GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 04/11/2019 | Sign Off | JEREMYA | JEREMYA | | B= | C | 6162405 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 08/23/2018 | Core/shell project OK pending all other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): OTIS ELEVATOR CO - TAX DEPT Mechanical Final Inspection is not Completed yet, STURGEON ELECTRIC CO INC Electrical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5944098 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | C | 08/17/2018 | Balance of lath complete for project | JEREMYA | JEREMYA | | BLA | C | 5937162 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 08/13/2018 | Rear wall at parking garage lath OK // Ceiling at rear of parking garage OK // All of parking garage OK pending completion of elevator vestibule | JEREMYA | JEREMYA | | BLA | P | 5932490 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 08/08/2018 | Lath at center bays of parking garage ceiling complete | JEREMYA | JEREMYA | | BLA | P | 5926970 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/25/2018 | above grid penetrations -- wellness garden lobby area/patch hole in drywall top left corner of barrier -- 3rd floor south elevator above grid ok -- 3rd floor front of room 29/30 and front of south stairwell ok -- 4th floor front of south stairwell ok -- 4th floor front of north stairwell/seal electrical conduit penetrations | SCOTTS | SCOTTS | | BSP | P | 5914169 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/25/2018 | partial frame at garden level south elevator/shaft wall and drop soffit framing ok | SCOTTS | SCOTTS | | BFR | P | 5914155 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 07/25/2018 | exterior wall of north elevator lobby on garden level lath ok | SCOTTS | SCOTTS | | BLA | P | 5914154 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/24/2018 | North exterior wall framing at 2nd floor OK // Wall infill at slab edge OK along north wall OK | JEREMYA | JEREMYA | | BFR | P | 5912448 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/19/2018 | Vestibule framing at stair towers, North and south, on floors 3-4 OK | JEREMYA | JEREMYA | | BFR | P | 5908661 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 07/13/2018 | PARTIAL / lath - lid and (3) walls along north - north east elevation to existing building okay | BRIANB | BRIANB | | BLA | P | 5902180 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/13/2018 | Above ceiling fire stop and penetrations OK at area 8, 3rd floor | JEREMYA | JEREMYA | | BSP | P | 5902110 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/11/2018 | Fire safing at south elevator face from garden to 4th floor OK // Fire penetrations and framing OK in electric room, low volt room and mechanical shafts on floors 1-3 OK | JEREMYA | JEREMYA | | BSP | P | 5899594 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 07/06/2018 | 3rd floor wellness garden patio lath ok | SCOTTS | SCOTTS | | BLA | P | 5895671 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/05/2018 | seal penetrations for electrical/complete electrical on south elevator faces from garden to 4th | SCOTTS | SCOTTS | | BFR | P | 5894429 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 07/03/2018 | All lath at roof OK | JEREMYA | JEREMYA | | BLA | P | 5893279 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 07/03/2018 | all lath at roof complete | JEREMYA | JEREMYA | | BLA | P | 5893304 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/28/2018 | Discussed accessible elements for final // Discussed phased TCO plan | JEREMYA | JEREMYA | | BSP | P | 5889016 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 06/28/2018 | 2nd bay at south end of garden level OK | JEREMYA | JEREMYA | | BLA | P | 5887939 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/28/2018 | Mech shaft at Area 2, 1st floor OK | JEREMYA | JEREMYA | | BFR | P | 5887937 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 06/25/2018 | Lath at garden level parking OK from south to first column and west to first column | JEREMYA | JEREMYA | | BLA | P | 5884842 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/19/2018 | firestop at 4th floor Elevators E12/E13 ok -- dummy wall framing in front of Elevators E12/E13 ok | SCOTTS | SCOTTS | | BSP | P | 5879076 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 06/18/2018 | south elevation lath now complete | SCOTTS | SCOTTS | | BLA | P | 5877655 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 06/15/2018 | south elevation lath ok excluding tie in at corner from 3rd floor up | SCOTTS | SCOTTS | | BLA | P | 5876705 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/14/2018 | firestopping on E12/E13 face of elevators on garden/1st/2nd/4th floors ok/3rd floor incomplete | SCOTTS | SCOTTS | | BSP | P | 5875219 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/08/2018 | Fire safing at 2nd floor slab edge along existing building tie in complete // NICU fire caulking OK at 2nd and 3rd floors // 3rd floor elevator fire caulk complete at face wall | JEREMYA | JEREMYA | | BSP | P | 5868601 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/30/2018 | Elevator Fronts Floor Board Inspection, Elevator 12 and 13, level garden to the roof OK | JEREMYA | JEREMYA | | BSP | P | 5858430 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/24/2018 | 3rd floor patio lid framing OK | JEREMYA | JEREMYA | | BFR | P | 5854177 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/21/2018 | Fire caulk at fire windows in recovery garden, west walls OK | JEREMYA | JEREMYA | | BSP | P | 5850895 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/18/2018 | Elevator Core at roof level, exterior heavy gage framing OK // Heavy gage framing at elevator vestibule in garden level OK | JEREMYA | JEREMYA | | BFR | P | 5848986 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/07/2018 | Fire safing at slab edge OK at north vestibule landings | JEREMYA | JEREMYA | | BSP | P | 5837859 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/24/2018 | partial fire caulking inspection/ 2nd floor horizontal penetrations in area 2 and area 3 shafts ok | SCOTTS | SCOTTS | | BSP | P | 5825993 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/24/2018 | partial framing inspection -- 2nd floor area 4 shaft 3 walls ok -- 2nd floor area 3 shaft walls 2 sides ok | SCOTTS | SCOTTS | | BFR | P | 5825991 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/13/2018 | Framing for shaft at Area 4, 2nd floor OK // Balance of framing at Area 3 on 2nd floor OK // Low voltage in Area 3, room framing OK // Framing at low vlotage room on 4th floor OK | JEREMYA | JEREMYA | | BFR | P | 5816181 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/06/2018 | Fire stopping at cast iron pipes in room 3577 OK per Hilti details | JEREMYA | JEREMYA | | BSP | P | 5810515 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 04/04/2018 | west elevation lath now complete in entirety | SCOTTS | SCOTTS | | BLA | P | 5807883 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/30/2018 | area 6 head wall fire caulking ok 3rd floor -- low voltage room 3rd floor shaft and wall framing ok -- shaft wall XC.6 to XD.8 along X8 4th floor ok | SCOTTS | SCOTTS | | BFR | P | 5803869 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/29/2018 | 3rd floor shaft liner inspection cancelled by Jason w/Spacecon/not ready | SCOTTS | SCOTTS | | BSP | P | 5803074 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 03/29/2018 | west elevation from grid line 4-12.5 lath ok | SCOTTS | SCOTTS | | BLA | P | 5803069 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/27/2018 | Shaft walls at 4th floor mech shafts OK | JEREMYA | JEREMYA | | BSP | P | 5800402 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/26/2018 | 2nd floor exterior framing on gridline 1 from E to XE // Area 3 shaft OK // 4th floor, Mechanical Shaft OK | JEREMYA | JEREMYA | | BFR | P | 5798198 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/19/2018 | Slab edge fire safing OK at all floor levels | JEREMYA | JEREMYA | | BSP | P | 5793074 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/19/2018 | Hardlid at vestibule at grid B8.1 OK // Framing for 3rd floor patio lid OK // Mech shafts at grids XD/16, XB.5/10 and X7/5 OK on shaft liner installation once mech inspector has inspected damper framing | JEREMYA | JEREMYA | | BFR | P | 5793073 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/16/2018 | partial framing for entry canopy parapet framing along G from X1-4/B to G along X1 and X4 -- parapet framing ok | SCOTTS | SCOTTS | | BSP | P | 5791441 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/09/2018 | Firestop at slab edge in area 4, along gridline B from 13 to 16 OK | JEREMYA | JEREMYA | | BSP | P | 5785465 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/09/2018 | Exterior framing at garden level south parapet OK | JEREMYA | JEREMYA | | BFR | P | 5785462 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/02/2018 | Firestopping at parapet wall on 4th floor along gridline X8 OK | JEREMYA | JEREMYA | | BSP | P | 5779261 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/02/2018 | Exterior wall framing at Gridline X* OK at floors 1 and 4 // ED Entry canopy framing above windows OK // Joint between new addition and existing building OK per approved listing on 3rd floor and at 3rd floor reception area | JEREMYA | JEREMYA | | BFR | P | 5779260 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 03/01/2018 | North elevation OK | JEREMYA | JEREMYA | | BLA | P | 5776990 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/27/2018 | Firestop at south and east parapet walls along slab edge at rooftop OK | JEREMYA | JEREMYA | | BSP | P | 5774696 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/27/2018 | Framing at rooftop south mech shaft enclosure OK // South paprapet wall framing OK at roof | JEREMYA | JEREMYA | | BFR | P | 5774695 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/09/2018 | Fire stopping at parapet wall on roof along gridline XD to gridline 13 and A.7 | JEREMYA | JEREMYA | | BSP | P | 5762404 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/09/2018 | Framing at 2nd floor on gridline X* from XA to XD OK // 3rd floor on gridline X8 from XA to XD OK // 4th Floor along gridline XE and XE.1 OK // Roof parapet framing from XD to 13 and A.7 to 13 | JEREMYA | JEREMYA | | BFR | P | 5762398 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/02/2018 | fire caulking at slab edge on roof along XA from 10 -16 | SCOTTS | SCOTTS | | BSP | P | 5756279 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/02/2018 | framing for garden level rooms G501/G510 -- 2nd floor core room 2551-- 4th floor kneewall and soffit along XD from 8-13 | SCOTTS | SCOTTS | | BFR | P | 5756273 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/30/2018 | Fire Safing at slab edge along parapet walls on XA from 10 to 16 OK | JEREMYA | JEREMYA | | BFR | P | 5752436 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/30/2018 | Parapet wall framing at skylights on east side OK // Parapet wall framing at roof on gridline XA from 10 to 16 OK | JEREMYA | JEREMYA | | BSP | P | 5752435 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/23/2018 | Fire caulking at duct penetrations at top of shaft enclosure on roof OK | JEREMYA | JEREMYA | | BSP | P | 5745203 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/22/2018 | Fire safing at slab edge OK on gridline XA from 10 to 16 | JEREMYA | JEREMYA | | BSP | P | 5743688 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/22/2018 | Exterior wall framing at gridline XA from 10 to 16 OK // Framing at Rooms 1581 & 1582 OK | JEREMYA | JEREMYA | | BFR | P | 5743686 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/17/2018 | Fire safing at slab edge of parapets along north, east and west walls OK | JEREMYA | JEREMYA | | BSP | P | 5740620 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/17/2018 | Framing at roof parapet along west, east and north walls OK // Forward wall framing at future elevator OK | JEREMYA | JEREMYA | | BFR | P | 5740600 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/11/2018 | Parapet framing at roof, along north, east and west walls from north to gridline 8 OK, fire safing at slab edge inside parapet OK | JEREMYA | JEREMYA | | BSP | P | 5735984 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/11/2018 | Framing at elec. room 3586 // Shaft framing at elevator core on roof, AND, north and south facing walls OK // Shaft liner at 4502 OK // Mech shaft, top enclosure on roof, framing for wall and lid OK | JEREMYA | JEREMYA | | BFR | P | 5735977 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B16 | P | 01/10/2018 | Met on-site to review some items of concern with site arch. Jon Bock from RTA. 1. The letter in regards to the damper framing over double doors that allows the use of the "King Kong" studs will be edited to show the proper room number and re-submitted. 2. Moving forward, Mr. Bock and the structural engineer feel that each damper will be case by case and treated as such. 3. I explained that in order to quickly pay splice fees, GE would need to get a CC on file through their online account, therefore only providing access to the CC by GE personel. This will allow splice fees to be paid at time of online inspection requests. 