HAIGH CONSTRUCTION, INC. | B= | C | 04/14/2017 | All other required Final inspections are complete. (This is a computer generated result) | JEREMYA | JEREMYA | | B= | C | 5475469 |
HAIGH CONSTRUCTION, INC. | B= | P | 04/13/2017 | Building final complete. Additional Inspections Required (computer generated): FRONTIER MECHANICAL SYSTEMS INC Plumbing Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5474603 |
ONI COMPANIES, LLC | BSP | T | 03/14/2017 | PAID (REC#1409736) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Removed existing receptacles - not health grade. | BERTHA | BERTHA | | BSP | T | 5440135 |
HAIGH CONSTRUCTION, INC. | BFR | P | 01/25/2017 | Interior framing including soffits OK. This should complete all interior wall framing in all suites on both floors | JEREMYA | JEREMYA | | BFR | P | 5398644 |
HAIGH CONSTRUCTION, INC. | BFR | P | 01/24/2017 | Interior framing at east suite, first floor OK | JEREMYA | JEREMYA | | BFR | P | 5397016 |
ONI COMPANIES, LLC | E= | C | 03/24/2017 | | MATTHEW | MATTHEW | | E= | C | 5454974 |
ONI COMPANIES, LLC | E= | R | 03/16/2017 | re-install gfci for elevator pit, gfci within 6' of sink in room 106, correct wire and breaker size for water heater, install emon dmon metering | MATTHEW | MATTHEW | | E= | R | 5443452 |
DILLER ELECTRIC LLC | E= | C | 03/13/2017 | FIRE ALARM INSPECTION: | GARYL | GARYL | | E= | C | 5438701 |
DILLER ELECTRIC LLC | ER | P | 03/13/2017 | FIRE ALARM INSPECTION: Fire alarm per Shelby okay | GARYL | GARYL | | ER | P | 5438695 |
ONI COMPANIES, LLC | ER | C | 03/03/2017 | | MATTHEW | MATTHEW | | ER | C | 5431370 |
ONI COMPANIES, LLC | ER | P | 03/02/2017 | ceilings south of corridor ok | MATTHEW | MATTHEW | | ER | P | 5429902 |
ONI COMPANIES, LLC | ER | P | 03/01/2017 | corridor and reception area | MATTHEW | MATTHEW | | ER | P | 5428887 |
ONI COMPANIES, LLC | EP | C | 02/06/2017 | 400 amp sub-panel ok | MATTHEW | MATTHEW | | EP | C | 5407013 |
ONI COMPANIES, LLC | EP | R | 02/03/2017 | need equipment ground in each raceway | MATTHEW | MATTHEW | | EP | R | 5406221 |
ONI COMPANIES, LLC | ER | P | 01/26/2017 | all of hard lids okay | GARYL | GARYL | | ER | P | 5399885 |
DILLER ELECTRIC LLC | ER | P | 01/26/2017 | walls only | GARYL | GARYL | | ER | P | 5435852 |
DILLER ELECTRIC LLC | ER | P | 01/25/2017 | FIRE ALARM INSPECTION: ceiling not ready---- walls only: second floor missing device in pediatric waiting----- first floor missing devices in exam room 108 and lobby--------- FACP not installed--------rest of walls complete | MATTHEW | MATTHEW | | ER | P | 5435851 |
ONI COMPANIES, LLC | ER | P | 01/24/2017 | all walls ok | MATTHEW | MATTHEW | | ER | P | 5397117 |
ONI COMPANIES, LLC | ER | P | 01/23/2017 | walls marked on plans (east side) | MATTHEW | MATTHEW | | ER | P | 5395588 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 03/29/2017 | MECHANICAL FINAL OK. ENGINEER LETTER APPROVING BALANCE REPORT READINGS RECEIVED AND SCANNED, SEE IMAGES. | NANCY | NANCY | | H= | C | 5458557 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 03/27/2017 | TEST AND BALANCE REPORT RECEIVED. MULTIPLE READINGS OUTSIDE OF +/- 10% ALLOWED. NEED REVISED REPORT OR LETTER FROM ENGINEER APPROVING THESE READINGS. | NANCY | NANCY | | H= | P | 5455923 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 02/27/2017 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5425574 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 02/08/2017 | ABOVE CEILING LOW PRESSURE DUCT AND RUN OUTS OK - STILL NEED ALL MEDIUM PRESSURE TIE INS AND BOXES | JERRYF | JERRYF | | HD | P | 5410384 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/31/2017 | ABOVE CEILING MEDIUM AND LOW PRESSURE MAINS / RUN OUTS AND EXHAUST OK ON EAST SIDE OF BUILDING - STILL NEED ALL VAV BOXES | JERRYF | JERRYF | | HD | P | 5403434 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 04/14/2017 | correction made | TED | TED | | P= | C | 5475468 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 04/13/2017 | complete west side hall sink install, rest ok | TED | TED | | P= | P | 5474194 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 01/09/2017 | correction made | TED | TED | | PB | C | 5384357 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 01/09/2017 | correction made | TED | TED | | PTO | C | 5384354 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 01/06/2017 | lost test east side dwv, west side base piping test and design ok to cover | TED | TED | | PB | P | 5383918 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 01/06/2017 | lost test on east side dwv, west dwv test and design ok, water piping ok | TED | TED | | PTO | P | 5383917 |