ECHO CONSTRUCTION AND REMODELING INC. | B= | C | 10/18/2017 | | BOBF | BOBF | | B= | C | 5659881 |
ECHO CONSTRUCTION AND REMODELING INC. | BSP | P | 10/17/2017 | Splice: (no charge) removed north and west decks from scope. Provided guards per inspector's notes. | BPHILLIPS | BPHILLIPS | | BSP | P | 5657678 |
ECHO CONSTRUCTION AND REMODELING INC. | B= | R | 10/12/2017 | west and south decks have not been built, guards installed at openings / need CO detectors outside lower and upper level bedrooms / hand rails inside of house must return to walls at ends | BOBF | BOBF | | B= | R | 5653676 |
ECHO CONSTRUCTION AND REMODELING INC. | BFR | C | 06/15/2017 | eng letter for revised deck framing on file | BOBF | BOBF | | BFR | C | 5537388 |
ECHO CONSTRUCTION AND REMODELING INC. | BLA | C | 05/16/2017 | Correction made | JUSTINL | JUSTINL | | BLA | C | 5508302 |
ECHO CONSTRUCTION AND REMODELING INC. | BLA | P | 05/15/2017 | All light and electrical boxes need extension rings. | JUSTINL | JUSTINL | | BLA | P | 5506718 |
ECHO CONSTRUCTION AND REMODELING INC. | BFR | R | 05/12/2017 | need to complete elec rough / fur bulkhead in garage down to allow for R-30 insulation to be installed / need to revise plans for deck over garage / okay to insulate after elec rough has been completed | BOBF | BOBF | | BFR | R | 5505340 |
ECHO CONSTRUCTION AND REMODELING INC. | BIN | P | 05/11/2017 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 5503201 |
ECHO CONSTRUCTION AND REMODELING INC. | BFD | C | 05/10/2017 | | BOBF | BOBF | | BFD | C | 5501336 |
ECHO CONSTRUCTION AND REMODELING INC. | BFN | C | 05/10/2017 | letter for steel and eufer on file | BOBF | BOBF | | BFN | C | 5501335 |
ECHO CONSTRUCTION AND REMODELING INC. | BFT | C | 05/10/2017 | open hole, design and letter for footing on file / 3000/3000 | BOBF | BOBF | | BFT | C | 5501334 |
ECHO CONSTRUCTION AND REMODELING INC. | BFD | R | 05/09/2017 | open hole is for 3000#, design was for 5000# need to have enf review and provide letter or new design due to design exceeding open hole bearing pressure | BOBF | BOBF | | BFD | R | 5499926 |
ECHO CONSTRUCTION AND REMODELING INC. | BFD | P | 04/18/2017 | need open hole to verify drain requirements, need eng letters for footing and foundation and underslab insulation, need foundation design | BOBF | BOBF | | BFD | P | 5479317 |
ECHO CONSTRUCTION AND REMODELING INC. | BFN | P | 11/16/2016 | OK to use engineer | DAKOTAB | DAKOTAB | | BFN | P | 5345668 |
ECHO CONSTRUCTION AND REMODELING INC. | BFT | P | 11/14/2016 | Authorized Third Party Inspection, stamped observation letter to follow | JEREMYA | JEREMYA | | BFT | P | 5343361 |
HOMEOWNER | E= | C | 10/11/2017 | no ac or rough | CRAIG | CRAIG | | E= | C | 5651420 |
HOMEOWNER | E= | R | 10/06/2017 | outside outlets need to be wr/tr outlets ---------- remove gfi outlet for dishwasher and replace with normal outlet and gfi / afci breaker ---------- gfi fridge outlet with gfi / afci breaker --------- block nm cable in mech room on top side of wire ---------- install tr outlet in master closet -------- complete re inspect | CRAIG | CRAIG | | E= | R | 5647328 |
HOMEOWNER | ES | C | 10/02/2017 | Residential Underground: 200 - amp 3 Wire new service, ok to seal meter / | CRAIG | CRAIG | | ES | C | 5642681 |
HOMEOWNER | EUG | P | 09/25/2017 | 2" pvc from house to 20' south east of house --------- NOTE leave trench open where you tie in conduit | CRAIG | CRAIG | | EUG | P | 5635850 |
HOMEOWNER | ER | C | 05/16/2017 | | MATTHEW | MATTHEW | | ER | C | 5507337 |
HOMEOWNER | ER | R | 05/15/2017 | staple nm in center of stud or use stand offs, a few light boxes still need ground clips, ground basement fan box, need connector at main level bath, install outlet at master deck and at peninsula | MATTHEW | MATTHEW | | ER | R | 5506966 |