4. Moving forward, it was requested that we do the inspections called in. If there is a splice that was submitted and approved after we have left the office, the inspection still gets done pending verification of the splice on the next business day. I have provided Mr. Bock with my contact info so if I am able to assist in any way, he can contact me. | JEREMYA | JEREMYA | | B16 | P | 5734654 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/10/2018 | Head wall and soffit framing at garden level, gridline XA from 10 to 16 OK | JEREMYA | JEREMYA | | BSP | P | 5734473 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/10/2018 | Framing at roof top edge along north and west walls OK // Plywood nailed off per detail | JEREMYA | JEREMYA | | BFR | P | 5734467 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 01/05/2018 | PAID (REC#1475125) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Minor revisions | MICHAELA | MICHAELA | | BSP | T | 5729637 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/04/2018 | Garden level soffit framing OK at Gridline XA from X7 to stair 8 // Head wall framing at 2nd floor on gridline XA from 9 to 16 OK // Fire safing at slab edge and exterior wall framing on 3rd and 4th floors along gridline XA from 5 to 7 OK // Fire safing at 4th floor slab edge along gridline X6 from XA to XD OK | JEREMYA | JEREMYA | | BFR | P | 5729515 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/29/2017 | 3rd floor, north and west walls, floor slab fire safing OK
| JEREMYA | JEREMYA | | BSP | P | 5724766 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/29/2017 | Exterior wall framing at Garden level gridline XA from 8 to 10, 1st floor gridline XE from X6 to X7, 2nd floor gridline X6 from XA to XE, XD from X6 to X7, 4th floor gridline X6 from XA to XD, XD from X6 to X7 OK // Framing at 4th floor electric room 4502 ad elevator equipment room 4503 OK // Training with Scott S | JEREMYA | JEREMYA | | BFR | P | 5724744 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/19/2017 | Interior wall framing at rooms 3565, 3567, 3568 OK // Wall framing at gridline XD 1 from 4-8 OK // Shaft wall framing in electric room 3563 OK | JEREMYA | JEREMYA | | BFR | P | 5717561 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/14/2017 | Exterior wall framing at gridline XA from X7 to 8 on 2nd floor // Exterior wall framing at gridline X7 from 5 to 8 on 3rd floor | JEREMYA | JEREMYA | | BSP | P | 5713339 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/11/2017 | framing for core XD.8 to XE along 5/ XC.05 to XE along 3/ 0-3 along XC.05 | SCOTTS | SCOTTS | | BFR | P | 5709414 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/05/2017 | Wall framing and shaft liner at electric room 2562 on 2nd floor OK // Clear story framing at 3rd floor roof parapet OK | JEREMYA | JEREMYA | | BFR | P | 5704286 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/05/2017 | Firestop at head of wall on grid XE from 16 to X6 at garden level OK | JEREMYA | JEREMYA | | BSP | P | 5704279 |
OLSON PLUMBING & HEATING COMPANY | BSP | T | 12/04/2017 | PAID (REC#1469331): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice for ASI-08 | DALEH | DALEH | | BSP | T | 5701278 |
OLSON PLUMBING & HEATING COMPANY | BSP | T | 11/30/2017 | PAID (REC#1469343): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 11-30-2017 | TCRIPPEN | TCRIPPEN | | BSP | T | 5698115 |
STURGEON ELECTRIC CO INC | BSP | T | 11/29/2017 | PAID (REC#1469358): PLAN SPLICE FEE: $50 by: SHELBY for Electrical Revised parking lot conduit for lighting E-ES 110----NOTE ! Revised one line majority of changes made to HVAC feeders E 202. | SHELBY | SHELBY | | BSP | T | 5697987 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 11/28/2017 | PAID (REC#1469185) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Minor architectural and structural revisions - correct details | MICHAELA | MICHAELA | | BSP | T | 5696541 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/27/2017 | Mineral wool at concrete columns and top of CMU wall OK at gridline XE from 16 to X6 and X6 from XE to XA | JEREMYA | JEREMYA | | BSP | P | 5695224 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/27/2017 | framing at electric room 1549 OK // Exterior wall framing at grid X1 from XB.2 to XE OK, stamped welding and bolting observation to follow | JEREMYA | JEREMYA | | BFR | P | 5695222 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/13/2017 | parapet wall framing at gridlines F-M and 16-20 OK // Framing at skylight inside parapet walls above NICU reception OK // Garden Level electric roon (G502) // Exterior soffit on gridline XA from X2 to X5.7 OK | JEREMYA | JEREMYA | | BFR | P | 5683798 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/30/2017 | Exterior wall and parapet framing at the following gridlines:
XA/X1-X6, XA.1/X2-X5, X5/XA.1-XB.1, XB.1/X2-X5, X2/XB.1-XB.2, X2/XB.1-XB.2, X3/XB.2-XE, XE/X3-X6 | JEREMYA | JEREMYA | | BFR | P | 5671566 |
