THE WRIGHT GROUP, LLC | B= | C | 05/02/2018 | Sign off | JEREMYA | JEREMYA | | B= | C | 5833468 |
THE WRIGHT GROUP, LLC | B= | P | 04/26/2018 | Temp CO: partials ( Expires: 5/26/2018 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 5828840 |
THE WRIGHT GROUP, LLC | B= | P | 04/25/2018 | Rails under stairs OK / door hardware issue from Apr 28 complete / all remaining guest rooms OK / laundry chute & storage areas OK / hotel complete pending other Finals / NOTE - patio rail at rear is not installed - Contractor to provide Splice showing this deletion / NOTE - indoor pool is under Permit L11731. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, CONDITIONED AIR CORPORATION Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5827521 |
THE WRIGHT GROUP, LLC | BFN | C | 04/25/2018 | Paperwork on file | RICHB | RICHB | | BFN | C | 5827514 |
THE WRIGHT GROUP, LLC | BFT | C | 04/25/2018 | Paperwork on file | RICHB | RICHB | | BFT | C | 5827512 |
THE WRIGHT GROUP, LLC | BFN | P | 04/24/2018 | Observation reports on file ok/need pool addressed | BERTW | BERTW | | BFN | P | 5825822 |
THE WRIGHT GROUP, LLC | BFT | P | 04/24/2018 | Observation reports on file ok/need pool addressed | BERTW | BERTW | | BFT | P | 5825820 |
THE WRIGHT GROUP, LLC | B= | P | 04/24/2018 | Still need paperwork to complete BFT & BFN / re-inspection of items from Apr 23 - still need rails under stairs, all other items complete / 4th floor guest rooms - need door hardware completed at all Type D7 (sliding barn) doors - all guest rooms OK otherwise / 3rd floor guest rooms - need D7 doors completed (same as 4th floor) - discussed accessible elements for "ADA" rooms - rooms 301 through 306 OK, still need all other guest rooms on this floor -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, CONDITIONED AIR CORPORATION Mechanical Final Inspection is not C | RICHB | RICHB | | B= | P | 5825500 |
THE WRIGHT GROUP, LLC | B= | P | 04/23/2018 | Need to complete fdn // Need stamped open hole // Seal penetrations in mech room // Need safety equipment and emergency numbers in pool area // Need to put rails under stairs to avoid 6'8" head knocker // Need under sink pipe protection in restrooms // Only inspected public areas, all units still need to be walked -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, CONDITIONED AIR CORPORATION Mechanical Final Inspection is not Completed yet, EMF ELECTRICAL CORPORATION Electrical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5824372 |
THE WRIGHT GROUP, LLC | BSP | P | 04/20/2018 | met on site with contractor to discuss inspection process for final and TCO / discussed need to complete BFN - still need open hole and engineer observation | DANE | DANE | | BSP | P | 5822767 |
THE WRIGHT GROUP, LLC | BSP | P | 03/14/2018 | Fire extinguisher cabinet opening sheetrock - all corridors OK | RICHB | RICHB | | BSP | P | 5789055 |
THE WRIGHT GROUP, LLC | BSP | P | 03/14/2018 | Frame & 1st layer of sheetrock on elevator shaft (controls & door wall only) - 3rd & 4th floor OK / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5789053 |
THE WRIGHT GROUP, LLC | BSP | P | 03/12/2018 | Post-rock ceiling firestop - corridor on 1st floor OK, still need laundry chute closet (in Laundry C109) inspected - all other grid ceiling areas on 1st floor OK | RICHB | RICHB | | BSP | P | 5786570 |
THE WRIGHT GROUP, LLC | BSP | P | 03/06/2018 | Elevator shaft wall - 1st layer of sheetrock on 1st floor OK / discussed required inspections for this area on all levels with Contractor | RICHB | RICHB | | BSP | P | 5781663 |
THE WRIGHT GROUP, LLC | BSP | P | 03/05/2018 | Fire extinguisher cabinet mockup (on 4th floor) in rated corridor - framing & sheetrock OK | RICHB | RICHB | | BSP | P | 5779754 |
THE WRIGHT GROUP, LLC | BSP | P | 03/01/2018 | Post-rock ceiling firestop - corridors on 2nd, 3rd & 4th floors OK - still need to inspect elevator lobbies on these floors | RICHB | RICHB | | BSP | P | 5777613 |
THE WRIGHT GROUP, LLC | BSP | P | 02/16/2018 | 1st floor post-rock ceiling firestop - additional fire sprinkler penetrations in Lobby (C102) OK, portions of Pool (C119 & C119a) framed for 10' hard lid OK | RICHB | RICHB | | BSP | P | 5768108 |
THE WRIGHT GROUP, LLC | BSP | P | 02/15/2018 | 1st floor post-rock ceiling firestop - lobby OK / discussed remaining firestop inspections | RICHB | RICHB | | BSP | P | 5766866 |
THE WRIGHT GROUP, LLC | BSP | P | 01/29/2018 | Framing for 2-hour laundry chute wall (intake door side only) OK on 2nd & 3rd floors / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5749976 |
THE WRIGHT GROUP, LLC | BSP | P | 01/22/2018 | Met with Dave (Wright Group) - discussed post-rock inspections, firestopping at PVC penetrations in pool room ceiling, accessibility and rated fire extinguisher cabinets in corridors / inspected mechanical room ceilings & wall penetrations | RICHB | RICHB | | BSP | P | 5744315 |
THE WRIGHT GROUP, LLC | BSP | P | 01/11/2018 | Reviewed rated exterior wall requirements (including mechanical room) / alternating tread device OK / training with Noah (rated assemblies, types of construction, alternating tread devices) | RICHB | RICHB | | BSP | P | 5736199 |
THE WRIGHT GROUP, LLC | BSP | P | 12/12/2017 | 1st floor ceiling firestopping - OK in guest rooms from Gridline 12 through 18 - still need corridor & North portion of 1st floor inspected / discussed alternating tread devices including handrail continuity & termination / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5710725 |
THE WRIGHT GROUP, LLC | BIN | P | 12/08/2017 | 1st floor thermal - C129 (Electrical) OK / training with Shaun - commercial thermal envelope / plans reviewed onsite | RICHB | RICHB | | BIN | P | 5707976 |
THE WRIGHT GROUP, LLC | BSP | P | 12/08/2017 | Training with Rich on commercial insulation | SHAUN | SHAUN | | BSP | P | 5707975 |
THE WRIGHT GROUP, LLC | BFR | P | 12/06/2017 | 1st floor frame & firestop - Rooms 125A & 129 OK / courtesy walk on upper levels to check status of firestopping in rated ceiling assemblies in corridors | RICHB | RICHB | | BFR | P | 5705329 |
THE WRIGHT GROUP, LLC | BFR | P | 12/01/2017 | 1st floor interior shear - 119 (north wall) and 125 (north & south walls) OK / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5700552 |
THE WRIGHT GROUP, LLC | BIN | P | 11/21/2017 | 1st floor thermal insulation - Pool C119 & Meeting C125 OK | RICHB | RICHB | | BIN | P | 5692085 |
THE WRIGHT GROUP, LLC | BSP | P | 11/20/2017 | 1st floor structural sheathing - pool & pool mech OK (See Walls 2 on S2) / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5690510 |
THE WRIGHT GROUP, LLC | BFR | P | 11/20/2017 | Meeting room frame & firestop - field cancelled by Dave | RICHB | RICHB | | BFR | P | 5690502 |
THE WRIGHT GROUP, LLC | BFR | P | 11/17/2017 | 1st floor frame & firestop - Rooms C114, C115, C117 & C119 OK | RICHB | RICHB | | BFR | P | 5689374 |
THE WRIGHT GROUP, LLC | BIN | P | 11/16/2017 | 1st floor thermal insulation - common areas on East side (north half of the building) OK | RICHB | RICHB | | BIN | P | 5687955 |
THE WRIGHT GROUP, LLC | BFR | P | 11/07/2017 | 1st floor frame & firestop - Still need to inspect Pantry C124, Mech C114, Pool C119 & Elec C129 - all other rooms OK / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5679363 |
THE WRIGHT GROUP, LLC | BSP | P | 11/03/2017 | 1st floor interior shear - Rooms 105, 107, 108 & 109 OK | RICHB | RICHB | | BSP | P | 5676090 |
THE WRIGHT GROUP, LLC | BSP | P | 10/31/2017 | First floor thermal insulation - rooms 103, 106, 107, 108, 109, 111 okay / elevator shaft first floor rock wool okay. / training with Noah | RICHB | RICHB | | BSP | P | 5672657 |
THE WRIGHT GROUP, LLC | BIN | P | 10/30/2017 | 2nd floor thermal insulation - Storage C203 OK / 1st Floor Thermal Insulation - Rooms 101, 102 & 104 OK | RICHB | RICHB | | BIN | P | 5671202 |
THE WRIGHT GROUP, LLC | BFR | P | 10/30/2017 | 2nd floor - frame & firestop Storage C203 OK | RICHB | RICHB | | BFR | P | 5671196 |
