EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 02/16/2017 | Remove roof E1 | SHELBY | SHELBY | | BSP | P | 5416822 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | B= | C | 02/15/2017 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5415821 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 02/14/2017 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: REVISED EF'S | JUSTINC | JUSTINC | | BSP | P | 5414612 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | B= | P | 02/13/2017 | final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), BIBLE ELECTRIC, INC. Electrical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5414132 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 01/23/2017 | engineer letter for welding and bolting received / measures all grab bars in bathrooms with Superintendent and discussed correct positions for them and also discussed other accessible elements | DANE | DANE | | BFR | P | 5413860 |
NIELSEN MECHANICAL CONTRACTORS, INC. | BSP | T | 01/19/2017 | PAID (REC#1396844) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised duct layout | JUSTINC | JUSTINC | | BSP | T | 5393380 |
NIELSEN MECHANICAL CONTRACTORS, INC. | BSP | T | 01/19/2017 | PAID (REC#1396844) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised duct layout | JUSTINC | JUSTINC | | BSP | T | 5413872 |
NIELSEN MECHANICAL CONTRACTORS, INC. | BSP | T | 01/19/2017 | PAID (REC#1396844) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised duct layout | JUSTINC | JUSTINC | | BSP | T | 5413887 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/29/2016 | interior light gauge framing OK pending other roughs / need to pull electrical and plumbing permits still | DANE | DANE | | BFR | P | 5413868 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/29/2016 | interior light gauge framing OK pending other roughs / need to pull electrical and plumbing permits still | DANE | DANE | | BFR | P | 5413883 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/29/2016 | interior light gauge framing OK pending other roughs / need to pull electrical and plumbing permits still | DANE | DANE | | BFR | P | 5378696 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/28/2016 | Fire taping & penetration sealing OK at elevator chase / Spoke with Alan Erikson about need for inspection on interior finish permit / training with Rich B | DANE | DANE | | BFR | P | 5413853 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 12/23/2016 | RC and 4th layer OK at lid of elevator chase | DANE | DANE | | BSP | P | 5413851 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 12/23/2016 | 2nd and 3rd layers of rock at top of elevator chase OK | DANE | DANE | | BSP | P | 5413850 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 12/23/2016 | fist layer and 1/2 of second layer at lid of elevator chase OK | DANE | DANE | | BSP | P | 5413849 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 12/22/2016 | Talked to Allen on phone about sequencing of inspections for rated lid in elevator chase. 4:15 PM | DANE | DANE | | BSP | P | 5413848 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/21/2016 | basement framing OK pending other roughs / still need copy of open hole / mineral wool installed OK / discussed continuous graspable rails and guards at stairs | DANE | DANE | | BFR | P | 5413846 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/20/2016 | listing for elevator guide penetrations at elevator chase received / discussed accessible elements with Allen of Executive custom Construction / training with Justin L | DANE | DANE | | BFR | P | 5413845 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/19/2016 | drywall installed above ceiling framing at elevator chase - still need listing for penetrations and need to fire tape rock above ceiling / training with Matt M | DANE | DANE | | BFR | P | 5413844 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/15/2016 | interior layer of rock at elevator chase walls OK through rated lid / drywall will need to continue to the bottom of the roof deck / stamped letter received for use of American rock as long as it is applied how the listings on the print require it to be applied | DANE | DANE | | BFR | P | 5413843 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | C | 12/14/2016 | remainder of stucco lath OK | DANE | DANE | | BLA | C | 5413837 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | R | 12/12/2016 | still need listed assembly for fire barrier on ceiling using american gyp, paper work provided is only a product description, current listing calls for USG drywall | BOBF | BOBF | | BFR | R | 5413836 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/08/2016 | interior wall framing excluding stair walls and elevator walls OK pending other roughs / exterior walls OK pending other roughs / need backing for grab bars in bathrooms / discussed accessibility with contractor / discussed proprietary listings for elevator chase (U419 called out and American being used) will need a listing for American rock / discussed inspection process for rated lid in elevator and discussed listing / will need listings for all penetrations at elevator chase | DANE | DANE | | BFR | P | 5413832 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | P | 12/02/2016 | south and east elevations OK all except need to install door to deck on south side / north and west elevations still need inspection | DANE | DANE | | BLA | P | 5413829 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/29/2016 | light gauge framing at towers on roof OK pending other roughs / welding and bolting letter for for red iron to follow / Note: rated walls and ceiling at elevator are both proprietary listings calling for USG rock | DANE | DANE | | BFR | P | 5413828 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/14/2016 | exterior light gauge framing at south, east and west walls OK - North wall OK to sheet outside but still need to complete stiffeners and need anchor bolts / all headers and gang studs have been pre-insulated / welding and bolting letter for red iron is to follow / discussed accessible elements with framer | DANE | DANE | | BFR | P | 5413827 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFN | C | 09/29/2016 | Eufer inspected by electrical inspector | DANE | DANE | | BFN | C | 5413826 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFD | C | 09/29/2016 | engineer observation report received | DANE | DANE | | BFD | C | 5413825 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFN | P | 09/29/2016 | engineer observation report received for reinforcement / need observation for Eufer / open hole on file | DANE | DANE | | BFN | P | 5413824 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFT | C | 09/29/2016 | engineer observation report received | DANE | DANE | | BFT | C | 5413823 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFD | P | 08/22/2016 | met contractor on site - no open hole on site - OK to use engineer for drain inspection / observation report to follow | DANE | DANE | | BFD | P | 5413819 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFN | P | 07/22/2016 | ok for engineer to inspect / observation letter to follow | JOHN | JOHN | | BFN | P | 5413814 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFT | P | 07/22/2016 | ok for engineer to inspect / observation letter to follow | JOHN | JOHN | | BFT | P | 5413813 |
BIBLE ELECTRIC, INC. | E= | C | 02/15/2017 | FIRE ALARM INSPECTION: fire alarm rough ok per bret | MATTHEW | MATTHEW | | E= | C | 5415498 |
BIBLE ELECTRIC, INC. | E= | C | 02/14/2017 | | BRET | BRET | | E= | C | 5415123 |