OLSON PLUMBING & HEATING COMPANY | BSP | T | 09/07/2017 | PAID (REC#1452344) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice to remove water lines from mechanical | DALEH | DALEH | | BSP | T | 5619003 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/16/2017 | PLAN SPLICE: (No Fee) by: MICHAELA for Construction: Duplicate missing structural pages. | MICHAELA | MICHAELA | | BSP | P | 5596845 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFT | P | 08/14/2017 | Stopped on-site to check status and make sure project was on track with the upcoming precon // UPDATE: There are no structural plans in the RBD scanned images. Will need to either return to RBD with the "RBD" stamped set to have them scanned in, or, submit structural drawings for a structural review. Will also need to have all 8.5" x 11" sheets from the permit set scanned. | JEREMYA | JEREMYA | | BFT | P | 5595128 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | P | 06/27/2017 | Grade beam pour #2 and elevator footing OK | JEREMYA | JEREMYA | | BFN | P | 5547602 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | P | 06/14/2017 | Met on-site with Chuck Silva for pre-inspection walk at the grade beams. GE will be using Kumar for third party observations, buit, will have RBD out periodically to inspect as well. Areas that were formed up are OK pending the extra cleaning that was being done when I arrived. | JEREMYA | JEREMYA | | BFN | P | 5535089 |
OLSON PLUMBING & HEATING COMPANY | BSP | T | 06/09/2017 | PAID (REC#1431185) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 6-9-17 | TCRIPPEN | TCRIPPEN | | BSP | T | 5531174 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFT | P | 05/02/2017 | Site visit with GE Supt., Chuck Silva, to discuss scheduling for upcoming inspections. Also releasing GE to use Authorized Third Party inspector for all footing inspections. Stamped letter of compliance to follow. | JEREMYA | JEREMYA | | BFT | P | 5493940 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 03/22/2017 | PAID (REC#1412954) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELBY Added scope to all sheets | SHELBY | SHELBY | | BSP | T | 5453165 |
STURGEON ELECTRIC CO INC | E= | C | 11/28/2018 | | RANDY | RANDY | | E= | C | 6037203 |
STURGEON ELECTRIC CO INC | E= | P | 08/09/2018 | need to inspect elevator pit and disconnects-----also patio | RANDY | RANDY | | E= | P | 5928555 |
STURGEON ELECTRIC CO INC | E= | P | 07/27/2018 | need WR outlet on rooftop | RANDY | RANDY | | E= | P | 5916977 |
STURGEON ELECTRIC CO INC | E= | P | 07/26/2018 | unable to get on roof | RANDY | RANDY | | E= | P | 5915528 |
STURGEON ELECTRIC CO INC | ER | P | 07/19/2018 | checked remainder of one line----- CT-3CP breaker set at 100 instead of 90 on #4cu; need to check motor nameplate------ need to verify CWP-1CP, CWP-2CP, HWP-1CP AND HWP-2CP when i get to the office CWP's on 200 amp breaker 100hp HWP's on 125 amp breaker 50hp | MATTHEW | MATTHEW | | ER | P | 5908692 |
STURGEON ELECTRIC CO INC | E= | P | 07/17/2018 | no final at this time | RANDY | RANDY | | E= | P | 5905790 |
STURGEON ELECTRIC CO INC | ER | P | 07/17/2018 | panels EL1F,NH1F,LL4F, also looked at 3rd floor stair wall | RANDY | RANDY | | ER | P | 5905789 |
STURGEON ELECTRIC CO INC | EUG | P | 10/12/2017 | 6 - pole bases 1" pvc | TOMC | TOMC | | EUG | P | 5653160 |
STURGEON ELECTRIC CO INC | ER | P | 10/12/2017 | 19 - 3" EMT , 1 - 2" EMT , 2 - 2.5" EMT -- feeder conduit 4th floor , north wall crawl space , Page E202 hilighted in orange | TOMC | TOMC | | ER | P | 5653146 |
STURGEON ELECTRIC CO INC | ER | P | 09/06/2017 | motors for hp1 125 amp and cp1 200 amp+vfd's in cup ok | RANDY | RANDY | | ER | P | 5617522 |
STURGEON ELECTRIC CO INC | ER | P | 08/16/2017 | corrections made ok ----------- moter - CWP3CP ok motor - HWP3CP ok talked to contractor about expansion for EMT | CRAIG | CRAIG | | ER | P | 5597233 |
STURGEON ELECTRIC CO INC | ER | R | 07/27/2017 | Need bonding bushings at variable frequency drives where reducing washers are used. Also need bonding bushings where raceways transition to metal flex for vibration.----------- Unable to verify that raceways are bonded correctly at MDP because gear is hot.----- Inspected CP 3CP ----------- CT-3CP ----------------- CH 3CP | JOSEPH | JOSEPH | | ER | R | 5577895 |
STURGEON ELECTRIC CO INC | ER | P | 07/19/2017 | I inspected rtu4 and rtu5 and ex-fan fed from CPNHG1------------------ need rtu's labeles; rtu5 needs breaker set at 25 amps-----------need power to rtu service outlets--------------- need disconnect for ex-fan controller | MATTHEW | MATTHEW | | ER | P | 5569169 |