THE WRIGHT GROUP, LLC | BSP | P | 10/27/2017 | Elevator shaft - 2nd & 3rd floor rock wool OK / Laundry Chute - rock wool on 3 sides OK, other side will be completed once chute is installed / 2nd floor electrical - firestop OK / 1st floor pool - WWF reinforcing on slab OK, R-10 minimum 2' horizontal OK / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5670038 |
THE WRIGHT GROUP, LLC | BFR | P | 10/27/2017 | 1st floor frame & firestop - Rooms 101-109 & 111 OK | RICHB | RICHB | | BFR | P | 5670021 |
THE WRIGHT GROUP, LLC | BFR | P | 10/25/2017 | 1st floor guest room ceilings - BCI's in Rooms 101, 102, 103, 104, 105, 106, 107, 108, 109 & 111 OK - no other framing items inspected / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5667194 |
THE WRIGHT GROUP, LLC | BIN | P | 10/18/2017 | South stairwell - thermal insulation OK - rated assemble Wall Type 5 has already been inspected / 2nd floor - TENMAT light covers and ceilings OK in all units / 4th floor laundry chute - rock wool insulation OK on 3 sides - side with the opening will be framed & insulated once chute is installed | RICHB | RICHB | | BIN | P | 5659822 |
THE WRIGHT GROUP, LLC | BSP | P | 10/16/2017 | North stair thermal insulation OK - training with Justin | RICHB | RICHB | | BSP | P | 5656919 |
THE WRIGHT GROUP, LLC | BSP | P | 10/16/2017 | 2nd floor interior shear - entire floor OK / training with Justin on RC channel installation, shear walls, thermal insulation for walls & attics | RICHB | RICHB | | BSP | P | 5656896 |
THE WRIGHT GROUP, LLC | BSP | P | 10/12/2017 | 2nd floor bathroom lids & TENMAT light covers - Rooms 201-210 OK | RICHB | RICHB | | BSP | P | 5653785 |
THE WRIGHT GROUP, LLC | BFR | P | 10/12/2017 | 2nd floor frame & firestop - previous items completed | RICHB | RICHB | | BFR | P | 5653778 |
THE WRIGHT GROUP, LLC | BFR | P | 10/11/2017 | 2nd floor frame & firestop - OK in rooms 211, 213, 214, 215, 219, 223, 226 & 228 / need plate penetrations at bathroom firestopped in 216, 217, 218, 222, 224 & 230 / need plate penetrations firestopped & putty pads installed in 212, 225, 227, 229 &231 / need top plates repaired in 217 at electrical & comm sleeves | RICHB | RICHB | | BFR | P | 5652255 |
THE WRIGHT GROUP, LLC | BIN | P | 10/11/2017 | 2nd floor thermal insulation - OK in Rooms 201 through 210 | RICHB | RICHB | | BIN | P | 5652237 |
THE WRIGHT GROUP, LLC | BSP | P | 10/04/2017 | 2nd floor framing & firestop - Rooms 201 through 206 OK pending other roughs, Rooms 208 through 210 OK pending other roughs / Room 207 has duct penetrations at top plate in bathroom that cannot be firecaulked (top plate broken off) - need fix in this room / training with Shaun / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5645309 |
THE WRIGHT GROUP, LLC | BSP | P | 09/26/2017 | 3rd floor - TENMAT light cover inspection prior to sheetrock - need covers replaced in Rms 303 & 322 (damaged during installation) - need covers adjusted for clearance to fixture in Rms 302, 304, 306 & 307 // need firestopping completion on (1) plumbing penetration in bathroom ceiling chase Rm 302 // training with Luke S on fire resistive construction & thermal insulation | RICHB | RICHB | | BSP | P | 5637318 |
THE WRIGHT GROUP, LLC | BIN | P | 09/25/2017 | 3rd floor thermal insulation - still need hole in bottom plate fixed in Rm 330 (see BFR inspection 15-Sep), firestop corrections were made in (2) rooms during walk, all guest rooms on this floor OK / discussed TENMAT installation with Dave - will wait until RC is complete before inspection / permit set reviewed onsite | RICHB | RICHB | | BIN | P | 5636491 |
THE WRIGHT GROUP, LLC | BFR | P | 09/19/2017 | North & South stair framing (stringers, exterior walls & landings) OK - Type 5 (interior) framing has already been inspected / 3rd floor bathrooms - plumbing chase lid firestopping OK in all guest rooms | RICHB | RICHB | | BFR | P | 5630766 |
THE WRIGHT GROUP, LLC | BFR | P | 09/15/2017 | 3rd floor framing & firestop - Room 330 needs (1) hold down anchor rod installed (back left) and large hole in bathroom sill plate sealed - all other guest rooms on this floor OK (previous items completed) - permit set reviewed onsite | RICHB | RICHB | | BFR | P | 5627875 |
THE WRIGHT GROUP, LLC | BSP | P | 09/14/2017 | 4th floor bathroom chase firestopping - all rooms OK on this floor / 4th floor TENMAT light covers need adjustment in rooms 411, 412, 413, 414, 415, 417, 419, 422 and 423 | RICHB | RICHB | | BSP | P | 5625803 |
THE WRIGHT GROUP, LLC | BFR | P | 09/14/2017 | 3rd floor framing & firestop - Rooms 301 through 308 OK, Room 309 needs many putty pads, room 310 OK / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5625789 |
THE WRIGHT GROUP, LLC | BSP | P | 09/12/2017 | Thermal insulation 4th floor - Rooms 414, 413, 4132, 411, 410, 409, 408, 407, 406, 405, 404, 403, 402 & Storage C303 OK / discussed TENMAT light cover integration with RC channel - needs special attention during install to make sure light cover seats against drywall per mfr / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5623897 |
THE WRIGHT GROUP, LLC | BSP | P | 09/08/2017 | Discussed Wall Type 5 at elevator shaft and Corridor C100 - wall is double-framed and may need a different wall type specified / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5620531 |
THE WRIGHT GROUP, LLC | BFR | P | 09/08/2017 | Wall framing - Room C129, North & East walls OK - still need rest of room inspected / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5620530 |
THE WRIGHT GROUP, LLC | BSP | P | 09/07/2017 | 4th floor corridor walls - RC channel on Wall Type 2 OK / 4th floor ceiling RC - Room 425 OK / firestopping items from Sept 6 BSP corrected / discussed Wall Type 5 at exit stairs / permit set reviewed onsite | RICHB | RICHB | | BSP | P | 5619247 |
THE WRIGHT GROUP, LLC | BSP | R | 09/06/2017 | Need top plate penetrations firestopped in C402 Vending and 417 - yellow electrical wiring | RICHB | RICHB | | BSP | R | 5618162 |
THE WRIGHT GROUP, LLC | BIN | P | 09/06/2017 | Thermal insulation 4th floor - Rooms 428, 427, 426, 425, 424, 423, 422, 420, 419, 418, 417, 416, 415, 413 & Vending C412 OK / plans reviewed electronically | RICHB | RICHB | | BIN | P | 5618096 |
THE WRIGHT GROUP, LLC | BFR | P | 09/06/2017 | RC on lid of 4th floor corridor OK / discussed the need for RC inspections in rooms with Dave | RICHB | RICHB | | BFR | P | 5618092 |
THE WRIGHT GROUP, LLC | BIN | P | 09/01/2017 | Thermal insulation in Rooms 429, 430, 431 & Storage C303 OK / plans reviewed onsite | RICHB | RICHB | | BIN | P | 5614456 |
THE WRIGHT GROUP, LLC | BSP | P | 09/01/2017 | Pool reinforcement OK - bonding observed in 10 places (noted on Electrical Inspection) - stamped plans reviewed onsite / TENMAT FF109-300 light covers in all 4th floor bathrooms OK per mfr installation instructions | RICHB | RICHB | | BSP | P | 5614438 |
THE WRIGHT GROUP, LLC | BSP | P | 08/31/2017 | Discussed installation requirements for TENMAT light covers being used on 4th floor for fire rating - will need to verify installation prior to sheetrocking the lids / discussed pool rebar inspection requirements - plumbing inspection not required for process water / discussed inspection sequencing for rated wall assemblies at stairs / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5613362 |
THE WRIGHT GROUP, LLC | BFR | P | 08/31/2017 | 1st floor corridor framing OK / discussed firestopping requirements in same area / contractor to remove OSB at wall type 5 in one section | RICHB | RICHB | | BFR | P | 5613339 |
THE WRIGHT GROUP, LLC | BSP | P | 08/31/2017 | Discussed pre-rock requirements and inspection sequencing - mockup on 4th floor bathroom OK / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5613327 |
THE WRIGHT GROUP, LLC | BFR | P | 08/21/2017 | Frame & firestop on 4th floor - need (1) putty pad in Rm 420 - complete other roughs / discussed rated light covers being used on 4th floor - need Product Data & listing for these items / walked with Dave (Superintendent) / permit set reviewed on-site | RICHB | RICHB | | BFR | P | 5602496 |
THE WRIGHT GROUP, LLC | B16 | P | 08/10/2017 | Met with John Nuss (Electrical Insp) - reviewed rated light covers - need Product Data and listing for products being used | RICHB | RICHB | | B16 | P | 5591245 |
