NORTH WIND MECHANICAL LLC | HD | P | 08/24/2017 | ABOVE CEILING DUCT INSPECTION - S/R AND BATH EXHAUST OK FOR DINING AND CORRIDOR WEST/SOUTH END. Met with Jon B. on site to discuss corridor dampers | MARKB | MARKB | | HD | P | 5606341 |
NORTH WIND MECHANICAL LLC | HD | P | 08/21/2017 | CRD DAMPER SUPPORT OK FOR WEST CORRIDOR - DAMPERS IN CORRIDOR CEILING AND BATH EXHAUST ON BOTH SIDE OF CORRIDOR | MARKB | MARKB | | HD | P | 5602474 |
NORTH WIND MECHANICAL LLC | HSP | P | 08/11/2017 | Had consult with Dennis (Koelsch Const.) and Owner of North Wind Mech about dampers needing to meet listing of the construction they are mounted in. Went over instructions for new dampers to be installed in corridors and how they are to be installed. Looked at one damper installed in corridor. Talked about engineer needing to address new damper to be installed at furnaces and the need to damper makeup air to laundry and kitchen. Explained to contractor that he needs to call inspections has he completes different stages of work as to not hold up the job. Talked about needing to inspect framing and openings for smoke dampers in smoke walls above corridors in attic. | MARKB | MARKB | | HSP | P | 5593246 |
NORTH WIND MECHANICAL LLC | HD | P | 08/04/2017 | ABOVE CEILING DUCT (ATTIC) FOR M3.1 OK TO INSULATE TO MIN. REQUIRED BY CODE IN UNCONDITIONED. NO DAMPER INSPECTIONS . Met on site with Jon B. and had discussion with JOSE and DENNIS about engineer to address dryer makeup air through rated assembly with no protection. Still need new dampers at furnace's corrected on plans and discussed how all dampers needed to be list for use in each UL assembly. Engineer also to address cleanouts in dryer ducts per note #1 on plans. Hood wall currently has plastic plumbing and fire treated ply wood in it. Inspector's will review plans in more detail and relay and new information back to Dennis and Jose. | MARKB | MARKB | | HD | P | 5586569 |
NORTH WIND MECHANICAL LLC | HD | P | 08/02/2017 | ABOVE CEILING DUCT (ATTIC) FOR M3.2 (LIVING, DINING AND EXHAUST FANS) AND ALL OF M5.2 (EXCLUDING GREASE DUCT, MUA DUCT OR INTAKE IH-5 LAUNDRY) OK TO INSULATE TO MIN. REQUIRED BY CODE IN UNCONDITIONED. NO DAMPER INSPECTIONS | MARKB | MARKB | | HD | P | 5583996 |
NORTH WIND MECHANICAL LLC | HD | R | 07/14/2017 | NO INSPECTION TODAY - ALL DUCT WORK HAS BEEN INSTALLED AS ROUND WHEN PLANS CALL FOR RECTANGLE AND SIZES HAVE BEEN CHANGED. WILL NOT BE ABLE TO GET PROPER DEPTH OF INSULATION UNDER ROUND DUCTS AT FURNACE LOCATIONS. SPOKE WITH GC AND MECHANICAL CONTRACTOR - WILL NEED A PLAN SPLICE SHOWING DUCT AS BUILT WITH A DETAIL ADDRESSING INSULATION AT FURNACE SUPPLIES | MARKB | MARKB | | HD | R | 5564905 |
NORTH WIND MECHANICAL LLC | H16 | C | 07/13/2017 | GOT WITH GC AND MECHANICAL CONTRACTOR IN TRAILER AND WENT OVER PLANS. LOOKED AT DAMPER INSTRUCTIONS AND WENT OVER WHAT NEEDS TO BE CHANGED PER INSTRUCTIONS ON DAMPERS. HAD DISCUSSION ABOUT KEEPING DUCT 18" ABOVE INSULATION AND WILL NEED TO BE WRAPPED WITH A MINIMUM R8 ON ALL SUPPLY DUCTS IN UNCONDITIONED AREAS. | MARKB | MARKB | | H16 | C | 5563642 |
NORTH WIND MECHANICAL LLC | HD | R | 06/23/2017 | NEED ARCHITECT TO ADDRESS HOW PROTECTING RATED CEILING PENETRATIONS AT ALL FIRE DAMPERS INCLUDING FURNACE SUPPLY AND RETURN / SUPPLY GRILLES / RETURN GRILLES / RESTROOM AND ALL OTHER DAMPERS TO ADDRESS ROOF INSULATION AND AIR FLOW REQUIREMENTS I.E. WITH AIR FLOW OR AGAINST AIR FLOW | JERRYF | JERRYF | | HD | R | 5544904 |
NORTH WIND MECHANICAL LLC | HD | P | 06/22/2017 | HAD CONSULT WITH G.C. AND MECH CONTRACTOR ON RATED CEILING MEMBRANE PENETRATIONS - NEED ARCHITECT TO ADDRESS LARGE OPENINGS AT ALL AIR HANDLERS AND NEED TO REVIEW RADIATION DAMPER INSTALL - NEED ALL DUCT WORK IN ATTIC RAISED ABOVE INSULATION LEVEL | JERRYF | JERRYF | | HD | P | 5543978 |
RAPID PLUMBING SERVICES, LLC | P= | C | 08/03/2018 | see images for alternate method and materials | TED | TED | | P= | C | 5922943 |
