PARADISE BUILDERS, LLC | B= | C | 05/09/2017 | corrections complete | ERICR | ERICR | | B= | C | 5500254 |
PARADISE BUILDERS, LLC | B= | R | 05/08/2017 | not ready. Additional Inspections Required (computer generated): O.M.A.G.M., INC. Mechanical Final Inspection is not Completed yet. | ERICR | ERICR | | B= | R | 5498782 |
PARADISE BUILDERS, LLC | B= | P | 05/05/2017 | need to raise hand rails on stairs to minimum 34" to maximum of 38" from nose of tread / handrail needs to return to the wall top and bottom -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): O.M.A.G.M., INC. Mechanical Final Inspection is not Completed yet. | ERICR | ERICR | | B= | P | 5497982 |
PARADISE BUILDERS, LLC | BSP | P | 02/22/2017 | frame at rear deck okay | NATHAN | NATHAN | | BSP | P | 5421557 |
PARADISE BUILDERS, LLC | BFT | P | 02/22/2017 | 2 rear deck piers okay | NATHAN | NATHAN | | BFT | P | 5421542 |
PARADISE BUILDERS, LLC | BSP | P | 02/17/2017 | All deck framing items OK | NICK | NICK | | BSP | P | 5418503 |
PARADISE BUILDERS, LLC | BSP | P | 02/16/2017 | need 2 lags in ledger on 16" centers / need to use approved simpson fastners in joist hangers used deck screws / porch roof ok | ERICR | ERICR | | BSP | P | 5416791 |
PARADISE BUILDERS, LLC | BSP | P | 02/03/2017 | PLAN SPLICE: (No Fee) by: DANM for Construction: Two steps added to end of deck - revised framing to accommodate | DANM | DANM | | BSP | P | 5406402 |
PARADISE BUILDERS, LLC | BSP | P | 02/03/2017 | 3 piers at 12" , 2 piers at 14" ok/ need to revise deck plan to show added 12" pier/ training with Shaun | ERICR | ERICR | | BSP | P | 5405978 |
PARADISE BUILDERS, LLC | BIN | C | 01/31/2017 | | LINDSEY | LINDSEY | | BIN | C | 5402617 |
PARADISE BUILDERS, LLC | BFR | C | 01/31/2017 | corrections made to framing | LINDSEY | LINDSEY | | BFR | C | 5402545 |
PARADISE BUILDERS, LLC | BFR | R | 01/27/2017 | Need to install bearing blocks for BG girder / Need to install double HTS20 straps for BG girder / Plans call for exterior wall at stairs to be 12" oc / Need to install 3 king studs for front window header / Need to install new LVL in existing floor framing / Need to draft stop throughout / Still need to inspect deck framing / OK to insulate | NICK | NICK | | BFR | R | 5400387 |
PARADISE BUILDERS, LLC | BSP | P | 01/27/2017 | Contractor wanted to cancel pier inspection, not ready for inspection | NICK | NICK | | BSP | P | 5400371 |
PARADISE BUILDERS, LLC | BSP | T | 01/24/2017 | PAID (REC#1397170) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Add deck | MICHAELA | MICHAELA | | BSP | T | 5397446 |
PARADISE BUILDERS, LLC | BSP | P | 12/16/2016 | Looked at R30 in both front and rear cantilevers // looked at hangers in both cantilevers | LINDSEY | LINDSEY | | BSP | P | 5371084 |
MOUNTAIN STATES ELECTRIC | E= | C | 04/19/2017 | | BRIAN | BRIAN | | E= | C | 5479723 |
MOUNTAIN STATES ELECTRIC | E= | R | 04/17/2017 | range se cable in air return, install receptacle for condensate at furnace, switch plate for furnace crawl and garage lights. remove stucco at intersystem bond terminal so that it can be used. note:25 amp a/c installed | BRET | BRET | | E= | R | 5477333 |
MOUNTAIN STATES ELECTRIC | EUG | C | 01/10/2017 | 2" pvc 24" deep feeder conduit from the house to the garage | CRAIGS | CRAIGS | | EUG | C | 5385222 |
MOUNTAIN STATES ELECTRIC | ER | C | 01/10/2017 | need a separate permit for the garage as it is detached---- need to inspect the crawler | CRAIGS | CRAIGS | | ER | C | 5385221 |
O.M.A.G.M., INC. | H= | C | 05/08/2017 | Gas contractor complete. | MICHAELS | MICHAELS | | H= | C | 5499856 |
DESIGN SYSTEMS HEATING & AC | H= | C | 05/05/2017 | DIRECT VENT , A/C COMPLETE | DAVIDH | DAVIDH | | H= | C | 5497817 |
JOEAGLE PLUMBING & HEATING, INC. | H= | C | 05/03/2017 | Water heater complete. | JACK | JACK | | H= | C | 5494907 |
JOEAGLE PLUMBING & HEATING, INC. | H= | R | 05/02/2017 | PERMIT FEES DO NOT COVER SCOPE OF WORK VALUATION SHOWS $100.00 AND A $40.00 FLAT FEE . THAT IS ONLY FOR A LIKE FOR LIKE CHANGE OUT .THIS IS NOT THE CASE A ON DEMAND WATER HEATER WAS INSTALLED WITH NEW VENT PROPER EVALUATION IS REQUIRED TO BE COMPLETED. | DAVIDH | DAVIDH | | H= | R | 5493918 |
JOEAGLE PLUMBING & HEATING, INC. | H= | R | 04/28/2017 | no call ahead #, no answer at door, no access to home, no inspection. | PAULO | PAULO | | H= | R | 5490971 |
DESIGN SYSTEMS HEATING & AC | H= | P | 04/19/2017 | Who is claiming on demand w/h?, need intake fitting on furnace, support a/c coil. Note: conditioned crawl space, full a/c. | MICHAELS | MICHAELS | | H= | P | 5481017 |
O.M.A.G.M., INC. | HI | C | 01/23/2017 | 10 LB TEST OK NOTE 1" LINE 1 ON DEMAND W/H AND FURN FURN IS NOT VENTED METER IS UNLOCKED STILL NEED HRR COMPLETED BE FORE GAS IS TURNED ON | DAVIDH | DAVIDH | | HI | C | 5396264 |
DESIGN SYSTEMS HEATING & AC | HRR | C | 01/10/2017 | ADDED NOTES WILL CHECK CRAWL SPACE AT FINAL 1-31-17 NO ACCESS TO CRAWL SPACE. NOTE: MAIN LEVEL AND UPPER LEVEL OK. | LUKE | LUKE | | HRR | C | 5386008 |
DESIGN SYSTEMS HEATING & AC | HC | C | 01/10/2017 | RELEASE METER | LUKE | LUKE | | HC | C | 5402803 |
DESIGN SYSTEMS HEATING & AC | HRR | L | 01/04/2017 | LOCKED NO ACCESS | DAVIDH | DAVIDH | | HRR | L | 5382665 |
JOEAGLE PLUMBING & HEATING, INC. | P= | C | 05/03/2017 | Corrections made. | JACK | JACK | | P= | C | 5494904 |
JOEAGLE PLUMBING & HEATING, INC. | P= | P | 04/20/2017 | add water heater to scope of work, rest ok. | TAYLOR | TAYLOR | | P= | P | 5481323 |
JOEAGLE PLUMBING & HEATING, INC. | PTO | C | 12/29/2016 | | TIM | TIM | | PTO | C | 5379009 |