PEAK PROFESSIONAL CONTRS INC | B= | C | 03/07/2017 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 5432957 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 03/06/2017 | Building final OK pending all other finals complete. Additional Inspections Required (computer generated): RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5432694 |
PEAK PROFESSIONAL CONTRS INC | BFR | C | 03/06/2017 | All penetrations OK | NICK | NICK | | BFR | C | 5432693 |
PEAK PROFESSIONAL CONTRS INC | BSP | P | 01/27/2017 | Need UL listings for all through penetrations and inspection of penetrations / Fire caulk installed for most penetrations at time of inspection | NICK | NICK | | BSP | P | 5400476 |
PEAK PROFESSIONAL CONTRS INC | BSP | P | 12/20/2016 | corridor drywall installed per IBC 720.1(2) 13-1.1 for 1 hour rated wall ok / received architects stamped revision changing the detail from IBC 720.1(2)13-1.3 which required nails to IBC 720.1(2)13-1.1 which allows screws | ERICR | ERICR | | BSP | P | 5372497 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 12/07/2016 | Met on site with contractor / Wants to change listing from IBC for corridor walls / Need to have stamped by Architect / Framing for in fill corridor walls OK / Need all MEP's complete / Still need to attach plumbing | NICK | NICK | | BFR | P | 5362779 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 11/28/2016 | Need to attach plumbing / Need all MEP's complete / Reviewed accessible elements / Need Dr. office sink to be 34" max at final / Reviewed rated construction for corridor in fill walls detail D / using IBC 720.1(2) 13-1.3 / Need to inspect nail pattern for rated walls | NICK | NICK | | BFR | P | 5353688 |
RIAL HEATING AND AIR CONDITIONING, INC. | BSP | P | 11/21/2016 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical | DALEH | DALEH | | BSP | P | 5349874 |
PEAK PROFESSIONAL CONTRS INC | BSP | T | 11/21/2016 | PAID (REC#1383922) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 11-21-16 | TCRIPPEN | TCRIPPEN | | BSP | T | 5349831 |
EL PASO ELECTRIC, LLC. | E= | C | 03/06/2017 | | JOSEPH | JOSEPH | | E= | C | 5431979 |
EL PASO ELECTRIC, LLC. | E= | P | 03/03/2017 | install floor outlets in main area ---------- everything else is ok | CRAIG | CRAIG | | E= | P | 5430721 |
EL PASO ELECTRIC, LLC. | ER | P | 02/08/2017 | all ceilngs ok,except above panel "2 LA",leave open | JOHNN | JOHNN | | ER | P | 5409747 |
EL PASO ELECTRIC, LLC. | ER | R | 02/02/2017 | not ready j-boxes open, install 4 clips or 2 screws on all fixtures, support wire for fan complete re-inspect. | BRET | BRET | | ER | R | 5404961 |
EL PASO ELECTRIC, LLC. | ER | P | 01/12/2017 | hard lid complete | BRET | BRET | | ER | P | 5388167 |
EL PASO ELECTRIC, LLC. | ER | R | 01/05/2017 | could not find any area that needed inspected ceilings are not ready at this time. | BRET | BRET | | ER | R | 5382713 |
EL PASO ELECTRIC, LLC. | ER | P | 12/22/2016 | walls complete | BRET | BRET | | ER | P | 5374490 |
EL PASO ELECTRIC, LLC. | ER | P | 12/07/2016 | walls ok | BRET | BRET | | ER | P | 5362630 |
EL PASO ELECTRIC, LLC. | ER | P | 11/29/2016 | inside walls of exam rooms , corridor and book end walls not wired. remove old wiring and receptacles east side exam rooms under windows. | BRET | BRET | | ER | P | 5354607 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 03/07/2017 | MECHANICAL FINAL OK. TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 5432956 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 03/01/2017 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5427902 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 02/23/2017 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5422723 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 02/08/2017 | ABOVE CEILING ALL OK EXCEPT SECURE MINI-SPLIT CONDENSATE TUBING TO COPPER DRAIN LINE. INSTALL ALL RETURN GRILLS. STILL NEED ON-SITE FINAL INSPECTION. | NANCY | NANCY | | HD | P | 5409686 |
ARTISAN PIPE SYSTEMS, INC. | H= | C | 01/20/2017 | ALL FINAL CONNECTIONS COMPLETE | JERRYF | JERRYF | | H= | C | 5394179 |
ARTISAN PIPE SYSTEMS, INC. | HWP+ | C | 01/20/2017 | HUMIDIFIER PIPING RELOCATE OK | JERRYF | JERRYF | | HWP+ | C | 5394169 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 12/27/2016 | EF-1 EXHAUST DUCT AND FAN OK. EF-2 EXHAUST DUCT OK UP TO RESTROOM WALL, NO FAN YET. HP-5 SUPPLY TRUNK LINE AND LATERALS OK, OK TO WRAP. REST OF SUPPLIES OK, OK TO WRAP. NO FRESH AIR FOR SURGERY ROOM OR OPTICAL DISPLAY, HUMIDIFIER OR TRANSFER AIR YET. | NANCY | NANCY | | HD | P | 5376695 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | L | 12/22/2016 | JOB SITE LOCKED AT 3:00 PM? | NANCY | NANCY | | HD | L | 5375418 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 12/09/2016 | NEED MECHANICAL CONTRACTOR INSTALLING PIPING TO COILS TO ATTACH TO PERMIT. NEED PLUMBING CONTRACTOR ATTACHED TO PERMIT. OUTSIDE AIR TRUNK LINE AND LATERALS OK, OK TO WRAP. NO PLENUM HEATER OR DUCT THROUGH OUTSIDE WALL YET. | NANCY | NANCY | | HD | P | 5364141 |
ARTISAN PIPE SYSTEMS, INC. | P= | C | 03/03/2017 | correction made. | TAYLOR | TAYLOR | | P= | C | 5430812 |
ARTISAN PIPE SYSTEMS, INC. | P= | P | 03/02/2017 | need open front end toilet seat, rest ok. | TAYLOR | TAYLOR | | P= | P | 5429655 |
ARTISAN PIPE SYSTEMS, INC. | PTO+ | C | 12/21/2016 | move sink location | TED | TED | | PTO+ | C | 5373501 |
ARTISAN PIPE SYSTEMS, INC. | PTO | C | 12/16/2016 | aav on sinks in restroom 221 and flex room 234 at final, note: all other sinks are vented or cwv | TED | TED | | PTO | C | 5370362 |