BIBLE ELECTRIC, INC. | E= | P | 02/13/2017 | pending fire alarm attachment fire alarm ok. | BRET | BRET | | E= | P | 5414139 |
BIBLE ELECTRIC, INC. | E= | P | 02/01/2017 | attach to tenant finish permit and have notes transferred may need to call Dean to address this issue. install w/r type receptacles front ,back and at cooler condenser on roof. gfci receptacles within 6' of sink. trim out wine tasting half wall. available fault current labels at all panels. 50 amp max on rtu 3 and 4 currently 60 ok if equipped with power exhaust . if so provide paper work. missing 3 parking lot light poles. | BRET | BRET | | E= | P | 5413898 |
BIBLE ELECTRIC, INC. | E= | P | 02/01/2017 | FIRE ALARM INSPECTION: attach to tenant finish permit | BRET | BRET | | E= | P | 5413897 |
BIBLE ELECTRIC, INC. | ER | R | 01/17/2017 | tile installed prior to inspection. remove all ceiling tiles, wet glue on floor. | BRET | BRET | | ER | R | 5413859 |
BIBLE ELECTRIC, INC. | ER | P | 01/12/2017 | 5 soffit lights on south side / pony wall in wine area ok | CRAIG | CRAIG | | ER | P | 5413858 |
BIBLE ELECTRIC, INC. | ER | P | 01/04/2017 | elevator pit and bathroom hard lid | BRET | BRET | | ER | P | 5413855 |
BIBLE ELECTRIC, INC. | ER | P | 12/30/2016 | pony wall front east ok | BRET | BRET | | ER | P | 5413854 |
BIBLE ELECTRIC, INC. | ER | P | 12/28/2016 | FIRE ALARM INSPECTION: facp in wall at entry only | BRET | BRET | | ER | P | 5413852 |
BIBLE ELECTRIC, INC. | ER | P | 12/22/2016 | front soffit, vestibule and walls framed wall in basement. | BRET | BRET | | ER | P | 5413847 |
BIBLE ELECTRIC, INC. | ER | P | 12/15/2016 | walls for offices / bath room / elevator wall / mop sink area / security area only | CRAIG | CRAIG | | ER | P | 5413842 |
BIBLE ELECTRIC, INC. | ES | C | 12/12/2016 | Commercial Service: 800 amp 4/w 3 sets of 400 mcm al ok to set meter --------------- note to main breaker only in panel ------------ ufer / steel / water ok | CRAIG | CRAIG | | ES | C | 5413835 |
BIBLE ELECTRIC, INC. | ER | P | 12/09/2016 | exterior walls | BRET | BRET | | ER | P | 5413833 |
BIBLE ELECTRIC, INC. | ESL | C | 09/02/2016 | 2 1' conduits in wine tasting slab | BRET | BRET | | ESL | C | 5413822 |
BIBLE ELECTRIC, INC. | EUG | C | 09/02/2016 | parking lot lighting eug ok | BRET | BRET | | EUG | C | 5413821 |
BIBLE ELECTRIC, INC. | EUG | P | 08/16/2016 | concrete pour for ufer ok | CRAIG | CRAIG | | EUG | P | 5413818 |
BIBLE ELECTRIC, INC. | EUG | P | 08/12/2016 | ufer | BRET | BRET | | EUG | P | 5413817 |
BIBLE ELECTRIC, INC. | EUG | R | 08/09/2016 | rebar cannot be in contract with earth (s.w corner, clamp conductor to rebar riser in foundation wall) | BRET | BRET | | EUG | R | 5413816 |
BIBLE ELECTRIC, INC. | EUG | R | 08/01/2016 | foundation poured prior to ufer inspection | BRET | BRET | | EUG | R | 5413815 |
DREAM CATCHER MECHANICAL | H= | C | 01/31/2017 | REFRIGERATION FINAL OK. | NANCY | NANCY | | H= | C | 5402714 |
DREAM CATCHER MECHANICAL | H= | C | 01/31/2017 | REFRIGERATION FINAL OK. | NANCY | NANCY | | H= | C | 5413876 |
DREAM CATCHER MECHANICAL | H= | C | 01/31/2017 | REFRIGERATION FINAL OK. | NANCY | NANCY | | H= | C | 5413891 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 01/27/2017 | NEED ELECTRICAL CONTRACTOR ATTACHED TO PERMIT. TEST AND BALANCE REPORT RECEIVED. STILL NEED REVISED/APPROVED PRINTS FOR WINE ROOM, SEE INSPECTION NOTES DATED 1/24/17. | NANCY | NANCY | | H= | P | 5400005 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 01/27/2017 | NEED ELECTRICAL CONTRACTOR ATTACHED TO PERMIT. TEST AND BALANCE REPORT RECEIVED. STILL NEED REVISED/APPROVED PRINTS FOR WINE ROOM, SEE INSPECTION NOTES DATED 1/24/17. | NANCY | NANCY | | H= | P | 5413875 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 01/27/2017 | NEED ELECTRICAL CONTRACTOR ATTACHED TO PERMIT. TEST AND BALANCE REPORT RECEIVED. STILL NEED REVISED/APPROVED PRINTS FOR WINE ROOM, SEE INSPECTION NOTES DATED 1/24/17. | NANCY | NANCY | | H= | P | 5413890 |