RAPID PLUMBING SERVICES, LLC | P= | P | 07/19/2018 | still need transfer showers that are wrong corrected, inspection on 6-4-18 has room 32 as complete, the shower is not correct | TED | TED | | P= | P | 5907903 |
RAPID PLUMBING SERVICES, LLC | P= | P | 06/04/2018 | room 32 and kitchen | TED | TED | | P= | P | 5863218 |
RAPID PLUMBING SERVICES, LLC | P= | P | 05/02/2018 | rooms 54, 56, 57, 58, 59, 60, room number per plan 119 A and B, 126, 127, 129, 130, 132, 135, R.P. irrigation backflow in court yard | TED | TED | | P= | P | 5833372 |
RAPID PLUMBING SERVICES, LLC | P= | P | 05/01/2018 | rooms 34, 35, 36, 38, 39,41, 42, 43, 44, 45, 47. 48, 49, 50, 51, 52, 53, room number per plan 143, 146, 147 | TED | TED | | P= | P | 5832165 |
RAPID PLUMBING SERVICES, LLC | P= | P | 04/30/2018 | rooms 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, room number per plan- 111, 151, 152 | TED | TED | | P= | P | 5830732 |
RAPID PLUMBING SERVICES, LLC | P= | P | 04/20/2018 | rooms 2, 3, 5, 6, 8, 9, 10, 11, 13, room number per plan 101(tub room), 108, 113 | TED | TED | | P= | P | 5822934 |
COMMERCIAL PLUMBING | PTO | P | 10/23/2017 | water pipe insulation complete | TED | TED | | PTO | P | 5663453 |
COMMERCIAL PLUMBING | PTO | P | 09/28/2017 | water piping insulation in tenant rooms less 126, ok, still need laundry, kitchen and mech. | TED | TED | | PTO | P | 5640039 |
COMMERCIAL PLUMBING | PTO | P | 09/08/2017 | room 55 water piping ok | TED | TED | | PTO | P | 5619717 |
COMMERCIAL PLUMBING | PTO | P | 08/31/2017 | water piping to all rooms and fixtures less room 55 (hot and cold) | TED | TED | | PTO | P | 5612593 |
COMMERCIAL PLUMBING | PTO | P | 08/28/2017 | water piping mains (hot, cold and return) from meter room, through kitchen area walls and ceiling, down hallway ceilings less room take offs and laundry room area | TED | TED | | PTO | P | 5608532 |
COMMERCIAL PLUMBING | PTO | P | 07/28/2017 | dwv walls and ceiling through roof--119 a and b, kitchen area | TED | TED | | PTO | P | 5578997 |
COMMERCIAL PLUMBING | PTO | P | 07/27/2017 | dwv in walls and ceiling through roof--122, 123, 126, 129, 130, 132, 135, 136, 154, 54, 55, 56, 57, 58, 59, 60 | TED | TED | | PTO | P | 5578070 |
COMMERCIAL PLUMBING | PTO | P | 07/26/2017 | dwv walls and ceiling through roof--143, 144, 155, rooms 33 through 53 | TED | TED | | PTO | P | 5576193 |
COMMERCIAL PLUMBING | PTO | P | 07/25/2017 | dwv walls and ceiling through roof, 108, 111, 113, 152, rooms 14 through 32 | TED | TED | | PTO | P | 5574816 |
COMMERCIAL PLUMBING | PTO | P | 07/19/2017 | units 1 through 13 and room 101, dwv in walls and ceilings through roof | TED | TED | | PTO | P | 5569072 |
COMMERCIAL PLUMBING | PB | C | 02/10/2017 | ok. all kitchen grease dwv and one sanitary dwv line complete. this completes ALL underground dwv lines. | JOHNS | JOHNS | | PB | C | 5412545 |
COMMERCIAL PLUMBING | PB | P | 02/07/2017 | 1-bathroom, laundry and mech room o.k, need 3'' f.d for laundry area | JOEL | JOEL | | PB | P | 5408280 |
COMMERCIAL PLUMBING | PB | P | 01/31/2017 | east and south east end of building as noted on plan | TIM | TIM | | PB | P | 5402620 |
COMMERCIAL PLUMBING | PB | P | 01/19/2017 | east side to south mid line of building as marked on plan | TIM | TIM | | PB | P | 5393080 |
COMMERCIAL PLUMBING | PB | P | 01/05/2017 | north section ok see plan | TIM | TIM | | PB | P | 5383040 |
COMMERCIAL PLUMBING | PB | P | 12/28/2016 | west side- from south to north, north and south side west to east runs deep base, plan marked | TED | TED | | PB | P | 5378014 |
COMMERCIAL PLUMBING | PB | P | 12/21/2016 | south to north, plan marked | TED | TED | | PB | P | 5373851 |
COMMERCIAL PLUMBING | PTO | L | 12/13/2016 | not ready for PTO. | DICK | DICK | | PTO | L | 5367420 |
COMMERCIAL PLUMBING | PB | P | 12/13/2016 | from south to north as marked on plan. | DICK | DICK | | PB | P | 5367418 |
COMMERCIAL PLUMBING | PB | P | 12/05/2016 | from south to north as marked on plan. | DICK | DICK | | PB | P | 5360387 |
COMMERCIAL PLUMBING | PB | P | 11/23/2016 | south, plan marked | TED | TED | | PB | P | 5352247 |