STURGEON ELECTRIC CO INC | EP | P | 07/10/2017 | 1600a 480v CPEDB3 ok; need info for arc flash reduction | MATTHEW | MATTHEW | | EP | P | 5558914 |
STURGEON ELECTRIC CO INC | ER | P | 07/06/2017 | feeders to ATS for gear CPEDB3 normal power from MDC-P1 emergency power fed from paralleling gear EDP-P ok CPEDB3 not complete at time of inspection I informed contractor that we would need GFPE test reports and info for arc flash energy reduction | MATTHEW | MATTHEW | | ER | P | 5556217 |
STURGEON ELECTRIC CO INC | EUG | P | 06/22/2017 | marked on plans | MATTHEW | MATTHEW | | EUG | P | 5544392 |
STURGEON ELECTRIC CO INC | ER | P | 06/22/2017 | marked on plans | MATTHEW | MATTHEW | | ER | P | 5544388 |
STURGEON ELECTRIC CO INC | EUG | P | 05/25/2017 | fuel tanks pipes marked on plans | RANDY | RANDY | | EUG | P | 5517727 |
STURGEON ELECTRIC CO INC | EUG | P | 05/17/2017 | underground marked on plans | MATTHEW | MATTHEW | | EUG | P | 5509784 |
STURGEON ELECTRIC CO INC | EUG | P | 05/10/2017 | duct bank marked on plans------ life safety and critical branch feeders will be encased in concrete | MATTHEW | MATTHEW | | EUG | P | 5502045 |
OTIS ELEVATOR COMPANY | HE= | C | 12/11/2018 | ELEVATORS COMPLETE, RELEASED FOR PUBLIC USE | ERIC | ERIC | | HE= | C | 6048691 |
OTIS ELEVATOR COMPANY | HE= | P | 12/06/2018 | ELEVATORS COMPLETE. NEED FIRE FINAL | ERIC | ERIC | | HE= | P | 6045608 |
OTIS ELEVATOR COMPANY | HE= | P | 11/28/2018 | ELEVATOR SUMP PUMP TESTED | ERIC | ERIC | | HE= | P | 6036074 |
OLSON PLUMBING & HEATING COMPANY | HO | P | 09/07/2018 | 10 lb TEST FOR UNDER GROUND GAS TO FIRE PIT OR FIRE PLACE OK / GAS INSTALLED PER PLAN . IS THIS A FIRE PIT OR A FIRE PLACE ? IF THIS IS A FIRE PLACE THIS WILL REQUIRE A FIRE PLACE CONTRACTOR . | LIDO | LIDO | | HO | P | 5957790 |
OTIS ELEVATOR COMPANY | HE= | P | 08/17/2018 | ELEVATORS GENERATOR TESTING COMPLETE. NEED FIRE FINAL AND TESTING OF SUMP PUMP. OTIS NEEDS TO COMPLETE HALL CALLS, LANTERNS, FIRE SERVICE, PHONES, PRIORITY SERVICE, AND HOISTWAY REINSPECTIONS. | ERIC | ERIC | | HE= | P | 5938277 |
US ENGINEERING COMPANY | H= | C | 08/01/2018 | RECEIVED TEST AND BALANCE REPORT ( SEE IMAGES ) | LIDO | LIDO | | H= | C | 5920097 |
US ENGINEERING COMPANY | H= | P | 07/30/2018 | RECEIVED 3RD PARTY TEST DOCUMENTS FOR EF-CUP-1 ( SEE IMAGES ) PARTIAL PENDING FOR - NEED TEST AND BALANCE WITH ROOF TOP OUTSIDE AIR READINGS. | LIDO | LIDO | | H= | P | 5918426 |
OTIS ELEVATOR COMPANY | HE= | P | 07/30/2018 | NEED FIRE FINAL, PIT AND HOISTWAY LIGHTING AND CIRCUITS, TRIM COREBOARD FASTENERS IN HOISTWAY WALLS, CAULK PENETRATIONS IN MACHINE ROOMS, ELECTRICAL OUTLETS AND SWITCHES IN MACHINE ROOMS, CODE DATA TAGS, LABEL COUNTERWEIGHT RUNBY TAGS, TEST SUMP PUMPS, TESTING FOR EMERGENCY POWER | ERIC | ERIC | | HE= | P | 5917312 |
US ENGINEERING COMPANY | HSP | P | 07/27/2018 | TEST AND BALANCE REPORT RECEIVED IS MISSING OUTSIDE AIR READING FOR THE ROOF TOP UNITS . | LIDO | LIDO | | HSP | P | 5915952 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 07/20/2018 | PER CONVERSATION WITH SENIOR INSPECTOR JON BRAZIER BOILER PRESSURE RELIEF LINE TIED INTO MANIFOLD OK .( HEAT FINAL -OK ) | LIDO | LIDO | | H= | C | 5908758 |
OLSON PLUMBING & HEATING COMPANY | HSP | P | 07/19/2018 | RECEIVED STAMPED ENGINEER LETTER FOR 1-1/2" FUEL OIL PIPE INSTALLED TO BOILER 500BHP / INSTALL OK .( SEE IMAGES ) | LIDO | LIDO | | HSP | P | 5907583 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 07/18/2018 | UTILITY PLANT - FUEL OIL PIPING UNDER OPERATING PRESSURE NO VISIBLE LEAKS . BOILER FINAL CONNECTION OK . SNOW MELT MANIFOLD 1-,2,3,4,5 OK . SMP3CP IS EXISTING DO NOT NEED REVISED PLAN FOR THIS ASKED FOR ON PREVIOUS INSPECTION . NEED STAMPED ENGINEER LETTER FOR 1-1/2 FUEL OIL PIPE INSTALLED PLAN SHOWS 2" . NEED TO CONSULT WITH SENIOR INSPECTOR FOR BOILER PRESSURE RELIEF MANIFOLD . | LIDO | LIDO | | H= | P | 5906950 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 07/17/2018 | GARDEN LEVEL M 202 - UTILITY PLANT -(( NEED REVISED PLAN FOR DELETED SMP3CP)) HX6CP,ET4CP,BFP1CP, BFP2CP OK. REFRIGERATION MONITOR INSTALLED (SEE IMAGES FOR STAMPED ENGINEER LETTER. ( NEED TO CONSULT WITH PREVIOUS INSPECTOR ON FUEL OIL PIPING . | LIDO | LIDO | | H= | P | 5905440 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 06/19/2018 | 60 lb TEST FOR SNOW MELT - MANIFOLD # 4 OK. | LIDO | LIDO | | HWP | P | 5878548 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 06/18/2018 | FIELD CANCELED BY CONTRACTOR . | LIDO | LIDO | | HWP | P | 5877825 |
