MCPHERSON DEVELOPMENT CO. INC. | B= | C | 02/14/2018 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 5765124 |
MCPHERSON DEVELOPMENT CO. INC. | B= | P | 11/17/2017 | items corrected all work for permit has been completed. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JLC ELECTRIC LLC Electrical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, PARKER SERVICES, LLC. Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5688677 |
JLC ELECTRIC LLC | BSP | T | 11/03/2017 | PAID (REC#1474076): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: To address inspector comments | SHELBY | SHELBY | | BSP | T | 5675974 |
MCPHERSON DEVELOPMENT CO. INC. | B= | P | 10/25/2017 | Temp CO: pending finals ( Expires: 11/24/2017 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 5667357 |
MCPHERSON DEVELOPMENT CO. INC. | B= | P | 10/23/2017 | need main entry outside canopy and flashing under left side rock wainscot, remaining items corrected. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), Floodplain Final Inspection is not Completed yet, JLC ELECTRIC LLC Electrical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, PARKER SERVICES, LLC. Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5664092 |
MCPHERSON DEVELOPMENT CO. INC. | BIN | C | 10/17/2017 | letter for parapet insulation on file. | NATHAN | NATHAN | | BIN | C | 5657389 |
MCPHERSON DEVELOPMENT CO. INC. | BFR | C | 10/17/2017 | engineer letter of structural observation on file | NATHAN | NATHAN | | BFR | C | 5657376 |
MCPHERSON DEVELOPMENT CO. INC. | BFN | C | 10/10/2017 | Engineers observation Letter on file / | NATHAN | NATHAN | | BFN | C | 5650066 |
MCPHERSON DEVELOPMENT CO. INC. | BFT | C | 10/10/2017 | Engineers observation Letter on file / | NATHAN | NATHAN | | BFT | C | 5650065 |
MCPHERSON DEVELOPMENT CO. INC. | B= | P | 10/10/2017 | need all completed final inspections, seal refrigerate vent on roof where all lines go into building, need exposed framing weatherproofed under rock wainscot left of entry in front of handicapped parking spaces, need letter for insulation at parapet wall, engineer letter for structural and foundation observation on file. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, Floodplain Final Inspection is not Completed yet, JLC ELECTRIC LLC Electrical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed | NATHAN | NATHAN | | B= | P | 5650051 |
MCPHERSON DEVELOPMENT CO. INC. | BSP | P | 09/29/2017 | engineers letter for footer pads and openex that was not seen by RBD needed, for completed framing engineer letter for structural steel and roof needed, insulation letter for parapet inspection needed, will need final walk through, discussed TCO requirements and what is needed to get to that point. | NATHAN | NATHAN | | BSP | P | 5640386 |
LANDMARK PLUMBING AND HEATING, INC. | BSP | P | 09/22/2017 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing | TCRIPPEN | TCRIPPEN | | BSP | P | 5633667 |
MCPHERSON DEVELOPMENT CO. INC. | BSP | T | 09/21/2017 | PAID (REC#1455992) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised storefront and roof layout | SHELLEY | SHELLEY | | BSP | T | 5633220 |
MCPHERSON DEVELOPMENT CO. INC. | BLA | C | 08/30/2017 | remaining west side completed. | NATHAN | NATHAN | | BLA | C | 5611883 |
MCPHERSON DEVELOPMENT CO. INC. | BLA | P | 08/29/2017 | East side okay | NATHAN | NATHAN | | BLA | P | 5609778 |
MCPHERSON DEVELOPMENT CO. INC. | BLA | P | 08/18/2017 | north wall only lathe okay | NATHAN | NATHAN | | BLA | P | 5600359 |
PARKER SERVICES, LLC. | BSP | T | 08/18/2017 | PAID (REC#1449322) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: revised gas | DALEH | DALEH | | BSP | T | 5600063 |
