HOMEOWNER | BIN | C | 03/25/2024 | Floor insulation okay / Attic insulation to be inspected at final | TRENTP | TRENTP | | BIN | C | 8031771 |
HOMEOWNER | BIN | P | 10/04/2022 | Need to inspect floor insulation above unconditioned garage prior to covering with 5/8 gypsum / Rest of exterior walls okay / Will inspect attic insulation at final | TRENTP | TRENTP | | BIN | P | 7539448 |
HOMEOWNER | BFR | C | 09/23/2022 | Items corrected / NOTE: Will inspect deck as BSP inspection when ready at later date | TRENTP | TRENTP | | BFR | C | 7528380 |
HOMEOWNER | BFR | P | 09/22/2022 | Need to foam and fireblock whole house./ Still need to inspect deck./ Rest OK./ | RYANF | RYANF | | BFR | P | 7526206 |
HOMEOWNER | BE | C | 04/14/2020 | Having difficutlty getting materials and the work done due to COVID19 continueing to work just not quite ready for an inspection, Framing is ready but needs roughs completed first. | JLANE | JLANE | | BE | C | 6539740 |
HOMEOWNER | BE | C | 04/25/2019 | | TERRI | TERRI | | BE | C | 6177776 |
HOMEOWNER | BSP | P | 04/30/2018 | 2 new pads in floor 24" x 24"x 10" pads / #4 rebar 6" oc in place / need on foundation plan | DALE | DALE | | BSP | P | 5831429 |
HOMEOWNER | BFD | C | 10/13/2017 | exterior / entire foundation | BOBF | BOBF | | BFD | C | 5655091 |
HOMEOWNER | BFI | C | 10/12/2017 | 2 " R-10 Rigid | BOBF | BOBF | | BFI | C | 5653620 |
HOMEOWNER | BFD | R | 10/12/2017 | need Mirafi 140N or equivilent , rest of drain okay | BOBF | BOBF | | BFD | R | 5653595 |
HOMEOWNER | BFN | C | 10/11/2017 | letter for eufer on file | BOBF | BOBF | | BFN | C | 5650975 |
HOMEOWNER | BFN | P | 09/07/2017 | Steel reinforced foundation OK - Still need to install Eufer / Open hole received - 1500 PSF (verified) / Drain usable / Foundation design received | JUSTINL | JUSTINL | | BFN | P | 5618800 |
HOMEOWNER | BFT | C | 06/30/2017 | Footing forms and pads OK -- Will need to collect foundation design and open hole at next inspection | DAKOTAB | DAKOTAB | | BFT | C | 5552285 |
HOMEOWNER | ER | C | 10/06/2021 | | TOMC | TOMC | | ER | C | 7131616 |
HOMEOWNER | EP | C | 10/06/2021 | | TOMC | TOMC | | EP | C | 7131589 |
HOMEOWNER | EP | P | 09/29/2021 | replace schedule 40 pvc with schedule 80 at home and at service at pole | BRET | BRET | | EP | P | 7123756 |
HOMEOWNER | ER | R | 09/29/2021 | make up grounds with pigtails, install connectors on all recessed light fixtures, ground metal fan box, install range box for range and dryer, add 2 receptacles to master bedroom, add receptacles to center of garage bay at accessible height. , add receptacle to front deck, relocate smoke detector in hall to close to wall. add light and receptacle to storage and mech room, complete re-inspect | BRET | BRET | | ER | R | 7123746 |
HOMEOWNER | EUG | C | 10/29/2018 | EUG OK----1/0 # 2 GROUND---- | GREGM | GREGM | | EUG | C | 6008717 |
HOMEOWNER | HC | C | 09/20/2022 | RELEASE METER | CASEYM | CASEYM | | HC | C | 7522777 |
HOMEOWNER | HI | C | 09/20/2022 | 10 lb test ok / 1 inch main / 1 Boiler / | CASEYM | CASEYM | | HI | C | 7522776 |
HOMEOWNER | HRR | C | 09/19/2022 | Verify all water and gas connections at final / Homeowner to provide installation instructions for duravent pipe used by final / Verify method of condensate disposal at final / NOTE / Direct vent boiler / | CASEYM | CASEYM | | HRR | C | 7521213 |
HOMEOWNER | HWP | P | 09/19/2022 | 60lb test ok / Switched from baseboard heating to in-floor heating system / | CASEYM | CASEYM | | HWP | P | 7521200 |
HOMEOWNER | HO | C | 04/04/2022 | 10 LB TEST OK ON 118 FEET OF 1 INCH PE FROM ROAD SIDE WHERE METER WILL BE TO SIDE OF HOUSE/ OK TO COVER/ SPOKE WITH HOME OWNER ABOUT GAS LINE IN SIDE HOUSE TO BOILER. PER HOMEOWNER BOILER WILL BE 150K BTUS. 1 INCH GAS LINE FROM THE RISER TO THE BOILER WILL MEET TABLE REQUIREMENTS | JHORSMAN | JHORSMAN | | HO | C | 7324715 |
HOMEOWNER | HWP | C | 10/09/2020 | 60 LB TEST OK / PRESSURE TEST FOR BASEBOARD HYDRONIC SUPPLY AND RETURN LINES / | BILLS | BILLS | | HWP | C | 6736234 |
HOMEOWNER | PB | C | 09/28/2023 | CORRECTION MADE | LEE | LEE | | PB | C | 7870974 |
HOMEOWNER | PB | P | 04/03/2023 | Floor drain in mech room will need a trap and will need to discharge to the sanitary (when tying the sump discharge into a horizontal drain, the connection needs to be vertical dropping down into the drain) | ADRIANM | ADRIANM | | PB | P | 7704978 |
HOMEOWNER | PB | P | 03/31/2023 | Will follow up Monday regarding mech room floor drain terminating outdoors (serving condensing combi boiler) | ADRIANM | ADRIANM | | PB | P | 7704591 |
HOMEOWNER | PTO | C | 10/04/2021 | note: check water heater at final | JOSEPHD | JOSEPHD | | PTO | C | 7128451 |
HOMEOWNER | PTO | L | 09/29/2021 | field canceled | JOSEPHD | JOSEPHD | | PTO | L | 7124127 |
HOMEOWNER | PTO | P | 04/05/2021 | powder bathroom not vented to code, can not have horizontal dry vent below floor at master toilet, lacking freeze protection at washer p-trap, need freeze protection at water lines in garage, note: at final check connection for drain at wall, check water heater, check well tank, will need potable water certification by final | JOSEPHD | JOSEPHD | | PTO | P | 6921958 |
HOMEOWNER | PTO | P | 10/09/2020 | Consult only, re-inspect all | MALYNDA | MALYNDA | | PTO | P | 6735909 |
HOMEOWNER | PWO | C | 10/21/2019 | Correction made | MALYNDA | MALYNDA | | PWO | C | 6374843 |
HOMEOWNER | PWO | P | 10/25/2018 | will need to see connection at well, rest ok to cover at final will need potable water certification | JOSEPHD | JOSEPHD | | PWO | P | 6005934 |
HOMEOWNER | XBS | T | 02/05/2018 | PAID (REC#1480324) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise wall framing | MICHAELA | MICHAELA | | XBS | T | 5757378 |