BRECKENRIDGE CONSTRUCTION LLC | B= | C | 08/24/2017 | Other Finals now complete | RICHB | RICHB | | B= | C | 5605282 |
BRECKENRIDGE CONSTRUCTION LLC | B= | P | 06/16/2017 | corrections completed / need to complete other final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): HVAC- 719 LLC Mechanical Final Inspection is not Completed yet. | ERICR | ERICR | | B= | P | 5538142 |
BRECKENRIDGE CONSTRUCTION LLC | B= | P | 06/08/2017 | need accessible sign for either sex bathroom / rear grab bar in wrong location need 12" from center of toilet on wall side and 24" from center of toilet on open side of toilet / side wall grab bar in wrong location need maximum of 12" from rear wall to grab and 54 " minimum to leading edge of grab bar from back wall of toilet / need accessible benches mounted in dressing rooms / and accessible signs on dressing rooms -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): HVAC- 719 LLC Mechanical Final Inspection is not Completed yet. | ERICR | ERICR | | B= | P | 5529732 |
BRECKENRIDGE CONSTRUCTION LLC | BSP | T | 05/25/2017 | PAID (REC#1427177) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised exhaust layouts | JUSTINC | JUSTINC | | BSP | T | 5516682 |
BRECKENRIDGE CONSTRUCTION LLC | BFR | P | 04/14/2017 | window lentils OK per engineers detail / framing ok / reviewed accessible elements/ need mechanical contractor attached / need to complete other rough inspections | ERICR | ERICR | | BFR | P | 5475340 |
BRECKENRIDGE CONSTRUCTION LLC | BSP | T | 04/14/2017 | PAID (REC#1417222) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Added engineered drawings for new window openings. | BPHILLIPS | BPHILLIPS | | BSP | T | 5475075 |
CASCADE ELECTRIC, LLC. | E= | C | 06/02/2017 | Fixtures are installed--- | ROB | ROB | | E= | C | 5523612 |
CASCADE ELECTRIC, LLC. | E= | R | 05/26/2017 | 2 high bay fixtures not installed,with lead hanging down, | JOHNN | JOHNN | | E= | R | 5518065 |
CASCADE ELECTRIC, LLC. | ER | C | 05/10/2017 | rough ok,------------------------------------need main breaker on transformer secondary, | JOHNN | JOHNN | | ER | C | 5501886 |
CASCADE ELECTRIC, LLC. | EP | C | 05/05/2017 | transformer/panel,ok | JOHNN | JOHNN | | EP | C | 5497400 |
CASCADE ELECTRIC, LLC. | ER | R | 05/05/2017 | need ceiling wires on troffers, transformer/panel,ok | JOHNN | JOHNN | | ER | R | 5497399 |
CASCADE ELECTRIC, LLC. | ER | P | 04/13/2017 | walls | BRET | BRET | | ER | P | 5474096 |
HVAC- 719 LLC | H= | C | 08/15/2017 | MECHANICAL FINAL OK. | LIDO | LIDO | | H= | C | 5595554 |
HVAC- 719 LLC | H= | P | 05/31/2017 | DUCT OK, TAB REPORT RECEIVED ,ALSO NEED BACK DRAFT DAMPER INSTALLED IN 8" PER PAINS . | LIDO | LIDO | | H= | P | 5521164 |
HERMANS PLUMBING SERVICE, INC | P= | C | 05/25/2017 | still need mechanical permit attached. | TAYLOR | TAYLOR | | P= | C | 5517255 |
HERMANS PLUMBING SERVICE, INC | PTO | C | 04/03/2017 | aav next to water heater, revise plans to show point of connection to existing 3/4 DCW by final, note: need mechanical and electrical permits attached. | TAYLOR | TAYLOR | | PTO | C | 5463823 |
HERMANS PLUMBING SERVICE, INC | PB | C | 03/20/2017 | | TAYLOR | TAYLOR | | PB | C | 5445587 |