MCPHERSON DEVELOPMENT CO. INC. | BLA | P | 08/16/2017 | exterior lathe at complete south side and SE half of west side okay only | NATHAN | NATHAN | | BLA | P | 5597623 |
MCPHERSON DEVELOPMENT CO. INC. | BIN | P | 08/16/2017 | 2" rigid at north side okay. | NATHAN | NATHAN | | BIN | P | 5597610 |
LANDMARK PLUMBING AND HEATING, INC. | BSP | T | 08/10/2017 | PAID (REC#1447529): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 8-10-17 | TCRIPPEN | TCRIPPEN | | BSP | T | 5591286 |
JLC ELECTRIC LLC | BSP | T | 08/08/2017 | PAID (REC#1449323) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised site, added coffee grinder receptacles, revised panel schedule. | BERTHA | BERTHA | | BSP | T | 5588560 |
MCPHERSON DEVELOPMENT CO. INC. | BIN | P | 08/04/2017 | exterior 2" rigid on south and west side okay | NATHAN | NATHAN | | BIN | P | 5586156 |
MCPHERSON DEVELOPMENT CO. INC. | BSP | T | 08/03/2017 | PAID (REC#1446483) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Minor revisions | MICHAELA | MICHAELA | | BSP | T | 5585477 |
MCPHERSON DEVELOPMENT CO. INC. | BLA | P | 08/02/2017 | double layer of 15 pound felt for stucco system OK / Still need to inspect wire lath | NICK | NICK | | BLA | P | 5584094 |
MCPHERSON DEVELOPMENT CO. INC. | BIN | P | 08/02/2017 | Exterior wall insulation OK / Box headers and trimmers OK / Need letter for parapet wall insulation / Need to inspect roof insulation | NICK | NICK | | BIN | P | 5584092 |
MCPHERSON DEVELOPMENT CO. INC. | BFR | P | 08/02/2017 | Upon further review splice in for items of last inspection / Frame OK / Reviewed accessible elements / Need all MEP's complete | NICK | NICK | | BFR | P | 5584086 |
MCPHERSON DEVELOPMENT CO. INC. | BIN | P | 07/31/2017 | Not ready for insulation inspection | NICK | NICK | | BIN | P | 5581316 |
MCPHERSON DEVELOPMENT CO. INC. | BFR | P | 07/31/2017 | Need to splice plans to show new interior lay out / Need to splice plans to show bulkhead framing and soffit framing / Need letter for steel observation / Need letter for insulation in parapet walls / Need to insulate headers and trimmers of exterior walls, contractor said going to foam / Once plumbing complete exterior walls OK to insulate / Reviewed accessible elements / Interior framing inspection / Need detail for hard lid throughout, can splice in with other items | NICK | NICK | | BFR | P | 5581310 |
MCPHERSON DEVELOPMENT CO. INC. | BIN | P | 07/24/2017 | --------discussed with Scott insulation in headers and trimmers installed prior to insulation inspection so continuity can be verified.------------ | NATHAN | NATHAN | | BIN | P | 5573412 |
MCPHERSON DEVELOPMENT CO. INC. | BFR | P | 07/20/2017 | need correct spliced plans on site for new interior finish, produce, break rooms and all hardlids not completed, receiving area walls not completed / need insulation at headers and trimmers / complete all required rough inspections, need engineering letters for structural steel, Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | P | 5571143 |
MCPHERSON DEVELOPMENT CO. INC. | BFR | P | 06/30/2017 | exterior 18ga framed walls and parapet at all of west and south side and grid line C.4-D, A-B grid line 1 / 5-6,1-2 D line okay with completed required inspections / window header and built up stud columns need to be insulated. | NATHAN | NATHAN | | BFR | P | 5552283 |
MCPHERSON DEVELOPMENT CO. INC. | BSP | P | 05/16/2017 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 5-16-17 | TCRIPPEN | TCRIPPEN | | BSP | P | 5507920 |
MCPHERSON DEVELOPMENT CO. INC. | BSP | T | 05/15/2017 | PAID (REC#1427541) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised layout | JUSTINC | JUSTINC | | BSP | T | 5506199 |
MCPHERSON DEVELOPMENT CO. INC. | BFT | P | 05/12/2017 | north foundation wall okay | NATHAN | NATHAN | | BFT | P | 5504852 |