DREAM CATCHER MECHANICAL | H= | P | 01/25/2017 | COMPLETELY SEAL AROUND PVC PENETRATIONS OF COOLER FLOOR. NEED PROPER SLOPE ON CONDENSATE DRAIN AT SOUTH EAST CORNER OF COOLER. VERIFY YOU HAVE PROPER SLOPE ON CONDENSATE DRAIN AFTER IT GOES THROUGH FLOOR. SECURE DRAIN WHERE IT GOES ACROSS FLOOR ON LOWER LEVEL. TRAP REQUIRED IN DRAIN? ONE CONDENSER CORNER STILL NEEDS TO BE SECURED TO WOOD SLEEPER. WOOD SLEEPER ALLOWED TO BE INSTALLED DIRECTLY ON ROOF? | NANCY | NANCY | | H= | P | 5413889 |
DREAM CATCHER MECHANICAL | H= | P | 01/25/2017 | COMPLETELY SEAL AROUND PVC PENETRATIONS OF COOLER FLOOR. NEED PROPER SLOPE ON CONDENSATE DRAIN AT SOUTH EAST CORNER OF COOLER. VERIFY YOU HAVE PROPER SLOPE ON CONDENSATE DRAIN AFTER IT GOES THROUGH FLOOR. SECURE DRAIN WHERE IT GOES ACROSS FLOOR ON LOWER LEVEL. TRAP REQUIRED IN DRAIN? ONE CONDENSER CORNER STILL NEEDS TO BE SECURED TO WOOD SLEEPER. WOOD SLEEPER ALLOWED TO BE INSTALLED DIRECTLY ON ROOF? | NANCY | NANCY | | H= | P | 5413874 |
DREAM CATCHER MECHANICAL | H= | P | 01/25/2017 | COMPLETELY SEAL AROUND PVC PENETRATIONS OF COOLER FLOOR. NEED PROPER SLOPE ON CONDENSATE DRAIN AT SOUTH EAST CORNER OF COOLER. VERIFY YOU HAVE PROPER SLOPE ON CONDENSATE DRAIN AFTER IT GOES THROUGH FLOOR. SECURE DRAIN WHERE IT GOES ACROSS FLOOR ON LOWER LEVEL. TRAP REQUIRED IN DRAIN? ONE CONDENSER CORNER STILL NEEDS TO BE SECURED TO WOOD SLEEPER. WOOD SLEEPER ALLOWED TO BE INSTALLED DIRECTLY ON ROOF? | NANCY | NANCY | | H= | P | 5398971 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 01/24/2017 | NEED REVISED/APPROVED PRINTS FOR WINE ROOM. WINE ROOM HAS A CEILING AND ONLY THREE SUPPLY AIR RUNS AND LACKS RETURN AIR. ALSO NEED TO SHOW RETURN AIR OPENING IN TRUNK LINE IN STORAGE 002. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5413888 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 01/24/2017 | NEED REVISED/APPROVED PRINTS FOR WINE ROOM. WINE ROOM HAS A CEILING AND ONLY THREE SUPPLY AIR RUNS AND LACKS RETURN AIR. ALSO NEED TO SHOW RETURN AIR OPENING IN TRUNK LINE IN STORAGE 002. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5413873 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 01/24/2017 | NEED REVISED/APPROVED PRINTS FOR WINE ROOM. WINE ROOM HAS A CEILING AND ONLY THREE SUPPLY AIR RUNS AND LACKS RETURN AIR. ALSO NEED TO SHOW RETURN AIR OPENING IN TRUNK LINE IN STORAGE 002. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5397645 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 01/24/2017 | MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 5413861 |
DREAM CATCHER MECHANICAL | HRP | C | 01/17/2017 | TWO 300 LB TESTS OK. STILL NEED REVISED/APPROVED PRINTS. COMPLETE CONDENSATE DRAINS. NO ROOF YET. | NANCY | NANCY | | HRP | C | 5413886 |
DREAM CATCHER MECHANICAL | HRP | C | 01/17/2017 | TWO 300 LB TESTS OK. STILL NEED REVISED/APPROVED PRINTS. COMPLETE CONDENSATE DRAINS. NO ROOF YET. | NANCY | NANCY | | HRP | C | 5390785 |
DREAM CATCHER MECHANICAL | HRP | C | 01/17/2017 | TWO 300 LB TESTS OK. STILL NEED REVISED/APPROVED PRINTS. COMPLETE CONDENSATE DRAINS. NO ROOF YET. | NANCY | NANCY | | HRP | C | 5413871 |
DREAM CATCHER MECHANICAL | HRP | P | 01/03/2017 | CONSULTATION ONLY FOR ISSUES WITH DRAIN WASTE AND VENT INSIDE WALKIN COOLERS. THIS NEEDS TO BE DETAILED OUT ON THE PLANS. ALSO CONSULTED WITH CONTRACTOR BECAUSE THERE IS NO NO EQUIPMENT SCHEDULE FOR REFER EQUIPMENT AND REFRIGERANT QUANTITIES FOR LEAK DETECTIONS PURPOSES. | JON | JON | | HRP | P | 5413885 |
DREAM CATCHER MECHANICAL | HRP | P | 01/03/2017 | CONSULTATION ONLY FOR ISSUES WITH DRAIN WASTE AND VENT INSIDE WALKIN COOLERS. THIS NEEDS TO BE DETAILED OUT ON THE PLANS. ALSO CONSULTED WITH CONTRACTOR BECAUSE THERE IS NO NO EQUIPMENT SCHEDULE FOR REFER EQUIPMENT AND REFRIGERANT QUANTITIES FOR LEAK DETECTIONS PURPOSES. | JON | JON | | HRP | P | 5413870 |
