PEAK PROFESSIONAL CONTRS INC | B= | C | 03/02/2018 | markings completed | NATHAN | NATHAN | | B= | C | 5778946 |
PEAK PROFESSIONAL CONTRS INC | BE | C | 09/21/2017 | | GITA | GITA | | BE | C | 5632881 |
EL PASO ELECTRIC, LLC. | BSP | T | 04/06/2017 | PAID (REC#1415142) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise A and SKF panel schedules | SHELBY | SHELBY | | BSP | T | 5467035 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 03/28/2017 | need markings above ceiling for rated walls / complete all required inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): ARTISAN PIPE SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5458332 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 03/10/2017 | rated wall marking at walls above grid ceiling by final per section 703.6 / all penetrations have been sealed. | NATHAN | NATHAN | | BFR | P | 5437986 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 03/07/2017 | with all completed required inspections all walls okay / penetrations sealed. | NATHAN | NATHAN | | BFR | P | 5434085 |
PEAK PROFESSIONAL CONTRS INC | BFR | R | 03/06/2017 | east wall of old storage area by new electric service need 2 UL listings and penetrations corrected. | NATHAN | NATHAN | | BFR | R | 5432607 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 02/27/2017 | partial exterior walls to east and south see approved plans on site marked and dated | NATHAN | NATHAN | | BFR | P | 5425900 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 02/01/2017 | perimeter and exterior walls not done / walls at SCIF, conference room and 3 offices okay all electric to be surface mounted / need mechanical, electric and permits attached before work is started. | NATHAN | NATHAN | | BFR | P | 5404413 |
EL PASO ELECTRIC, LLC. | E= | C | 04/07/2017 | | TIMA | TIMA | | E= | C | 5467418 |
EL PASO ELECTRIC, LLC. | E= | P | 03/27/2017 | need plans revised with new load calculations for panels scif and "a" because of 200 amp breakers for equipment test recepts 1 in each panel,breaker to big on rtu-6 50 amp max,need bushings inside rtu's for wires,need gfci recept within 25' of rtu's,need mounting screws for industrial covers in open dock area can't use yolk for support----rest ok-- | TIMA | TIMA | | E= | P | 5456469 |
EL PASO ELECTRIC, LLC. | ER | P | 03/27/2017 | ceilings ok | TIMA | TIMA | | ER | P | 5456468 |
EL PASO ELECTRIC, LLC. | ER | C | 03/27/2017 | FIRE ALARM INSPECTION: fplp cable installed | TIMA | TIMA | | ER | C | 5456455 |
EL PASO ELECTRIC, LLC. | E= | C | 03/27/2017 | FIRE ALARM INSPECTION: fplp cable installed | TIMA | TIMA | | E= | C | 5456456 |
EL PASO ELECTRIC, LLC. | ER | P | 03/07/2017 | WALLS OK--- | BRIAN | BRIAN | | ER | P | 5433580 |
ARTISAN PIPE SYSTEMS, INC. | H= | C | 04/03/2017 | CORRECTIONS MADE VERIFIED BY PICTURE | JERRYF | JERRYF | | H= | C | 5462867 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 03/31/2017 | TAB REPORT RECEIVED AND CORRECTIONS MADE | JERRYF | JERRYF | | H= | C | 5461031 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 03/22/2017 | PARTIAL FINAL PENDING TAB REPORT - LABEL UNITS TO AREA SERVED - INSTALL REMOTE INDICATORS FOR SMOKE SHUT DOWN - ATTACH PICTURES OF CORRECTIONS WITH TAB REPORT TO NEXT INSPECTION REQUEST NOTES: ALL SA / RA GRILLES AND FINAL CONNECTIONS OK | JERRYF | JERRYF | | H= | P | 5452316 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | C | 03/22/2017 | ABOVE CEILING OK | JERRYF | JERRYF | | HD | C | 5452315 |
ARTISAN PIPE SYSTEMS, INC. | HC | C | 03/22/2017 | RELEASE METER FOR ADDED LOAD | JERRYF | JERRYF | | HC | C | 5452314 |
ARTISAN PIPE SYSTEMS, INC. | HI | C | 03/22/2017 | NEED GAS SHUT OFFS WITH IN 6' OF EQUIPMENT AND FINAL CONNECTIONS - ATTACH PICTURES OF CORRECTIONS TO NEXT INSPECTION REQUEST NOTES: PRESSURE TEST OK - PIPING PER PLAN | JERRYF | JERRYF | | HI | C | 5452305 |