MCPHERSON DEVELOPMENT CO. INC. | BSP | T | 05/12/2017 | PAID (REC#1427541) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised lighting, power, data and panel schedules. | BERTHA | BERTHA | | BSP | T | 5504186 |
MCPHERSON DEVELOPMENT CO. INC. | BFT | P | 05/08/2017 | openex on file 2500 psf, pad at grid lines 5.5, A.8 not ready, all remaining footer and interior pads okay | NATHAN | NATHAN | | BFT | P | 5499405 |
JLC ELECTRIC LLC | E= | C | 02/14/2018 | Per BM | SHELBY | SHELBY | | E= | C | 5765123 |
JLC ELECTRIC LLC | E= | R | 01/11/2018 | need the plans changed to show the fused disconnect | BRIAN | BRIAN | | E= | R | 5735103 |
JLC ELECTRIC LLC | E= | P | 10/18/2017 | STILL NEED TO SPLICE THE ONE LINE------ | BRIAN | BRIAN | | E= | P | 5659340 |
JLC ELECTRIC LLC | ES | C | 10/18/2017 | Commercial Service: 1200 AMP W-W --OK NO ACTION NEEDED-- | BRIAN | BRIAN | | ES | C | 5659323 |
JLC ELECTRIC LLC | E= | P | 10/09/2017 | NEED TO SPLICE PLANS TO SHOW DISCONNECT INSTEAD OF GFCI MAIN------NEED LABEL MDP AND MAIN DISCONNECT ( MULTIPLE POWER SOURCES 1- UTILITY 2 GENERATOR ) --- LOCKABLE DISCONNECTS FOR SIGNS----SHOCK HAZARD LABELS FOR GENERATOR NEUTRAL PER 702.7.B -----PANEL SCH ----CIRCUIT G-18 NO POWER -------REST OK | BRIAN | BRIAN | | E= | P | 5649153 |
JLC ELECTRIC LLC | ER | P | 10/04/2017 | RTU;S AND ROOF------------NOTE UNIT 5 &6 NEED 25 MAX OCP----REST OK | BRIAN | BRIAN | | ER | P | 5644628 |
JLC ELECTRIC LLC | ES | C | 10/03/2017 | Commercial Service: 1200 AMP 4-W ----OK TO UP TO SWITCH GEAR----OK TO ENERGIZE AND SET METER---------NOTES---NEED EP INSPECTIONS--- | BRIAN | BRIAN | | ES | C | 5643535 |
JLC ELECTRIC LLC | ER | P | 09/20/2017 | CEILINGS--OK | BRIAN | BRIAN | | ER | P | 5631198 |
JLC ELECTRIC LLC | ER | P | 08/03/2017 | HARD LIDS--OK | BRIAN | BRIAN | | ER | P | 5584834 |
JLC ELECTRIC LLC | ER | P | 07/31/2017 | WALLS --SEE PLANS-- | BRIAN | BRIAN | | ER | P | 5580427 |
JLC ELECTRIC LLC | EUG | P | 07/07/2017 | SITE LIGHTING---OK | BRIAN | BRIAN | | EUG | P | 5556993 |
JLC ELECTRIC LLC | ESL | C | 06/02/2017 | | BRIAN | BRIAN | | ESL | C | 5523633 |
MCPHERSON DEVELOPMENT CO. INC. | FP= | C | 10/25/2017 | | KEITH | KEITH | BDA | FP= | C | 5667140 |
MCPHERSON DEVELOPMENT CO. INC. | FP= | R | 04/25/2017 | Entered at Permit Issuance to ensure Floodplain inspections get completed. | NELIDA | NELIDA | | FP= | R | 5486032 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 02/13/2018 | CORRECTION MADE | JERRYF | JERRYF | | H= | C | 5763802 |
PARKER SERVICES, LLC. | H= | C | 02/13/2018 | ALL CORRECTIONS MADE | JERRYF | JERRYF | | H= | C | 5763801 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 12/22/2017 | SPOKE WITH MIKE FROM LANDMARK, GENERATOR TO HAVE A MECHANICAL CONTRACTOR ADD TO SCOPE OF WORK. | JON | JON | | H= | P | 5721146 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 10/24/2017 | CORRECTION MADE STILL NEED SOMEONE TO CLAIM GENERATOR ON PERMIT | JERRYF | JERRYF | | H= | P | 5665479 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 10/20/2017 | NO CONTACT WITH CALL AHEAD, TRIED TO CALL MIKE WITH LANDMARK AND NO ANSWER. NEED TO RESCHEDULE INSPECTION. | JON | JON | | H= | P | 5662597 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 10/10/2017 | NEED STORAGE TANK ADDED TO PERMIT AND SEE HV NOTES | JERRYF | JERRYF | | H= | P | 5650279 |
LANDMARK PLUMBING AND HEATING, INC. | HV | P | 10/10/2017 | NEED WATER HEATER VENTED PER INSTALL MANUAL - DO NOT TERMINATION CAP IN INSTALL MANUAL FOR WATER HEATER | JERRYF | JERRYF | | HV | P | 5650272 |
PARKER SERVICES, LLC. | H= | P | 10/09/2017 | PARTIAL PENDING TAB REPORT - ALL DRAINS AND ALARMS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 5649348 |
