THE HOTZ COMPANY | B= | C | 11/13/2017 | corrections okay
| BRIANB | BRIANB | | B= | C | 5682984 |
THE HOTZ COMPANY | B= | P | 11/09/2017 | Temp CO: all finals are partial ( Expires: 12/9/2017 12:00:00 AM) | GITA | GITA | | B= | P | 5681742 |
THE HOTZ COMPANY | B= | P | 11/09/2017 | missing code compliant address posted on home / stucco incomplete at front porch area in (3) spots under and to side of front door / penetrations (2) in garage to house wall / missing continuous handrail at rear deck stairs / missing carbon alarm outside main floor bedroom -- Schedule a new Building Final when above items are complete. | BRIANB | BRIANB | | B= | P | 5681301 |
THE HOTZ COMPANY | BIN | C | 08/14/2017 | | JUSTINL | JUSTINL | | BIN | C | 5595345 |
THE HOTZ COMPANY | BFR | C | 08/14/2017 | Letter received for deleting 3 2X6 EE of great room wall / letter received for header, Trimmer and King for window in bedroom - Frame OK | JUSTINL | JUSTINL | | BFR | C | 5595329 |
THE HOTZ COMPANY | BSP | P | 08/10/2017 | Letter for overframing changes , Squash block installed under GT6 in basement, Deck framing changes and eliminating T strap on entry truss framing / Rear deck piers inspected 06/07/17 | JUSTINL | JUSTINL | | BSP | P | 5592585 |
THE HOTZ COMPANY | BFR | P | 08/10/2017 | Need letter for missing 3 2X6 on EE of wall of great room / Need letter or requirements for T, K and header for window in bedroom 3 in basement | JUSTINL | JUSTINL | | BFR | P | 5592584 |
THE HOTZ COMPANY | BLA | C | 08/10/2017 |
| JUSTINL | JUSTINL | | BLA | C | 5592583 |
THE HOTZ COMPANY | BSP | T | 07/26/2017 | PAID (REC#1442313) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice to revise duct design this is a 4 zone damper system | DALEH | DALEH | | BSP | T | 5575963 |
THE HOTZ COMPANY | BSP | P | 07/18/2017 | rear deck post okay - still need to inspect 4x4 posts at rear deck landing only - no stairs installed / observation letter for rear deck piers to follow - per Justin / covered front porch post base okay only - still need to inspect top of front porch post connection to beams / MSTC66 strap at rear balloon wall okay | BRIANB | BRIANB | | BSP | P | 5568030 |
THE HOTZ COMPANY | BFD | C | 06/08/2017 | All paperwork on file | DAKOTAB | DAKOTAB | | BFD | C | 5529084 |
THE HOTZ COMPANY | BFN | C | 06/08/2017 | Engineer letter for foundation on file -- Eufer noted | DAKOTAB | DAKOTAB | | BFN | C | 5529081 |
THE HOTZ COMPANY | BFT | C | 06/08/2017 | Engineer letter for footing on file | DAKOTAB | DAKOTAB | | BFT | C | 5529079 |
THE HOTZ COMPANY | BSP | P | 06/07/2017 | 2 North 24 sq ft pads OK -- 7 deck piers OK | DAKOTAB | DAKOTAB | | BSP | P | 5528162 |
THE HOTZ COMPANY | BFI | C | 06/07/2017 | Engineer letter for foundation insulation received | DAKOTAB | DAKOTAB | | BFI | C | 5528161 |
THE HOTZ COMPANY | BFD | P | 06/07/2017 | Need to complete BFT and BFN -- Engineer letter for perimeter drain and damp proofing received | DAKOTAB | DAKOTAB | | BFD | P | 5528160 |
THE HOTZ COMPANY | BFI | P | 05/24/2017 | AUTHORIZED INSPECTION BY ENGINEER / per call with Justin - observation letter to follow | BRIANB | BRIANB | | BFI | P | 5516452 |
THE HOTZ COMPANY | BFD | P | 05/24/2017 | AUTHORIZED INSPECTION BY ENGINEER / per call with Justin - observation letter to follow | BRIANB | BRIANB | | BFD | P | 5516451 |
THE HOTZ COMPANY | BFI | R | 05/24/2017 | based on date per foundation footing observation letter (5MAY17) work started prior to permit / please contact Chief building inspector John Welton / no inspection performed | BRIANB | BRIANB | | BFI | R | 5515746 |
THE HOTZ COMPANY | BFD | R | 05/24/2017 | based on date per foundation footing observation letter (5MAY17) work started prior to permit / please contact Chief building inspector John Welton / no inspection performed | BRIANB | BRIANB | | BFD | R | 5515745 |
THE HOTZ COMPANY | BFN | R | 05/24/2017 | based on date per foundation footing observation letter (5MAY17) work started prior to permit / please contact Chief building inspector John Welton / Engineers observation Letter on file / Eufer OK / Foundation design on file / Soils report on file / 4000 psf / habitable drain | BRIANB | BRIANB | | BFN | R | 5515744 |
THE HOTZ COMPANY | BFT | R | 05/24/2017 | based on date per foundation footing observation letter (5MAY17) work started prior to permit / please contact Chief building inspector John Welton / foundation footing observation letter received | BRIANB | BRIANB | | BFT | R | 5515741 |