OTIS ELEVATOR COMPANY | HE= | P | 06/12/2018 | ELEVATOR # 13 OK FOR CONSTRUCTION USE ONLY. NO PUBLIC USE ALLOWED. | ERIC | ERIC | | HE= | P | 5872294 |
OTIS ELEVATOR COMPANY | HER | P | 06/11/2018 | ELEVATOR # 13, MUST HAVE 110V CAB LIGHT CIRCUIT BEFORE RELEASE FOR CONSTRUCTION USE. ALSO BY FINAL WALL BOARD FASTENERS PROTRUDING INTO HOISTWAY MUST BE CUT OFF. | ERIC | ERIC | | HER | P | 5870712 |
OTIS ELEVATOR COMPANY | HE | L | 06/11/2018 | Renewed at 6/11/2018 7:58:48 AM | ERIC | ERIC | | HE | L | 5869828 |
US ENGINEERING COMPANY | HE | L | 05/09/2018 | Renewed at 5/9/2018 1:41:34 PM | GITA | GITA | | HE | L | 5840081 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 11/30/2017 | Need plan for snow melt spliced in . MANIFOLD # 1 - 40 lb TEST PER MANUFACTURE REQUIREMENTS OK. | LIDO | LIDO | | HWP | P | 5698494 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 11/16/2017 | VERIFIED AIR TEST FOR SNOW MELT MANIFOLD # 1 AND # 2 STILL OK AFTER CONCRETE POURED ON TOP . AIR TEST PER MANUFACTURE REQUIREMENTS . | LIDO | LIDO | | HWP | P | 5687781 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 11/14/2017 | AIR TEST FOR SNOW MELT MANIFOLD # 1 AND # 2 OK . | LIDO | LIDO | | HWP | P | 5684835 |
US ENGINEERING COMPANY | HD | P | 09/13/2017 | MECHANICAL CONTRACTOR WILL ATTACH PICTURES LABELED ROOF TOP EQUIPMENT TO IMAGES ON PERMIT.Correct scope of work to match equipment installed for core and shell, Refrigeration monitoring devise still needs to be changed out per print M-104 note 1 , need interlocks verified , need test and balance report. | LIDO | LIDO | | HD | P | 5624845 |
OLSON PLUMBING & HEATING COMPANY | HSP | P | 09/13/2017 | PAGE # 303/ M-152 SHOWS MEDIUM PRESSURE GAS , NOTE (6.) | LIDO | LIDO | | HSP | P | 5624791 |
OLSON PLUMBING & HEATING COMPANY | HSP | P | 09/12/2017 | RTU-5CP GAS REGULATORS IN PLACE AND FINAL CONNECTION OK. | LIDO | LIDO | | HSP | P | 5622596 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 09/11/2017 | CT-3CP OK . CH-3CP OK, CWP-1CP & CWP-2CP OK.Added to notes on 9/12/17 Still need to see insulation and labeling for inside piping NOTE: CHILLED WATER | LIDO | LIDO | | HWP | P | 5622207 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 08/29/2017 | HWP 1 CP, HWP 2 CP, HWP 3 CP OK . CWP 3 CP OK . | LIDO | LIDO | | HWP | P | 5610716 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 07/26/2017 | NO TEST ON OUTSIDE UNDER GROUND HOT WATER PIPING FOR SNOW MELT AT THIS TIME. CONTRACTOR WILL TEST AT A LATER DATE. | LIDO | LIDO | | HWP | P | 5576560 |
US ENGINEERING COMPANY | HD | P | 07/20/2017 | DUCT DROPS FOR RTU-5CP / 4CP AND EF-CUP-1 OK, HIGH LIGHTED PRINT M-152. BY FINAL LABEL ALL EQUIPMENT ON ROOF,NEED TO CORRECT SCOPE OF WORK TO MATCH INSTALL, ADDED AND ALTERED NOTES ON 7/21/17 MOVED RTU-5CP OK . | LIDO | LIDO | | HD | P | 5570954 |
OLSON PLUMBING & HEATING COMPANY | HI | P | 07/18/2017 | PRESSURE TEST OK . GAS INSTALLED PER PRINT TO RTU-5CP , NEED TO VERIFY GAS REGULATOR AND FINAL CONNECTION TO RTU-5CP( ALL FUTURE GAS TEST ARE REQUIRED TO BE A 10 LB TEST ON A 30 LB GAUGE ) NEED GAS PRINT M-204 REVISED TO SHOW MEDIUM PRESSURE GAS . | LIDO | LIDO | | HI | P | 5567863 |
US ENGINEERING COMPANY | HV | P | 07/03/2017 | BOILER VENT OK - INSTALLED PER PLAN PER PAGE M204 | JERRYF | JERRYF | | HV | P | 5554071 |
OLSON PLUMBING & HEATING COMPANY | HO | P | 06/27/2017 | PRESSURE TEST OK - ALL UNDER GROUND 2" PE WITH TRACER OK TO BURY AT FUTURE INSPECTION VERIFY TIE IN AT MAIN | JERRYF | JERRYF | | HO | P | 5548229 |
OLSON PLUMBING & HEATING COMPANY | HO | P | 06/20/2017 | 10# PRESSURE TEST OK ON 2" PE WITH TRACER FROM BOILER BUILDING TO NEW STRUCTURE - WILL NEED TO SEE VERIFY TIE IN AT BOILER BUILDING AND VERIFY CORRECT PIPING ON TEMPORARY LINES IN NEW BUILDING BEFORE METER RELEASE | JERRYF | JERRYF | | HO | P | 5540396 |
OLSON PLUMBING & HEATING COMPANY | HO | P | 06/08/2017 | 10 LB TEST ON APROX 100 FEET OF 2" PE. INSPECTED LINE WITH TRACER FROM RISER AT NEW BUILDING RUN DOWN TO ELECTRICAL VAULT. THIS LINE WILL BE FOR TEMPORARY HEAT AND WILL CONNECT TO EXISTING METER. SEND RELEASE TO CSU BEFORE CONNECTION. | JON | JON | | HO | P | 5529776 |
OLSON PLUMBING & HEATING COMPANY | HO | P | 05/25/2017 | CONTRACTOR INSTALLING RTU'S, BOILER VENTS, ETC MUST ATTACH TO PERMIT AND CALL FOR INSPECTION WHEN READY. RELOCATE TEMPORARY HEAT GAS LINE OUT FROM UNDER STRUCTURE. GAS LINE TO BE 18 INCHES DEEP WITH TRACER WIRE AND INSTALLED ON FILL DIRT. PROVIDE INFORMATION REGARDING INSTALLATION OF BOILER PRESSURE RELIEF LINES, OK TO MANIFOLD? | NANCY | NANCY | | HO | P | 5517086 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 05/24/2017 | TEST AT STEAM LINES TO BE AT SPECIFICATIONS APPROPRIATE FOR SYSTEM OPERATION. OK FOR INSULATION ON STEAM LINES. QUESTION MANIFOLDING STEAM DISCHARGE LINES TOGETHER, NEED INSTRUCTIONS FROM MANUFACTURER. ALSO DID NOT LOCATE STEAM PIPING ON APPROVED DRAWINGS. ALSO APPROVED DRAWINGS SHOW 2" FEEDS ON FUEL OIL PIPING, APPEARS TO BE 1 1/2' AT THIS TIME. | JON | JON | | HWP | P | 5516420 |