DREAM CATCHER MECHANICAL | HRP | P | 01/03/2017 | CONSULTATION ONLY FOR ISSUES WITH DRAIN WASTE AND VENT INSIDE WALKIN COOLERS. THIS NEEDS TO BE DETAILED OUT ON THE PLANS. ALSO CONSULTED WITH CONTRACTOR BECAUSE THERE IS NO NO EQUIPMENT SCHEDULE FOR REFER EQUIPMENT AND REFRIGERANT QUANTITIES FOR LEAK DETECTIONS PURPOSES. | JON | JON | | HRP | P | 5381361 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 01/03/2017 | OK AT HARD LIDS ONLY, ALSO SEE NOTES FROM PREVIOUS INSPECTOR | JON | JON | | HD | P | 5381350 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 01/03/2017 | OK AT HARD LIDS ONLY, ALSO SEE NOTES FROM PREVIOUS INSPECTOR | JON | JON | | HD | P | 5413884 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 01/03/2017 | OK AT HARD LIDS ONLY, ALSO SEE NOTES FROM PREVIOUS INSPECTOR | JON | JON | | HD | P | 5413869 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 12/20/2016 | NEED REVISED APPROVED PRINTS SHOWING TWO EXHAUST FANS IN BATHROOM CEILINGS INSTEAD OF FAN ON ROOF, RTU-4 SUPPLY AND RETURN DUCTS GOING INTO BASEMENT THROUGH CONTROL ROOM INSTEAD OF NEAR STAIRS AND WINE ROOM HAVING A CEILING INSTALLED. REMOTE INDICATORS FOR SMOKE DETECTORS? SEAL DUCTS ABOVE WINE ROOM CEILING. REST OF ROUGH DUCTS AND BATH EXHAUST ALL OK. NO ROOF YET. | NANCY | NANCY | | HD | P | 5413882 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 12/20/2016 | NEED REVISED APPROVED PRINTS SHOWING TWO EXHAUST FANS IN BATHROOM CEILINGS INSTEAD OF FAN ON ROOF, RTU-4 SUPPLY AND RETURN DUCTS GOING INTO BASEMENT THROUGH CONTROL ROOM INSTEAD OF NEAR STAIRS AND WINE ROOM HAVING A CEILING INSTALLED. REMOTE INDICATORS FOR SMOKE DETECTORS? SEAL DUCTS ABOVE WINE ROOM CEILING. REST OF ROUGH DUCTS AND BATH EXHAUST ALL OK. NO ROOF YET. | NANCY | NANCY | | HD | P | 5413867 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 12/20/2016 | NEED REVISED APPROVED PRINTS SHOWING TWO EXHAUST FANS IN BATHROOM CEILINGS INSTEAD OF FAN ON ROOF, RTU-4 SUPPLY AND RETURN DUCTS GOING INTO BASEMENT THROUGH CONTROL ROOM INSTEAD OF NEAR STAIRS AND WINE ROOM HAVING A CEILING INSTALLED. REMOTE INDICATORS FOR SMOKE DETECTORS? SEAL DUCTS ABOVE WINE ROOM CEILING. REST OF ROUGH DUCTS AND BATH EXHAUST ALL OK. NO ROOF YET. | NANCY | NANCY | | HD | P | 5372663 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 12/15/2016 | GAS FINAL OK. | NANCY | NANCY | | H= | C | 5413840 |
FRONTIER MECHANICAL SYSTEMS INC | HC | C | 12/15/2016 | OK TO SET 2 LB METER. | NANCY | NANCY | | HC | C | 5413839 |
FRONTIER MECHANICAL SYSTEMS INC | HI | C | 12/15/2016 | 10 LB TEST OK. INSTALLED AS PER PRINTS. | NANCY | NANCY | | HI | C | 5413838 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 02/01/2017 | ok. | JOHNS | JOHNS | | P= | C | 5413899 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 02/01/2017 | ok. | JOHNS | JOHNS | | P= | C | 5404349 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 12/15/2016 | ALL H2O ON TEST , IRRIGATION COMPLETE , SLEEVED THROUGH FOUNDATION | GABE | GABE | | PTO | C | 5403611 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 12/15/2016 | ALL H2O ON TEST , IRRIGATION COMPLETE , SLEEVED THROUGH FOUNDATION | GABE | GABE | | PTO | C | 5413896 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 12/15/2016 | ALL H2O ON TEST , IRRIGATION COMPLETE , SLEEVED THROUGH FOUNDATION | GABE | GABE | | PTO | C | 5413841 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 12/15/2016 | ALL H2O ON TEST , IRRIGATION COMPLETE , SLEEVED THROUGH FOUNDATION | GABE | GABE | | PTO | C | 5413866 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 12/15/2016 | ALL H2O ON TEST , IRRIGATION COMPLETE , SLEEVED THROUGH FOUNDATION | GABE | GABE | | PTO | C | 5413881 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/12/2016 | ALL