THE WRIGHT GROUP, LLC | BSP | P | 08/07/2017 | Exterior shear OK throughout // Hold downs installed at all specified locations, as well as throughout the building at all shear walls | JEREMYA | JEREMYA | | BSP | P | 5588300 |
THE WRIGHT GROUP, LLC | BSP | R | 08/01/2017 | Cancelled at call ahead | JEREMYA | JEREMYA | | BSP | R | 5581734 |
THE WRIGHT GROUP, LLC | BSP | P | 07/28/2017 | 3rd Floor corridor and interior unit shear OK throughout | JEREMYA | JEREMYA | | BSP | P | 5579714 |
THE WRIGHT GROUP, LLC | BSP | P | 07/26/2017 | On-site consult with super and PM. Discussed fire rated assemblies in the exit enclosures and how to remedy the fact that they are currently built as non-rated walls. Discussed exhaust fans, draftstop and insulation in attic spaces. Will need to confer more with senior personnel. Discussed the fire rating and construction of the Porte Cachere. | JEREMYA | JEREMYA | | BSP | P | 5577113 |
THE WRIGHT GROUP, LLC | BSP | P | 07/25/2017 | All truss hardware OK through entire upper floor // Header to King Stud straps installed throughout entire upper floor | JEREMYA | JEREMYA | | BSP | P | 5575747 |
THE WRIGHT GROUP, LLC | BSP | P | 07/24/2017 | Met on-site with contractor and mechanical contractor. They were informed that the framing for the dampers would need to be inspected by the mechanical inspector for this project. We did discuss how to construct the "cans" that go on-top of the Potteroff dampers that are approved for this project and being able to get the R-38 insulation in the roof system. Mech contractor will be contacting his mech inspector to discuss further. | JEREMYA | JEREMYA | | BSP | P | 5574333 |
THE WRIGHT GROUP, LLC | BSP | P | 07/24/2017 | Site visit, discussed continuity of fire barriers at stair towers (exit enclosures). The way theya re currently built will not allow for the drywall to be slid past the stringers, therefore, interupting the continuity. Also discussed fire protection of the Porte Cachere. There are details on the approved plans for intumescent spray and a drywall wrap. Contractor will have his PM contact architect and have stamped details drawn and spliced into the approved plans. | JEREMYA | JEREMYA | | BSP | P | 5574332 |
THE WRIGHT GROUP, LLC | BSP | P | 07/21/2017 | Started walking 4th floor. Hold downs on south half of building in place. The uplift connections being used for the trusses are H2.5T's. Need to re-walk the building and anywhere there is an uplift greater than 545 lbs, H2.5T's will need to be added or an appropriate connection for the uplift needs to be installed. Also found a lot of H2.5T's installed backwards, these are specific to left and right. Contractor is also going to get the most recent splice sheet fixed for the roof trusses. In Feb. 2017 a splice was done that changed the roof truss plan to remove the steel beams. In June 2017, a splice was done that added the beams back in. The beams are NOT installed. Also discussed draft stop in the attic and damper installation. More research will be needed to conclude that conversation. Discussed the Porte Cachere and whether or not it needed fire protection. | JEREMYA | JEREMYA | | BSP | P | 5572588 |
THE WRIGHT GROUP, LLC | BSP | P | 07/18/2017 | 4th floor, interior shear OK at all suites and corridors EXCEPT room 431, they missed the top seam // No hold downs done today | JEREMYA | JEREMYA | | BSP | P | 5568147 |
THE WRIGHT GROUP, LLC | BSP | P | 07/05/2017 | Not required | JEREMYA | JEREMYA | | BSP | P | 5555229 |
THE WRIGHT GROUP, LLC | BSP | P | 06/29/2017 | fire safe insulation installed above fire blocking and headers in north and south stair towers / 2nd layer of fire barrier of interior of north and south stair towers completed to top of fourth story per GA listing 4230 ok | ERICR | ERICR | | BSP | P | 5550653 |
THE WRIGHT GROUP, LLC | BSP | P | 06/27/2017 | shear wall at interior of south stair tower ok to top of fourth floor / fire safe insulation installed above headers and fire blocking in both stair towers to top of third floor | ERICR | ERICR | | BSP | P | 5548112 |
THE WRIGHT GROUP, LLC | BSP | P | 06/26/2017 | north side of elevator shaft fourth floor shear ok / need type 1 shear detail completed in south stair shaft 3" edge nailing not 4" | ERICR | ERICR | | BSP | P | 5546440 |
THE WRIGHT GROUP, LLC | BSP | P | 06/20/2017 | Inspected 2nd layer of fire barrier on interior of south stair enclosure to top of third floor / inspected fire safe insulation above headers and fire blocking in south stair tower / reviewed the exterior rated wall of the stair enclosure with Dave need to have continuity through the stair stringers with type x gypsum board | ERICR | ERICR | | BSP | P | 5540688 |
THE WRIGHT GROUP, LLC | BSP | P | 06/19/2017 | inspecting first layer of fire barrier on inside of south stair enclosure / reviewed rating of column protection on portacochere the columns need a 1 hour listing | ERICR | ERICR | | BSP | P | 5539321 |
THE WRIGHT GROUP, LLC | BSP | P | 06/15/2017 | training with Bert Warchol / Need wall intersection details for room fire partition walls / need to fire barrier walls to have continuity around stair enclosures / exterior wall shows type x board being continuous vertically through stair landings they are not built this way / need a design on laundry chute shaft to maintain listing of fire barrier on in side of shaft / inspected shear wall screwing of plates on exterior wall need to finish screwing and recall | ERICR | ERICR | | BSP | P | 5536712 |
THE WRIGHT GROUP, LLC | BSP | P | 06/14/2017 | inspected shear walls on interior room walls on 1st and 2nd floor checked one side of double shear walls marked ones that passed with an orange X / 3rd floor not ready / need a detail for the change in steel column protection from UL Y717 to Intumescent paint used | ERICR | ERICR | | BSP | P | 5535454 |
THE WRIGHT GROUP, LLC | BSP | P | 06/13/2017 | inspected 4 th floor sheathing nailing / inspected 1st and 2nd floor corridor shear walls marked walls that passed with an orange X / need a detail for shear walls at stair enclosures where it is pre rocked for joist hangers and shear was not done prior to pre rocking. | ERICR | ERICR | | BSP | P | 5533681 |
THE WRIGHT GROUP, LLC | BSP | T | 06/09/2017 | PAID (REC#1431021) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | BSP | T | 5530455 |
THE WRIGHT GROUP, LLC | BSP | T | 06/07/2017 | PAID (REC#1430232) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revised floor plan and structural | SHELLEY | SHELLEY | | BSP | T | 5528766 |
THE WRIGHT GROUP, LLC | BSP | P | 06/02/2017 | 2nd layer of fire barrier on elevator shaft at joist bearing point ok / 2nd layer for joist bearing and rock wool ok for north stair tower ok / reviewed floor assembly with Dave for rated floor ceiling | ERICR | ERICR | | BSP | P | 5523697 |
THE WRIGHT GROUP, LLC | BSP | P | 05/31/2017 | inspected 1 st layer of stair side of north stair enclosure interior fire barriers to 3rd floor floor/ checked stagger pattern of second layer with Dave of fire barrier per GA 4230 listing / checked fire safe insulation above door headers in north stair tower to 4th floor ok | ERICR | ERICR | | BSP | P | 5522042 |
THE WRIGHT GROUP, LLC | BSP | P | 05/31/2017 | inspected south stair tower interior shear wall to top of third floor / inspected interior and exterior shear wall plate to rim joist screwing on second floor ok/ interior shear walls on second floor need blocking at panel splices / reviewed GA 4230 being used for fire barriers of stair enclosures the joints on first layer need to staggered from each other on either side of wall / the fire barriers need to have continuity vertically and horizontally they can't stop at a wall and start on the other side they need to continue behind walls / Reviewed this with drywaller and Dave PM | ERICR | ERICR | | BSP | P | 5521285 |
THE WRIGHT GROUP, LLC | BSP | P | 05/30/2017 | Fire safe insulation in south stair tower in 1 st floor shear wall above fire blocking ok | ERICR | ERICR | | BSP | P | 5520605 |