OLSON PLUMBING & HEATING COMPANY | HI | P | 05/18/2017 | NEED CONSULT WITH SENIOR INSPECTOR ON FUEL / OIL PRESSURE TEST REQUIREMENTS WILL CALL CONTRACTOR IN THE AM ON 5/19 -----60# PRESSURE TEST OK ON MAIN BOILER INTERIOR WELDED GAS PIPING / STILL NEED ALL OTHER PIPING COMPLETED - REVISE PLAN TO SHOW ACTUAL INSTALLED | JERRYF | JERRYF | | HI | P | 5510945 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 05/18/2017 | HAD CONSULT WITH JOHN WITH OLSON INSPECTION REQUIREMENTS FOR 60# AIR TEST ON ALL NEW STEAM PIPING - AFTER FURTHER REVIEW CONTRACTOR SETTING TEST PRESSURE APPROPRIATE FOR THIS SYSTEM | JERRYF | JERRYF | | HWP | P | 5510921 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 07/12/2018 | core and shell | TED | TED | | P= | C | 5900489 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 12/29/2017 | wrong permit called in (entered under correct permit L12338) | TED | TED | | PRD | P | 5725313 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 10/04/2017 | under ground, bathroom -decom.- break room area, plan marked | TED | TED | | PB | P | 5644394 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/13/2017 | ok for spliced plans @ c.u.p. | JOHNS | JOHNS | | PTO | P | 5624126 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/18/2017 | still need a plumbing plan splice for the C.U.P. R.T.U. units (no change from last inspection) | TED | TED | | PTO | P | 5567868 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/13/2017 | C.U.P. building--water and drain piping to R.T.U. 5cp and 4cp, Need plan splice added to plumbing plan for water and drain piping to both units | TED | TED | | PTO | P | 5563224 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 06/29/2017 | de-con tank lines and vent from elevator shaft to building exit, sand/ oil venting, floor drain for snow melt, ok, note: need splice for snow melt floor drain | TED | TED | | PB | P | 5550922 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 06/21/2017 | trench drain | TED | TED | | PB | P | 5542441 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 06/08/2017 | 10" storm drain in area 3 ok | CRADE | CRADE | | PB | P | 5529426 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 06/07/2017 | 8" sanitary on test ok.In area 2. | CRADE | CRADE | | PB | P | 5528202 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 05/31/2017 | lost test, continuation of 10'' storm drains | TED | TED | | PB | P | 5521241 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 05/25/2017 | 10'' storm water and 8'' sanitary (plan marked) | TED | TED | | PB | P | 5517354 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 05/17/2017 | ok for interceptor inlet and trench drain wyes. | JOHNS | JOHNS | | PB | P | 5509561 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 05/15/2017 | sand and oil interceptor outlet base ok to cover | TED | TED | | PB | P | 5506521 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 05/04/2017 | 4 deep risers (3-6'', 1-8'') for sanitary to new buildings | TED | TED | | PB | P | 5496061 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | P | 06/11/2018 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: roof ladder | SHELLEY | SHELLEY | | XBS | P | 5870763 |
US ENGINEERING COMPANY | XMS | T | 05/17/2018 | PAID (REC#1521108) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 5-15-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 5848237 |
STURGEON ELECTRIC CO INC | XES | T | 04/10/2018 | PAID (REC#1493224) PLAN SPLICE FEE: $50 by: ERIC for Elevator: Access at top terminal landing | ERIC | ERIC | | XES | T | 5812454 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 04/09/2018 | PAID (REC#1493089) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Changes at elevator and some structural revisions | MICHAELA | MICHAELA | | XBS | T | 5811948 |
STURGEON ELECTRIC CO INC | XES | P | 02/13/2018 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Revise E 110 and E150 | SHELBY | SHELBY | | XES | P | 5764879 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 01/29/2018 | PAID (REC#1479012): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 1- 29 - 2018 | TCRIPPEN | TCRIPPEN | | XPS | T | 5750100 |