WATER - IRRIGATION LOOP , ALL TO PLAN ON TEST | GABE | GABE | | PTO | P | 5413834 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/12/2016 | ALL WATER - IRRIGATION LOOP , ALL TO PLAN ON TEST | GABE | GABE | | PTO | P | 5413865 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/12/2016 | ALL WATER - IRRIGATION LOOP , ALL TO PLAN ON TEST | GABE | GABE | | PTO | P | 5413880 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/12/2016 | ALL WATER - IRRIGATION LOOP , ALL TO PLAN ON TEST | GABE | GABE | | PTO | P | 5413895 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/12/2016 | ALL WATER - IRRIGATION LOOP , ALL TO PLAN ON TEST | GABE | GABE | | PTO | P | 5403610 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/06/2016 | DWV ONLY , AAV IN FIRE EQUIPMENT ROOM FOR FLOOR SINKS X2 , ALL LIFT PUMP DWV ON TEST ALL TO PLAN | GABE | GABE | | PTO | P | 5403609 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/06/2016 | DWV ONLY , AAV IN FIRE EQUIPMENT ROOM FOR FLOOR SINKS X2 , ALL LIFT PUMP DWV ON TEST ALL TO PLAN | GABE | GABE | | PTO | P | 5413831 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/06/2016 | DWV ONLY , AAV IN FIRE EQUIPMENT ROOM FOR FLOOR SINKS X2 , ALL LIFT PUMP DWV ON TEST ALL TO PLAN | GABE | GABE | | PTO | P | 5413864 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/06/2016 | DWV ONLY , AAV IN FIRE EQUIPMENT ROOM FOR FLOOR SINKS X2 , ALL LIFT PUMP DWV ON TEST ALL TO PLAN | GABE | GABE | | PTO | P | 5413894 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/06/2016 | DWV ONLY , AAV IN FIRE EQUIPMENT ROOM FOR FLOOR SINKS X2 , ALL LIFT PUMP DWV ON TEST ALL TO PLAN | GABE | GABE | | PTO | P | 5413879 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | P | 12/05/2016 | ROOF SCUPPER WILL BE PRIMARY , 2 , 6 INCH ROOF DRAINS ARE SECONDARY ON TEST TO PLAN , NEED TO SPLICE FOR CHANGES | GABE | GABE | | PRD | P | 5403608 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | P | 12/05/2016 | ROOF SCUPPER WILL BE PRIMARY , 2 , 6 INCH ROOF DRAINS ARE SECONDARY ON TEST TO PLAN , NEED TO SPLICE FOR CHANGES | GABE | GABE | | PRD | P | 5413830 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | P | 12/05/2016 | ROOF SCUPPER WILL BE PRIMARY , 2 , 6 INCH ROOF DRAINS ARE SECONDARY ON TEST TO PLAN , NEED TO SPLICE FOR CHANGES | GABE | GABE | | PRD | P | 5413863 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | P | 12/05/2016 | ROOF SCUPPER WILL BE PRIMARY , 2 , 6 INCH ROOF DRAINS ARE SECONDARY ON TEST TO PLAN , NEED TO SPLICE FOR CHANGES | GABE | GABE | | PRD | P | 5413878 |
FRONTIER MECHANICAL SYSTEMS INC | PRD | P | 12/05/2016 | ROOF SCUPPER WILL BE PRIMARY , 2 , 6 INCH ROOF DRAINS ARE SECONDARY ON TEST TO PLAN , NEED TO SPLICE FOR CHANGES | GABE | GABE | | PRD | P | 5413893 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 09/02/2016 | SANITARY DWV ON TEST , NEED PLANS SPLICED BY FINAL TO SHOW ADDITION OF FLOOR DRAINS/SINK AND WATER ENTRY LOCATION | GABE | GABE | | PB | P | 5403607 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 09/02/2016 | SANITARY DWV ON TEST , NEED PLANS SPLICED BY FINAL TO SHOW ADDITION OF FLOOR DRAINS/SINK AND WATER ENTRY LOCATION | GABE | GABE | | PB | P | 5413820 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 09/02/2016 | SANITARY DWV ON TEST , NEED PLANS SPLICED BY FINAL TO SHOW ADDITION OF FLOOR DRAINS/SINK AND WATER ENTRY LOCATION | GABE | GABE | | PB | P | 5413862 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 09/02/2016 | SANITARY DWV ON TEST , NEED PLANS SPLICED BY FINAL TO SHOW ADDITION OF FLOOR DRAINS/SINK AND WATER ENTRY LOCATION | GABE | GABE | | PB | P | 5413877 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 09/02/2016 | SANITARY DWV ON TEST , NEED PLANS SPLICED BY FINAL TO SHOW ADDITION OF FLOOR DRAINS/SINK AND WATER ENTRY LOCATION | GABE | GABE | | PB | P | 5413892 |