THE WRIGHT GROUP, LLC | BSP | P | 05/30/2017 | south stair shear wall to third floor ok / third floor north wall shear of elevator shaft ok / discussed with Dave staggering base layers joints of GA 4230 for shafts from side to side | ERICR | ERICR | | BSP | P | 5519787 |
THE WRIGHT GROUP, LLC | BSP | P | 05/22/2017 | 2nd and 3rd floor sheathing nailing ok / 3 rd floor pre rock at stair towers ok / need a T wall detail for GA W 4230 2 hr walls / spoke with Dave about joint staggers on stair tower 2 hr wall rock before joist need to stagger at least a stud bay | ERICR | ERICR | | BSP | P | 5513546 |
THE WRIGHT GROUP, LLC | BSP | P | 05/12/2017 | inspected shear on second floor at north side of elevator shaft / inspected shear on 3rd floor exterior walls / shear walls inspected marked with a orange X | ERICR | ERICR | | BSP | P | 5504463 |
THE WRIGHT GROUP, LLC | BSP | P | 05/02/2017 | discussed with Dave PM on site change of type 5 wall from U334 to WP4230 and the need to inspect installation of mineral wool insulation before it is covered | ERICR | ERICR | | BSP | P | 5493377 |
THE WRIGHT GROUP, LLC | BSP | P | 04/26/2017 | the listing for type 5 walls U334 requires base layer of 5/8 type x to be hung vertically it was installed horizontally need to change / inspecting pre rock for joist hanger installation around stair enclosures and elevator enclosure | ERICR | ERICR | | BSP | P | 5487514 |
THE WRIGHT GROUP, LLC | BSP | C | 04/18/2017 | inspected 1 st floor hold downs to foundation hold down inspected is marked with red paint / inspected 1 st floor shear walls walls marked with a red X or Arrow are ok / inspected east 2nd floor exterior wall for shear ok | ERICR | ERICR | | BSP | C | 5478655 |
THE WRIGHT GROUP, LLC | BSP | P | 04/17/2017 | reviewed fire barriers and exit enclosures with Dave on site PM / discussed intamecent paint for steel protection application and inspections / mech room under slab thermal and vapor barrier installed | ERICR | ERICR | | BSP | P | 5477694 |
THE WRIGHT GROUP, LLC | BFI | P | 03/14/2017 | mechanical room ok / need to inspect pool and mech room | ERICR | ERICR | | BFI | P | 5440002 |
THE WRIGHT GROUP, LLC | BFI | P | 03/13/2017 | R10 installed horizontally every where except electrical room and mechanical room | ERICR | ERICR | | BFI | P | 5438637 |
THE WRIGHT GROUP, LLC | BSP | T | 02/23/2017 | PAID (REC#1404840) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: revised framing details | BPHILLIPS | BPHILLIPS | | BSP | T | 5423124 |
THE WRIGHT GROUP, LLC | BFI | P | 02/23/2017 | R10 under slab insulation ok from grid D to column line 11 and from grid C to column line 13 / | ERICR | ERICR | | BFI | P | 5422823 |
THE WRIGHT GROUP, LLC | BSP | P | 01/25/2017 | PLAN SPLICE: (No Fee) by: DANM for Construction: Revised r-value and configuration of slab insulation | DANM | DANM | | BSP | P | 5398766 |
THE WRIGHT GROUP, LLC | BSP | P | 01/24/2017 | progress meeting with Dave Purdue, discussed items needed for inspections and preconstruction meeting. | NATHAN | NATHAN | | BSP | P | 5396660 |
THE WRIGHT GROUP, LLC | BFI | P | 01/13/2017 | 2'-0 of R10 installed vertically around entire foundation perimeter on interior side / need Revised envelope compliance / see notes on previous BFI inspection | ERICR | ERICR | | BFI | P | 5388577 |
THE WRIGHT GROUP, LLC | BFI | P | 01/12/2017 | envelope compliance calls for R 6 to be 3'-0 vertical on foundation walls / Dave site super installed 2'-0 of R10 vertical and is going to install 2'-0 vertical under slab / i asked him to get an RFI from architect on this design / at this time they R10 vertically installed on west wall from south wall to grid line 10, installed R10 vertically on entire south wall, and installed R10 vertically on west wall from south wall to grid line 6 on foundation plans/ need third party inspection paper work to complete open hole,footer and foundation inspections reviewed this with Dave site super / Reviewed envelope compliance with Dave | ERICR | ERICR | | BFI | P | 5387475 |
THE WRIGHT GROUP, LLC | BSP | P | 12/13/2016 | on site meeting with Inspector Nathan Rodeback and job super Dave | BERTW | BERTW | | BSP | P | 5367182 |
THE WRIGHT GROUP, LLC | BSP | P | 12/13/2016 | site visit with Bert Warchol for beginning of project 5A building 4 story, mixed occupancy of R1, A1, A3, B , M, / point of contact Dave Purdum SEE NOTES FOR CONTACT #. | NATHAN | NATHAN | | BSP | P | 5367055 |
THE WRIGHT GROUP, LLC | BFT | P | 12/12/2016 | Talked with Dave job super reviewed elevator pit dimensions and need approved plans on site. OK to use engineer to do footing and foundation inspections with all observation reports and open hole report to be picked up by inspector | BERTW | BERTW | | BFT | P | 5366090 |
EMF ELECTRICAL CORPORATION | E= | C | 04/24/2018 | | JOHNN | JOHNN | | E= | C | 5825071 |
EMF ELECTRICAL CORPORATION | E= | P | 04/11/2018 | all a/c cond outside: tighten all sealtite connectors wrench tight, white wire needs to be colored as a phase color, lighted bath mirror missing: 230,pool, still need panic hardware at service,ptac bases, patio conductors are in box,but patio is not complete, | JOHNN | JOHNN | | E= | P | 5814086 |
EMF ELECTRICAL CORPORATION | E= | R | 04/10/2018 | open conductors need to be capped off and in a box, patio not ready, label all condensers with uv labels or paint marker, panic hardware 2 doors, outside outlets not on, strap sealtite at condensers, need ptac bases, missing 1 lighted mirror in pool bath,-------------------stairwells and site lights,ok--previous corrections made, | JOHNN | JOHNN | | E= | R | 5812780 |
EMF ELECTRICAL CORPORATION | E= | P | 04/09/2018 | exercise rm : floor outlet needs handle tie, pool sump pump:gfci cb, ptac's: at least 2 units need factory base with outlet connected,staff break rm, pantry: ice machine outlet not working, 1st floor bath rm and several other rms missing lighted mirror, arc reduction switch:label, electrical rm panic hardware, ---------------------still need to look at: stairwells, site lighting, grd level a/c's outside... | JOHNN | JOHNN | | E= | P | 5811326 |
EMF ELECTRICAL CORPORATION | E= | R | 04/02/2018 | see rough notes | MIGUEL | MIGUEL | | E= | R | 5805191 |
EMF ELECTRICAL CORPORATION | ER | R | 04/02/2018 | cancelled by contractor on site (Robert) | MIGUEL | MIGUEL | | ER | R | 5805188 |
EMF ELECTRICAL CORPORATION | E= | P | 04/02/2018 | FIRE ALARM INSPECTION: | MIGUEL | MIGUEL | | E= | P | 5805187 |
EMF ELECTRICAL CORPORATION | ER | P | 04/02/2018 | FIRE ALARM INSPECTION: on site to sign red card / | MIGUEL | MIGUEL | | ER | P | 5805180 |
EMF ELECTRICAL CORPORATION | E= | L | 03/29/2018 | called call a head number to find the contractor and got voice mail 4:55 pm | CRAIGS | CRAIGS | | E= | L | 5803181 |
EMF ELECTRICAL CORPORATION | E= | P | 03/21/2018 | all panel labels/schedules, except: HD-1,LD, 2 elevator cb's, | JOHNN | JOHNN | | E= | P | 5795195 |
EMF ELECTRICAL CORPORATION | E= | C | 03/21/2018 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | E= | C | 5795188 |
EMF ELECTRICAL CORPORATION | ESL | P | 03/21/2018 | floor outlet in exercise rm, | JOHNN | JOHNN | | ESL | P | 5795186 |
EMF ELECTRICAL CORPORATION | E= | P | 03/20/2018 | panels LD,HD1:need handle ties, all panels are ok, just need to check labels on all, | JOHNN | JOHNN | | E= | P | 5793763 |
EMF ELECTRICAL CORPORATION | ER | P | 03/20/2018 | 1st floor meeting rm grid, | JOHNN | JOHNN | | ER | P | 5793755 |
EMF ELECTRICAL CORPORATION | ER | C | 03/20/2018 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | ER | C | 5793749 |
EMF ELECTRICAL CORPORATION | EP | P | 03/16/2018 | panels HD-2,3,4: EGC lug needs to be connected with nut/bolt, 3rd and 4th floor laundry and vending rm;complete, pool mech rm :complete except need to box out above panels, need to splice larger size elevator feeds, MD-1,P-1,ok | JOHNN | JOHNN | | EP | P | 5790977 |
EMF ELECTRICAL CORPORATION | E= | P | 03/15/2018 | 1st floor 101-108,ok, 109,111,storage rm: not ready, 3rd, 4th floor:lobby,mech,ok, vending rm not ready, | JOHNN | JOHNN | | E= | P | 5789709 |