PARKER SERVICES, LLC. | H= | P | 10/09/2017 | STILL NEED GENERATOR CLAIMED BY SOMEONE - NEED TAB REPORT - REST OK | JERRYF | JERRYF | | H= | P | 5649344 |
PARKER SERVICES, LLC. | H= | P | 10/06/2017 | NEED REMOTE INDICATORS ON 4 RTU'S - TAB REPORT - SOME ONE NEEDS TO CLAIM ELECTRIC UNIT HEATER - AIR CURTAIN - GENERATOR ON PERMIT - REST OK | JERRYF | JERRYF | | H= | P | 5647321 |
PARKER SERVICES, LLC. | HRP | P | 09/06/2017 | PRESSURE TEST AND PIPING OK AT ALL CASES - OK TO INSULATE | JERRYF | JERRYF | | HRP | P | 5617563 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 09/01/2017 | RELEASE METER | JERRYF | JERRYF | | HC | C | 5613994 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 09/01/2017 | PRESSURE TEST AND PIPING OK - AT FINAL NEED GENERATOR INSTALL MANUAL TO VERIFY CORRECT GAS FLEX CONNECTOR - REST OK | JERRYF | JERRYF | | HI | C | 5613993 |
PARKER SERVICES, LLC. | HRP | P | 08/15/2017 | PRESSURE TEST ON 11 LINES OK - PIPING PER PLAN - STILL NEED TIE INS AT ALL CASES / COOLERS AND WALK INS - BY FINAL DRAINS | JERRYF | JERRYF | | HRP | P | 5595964 |
PARKER SERVICES, LLC. | HD | P | 08/08/2017 | NEED ALL PVC PROTECTED IN RA PLENUM - REST OF ABOVE CEILING OK - STILL NEED MEZZANINE EXHAUST COMPLETED | JERRYF | JERRYF | | HD | P | 5589068 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 10/24/2017 | corrections made. | TAYLOR | TAYLOR | | P= | C | 5664898 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 10/20/2017 | still missing dome strainer, sink in education area still needs to connect directly to sanitary, rest ok. | TAYLOR | TAYLOR | | P= | P | 5662940 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 10/10/2017 | need 16-18 inches from side wall to center of toilet at womens restroom, missing dome strainers at floor sinks next to refrigerators, 2 comp sink needs to be individually piped, sink in education area needs to connect directly to sanitary, rest ok. | TAYLOR | TAYLOR | | P= | P | 5650871 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 08/21/2017 | | TAYLOR | TAYLOR | | PTO | C | 5602271 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | C | 08/02/2017 | | TAYLOR | TAYLOR | | PRD | C | 5584221 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 08/01/2017 | still need to install second shower valve, rest ok, check water heater and meter by final, aav at hand sink next to produce area. | TAYLOR | TAYLOR | | PTO | P | 5582932 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 07/31/2017 | undersized cold water piping, low test DWV at west end, need proper vent at floor sink on mezzanine, complete water piping at half wall, install second shower valve. | TAYLOR | TAYLOR | | PTO | P | 5581572 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 06/01/2017 | | TAYLOR | TAYLOR | | PB | C | 5522269 |
LANDMARK PLUMBING AND HEATING, INC. | PB | L | 05/31/2017 | cancelled by contractor. | TAYLOR | TAYLOR | | PB | L | 5520829 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 05/25/2017 | install water service, revised plans ok. | TAYLOR | TAYLOR | | PB | P | 5517838 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 05/19/2017 | 8" under footer OK | SHANEN | SHANEN | | PRD | P | 5511799 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 05/19/2017 | Floor sinks and clean outs grid A4-A1, A1-D1, and 2B, NEED REVISED PLANS ON SITE FOR GREASE WASTE ELIMINATION AND UNDERGROUND CHANGES | SHANEN | SHANEN | | PB | P | 5511796 |
LANDMARK PLUMBING AND HEATING, INC. | PB | L | 05/18/2017 | Base flooded, all under water | SHANEN | SHANEN | | PB | L | 5510699 |
JLC ELECTRIC LLC | XES | T | 02/14/2018 | PAID (REC#1482008) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise one line ---Main disconnect fused and generator reviswed per inspector comments | SHELBY | SHELBY | | XES | T | 5765121 |