HENSEL PHELPS CONSTRUCTION CO | B= | C | 03/02/2017 | final letter of engineer observation on file | NATHAN | NATHAN | | B= | C | 5429073 |
HENSEL PHELPS CONSTRUCTION CO | B= | P | 02/09/2017 | NEED LETTER FOR RED IRON FRAMING FOR DAMPERS / MISSING SMOKE SEAL ON MAIN CORRIDOR DOORS. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5410930 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 01/30/2017 | core board and framing per UL WSD135 at hybrid operation hall horizontal smoke barrier. | NATHAN | NATHAN | | BFR | P | 5401255 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 01/27/2017 | fire caulking at above ceiling with all penetrations sealed in hall bulkhead and walls / new UL listings supplied for penetrating items. Training with Matt | NATHAN | NATHAN | | BSP | P | 5400422 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 01/25/2017 | Red iron damper support framing is on approved engineer stamped plans ok- pending final letter of structural components observation/reviewed WSD 135 shaft liner horizontal assembly construction and correct branding of sheetrock/next inspection will be for all lids and penetrations | BERTW | BERTW | | BFR | P | 5398204 |
MECHONE, INC. | BSP | P | 01/10/2017 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised FSD location | JUSTINC | JUSTINC | | BSP | P | 5385341 |
HENSEL PHELPS CONSTRUCTION CO | BSP | T | 01/04/2017 | PAID (REC#1394103) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise smoke barrier location | MICHAELA | MICHAELA | | BSP | T | 5381585 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 12/20/2016 | stopped by to take photos of corridor above smoke barrier doors | BERTW | BERTW | | BSP | P | 5372741 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 12/09/2016 | fire wall assembly completed at both sides of old staff lounge room 2420 | NATHAN | NATHAN | | BFR | P | 5364365 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 12/08/2016 | 1st layer drywall at both sides of mechanical duct penetrations old staff lounge room 2420. | NATHAN | NATHAN | | BFR | P | 5363310 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 12/02/2016 | new smoke barrier doors and wall not included in inspections -----// above ceiling floor ceiling penetrations at Hybrid room control room and equipment storage room okay / new detail for multiple penetrations presented C_AJ-8143 / floor penetrations at Hybrid room sealed per listing / headwall and penetrations at Hybrid wall to corridor wall all okay.Med box putty padded ok per Nathan | NATHAN | NATHAN | | BSP | P | 5358855 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 11/30/2016 | Med gas box in smoke barrier needs to be putty packed or backrocked in equip room back side of corridor/robot arm electric conduit in floor per hilti C-A-J-1155 needs 1/2" deep FS 1 sealant inspected/penetrations in concrete 1A floor assembly above using T-P-1149 listing ok pending firecaulking from above inspection/need listing for double conduits through floor assembly above and inspections/need new door assembly in smoke barrier at corridor inspected after contractor meets with mech engineer to revise plans | BERTW | BERTW | | BFR | P | 5356425 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 11/30/2016 | training with Bert 1A , I2 OCCUPANCY floor ceiling and smoke barrier assembly. | NATHAN | NATHAN | | BSP | P | 5356253 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 11/17/2016 | firespray FS-1 ok at headwall for smoke barrier/discussed with Brendon the smoke barrier new door to be installed in corridor has many ducts and pipes that will go through the wall above the door when built/please get with architect and engineer to figure out how to to revise the plans | BERTW | BERTW | | BFR | P | 5347398 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 11/14/2016 | head wall detail rock wool at top of wall ok for smoke barrier/need all through penetration firestopping details for conduits etc.and inspections | BERTW | BERTW | | BSP | P | 5343386 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 11/09/2016 | framing ok @ hybrid operating room/reviewed smoke barrier wall membrane and through penetrations of gas box needs backrocked,ducts need listed penetration protection details/call in inspection for top of wall firesafing inspections/framing ok pending other roughs/______contractor will provide observation letter for IN-DAPT unit attchements to structure and red iron onbservation reports/need revised listing for UL 419 cannot use American gyp | BERTW | BERTW | | BFR | P | 5340651 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 02/08/2017 | | CRAIGS | CRAIGS | | E= | C | 5409479 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 01/24/2017 | PANELS EL2-NC-1--- EL2-NC-2----ok --- need an epo on the air handler and the corridor needs completed | CRAIGS | CRAIGS | | E= | P | 5396958 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 01/24/2017 | | CRAIGS | CRAIGS | | E= | P | 5396950 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 01/24/2017 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | E= | C | 5396951 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/02/2016 | hard ceiling OK | CRAIGS | CRAIGS | | ER | P | 5358589 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 12/02/2016 | FIRE ALARM INSPECTION: hard ceilings ---------OK | CRAIGS | CRAIGS | | ER | P | 5358583 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/22/2016 | conduits into the panels OK | CRAIGS | CRAIGS | | ER | P | 5350882 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/09/2016 | in wall -- operating room , control room , storage OK | CRAIGS | CRAIGS | | ER | P | 5340065 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 11/09/2016 | in wall operating room -- 1 horn strobe -- conduit and box | CRAIGS | CRAIGS | | ER | P | 5340060 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 02/09/2017 | ALL OK | JERRYF | JERRYF | | H= | C | 5411304 |
MECHONE, INC. | H= | C | 01/31/2017 | ALL F/SD RETAINAGE AND ACCESS DOORS COMPLETE | JERRYF | JERRYF | | H= | C | 5402964 |
MECHONE, INC. | H= | P | 01/31/2017 | TAB REPORT RECEIVED - STILL NEED OTHER ITEMS ADDRESSED PER PREVIOUS NOTES | JERRYF | JERRYF | | H= | P | 5402235 |
MECHONE, INC. | HD | P | 01/25/2017 | F/SD FRAMING AND DAMPERS OK - AT FUTURE INSPECTION VERIFY RETAINAGE AND DUCT ACCESS DOORS NOTES: REVIEWED REVISED F/SD DAMPER SUPPORT DETAIL IN CONSTRUCTION OFFICE | JERRYF | JERRYF | | HD | P | 5398456 |
MECHONE, INC. | HD | P | 01/12/2017 | ABOVE CEILING OK IN OR OK - STILL NEED F/SD FRAMING INSPECTIONS IN CORRIDOR AT REVISED AREA NOTES: F/SD DAMPER ACCESS IN 2ND FLOOR MECH ROOM OK | JERRYF | JERRYF | | HD | P | 5387939 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 11/30/2016 | PRESSURE TEST OK - PIPING PER PLAN OK TO INSULATE - AHU PIPING OK - AT FUTURE INSPECTION VERIFY FINAL CONNECTIONS AT CHILLED COILS - ADD 2 PRE HEAT COILS AND 2 COOLING UNITS TO PERMIT | JERRYF | JERRYF | | HWP | P | 5356441 |
MECHONE, INC. | HD | P | 11/29/2016 | ABOVE CEILING SA/RA OK F/SD DAMPERS OK - AT FUTURE VERIFY DAMPER ACCESS - | JERRYF | JERRYF | | HD | P | 5355653 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 02/02/2017 | | TIM | TIM | | P= | C | 5405066 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/10/2016 | hybrid O. R. new sink, dwv and water in wall and ceiling ok, still need tie ins on dwv in basement ceiling and 2nd floor vent | TED | TED | | PTO | P | 5341340 |
OLSON PLUMBING & HEATING COMPANY | PTO | R | 11/09/2016 | call ahead number no good, would not go through to poc person | TED | TED | | PTO | R | 5340013 |