EMF ELECTRICAL CORPORATION | E= | C | 03/15/2018 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | E= | C | 5789692 |
EMF ELECTRICAL CORPORATION | ER | C | 03/15/2018 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | ER | C | 5789691 |
EMF ELECTRICAL CORPORATION | ER | P | 03/07/2018 | POOL: wet niche encapsulation ,ok | JOHNN | JOHNN | | ER | P | 5782345 |
EMF ELECTRICAL CORPORATION | ER | P | 03/05/2018 | FIRE ALARM INSPECTION: elevator | JOHNN | JOHNN | | ER | P | 5779675 |
EMF ELECTRICAL CORPORATION | ER | P | 03/05/2018 | pit,ok | JOHNN | JOHNN | | ER | P | 5779674 |
EMF ELECTRICAL CORPORATION | ER | P | 03/01/2018 | GRID 1ST FLOOR: hallway,laundry,pantry,fitness,managers office, reception cube flex,ok, 2ND FLOOR:only need , 222,230 bath lights, lobby area,elevator feed connection,ok | JOHNN | JOHNN | | ER | P | 5777445 |
EMF ELECTRICAL CORPORATION | E= | P | 02/26/2018 | 201: bath rm open neutral, 202-209,ok, 210:bath rm open neutral, 211-220,ok, 222:no bath light, 223-229,ok, 230: no bath light, 231:ok, ALL SUITES ARE MISSING U/C LIGHT, storage rm N and S,ok , all a/c's 20 amp, | JOHNN | JOHNN | | E= | P | 5774028 |
EMF ELECTRICAL CORPORATION | E= | P | 02/23/2018 | ALL 3RD FLOOR,EXCEPT 322 NEEDS MIRROR, AND SOUTH STORAGE RM | JOHNN | JOHNN | | E= | P | 5772627 |
EMF ELECTRICAL CORPORATION | E= | P | 02/22/2018 | ALL 4TH FLOOR GUEST RMS AND BOTH STORAGE RMS COMPLETE | JOHNN | JOHNN | | E= | P | 5771685 |
EMF ELECTRICAL CORPORATION | E= | P | 02/21/2018 | not ready: rooms need gfci within 6' of sink, 20 amp max on a/c, strap mc on bottom of cook tops, rooms need to be 100% ready for final inspection, | JOHNN | JOHNN | | E= | P | 5770387 |
EMF ELECTRICAL CORPORATION | E= | P | 02/20/2018 | C404 storage rm, 411-420, except 416, ALL UNITS NEED 20 AMP MAX CB ON A/C,HAVE 30 NOW | JOHNN | JOHNN | | E= | P | 5768945 |
EMF ELECTRICAL CORPORATION | ER | P | 02/16/2018 | FIRE ALARM INSPECTION: 3rd floor main hall, | JOHNN | JOHNN | | ER | P | 5767934 |
EMF ELECTRICAL CORPORATION | ER | P | 02/16/2018 | portecochere, lights, 3rd floor main hall, | JOHNN | JOHNN | | ER | P | 5767919 |
EMF ELECTRICAL CORPORATION | ER | P | 02/14/2018 | FIRE ALARM INSPECTION: 1st floor common bath rms, 4th floor main hallway,ok, not elevator lobby, | JOHNN | JOHNN | | ER | P | 5765519 |
EMF ELECTRICAL CORPORATION | ER | P | 02/14/2018 | 1st floor:grid, common bath rms, 4th floor, main hallway,ok, not elevator lobby, | JOHNN | JOHNN | | ER | P | 5765514 |
EMF ELECTRICAL CORPORATION | E= | P | 02/14/2018 | see service | JOHNN | JOHNN | | E= | P | 5765513 |
EMF ELECTRICAL CORPORATION | ES | P | 02/14/2018 | Commercial Service: tighten all grds in MD1, bend 750 mcm off of bussing, jump water meter with 250 AL, CHECK FOR PANIC HARDWARE ON FINAL, | JOHNN | JOHNN | | ES | P | 5765501 |
EMF ELECTRICAL CORPORATION | ER | P | 02/13/2018 | FIRE ALARM INSPECTION: 1st floor lobby: complete, still need bath rms,hallways, | JOHNN | JOHNN | | ER | P | 5763965 |
EMF ELECTRICAL CORPORATION | ER | P | 02/13/2018 | 1st floor:lobby complete, still need bath rms,hallways, | JOHNN | JOHNN | | ER | P | 5763962 |
EMF ELECTRICAL CORPORATION | ER | P | 01/30/2018 | FIRE ALARM INSPECTION: 1st floor main lobby, | JOHNN | JOHNN | | ER | P | 5751848 |
EMF ELECTRICAL CORPORATION | ER | P | 01/30/2018 | 1st floor main lobby,hard lids, | JOHNN | JOHNN | | ER | P | 5751847 |
EMF ELECTRICAL CORPORATION | ER | P | 12/12/2017 | 1st floor: hard lids in bath rooms from entry to the south, | JOHNN | JOHNN | | ER | P | 5709957 |
EMF ELECTRICAL CORPORATION | ER | L | 12/07/2017 | elevator equipment consult. | JOHNN | JOHNN | | ER | L | 5706243 |
EMF ELECTRICAL CORPORATION | EUG | C | 12/06/2017 | car charging area in back | JOHNN | JOHNN | | EUG | C | 5705062 |
EMF ELECTRICAL CORPORATION | ES | R | 12/04/2017 | need cap on top of ct meter socket, terminate bare grd in meter socket, main cb: need to see AIC rating for 240 v, | JOHNN | JOHNN | | ES | R | 5701146 |
EMF ELECTRICAL CORPORATION | ES | P | 12/04/2017 | Commercial Service: 3000 amp,4w, new commercial, ok to set meter/connect,-----------------------only inspected line side of main, | JOHNN | JOHNN | | ES | P | 5702235 |
EMF ELECTRICAL CORPORATION | ESL | P | 11/30/2017 | 9 stubs for outside patio lights on NW corner | MATTHEW | MATTHEW | | ESL | P | 5698317 |
EMF ELECTRICAL CORPORATION | ER | C | 11/22/2017 | FIRE ALARM INSPECTION: pool bath, | JOHNN | JOHNN | | ER | C | 5692947 |
EMF ELECTRICAL CORPORATION | ER | P | 11/22/2017 | pool bath rm,electrical rm, | JOHNN | JOHNN | | ER | P | 5692938 |
EMF ELECTRICAL CORPORATION | ER | C | 11/17/2017 | FIRE ALARM INSPECTION: 1st floor | JOHNN | JOHNN | | ER | C | 5689051 |
EMF ELECTRICAL CORPORATION | E= | C | 11/17/2017 | FIRE ALARM INSPECTION: 1st floor | JOHNN | JOHNN | | E= | C | 5689052 |
EMF ELECTRICAL CORPORATION | ER | P | 11/17/2017 | pool ceiling, pool mech rm,ok--------only rough left: pool bath rm,lobby ceiling,1st floor bath rm soffits, | JOHNN | JOHNN | | ER | P | 5689041 |
EMF ELECTRICAL CORPORATION | E= | C | 10/27/2017 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | E= | C | 5669683 |
EMF ELECTRICAL CORPORATION | ER | C | 10/27/2017 | FIRE ALARM INSPECTION: all 1st floor,ok | JOHNN | JOHNN | | ER | C | 5669676 |
EMF ELECTRICAL CORPORATION | ER | P | 10/27/2017 | all 1st floor except: pantry, electrical rm, mech/pool , panel LD, | JOHNN | JOHNN | | ER | P | 5669674 |
EMF ELECTRICAL CORPORATION | ESL | P | 10/27/2017 | pool:deck bond, | JOHNN | JOHNN | | ESL | P | 5669668 |
EMF ELECTRICAL CORPORATION | ER | P | 10/19/2017 | 105,106,have proper ansi hts, 101-109 rough ok except need soffits, did not inspect pantry, | JOHNN | JOHNN | | ER | P | 5660605 |
EMF ELECTRICAL CORPORATION | ER | P | 10/19/2017 | FIRE ALARM INSPECTION: 101-109 and pantry, | JOHNN | JOHNN | | ER | P | 5660597 |
EMF ELECTRICAL CORPORATION | ER | P | 10/17/2017 | 3rd floor laundry,ok, south stairwell,ok, units 101-106,need soffits, 4/0 boxes need grd connected, units:105,106, need proper ANSI hts on switches and outlets, | JOHNN | JOHNN | | ER | P | 5657477 |
EMF ELECTRICAL CORPORATION | ESL | P | 10/17/2017 | pvc in slab,ok | JOHNN | JOHNN | | ESL | P | 5657462 |
EMF ELECTRICAL CORPORATION | ER | P | 10/04/2017 | all 2nd floor, north stairwell,hallway, | JOHNN | JOHNN | | ER | P | 5645125 |
EMF ELECTRICAL CORPORATION | ER | P | 10/04/2017 | FIRE ALARM INSPECTION: all 2nd floor | JOHNN | JOHNN | | ER | P | 5645117 |
EMF ELECTRICAL CORPORATION | ER | P | 09/29/2017 | FIRE ALARM INSPECTION: 2nd floor: storage rm, 201-210, | JOHNN | JOHNN | | ER | P | 5640840 |
EMF ELECTRICAL CORPORATION | ER | P | 09/29/2017 | 2nd floor:storage rm, 201-210, except,203 may be ADA, if so will need to lower boxes, | JOHNN | JOHNN | | ER | P | 5640827 |
EMF ELECTRICAL CORPORATION | EUG | P | 09/25/2017 | all site lighting trenching complete, | JOHNN | JOHNN | | EUG | P | 5635879 |
EMF ELECTRICAL CORPORATION | EUG | P | 09/22/2017 | trench from transformer to building, | JOHNN | JOHNN | | EUG | P | 5634370 |
EMF ELECTRICAL CORPORATION | EUG | P | 09/18/2017 | remainder of pole bases, | JOHNN | JOHNN | | EUG | P | 5629071 |
EMF ELECTRICAL CORPORATION | EUG | P | 09/15/2017 | 13 pole bases,ok, still have 4 in front, | JOHNN | JOHNN | | EUG | P | 5627152 |
EMF ELECTRICAL CORPORATION | EUG | P | 09/14/2017 | site lighting:see plan, rear parking area:3 3" pipes for LV, | JOHNN | JOHNN | | EUG | P | 5625882 |
EMF ELECTRICAL CORPORATION | EUG | P | 09/13/2017 | site lighting,see plan | JOHNN | JOHNN | | EUG | P | 5624632 |
EMF ELECTRICAL CORPORATION | EUG | P | 09/12/2017 | site lighting:see plan | JOHNN | JOHNN | | EUG | P | 5623232 |
EMF ELECTRICAL CORPORATION | EUG | P | 09/11/2017 | site lighting:see plan,E6.0, splice site lighting changes, | JOHNN | JOHNN | | EUG | P | 5622180 |
EMF ELECTRICAL CORPORATION | ER | P | 09/01/2017 | FIRE ALARM INSPECTION: 3rd floor FA complete | JOHNN | JOHNN | | ER | P | 5614068 |
