MCPHERSON DEVELOPMENT CO. INC. | B= | C | 02/20/2018 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 5768628 |
MCPHERSON DEVELOPMENT CO. INC. | B= | P | 02/15/2018 | . Additional Inspections Required (computer generated): Floodplain Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5766285 |
MCPHERSON DEVELOPMENT CO. INC. | B= | P | 02/12/2018 | . Additional Inspections Required (computer generated): Floodplain Final Inspection is not Completed yet, External Agency Inspection UF by CSUAPPSPRM is not Completed yet (Contact: CSU: Contract Admin at 668-8111), BRUNO'S MECHANICAL INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5762894 |
MCPHERSON DEVELOPMENT CO. INC. | B= | P | 01/17/2018 | engineers letter of corrections for observation report. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), Floodplain Final Inspection is not Completed yet, External Agency Inspection UF by CSUAPPSPRM is not Completed yet (Contact: CSU: Contract Admin at 668-8111), BRUNO'S MECHANICAL INC. Mechanical Final Inspection is not Completed yet, BRUNO'S MECHANICAL INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5739901 |
MCPHERSON DEVELOPMENT CO. INC. | B= | P | 01/10/2018 | engineer letter of structural observations picked up, need welded brace connection corrected for final letter. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), Floodplain Final Inspection is not Completed yet, External Agency Inspection UF by CSUAPPSPRM is not Completed yet (Contact: CSU: Contract Admin at 668-8111), BRUNO'S MECHANICAL INC. Mechanical Final Inspection is not Completed yet, BRUNO'S MECHANICAL INC. Plumbing Final Inspection is not Completed yet, JLC ELECTRIC LLC Electrical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5734501 |
MCPHERSON DEVELOPMENT CO. INC. | BSP | P | 12/29/2017 | NEED CORE AND SHELL COMPLETED BEFORE FINAL INSPECTION CAN BE DONE AT INTERIOR FINISH | NATHAN | NATHAN | | BSP | P | 5725221 |
MCPHERSON DEVELOPMENT CO. INC. | BSP | P | 11/29/2017 | ====need structural observation reports for foundation, footer, openexcavation, and structural steel completion. Complete all final inspections from MEP's and outside agencies. rated separation wall and penetrations completed. | NATHAN | NATHAN | | BSP | P | 5697233 |
MCPHERSON DEVELOPMENT CO. INC. | BSP | P | 10/23/2017 | need all penetrations firecaulked, 2nd layer drywall both sides and head of wall okay, | NATHAN | NATHAN | | BSP | P | 5664100 |
JLC ELECTRIC LLC | BSP | T | 09/25/2017 | PAID (REC#1459190) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised lighting. | BERTHA | BERTHA | | BSP | T | 5635464 |
MCPHERSON DEVELOPMENT CO. INC. | BSP | T | 09/21/2017 | PAID (REC#1459188) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised storefront and wall type | SHELLEY | SHELLEY | | BSP | T | 5633201 |
MCPHERSON DEVELOPMENT CO. INC. | BLA | C | 09/13/2017 | all lathe completed. | NATHAN | NATHAN | | BLA | C | 5624882 |
MCPHERSON DEVELOPMENT CO. INC. | BLA | P | 09/06/2017 | lathe west side and south side to bump out okay | NATHAN | NATHAN | | BLA | P | 5617487 |
MCPHERSON DEVELOPMENT CO. INC. | BLA | R | 08/30/2017 | not ready | NATHAN | NATHAN | | BLA | R | 5611897 |
MCPHERSON DEVELOPMENT CO. INC. | BSP | P | 08/18/2017 | exterior rated wall assembly at south wall exterior completed. | NATHAN | NATHAN | | BSP | P | 5600363 |
MCPHERSON DEVELOPMENT CO. INC. | BFR | R | 08/16/2017 | south exterior wall covered without inspection on needed rated drywall / interior rated wall will need inspection letter from engineer for compliance to UL 419 and head of wall detail since wall has been covered without RBD inspection. | NATHAN | NATHAN | | BFR | R | 5597542 |
MCPHERSON DEVELOPMENT CO. INC. | BLA | R | 08/16/2017 | not ready | NATHAN | NATHAN | | BLA | R | 5597524 |
MCPHERSON DEVELOPMENT CO. INC. | BSP | R | 07/25/2017 | south wall needs 1 hr rating per table 602 2009 IBC, detail sheet A301 A4 shows plywood instead of 5/8 Type X. Entire south wall must be rated 1 hr, address plywood in listing if plywood is left on studs and covered. | NATHAN | NATHAN | | BSP | R | 5575146 |