HOMEOWNER | ER | R | 05/12/2017 | complete re-inspect----- partial list: land circuits in panel and land all grounds, make up all grounds in boxes, install ground clip in light boxes and make up grounds, need 2 small appliance circuits, need dedicated 20 amp bath circuit for outlets, staple within 8" of boxes, finish wiring master bath, need exterior outlets for front and back, install mech room light, ground fan boxes, need nm connectors at ex-fans, land nm in range box with internal clamp, ----------- complete re-inspect | MATTHEW | MATTHEW | | ER | R | 5505363 |
WSM MECHANICAL | H= | C | 10/06/2017 | ALL CORRECTIONS MADE - DIRECT VENT FURNACE AND DIRECT VENT WATER HEATER | JERRYF | JERRYF | | H= | C | 5648248 |
WSM MECHANICAL | H= | P | 07/17/2017 | PROVIDE INSTALLATION INSTRUCTIONS FOR FURNACE AND WATER HEATER, NEED TO VERIFY VENTS ARE PROPERLY INSTALLED. COMPLETE CONDENSATE DRAINS FOR FURNACE AND WATER HEATER. INSTALLING SHEET ROCK ON WALL BETWEEN MECHANICAL ROOM AND BATHROOM? IF YES, MECHANICAL AND ADJACENT ROOMS LACK REQUIRED VOLUME FOR WATER HEATER COMBUSTION AIR REQUIREMENTS. COMPLETE 120 VOLT WIRING TO FURNACE. INSTALL FURNACE FILTER. SUPPORT DRYER VENT EVERY FOUR FEET. RANGE BTU'S? NOTE: FINISHED BASEMENT. HIGH/LOW GRILLS INTO MECHANICAL ROOM. OUTSIDE AIR TO FURNACE RETURN. NO A/C. DIRECT VENT FURNACE. | NANCY | NANCY | | H= | P | 5566242 |
WSM MECHANICAL | HC | C | 05/12/2017 | RELEASE METER | ACE | ACE | | HC | C | 5504919 |
WSM MECHANICAL | HI | C | 05/12/2017 | 10# test ok, 1" main, 1 furn, 1 w/h, 1 range (max load on range is 72k btu because of 50' of 1/2" black pipe). | ACE | ACE | | HI | C | 5504902 |
WSM MECHANICAL | HRR | C | 05/11/2017 | Correction made. Downstairs bedroom duct brought down through soffit. | ACE | ACE | | HRR | C | 5502565 |
WSM MECHANICAL | HRR | P | 05/08/2017 | Still need to drop downstairs bedroom duct down through soffit. Rest of duct ok. NOTES: No furnace of water heater vents installed yet, contractor states vents be very short and visible in unfinished mech room. Must be installed by final and visible. No plenum on furnace at this time. send pic of dropped duct to ace@pprbd.org | ACE | ACE | | HRR | P | 5499482 |
WSM MECHANICAL | HRR | R | 05/02/2017 | not ready. Need to change bath exhausts to insulated flex and route them outside of the house, drop supply run down through soffit in downstairs bedroom, add dryer vent, add water heater vent, add furnace, finish supply run from furnace, install furnace, all metal joints need sealed, NOTES: osa to return in place. | ACE | ACE | | HRR | R | 5493576 |
MISSION PLUMBING & HEATING | P= | C | 07/31/2017 | Corrections made. | CRADE | CRADE | | P= | C | 5580248 |
MISSION PLUMBING & HEATING | P= | P | 07/24/2017 | Certificate of potable water to scanning.Note:Still need to see back flow device in well pit for yard hydrant. | CRADE | CRADE | | P= | P | 5573059 |
MISSION PLUMBING & HEATING | P= | P | 07/10/2017 | Need back flow device in well pit for yard hydrant.Need certification of potable water.Rest ok.Note:unfinished bathroom in basement,upstairs hall bath lav and water closet only,no irrigation stub. | CRADE | CRADE | | P= | P | 5559222 |
MISSION PLUMBING & HEATING | PTO | C | 05/03/2017 | Note:Unfinished walk out,Up stairs main bath water closet and lav only, stub for future tub and valve,need back flow on yard hydrant by final.Need certificate of potable water by final. | CRADE | CRADE | | PTO | C | 5494860 |
MISSION PLUMBING & HEATING | PWO | C | 05/02/2017 | Corrections made.Note:Need certificate of potable water by final. | CRADE | CRADE | | PWO | C | 5493594 |
HOMEOWNER | PWO | P | 04/19/2017 | Water line needs to be 6" below frost line under footer. | CRADE | CRADE | | PWO | P | 5480136 |
MISSION PLUMBING & HEATING | PB | C | 04/11/2017 | OK, H2O under footer Note: need potable water certificate by final | SHANEN | SHANEN | | PB | C | 5472075 |