EMF ELECTRICAL CORPORATION | ESL | P | 09/01/2017 | shell bonding, need tail from light | JOHNN | JOHNN | | ESL | P | 5614061 |
EMF ELECTRICAL CORPORATION | ER | R | 08/31/2017 | FIRE ALARM INSPECTION: see previous rough inspection notes, | JOHNN | JOHNN | | ER | R | 5613466 |
EMF ELECTRICAL CORPORATION | ER | P | 08/30/2017 | 3rd floor: all units,ok for walls,ceiling,sub panels, | JOHNN | JOHNN | | ER | P | 5611233 |
EMF ELECTRICAL CORPORATION | ER | P | 08/29/2017 | 1st floor:hallway hard lid, 3rd floor:walls/ceiling/sub panels:317-320,322-331, unit 322 is ADA, verify proper height of microwave outlet, | JOHNN | JOHNN | | ER | P | 5610145 |
EMF ELECTRICAL CORPORATION | ER | P | 08/15/2017 | all 4th floor sub panels,ok, | JOHNN | JOHNN | | ER | P | 5595985 |
EMF ELECTRICAL CORPORATION | ER | R | 08/15/2017 | FIRE ALARM INSPECTION: address of this permit is not correct,need to attatch this permit to k60734 , call Matt or Dean in electrical, all 4th floor,ok | JOHNN | JOHNN | | ER | R | 5613465 |
EMF ELECTRICAL CORPORATION | ER | P | 08/14/2017 | 4th floor,all units, 4th floor,common areas,walls,hard lids,ok, will need to inspect grid in hallway, need to look at sub panels in each unit, | JOHNN | JOHNN | | ER | P | 5594962 |
EMF ELECTRICAL CORPORATION | ER | P | 08/11/2017 | 401-410 need another 20 amp small appl circuit, 411-420,ok, 422,ok | JOHNN | JOHNN | | ER | P | 5593181 |
EMF ELECTRICAL CORPORATION | ER | L | 08/10/2017 | cancelled by contractor, | JOHNN | JOHNN | | ER | L | 5592030 |
EMF ELECTRICAL CORPORATION | ER | L | 08/10/2017 | cancelled by contractor | JOHNN | JOHNN | | ER | L | 5592021 |
EMF ELECTRICAL CORPORATION | ER | R | 08/09/2017 | need 2nd 20 amp small appl circuit to counter outlet,ok to come off frig, units: 401,402,403,404,405,406, need to submit listing for fire rated fixture cover to building inspector,------------------------------unit panels not ready check later, | JOHNN | JOHNN | | ER | R | 5590480 |
EMF ELECTRICAL CORPORATION | ESL | P | 03/01/2017 | all inside slab ok, | JOHNN | JOHNN | | ESL | P | 5428442 |
CONDITIONED AIR CORPORATION | HSP | C | 05/02/2018 | TAB REPORT RECEIVED | JERRYF | JERRYF | | HSP | C | 5833466 |
CONDITIONED AIR CORPORATION | H= | C | 05/02/2018 | TEST AND BALANCE REPORT WITH AMENDED TAB REPORT FOR CORRIDORS RECEIVED | JERRYF | JERRYF | | H= | C | 5833383 |
CONDITIONED AIR CORPORATION | H= | C | 05/02/2018 | ALL TAB REPORTS RECEIVED | JERRYF | JERRYF | | H= | C | 5833377 |
CONDITIONED AIR CORPORATION | HSP | P | 05/02/2018 | LETTER FOR REVISED TAB REPORT CORRECTIONS HAS BEEN RECEIVED - NEED ORIGINAL TAB REPORT | JERRYF | JERRYF | | HSP | P | 5833146 |
CONDITIONED AIR CORPORATION | H= | P | 04/25/2018 | PARTIAL PENDING TAB REPORT - ADDED ENTRY AT OFFICE - NO SITE VISIT WAS DONE - GAS FINAL OK PENDING TAB REPORT | JERRYF | JERRYF | | H= | P | 5826233 |
CONDITIONED AIR CORPORATION | H= | R | 04/18/2018 | TAB REPORT SHOWS SEVERAL READINGS OUTSIDE +/- 10% - NEEDS TO BE CORRECTED OR GET APPROVAL FROM ENGINEER APPROVING THESE READINGS | JERRYF | JERRYF | | H= | R | 5819633 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | C | 04/13/2018 | ELEVATORS COMPLETE | ERIC | ERIC | | HE= | C | 5816859 |
CONDITIONED AIR CORPORATION | H= | P | 04/12/2018 | NEED THE FOLLOWING - OSA DUCT FOR POOL SYSTEM INSULATED - TAB REPORT/ ATTACH PICTURES OF INSULATION AND TAB REPORT TO NEXT INSPECTION REQUEST - CONTRACTOR TO WORK WITH MECHANICAL ENGINEER ON ALL REQUIRED PLAN REVISIONS PER PREVIOUS NOTES TO COMPLETE MECHANICAL FINAL | JERRYF | JERRYF | | H= | P | 5815794 |
CONDITIONED AIR CORPORATION | HD | P | 04/11/2018 | FIRE SMOKE DAMPER FRAMING OK AT 1ST FLOOR CORRIDOR - AT NEXT INSPECTION VERIFY GAP / RETAINAGE AND ACCESS DOORS | JERRYF | JERRYF | | HD | P | 5814495 |
CONDITIONED AIR CORPORATION | H= | P | 04/09/2018 | Altered notes 4/9/18 - refer to notes from 4/5/18 for fire/smoke damper being installed in the corridor (LM) .INSPECTION ON 1st FLOOR ONLY -Need to have plans revised and approved to show combustion air installed in mechanical room for pool boiler / the new splice does not show this dated 2/26/18 . Have plans revised and approved to show no longer a return air plenum ,WATER VENT INTAKE IS MISSING THE CONDENSATE DRAIN REFER TO PAGE # 24 .SPLICE M1.1 FOR 1 st FLOOR DATED 2/26/18 SHOWS FIRE / SMOKE DAMPER IN THE WALL OVER THE DOOR IN THE CORRIDOR . FIRE DAMPER WAS INSTALLED BEFORE ANY FRAMING INSPECTION WAS DONE REMOVE DRY WALL FOR FRAMING INSPECTION / Will need full fire smoke damper inspection starting with framing .THERMOSTATS NEED TO BE LOWERED TO 48" OFF FINISHED FLOOR. (FIRE SMOKE DAMPER LABELS OK) , PLUG SECONDARY DRAINS ON HEAT PUMPS 1st FLOOR ONLY .MISSING P-TACK IN LAUNDRY ROOM .( INTERLOCK FOR DRYER AND MOTORIZED DAMPER OK FOR MAKE UP AIR .) | LIDO | LIDO | | H= | P | 5811319 |
CONDITIONED AIR CORPORATION | H= | P | 04/05/2018 | SPLICE M1.1 FOR 1 st FLOOR DATED 2/26/18 SHOWS FIRE / SMOKE DAMPER IN THE WALL OVER THE DOOR IN THE CORRIDOR . NEW SPLICE M1.1 FORE 1st FLOOR DATED 4/3/18 HAS REMOVED THE FIRE/SMOKE DAMPER INSTALLED IN CORRIDOR AND SHOWS NO WALL AND DOOR ON THIS SPLICE . IF WALL AND DOOR IS INSTALLED FIRE /SMOKE DAMPER WILL NEED TO GO BACK IN .ENGINEER WILL NEED TO ADDRESS THIS ISSUE . | LIDO | LIDO | | H= | P | 5808441 |
CONDITIONED AIR CORPORATION | H= | P | 04/04/2018 | 1st FLOOR . Need to have plans revised and approved to show combustion air installed in mechanical room for pool boiler / the new splice does not show this dated 2/26/18 . Have plans revised and approved to show no longer a return air plenum . THERMOSTATS NEED TO BE LOWERED TO 48" OFF FINISHED FLOOR ,LABEL GRID FOR FIRE / SMOKE DAMPERS IN STORE ROOM AND LINEN ROOM REST OF FIRE SMOKE DAMPER LABELS OK , FINISH CONDENSATE DRAIN IN ELECTRICAL ROOM FOR MINI SPLIT ,NEED TO VERIFY INTERLOCK FOR DRYER AND MOTORIZED DAMPER FOR MAKE UP AIR .PLUG SECONDARY DRAINS ON HEAT PUMPS 1st FLOOR ONLY .MISSING P-TACK IN LAUNDRY ROOM ,VERIFY 3rd DRYER WAS REMOVED ON SPLICE .REVISED SPLICE DATED 2/26/18 SHOWS FIRE/ SMOKE DAMPER IN HALLWAY / THIS WAS NOT INSTALLED- Will need full fire / smoke damper inspection starting with framing . NEED TO CONSULT WITH TEAM ON WATER HEATERS .WILL ADD TO NOTES IN THE MORNING .( CONDENSATE DRAIN FOR POOL HEATER VENT OK . SUPPLY AIR AND RETURN AIR FINAL CONNECTIONS OK ,) | LIDO | LIDO | | H= | P | 5808216 |
CONDITIONED AIR CORPORATION | H= | P | 04/03/2018 | 4th FLOOR - M1.4 ( BDA 356 ) NEED SECONDARY PROTECTION FOR HEAT PUMP / CONDENSATE LINE NEEDS TO BE SECURED DOWN AND REQUIRES AN AIR GAP .NEED TO LOWER THERMOSTAT TO 48" OFF FLOOR FOR HEAT PUMP #10 .( HEAT FINAL IN ALL FLOOR UNITS AND CORRIDOR AND STAIR WELL OK . FIRE / SMOKE DAMPER LABELS OK . 3th FLOOR - NEED SECONDARY PROTECTION FOR HEAT PUMP / CONDENSATE LINE NEEDS TO BE SECURED DOWN AND REQUIRES AN AIR GAP .NEED TO LOWER THERMOSTAT TO 48" OFF FLOOR FOR HEAT PUMP .( HEAT FINAL IN ALL FLOOR UNITS AND CORRIDOR AND STAIR WELL OK . FIRE / SMOKE DAMPER LABELS OK . 2th FLOOR - NEED SECONDARY PROTECTION FOR HEAT PUMP / CONDENSATE LINE NEEDS TO BE SECURED DOWN AND REQUIRES AN AIR GAP .NEED TO LOWER THERMOSTAT TO 48" OFF FLOOR FOR HEAT PUMP .( HEAT FINAL IN ALL FLOOR UNITS AND CORRIDOR AND STAIR WELL OK . FIRE / SMOKE DAMPER LABELS OK .. | LIDO | LIDO | | H= | P | 5805935 |
CONDITIONED AIR CORPORATION | H= | P | 04/02/2018 | 4th FLOOR - M1.4 ( BDA 356 )NEED SECONDARY PROTECTION FOR HEAT PUMP # 10 / CONDENSATE LINE NEEDS TO BE SECURED DOWN AND REQUIRES AN AIR GAP .NEED TO VERIFY THERMOSTAT FOR HEAT PUMP #10 .( HEAT FINAL IN ALL 4 th FLOOR UNITS AND CORRIDOR OK . FIRE / SMOKE DAMPER LABELS OK EXCEPT FOR ICE MACHINE ROOM GRID NEEDS TO BE LABELED . | LIDO | LIDO | | H= | P | 5805132 |
CONDITIONED AIR CORPORATION | HV | P | 04/02/2018 | VENT FOR POOL BOILER INSTALLED PER INSTALLATION INSTRUCTIONS / Still need to inspect condensate drain for vent . NEED INSTALL MANUAL FOR WATER HEATERS .Still need the rest of the listed items from inspection dated on 3/28/18 | LIDO | LIDO | | HV | P | 5805109 |