MCPHERSON DEVELOPMENT CO. INC. | BFR | P | 07/20/2017 | exterior wall framing light steel studs okay with completed required inspections, need verification on 20 ga studs at center wall listing, print all UL listings for inspection, need all structural steel and foundation observation reports, | NATHAN | NATHAN | | BFR | P | 5571156 |
MCPHERSON DEVELOPMENT CO. INC. | BFT | R | 05/18/2017 | Need to remove all water from footing forms / Need to remove all dirt that has covered bar in forms / Need open hole report / Walked footing and pads, rebar looks OK per design | NICK | NICK | | BFT | R | 5510278 |
JLC ELECTRIC LLC | E= | C | 01/11/2018 | | BRIAN | BRIAN | | E= | C | 5735753 |
JLC ELECTRIC LLC | ES | C | 10/18/2017 | Commercial Service: 800 AMP 4-W ---OK TO SET METER TO HOUSE PANEL----100 AMP 4-W-------- | BRIAN | BRIAN | | ES | C | 5659312 |
JLC ELECTRIC LLC | ES | R | 10/16/2017 | NEED TO FLOAT THE NEUTRALS AFTER THE MAIN DISCONNECT----NEED ISOLATION KIT FOR HOUSE METER----- | BRIAN | BRIAN | | ES | R | 5656460 |
JLC ELECTRIC LLC | ER | P | 09/05/2017 | WALLS OK----NEED PIC OF STRAPS ON MC FOR THE EXITS----- | BRIAN | BRIAN | | ER | P | 5615888 |
JLC ELECTRIC LLC | ER | R | 09/05/2017 | NEED TO REMOVE ALL THE INSULATION FROM THE WALLS---- | BRIAN | BRIAN | | ER | R | 5615507 |
MCPHERSON DEVELOPMENT CO. INC. | FP= | C | 02/20/2018 | | KEITH | KEITH | BDA | FP= | C | 5768627 |
MCPHERSON DEVELOPMENT CO. INC. | FP= | R | 04/25/2017 | Entered at Permit Issuance to ensure Floodplain inspections get completed. | NELIDA | NELIDA | | FP= | R | 5486033 |
BRUNO'S MECHANICAL INC. | HC | C | 06/08/2018 | OK FOR METER RELEASE FOR SUITE 100 | JERRYF | JERRYF | | HC | C | 5868503 |
BRUNO'S MECHANICAL INC. | H= | C | 02/09/2018 | OK | JERRYF | JERRYF | | H= | C | 5761816 |
BRUNO'S MECHANICAL INC. | H= | P | 12/14/2017 | NEED GAS REGULATOR INSTALL MANUAL TO VERIFY PROPER POSITION (VENT LIMITERS APPEAR TO BE BE OPEN TO ATMOSPHERE WITH REGULATORS INSTALLED UPSIDE DOWN - REST OK | JERRYF | JERRYF | | H= | P | 5712537 |
BRUNO'S MECHANICAL INC. | H= | P | 11/01/2017 | INSTALL PERMANENT LADDER ON BUILDING. INSTALL ECONOMIZERS ON RTU'S. INSTALL MISSING CLAMPS ON GAS LINE. WEATHER PROTECT GAS REGULATORS ON ROOF. INSTALL ELECTRIC HEATER. | NANCY | NANCY | | H= | P | 5673088 |
BRUNO'S MECHANICAL INC. | HC | C | 11/01/2017 | OK TO SET METERS IF YOU ARE PUTTING THEM IN FOR SHELL. NO SUITE NUMBERS YET, NO TENANT FINISH YET. | NANCY | NANCY | | HC | C | 5673079 |
BRUNO'S MECHANICAL INC. | HI | C | 11/01/2017 | | NANCY | NANCY | | HI | C | 5673074 |
BRUNO'S MECHANICAL INC. | HI | P | 10/30/2017 | NEED THE FOLLOWING FOR METER RELEASE - CAP OR PLUG ALL OPEN LINES ON ROOF AND POST PERMANENT ADDRESS ON SUITE - CHANGED INSPECTION TO HI - PRESSURE TEST OK AND PIPING RAN PER PLAN - | JERRYF | JERRYF | | HI | P | 5670837 |
BRUNO'S MECHANICAL INC. | P= | C | 02/14/2018 | revised plans ok. | TAYLOR | TAYLOR | | P= | C | 5765772 |
BRUNO'S MECHANICAL INC. | PTO | C | 02/12/2018 | corrections made, note: need trap guard @ water entry room and revise plans to show 1 inch irrigation line by final. | CALE | CALE | | PTO | C | 5763266 |
BRUNO'S MECHANICAL INC. | PTO | T | 02/09/2018 | PAID (REC#1481434): still no corrections made. | TAYLOR | TAYLOR | | PTO | T | 5762594 |
BRUNO'S MECHANICAL INC. | PTO | R | 02/07/2018 | waive trip fee, no corrections made. | TAYLOR | TAYLOR | | PTO | R | 5760093 |
BRUNO'S MECHANICAL INC. | PTO | P | 09/06/2017 | re- grade and support vent for floor sink, still need to support vent as previously noted, rest ok, note: remove hose threads after RP by final. | TAYLOR | TAYLOR | | PTO | P | 5618098 |
BRUNO'S MECHANICAL INC. | PTO | P | 09/05/2017 | low test H2O and all DWV, support G.I. vent at change of direction, need to verify and test floor sink vent in wall at water entry room. | TAYLOR | TAYLOR | | PTO | P | 5616561 |
BRUNO'S MECHANICAL INC. | PB | C | 05/25/2017 | | TAYLOR | TAYLOR | | PB | C | 5517841 |
BRUNO'S MECHANICAL INC. | XPS | T | 02/14/2018 | PAID (REC#1482034) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 2-14-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5765274 |