CONDITIONED AIR CORPORATION | HV | P | 03/28/2018 | NEED CLEARANCE PER CODE TO ALL INTAKES FROM POOL BOILER - NEED POOL BOILER AND WATER HEATER INSTALL MANUALS TO VERIFY VENTING AND CLEARANCES - NEED PLAN REVISED DELETING 1 COMMERCIAL DRYER AND REVISE PLAN TO DRYER VENTING AS INSTALLED - NEED PERMIT CORRECTED TO SHOW CORRECT NUMBER OF ALL EQUIPMENT AND VENTS AS SHOWN ON PLANS NOTES: 3TD FLOOR GUEST LAUNDRY DRYER VENTS OK - | JERRYF | JERRYF | | HV | P | 5801777 |
CONDITIONED AIR CORPORATION | HD | P | 02/23/2018 | CONTRACTOR PROCEEDING AT OWN RISK IN REGARDS TO PLAN SPLICE - SPLICE HAS NOT BEEN APPROVED NOTES: POOL AREA ABOVE CEILING SA / RA OK PER UN APPROVED PLAN SPLICE | JERRYF | JERRYF | | HD | P | 5772956 |
CONDITIONED AIR CORPORATION | HD | P | 02/14/2018 | NEED RETAINING ANGLE SECURED PROPERLY AT 2ND FLOOR ELEVATOR LOBBY - ALL OTHER FIRE SMOKE DAMPER RETAINAGE AND GAP OK ON ALL FLOORS - WILL VERIFY ALL DAMPER ACCESS DOORS AND LABELS AT FUTURE INSPECTION - OSA DUCT OK TO WRAP AT HP#7 | JERRYF | JERRYF | | HD | P | 5765762 |
CONDITIONED AIR CORPORATION | HD | P | 01/23/2018 | Need revised and approved plans for return air in corridors is now ducted on all floors .HEAT PUMPS 1,2,8,9,10 FOR LEVEL 1,2,3,4 RETURN AIR , SUPPLY AIR , OUTSIDE AIR DUCT ROUGH IN HVAC ROOMS OK / WRAP. | LIDO | LIDO | | HD | P | 5744881 |
CONDITIONED AIR CORPORATION | HSP | P | 01/11/2018 | BUILDING INSPECTOR TO REVIEW ALL EXTERIOR OPENINGS AT POOL EQUIPMENT ROOM | JERRYF | JERRYF | | HSP | P | 5735140 |
CONDITIONED AIR CORPORATION | HV | P | 01/10/2018 | NEED CONSULT WITH BUILDING INSPECTOR ON 41/2" OUTSIDE DIAMETER PVC VENTS AT WATER HEATERS AT EXTERIOR WALL - REST OK ON 3 WATER HEATER FLUES | JERRYF | JERRYF | | HV | P | 5734710 |
CONDITIONED AIR CORPORATION | HC | C | 01/10/2018 | RELEASE METER | JERRYF | JERRYF | | HC | C | 5734709 |
CONDITIONED AIR CORPORATION | HI | C | 01/10/2018 | PRESSURE TEST OK ON LINES TO DRYER - POOL BOILER AND INTERIOR PIPING TO FIRE PITS - BEFORE FINAL NEED PLAN REVISED SHOWING ALL EXTERIOR PATIO LINES AND PLAN TO MATCH AS INSTALLED AT EXTERIOR AT METER AREA | JERRYF | JERRYF | | HI | C | 5734704 |
CONDITIONED AIR CORPORATION | HD | P | 12/28/2017 | THIS INSPECTION WAS FOR 1ST FLOOR ONLY - NEED ALL PLASTIC IN RA PLENUM PROTECTED NEED CONSULT WITH ELECTRICAL INSPECTOR ON HIGH VOLTAGE WIRING IN PLENUM - NEED PROPER ACCESS TO FCU IN MEETING ROOM - NEED VERIFICATION FROM F/SD MANUFACTURE ON DAMPER POSITION IN WALLS - STOPPED INSPECTION - REINSPECT ALL | JERRYF | JERRYF | | HD | P | 5724164 |
CONDITIONED AIR CORPORATION | HD | P | 12/19/2017 | NOTE TO CONTRACTOR MAINTAIN CLEARANCE AT CLOTHES DRYER DUCT PER IMC SECTION 504.7 AT EXTERIOR WALL ------ THIS INSPECTION WAS FOR THE FOLLOWING - 1ST - 2ND AND 3TD FLOOR FIRE SMOKE DAMPER RETAINAGE - NEED PROPER ANGLES AT 2ND FLOOR ICE ROOM - NEED ALL SCREWS AT DAMPERS SECURED TO STRUCTURE NOT SHEET ROCK - BUILDING INSPECTOR WILL NEED HILTI LISTINGS FOR ALL DUCT AT FLOOR CEILING PENETRATIONS FOR DUCTS LARGER THEN 4" - NEED DAMPER INSTALLED AT 1ST FLOOR POOL BOILER ROOM NOTES: 1ST FLOOR RESTROOM EXHAUST OK | JERRYF | JERRYF | | HD | P | 5717235 |
CONDITIONED AIR CORPORATION | HD | P | 12/08/2017 | ABOVE SOFFIT EXHAUST IN 1ST FLOOR RESTROOMS OK FROM SOUTH END TO ELEVATOR LOBBY - 1ST THROUGH 4TH FLOOR SHEET ROCK AT F/SD'S OK TO INSTALL DAMPERS | JERRYF | JERRYF | | HD | P | 5707682 |
CONDITIONED AIR CORPORATION | HRP | P | 11/30/2017 | 3 PRESSURE TESTS TO ALL ELEVATOR LOBBY UNITS AND PIPING OK - HAD CONSULT WITH MECH. CONTRACTOR ON F/SD FRAMING AND SHEET ROCK APPEARS DAMPERS MAY BE FRAMED INCORRECTLY TO MAINTAIN PROPER GAP | JERRYF | JERRYF | | HRP | P | 5698608 |
CONDITIONED AIR CORPORATION | HRP | R | 11/22/2017 | NEED SHEET ROCK REMOVED TO VERIFY NAIL PROTECTION AT ALL LINE SETS - STOPPED INSPECTION | JERRYF | JERRYF | | HRP | R | 5693494 |
CONDITIONED AIR CORPORATION | HD | P | 11/20/2017 | 2ND FLOOR CORRIDOR SA DUCT OK PER REVISED PLAN - NEED REVISED PLAN APPROVED FOR ALL NEW DUCT SIZING IN ALL CORRIDORS - CONTRACTOR AT OWN RISK | JERRYF | JERRYF | | HD | P | 5690206 |
CONDITIONED AIR CORPORATION | HO | C | 11/15/2017 | PRESSURE TEST AND PIPING OK - CONTRACTOR PROCEEDING AT OWN RISK OUTSIDE GAS LINES ARE NOT SHOWN ON PLANS - BY FINAL NEED REVISED PLANS - VERIFY PIPE SLEEVES WHERE CONCRETE IS INSTALLED | JERRYF | JERRYF | | HO | C | 5685931 |
CONDITIONED AIR CORPORATION | HO | P | 11/07/2017 | CHANGED INSPECTION TO HO FOR OUTSIDE GAS - NEED TRACER WIRES INSTALLED ON ALL UNDERGROUND LINES - CONTRACTOR TO SUPPLY PICTURES OF WIRES - PRESSURE TEST AND PIPING OK - STILL NEED PREVIOUS NOTES ADDRESSED | JERRYF | JERRYF | | HO | P | 5679024 |
CONDITIONED AIR CORPORATION | HO+ | L | 11/03/2017 | CHANGED INSPECTION TO HO FOR ALL UNDERGROUND PIPING - STOPPED INSPECTION NEED THE FOLLOWING - POST HOLE ALL UNDERGROUND PIPING TO VERIFY 18" DEPTH AND NEED 10# ON 30 # GAUGE - NEED ALL EXTERIOR PIPING SHOWN ON MECHANICAL PLANS AND APPROVED BY PPRBD - NEED MANUFACTURED HOME WATER HEATERS CHANGED ON PERMIT TO STANDARD WATER HEATERS - NEED ALL GAS STUBS SHOWN ON PERMIT TO INCLUDE ALL EXTERIOR CURRENTLY SHOWS 6 - STOPPED INSPECTION | JERRYF | JERRYF | | HO+ | L | 5675942 |
CONDITIONED AIR CORPORATION | HD | P | 10/27/2017 | THIS INSPECTION WAS FOR 3TD AND 4TH FLOOR CORRIDORS - ABOVE CEILING SA OK IN BOTH CORRIDORS - STILL NEED THE FOLLOWING - 3TD FLOOR F/SD'S INSTALLED AT SOUTH / NORTH AND ELEVATOR LOBBY - 4TH FLOOR- STILL NEED ELEVATOR LOBBY AND NORTH STORAGE F/SD'S INSTALLED | JERRYF | JERRYF | | HD | P | 5670154 |
CONDITIONED AIR CORPORATION | HD | P | 10/24/2017 | 1ST FLOOR ABOVE CEILING EXHAUST IN THE FOLLOWING UNITS OK TO WRAP - 101 - 102 - 103 - 104 - 105 - 106 - 107 - 108 - 109 - 111 - HAD CONSULT ON CLEARANCES FOR COMMERCIAL DRYER VENTS | JERRYF | JERRYF | | HD | P | 5664963 |
CONDITIONED AIR CORPORATION | HV | P | 10/04/2017 | THIS INSPECTION WAS FOR 2ND FLOOR - ALL UNITS TO INCLUDE THE FOLLOWING UNITS - 201 - 202- 203 - 204 - 205 - 206 - 207 - 208 - 209 - 210 - 211 - 212 - 213 - 214 - 215 - 216 - 217 - 218 - 219 - 220 - 222 - 223 - 224 - 225 - 226 - 227 - 228 - 229 - 230 - 231 - ABOVE PRE ROCK BATH FANS / FIRE DAMPERS AND VENTS ARE OK | JERRYF | JERRYF | | HV | P | 5644885 |
CONDITIONED AIR CORPORATION | HSP | P | 09/13/2017 | ONSITE TRAINING WITH DAVE AND BEN - DISCUSSED LIFE SAFETY PLAN - REVIEWED WOOD F/S DAMPER FRAMING DETAILS AND REQUIREMENTS - SHOE BOX - FIRE SEPARATION REQUIREMENTS - ELEVATOR EQUIPMENT ROOM OPENINGS | JERRYF | JERRYF | | HSP | P | 5624279 |
CONDITIONED AIR CORPORATION | HV | P | 09/12/2017 | THIS INSPECTION WAS FOR THE FOLLOWING - 2ND FLOOR F/D FRAMING AT THE FOLLOWING AREA'S - NORTH STORAGE - ELEVATOR LOBBY MECHANICAL AND ICE ROOM - SOUTH STORAGE ALL FRAMING OK - 3TD FLOOR BATH FAN CONNECTIONS AND VENTS IN WALLS - THE FOLLOWING UNITS ARE OK - 301 - 302 - 303 - 304 - 305 - 306 - 307 - 308 - 309 - 310 - 311 - 312 - 313 - 314 - 315 - 316 - 317 - 318 - 319 - 320 - 321 - 322 - 323 - 324 - 325 - 326 - 327 - 328 - 329 - 330 - 331 - STIIL ALL FIRE DAMPERS AT FANS | JERRYF | JERRYF | | HV | P | 5623506 |
CONDITIONED AIR CORPORATION | HD | P | 08/31/2017 | EXHAUST FAN INSULATION IN 4TH FLOOR ATTIC OK FROM NORTH END TO ELEVATOR LOBBY | JERRYF | JERRYF | | HD | P | 5613243 |
CONDITIONED AIR CORPORATION | HD | P | 08/30/2017 | THIS INSPECTION WAS FOR THE FOLLOWING - 4TH FLOOR EXHAUST FANS IN ROOMS - 405 - 401 - 410 - 431 - 4TH FLOOR SOUTH STORAGE ROOM F/D FRAMING X 2 - 4TH FLOOR NORTH STORAGE ROOM F/D FRAMING X 2 - 4TH FLOOR ELEVATOR LOBBY MECH AND ICE ROOM F/D FRAMING - ALL OK | JERRYF | JERRYF | | HD | P | 5611743 |
CONDITIONED AIR CORPORATION | HD | P | 08/29/2017 | NEED REVISED APPROVED PRINT SHOWING NEW EXHAUST FANS AND RADIATION DAMPER INSTALLED FOR ROOMS 401 - 410 AND 431 AND AND ALL OTHER ROOMS NEW FANS WILL BE INSTALLED AND WILL NEED ENGINEER TO PROVIDE INFORMATION FOR THE ADDED EXHAUST FANS VERIFYING EXHAUST FAN AND RADIATION DAMPER IS APPROVED FOR INSTALLATION IN A LISTED ROOF ASSEMBLY AND A FLOOR CEILING ASSEMBLY . ABOVE CEILING EXHAUST DUCT NOT COMPLETE IN ROOM 405 . EXHAUST DUCT ABOVE CEILING OK IN ROOMS 401,402,403,404,406,407,408,409,410,411,412,413,414,415,416,417,418,419,420.
| LIDO | LIDO | | HD | P | 5610061 |
CONDITIONED AIR CORPORATION | HD | P | 08/21/2017 | THE FOLLOWING 4TH UNIT EXHAUST DUCTS IN CEILINGS ARE OK - 401 - 403 - 407 - 411 - 417 - 418 - 420 - 416 - 414 - 412 - THE FOLLOWING 4TH FLOOR UNIT EXHAUST DUCT IN WALLS ARE OK ONLY - STILL NEED ALL CEILING - 401 - 402 - 405 - 407 - 409 - 411 - 413 - 417 - 419 - 418 - 420 - 414 - 412 - 410 - 408 - 406 - 404- 402 | JERRYF | JERRYF | | HD | P | 5602413 |
CONDITIONED AIR CORPORATION | HV | P | 08/15/2017 | THIS INSPECTION WAS FOR 4TH FLOOR NORTH END TO ELEVATOR LOBBY - ALL RESTROOM EXHAUST RUNS OK TO WRAP - ELEVATOR LOBBY / MECHROOM / ICE MACHINE ROOM FIRE DAMPER FRAMING OK - (((((NEED ALL RESTROOM FANS AND FIRE DAMPERS INSTALLED WITH CORRECT HANGERS PER INSTALL MANUAL - NEED EXHAUST COLLECTOR BOXES IN ATTIC INSPECTED AFTER WRAP | JERRYF | JERRYF | | HV | P | 5596182 |
CONDITIONED AIR CORPORATION | HD | P | 08/07/2017 | THIS INSPECTION WAS FOR 4TH FLOOR FIRE DAMPER FRAMING - ELEVATOR LOBBY MECHANICAL ROOM AND ICE MACHINE AREA NEED DAMPERS FRAMED PER INSTALL MANUAL - NORTH AND SOUTH STORAGE AREA,S OK FOR FIRE DAMPER FRAMING | JERRYF | JERRYF | | HD | P | 5587842 |
CONDITIONED AIR CORPORATION | HD | P | 07/27/2017 | NEED FIRE DAMPER FRAMING PER INSTALL MANUAL ON 4TH FLOOR - NEED ARCHITECT AND ENGINEER TO ADDRESS RESTROOM EXHAUST FANS IN 4TH FLOOR CEILING FOR INSULATION REQUIREMENTS | JERRYF | JERRYF | | HD | P | 5577479 |
HARLAN PLUMBING & HEATING, INC | P= | C | 04/11/2018 | | TAYLOR | TAYLOR | | P= | C | 5813605 |
HARLAN PLUMBING & HEATING, INC | P= | P | 04/09/2018 | all ok, minus piping for RP's and sump at mech room. | TAYLOR | TAYLOR | | P= | P | 5811274 |
HARLAN PLUMBING & HEATING, INC | P= | P | 04/05/2018 | public restrooms ok. | TAYLOR | TAYLOR | | P= | P | 5808694 |
HARLAN PLUMBING & HEATING, INC | P= | P | 04/02/2018 | room 106 and pool restroom ok. | TAYLOR | TAYLOR | | P= | P | 5804762 |
HARLAN PLUMBING & HEATING, INC | P= | P | 03/22/2018 | kitchen and bar area's ok. | TAYLOR | TAYLOR | | P= | P | 5796180 |
HARLAN PLUMBING & HEATING, INC | P= | P | 03/16/2018 | room 230, employee restroom and lounge ok. | TAYLOR | TAYLOR | | P= | P | 5791042 |
HARLAN PLUMBING & HEATING, INC | PTO | C | 03/16/2018 | piping for elevator shaft ok. | TAYLOR | TAYLOR | | PTO | C | 5791036 |
HARLAN PLUMBING & HEATING, INC | PB | C | 03/16/2018 | OK. | TAYLOR | TAYLOR | | PB | C | 5791035 |
HARLAN PLUMBING & HEATING, INC | P= | P | 03/12/2018 | rooms 105, 222, and 322 ok. | TAYLOR | TAYLOR | | P= | P | 5785931 |
HARLAN PLUMBING & HEATING, INC | P= | P | 02/27/2018 | rooms 101, 102, 103, 104, 107, 108, 109, and 111 ok. | TAYLOR | TAYLOR | | P= | P | 5775193 |
HARLAN PLUMBING & HEATING, INC | P= | P | 02/23/2018 | 2nd floor ok, minus rooms 222/ 230 and ice machine. | TAYLOR | TAYLOR | | P= | P | 5772486 |
HARLAN PLUMBING & HEATING, INC | P= | P | 02/22/2018 | 3rd floor ok, minus room 322 and ice machine. | TAYLOR | TAYLOR | | P= | P | 5771397 |
HARLAN PLUMBING & HEATING, INC | P= | P | 02/21/2018 | 4th floor complete, minus ice machine. | TAYLOR | TAYLOR | | P= | P | 5770087 |
HARLAN PLUMBING & HEATING, INC | P= | P | 02/08/2018 | rooms 413, 414, 415, 416, 417, 418, 420, 422, 423, 424, 425, 426, 427, 428, 429, and 430 ok. | TAYLOR | TAYLOR | | P= | P | 5760874 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 01/10/2018 | 4th floor recirculating line and H2O mains in hall on 1st floor ok. | TAYLOR | TAYLOR | | PTO | P | 5734059 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 12/01/2017 | sump piping ok for deck drains. | TAYLOR | TAYLOR | | PTO | P | 5699783 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 11/07/2017 | 1st floor tubs ok. | TAYLOR | TAYLOR | | PTO | P | 5678617 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 11/03/2017 | H2O at mens, womens, pantry, employee restroom, and meeting room ok. | TAYLOR | TAYLOR | | PTO | P | 5675975 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 10/27/2017 | H2O at rooms 101- 111 ok. | TAYLOR | TAYLOR | | PTO | P | 5669452 |
HARLAN PLUMBING & HEATING, INC | PB | P | 10/27/2017 | deck drains and sump ok, revise plans to show exact make and model for sump. | TAYLOR | TAYLOR | | PB | P | 5669445 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 10/19/2017 | traps at 2nd and 3rd floor complete. | TAYLOR | TAYLOR | | PTO | P | 5660500 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 10/17/2017 | traps at rooms 201, 202, 203, 204, 206, 207, 208, 209, and 210 ok. | TAYLOR | TAYLOR | | PTO | P | 5657675 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 10/13/2017 | H2O complete at 2nd floor. | TAYLOR | TAYLOR | | PTO | P | 5654463 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 10/06/2017 | H2O at rooms 201-212 ok. | TAYLOR | TAYLOR | | PTO | P | 5648065 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 10/04/2017 | undersized water lines for back to back sinks at rooms 201- 210. | TAYLOR | TAYLOR | | PTO | P | 5644691 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 09/26/2017 | all tub traps ok, minus rooms 302 and 304. | TAYLOR | TAYLOR | | PTO | P | 5636986 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 09/15/2017 | all traps at 4th floor complete. | TAYLOR | TAYLOR | | PTO | P | 5626959 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 09/14/2017 | traps at 4th floor ok, minus vending and mech room. | TAYLOR | TAYLOR | | PTO | P | 5625610 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 09/13/2017 | H2O complete at 3rd floor. | TAYLOR | TAYLOR | | PTO | P | 5624291 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 09/07/2017 | H2O at rooms, 311, 312, 313, 314, 315, 316, 317, 318, 319, 320, 322, 323, 324, 325, 326, 327, 328, 329, 330, 331 ok. | TAYLOR | TAYLOR | | PTO | P | 5618755 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 08/15/2017 | H2O at 4th floor complete ( minus recirculating lines in hallway ). | TAYLOR | TAYLOR | | PTO | P | 5596019 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 08/14/2017 | H2O at rooms 401, 402, 403, 404, 405, 406, 407, 408, 409, 410, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310 ok. | TAYLOR | TAYLOR | | PTO | P | 5594729 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 08/09/2017 | DWV at rooms 227, 229, 231, 327, 329, 331, 429, 431 ok, s-trap at tub for room 427, note: aav's at bar sinks in rooms 231 and 331. | TAYLOR | TAYLOR | | PTO | P | 5590120 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 08/08/2017 | DWV at rooms C109, C110, C111, C112, 224, 226, 228, 230, 324, 326, 328, 330, 424, 426, 428, 430 ok, minus traps. | TAYLOR | TAYLOR | | PTO | P | 5589099 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 08/03/2017 | DWV at rooms 127, 128, 215, 217, 219, 221, 223, 225, 315, 317, 318, 319, 321, 323, 325, 415, 417, 419, 421, 423, 425, vending rooms 202, 302, 402 ok, minus traps. | TAYLOR | TAYLOR | | PTO | P | 5584673 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 08/02/2017 | DWV at rooms 212, 214, 216, 218, 220, 222, 312, 314, 316, 320, 322, 412, 414, 416, 418, 420, 422 ok, minus traps, s-trap at room 318. | TAYLOR | TAYLOR | | PTO | P | 5583756 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 07/27/2017 | DWV at rooms 102, 104, 106, 108, 110, 111, 202, 204, 206, 208, 210, 211, 213, 302, 304, 306, 308, 310, 311, 313, 402, 404, 406, 408, 410, 411, 413 ok, minus traps. | TAYLOR | TAYLOR | | PTO | P | 5577892 |
HARLAN PLUMBING & HEATING, INC | PTO | P | 07/26/2017 | DWV at rooms 101, 103, 105, 107, 109, 201, 203, 205, 207, 209, 301, 303, 305, 307, 309, 401, 403, 405, 407, 409, ok, minus traps, note: aav's at sinks in rooms 105 and 107. | TAYLOR | TAYLOR | | PTO | P | 5576454 |
HARLAN PLUMBING & HEATING, INC | PRD | C | 07/26/2017 | | TAYLOR | TAYLOR | | PRD | C | 5576445 |
HARLAN PLUMBING & HEATING, INC | PRD | P | 07/25/2017 | partial roof and overflow drains ok, plans marked. | TAYLOR | TAYLOR | | PRD | P | 5574715 |
HARLAN PLUMBING & HEATING, INC | P16 | C | 06/01/2017 | consultation with contractor. | TAYLOR | TAYLOR | | P16 | C | 5522767 |
HARLAN PLUMBING & HEATING, INC | PB | P | 04/14/2017 | Water service ok | JACK | JACK | | PB | P | 5476263 |
HARLAN PLUMBING & HEATING, INC | PB | P | 03/14/2017 | water service ok. | TAYLOR | TAYLOR | | PB | P | 5440462 |
HARLAN PLUMBING & HEATING, INC | PB | P | 03/07/2017 | added floor sink at pantry area ok, note: revised plans ok. | TAYLOR | TAYLOR | | PB | P | 5433798 |
HARLAN PLUMBING & HEATING, INC | PB | P | 02/02/2017 | S.S. in mech/ water entry room ok, need inspection for water service, note: still need plans revised as previously noted, | TAYLOR | TAYLOR | | PB | P | 5405483 |
HARLAN PLUMBING & HEATING, INC | PB | P | 01/26/2017 | all 6 inch S.S. ok, need to revise plans to show new drains at pantry room, bar area, and HVAC room. | TAYLOR | TAYLOR | | PB | P | 5399373 |
HARLAN PLUMBING & HEATING, INC | PB | P | 01/24/2017 | grids 2-8 ok, see plans. | TAYLOR | TAYLOR | | PB | P | 5397061 |
HARLAN PLUMBING & HEATING, INC | PB | P | 01/23/2017 | grids 10-18 ok, see plans. | TAYLOR | TAYLOR | | PB | P | 5395754 |
HARLAN PLUMBING & HEATING, INC | PB | P | 12/16/2016 | all storm drains ok. | TAYLOR | TAYLOR | | PB | P | 5370395 |
EMF ELECTRICAL CORPORATION | XES | T | 04/04/2018 | PAID (REC#1491752) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Multiple lighting and power revisions. Updated panel schedules. | BERTHA | BERTHA | | XES | T | 5807848 |
CONDITIONED AIR CORPORATION | XMS | T | 04/03/2018 | PAID (REC#1491367) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 4-3-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 5806039 |
CONDITIONED AIR CORPORATION | XMS | T | 02/26/2018 | PAID (REC#1485647) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised for kitchenette fans at extended suites / Minor revisions | JUSTINC | JUSTINC | | XMS | T | 5773935 |
HARLAN PLUMBING & HEATING, INC | XPS | T | 02/23/2018 | PAID (REC#1484114) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 2-23-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5772889 |