THE HOTZ COMPANY | BFT | P | 05/24/2017 | AUTHORIZED INSPECTION BY ENGINEER | TERRI | TERRI | TERRI | BFT | P | 5515266 |
THE HOTZ COMPANY | BFN | P | 05/24/2017 | AUTHORIZED INSPECTION BY ENGINEER | TERRI | TERRI | TERRI | BFN | P | 5515265 |
BRILLIANT ELECTRIC 2.0 LLC | EP | C | 11/03/2017 | 100 amp 4/w to sub panel ok | CRAIG | CRAIG | | EP | C | 5676905 |
BRILLIANT ELECTRIC 2.0 LLC | E= | C | 11/03/2017 | ac ok 40 amp | CRAIG | CRAIG | | E= | C | 5676904 |
BRILLIANT ELECTRIC 2.0 LLC | ES | C | 11/03/2017 | Residential Underground: 200 - amp 3 Wire new service, ok to seal meter / | CRAIG | CRAIG | | ES | C | 5676903 |
BRILLIANT ELECTRIC 2.0 LLC | EUG | C | 08/29/2017 | 2" pvc from meter to house | CRAIG | CRAIG | | EUG | C | 5610765 |
BRILLIANT ELECTRIC 2.0 LLC | ER | C | 08/08/2017 | Photos accepted | JOSEPH | JOSEPH | | ER | C | 5588709 |
BRILLIANT ELECTRIC 2.0 LLC | ER | P | 08/07/2017 | Max opening in garage firewall is 16 sq inches ------------ Wire Fireplace. ---------- Will accept photos of these corrections. ------------- Notes: Finished basement -------- UFER is ir ------ 6/3 al ---- 6/3 cu ---- 2/3 ser ------ No vac ------------ sub panel has floated neutral. | JOSEPH | JOSEPH | | ER | P | 5588427 |
BRILLIANT ELECTRIC 2.0 LLC | EUG | P | 06/06/2017 | 6/3 cu TC ER cable from house to well | CRAIG | CRAIG | | EUG | P | 5527281 |
MILLER HEATING & AIR CONDITIONING, INC. | H= | C | 11/07/2017 | corrections made. note: finished basement, high/low combustion air to mechanical room, 6" outside air to return, direct vent furnace with zoned system, a/c complete, mantels ok, received change of equipment letter for coil. | PAULO | PAULO | | H= | C | 5679197 |
MILLER HEATING & AIR CONDITIONING, INC. | H= | P | 11/03/2017 | need the following-- combustion air to mechanical room, change of equipment letter for coil. rest ok. note: finished basement, 6" outside air to return, direct vent furnace with zoned system, a/c complete, mantels ok. | PAULO | PAULO | | H= | P | 5676380 |
MILLER HEATING & AIR CONDITIONING, INC. | HC | C | 08/08/2017 | RELEASE METER | PAULO | PAULO | | HC | C | 5589440 |
MILLER HEATING & AIR CONDITIONING, INC. | HRR | C | 08/08/2017 | corrections made. NEEDED BY FINAL-- CORRECT EQUIPMENT LIST FOR FURNACE AND A/C (MODEL #'S). note: finished basement, 6" outside air to return, direct vent furnace with zoned system, a/c rough and line set, duct design. | PAULO | PAULO | | HRR | C | 5589439 |
MILLER HEATING & AIR CONDITIONING, INC. | HRR | P | 08/07/2017 | need the following-- insulation shield to b-vent, insulation to exhaust duct Y in master bath and insulation complete to the roof deck. rest ok. NEEDED BY FINAL-- CORRECT EQUIPMENT LIST FOR FURNACE AND A/C (MODEL #'S). note: finished basement, 6" outside air to return, direct vent furnace with zoned system, a/c rough and line set, duct design. | PAULO | PAULO | | HRR | P | 5588241 |
O.M.A.G.M., INC. | HI | C | 07/27/2017 | corrections made. 10# test ok. note: 1 1/2" main at 120' to furnace, water heater, range, fire place, BBQ and future #19 csst in basement wall to left of walk out. | PAULO | PAULO | | HI | C | 5578399 |
O.M.A.G.M., INC. | HI | P | 07/13/2017 | call me in the morning as to the #19 csst that is capped in basement wall. will need protection to csst at any point csst is within 3" of threat, can not strap csst to stud if not outside of the 3" protection area. note: 1 1/2" main at 120' to furnace, water heater, range, fire place, BBQ and future #19 csst in basement wall to left of walk out. | PAULO | PAULO | | HI | P | 5563542 |
HOGAN MECHANICAL, INC. | P= | C | 11/09/2017 | corrections made see images (cert of potable water, future wet bar, pvb installed) | JOSEPHD | JOSEPHD | | P= | C | 5680618 |
HOGAN MECHANICAL, INC. | P= | P | 11/08/2017 | need pvb installed, hard cap at wet bar dwv, potable water cert, can submit pictures rest ok | JOSEPHD | JOSEPHD | | P= | P | 5679803 |
HOGAN MECHANICAL, INC. | P= | P | 11/07/2017 | wet bar not ready, need trap guards in both laundry rooms, powder room toilet not turned on, need pvb installed. rest ok note: finished basement, irrigation stub | JOSEPHD | JOSEPHD | | P= | P | 5678800 |
HOGAN MECHANICAL, INC. | PTO | C | 07/21/2017 | Note:finished basement,mixing valve will be under master tub deck at final,laundry sink aav,bar sink aav,vtr. | CRADE | CRADE | | PTO | C | 5571819 |
THE HOTZ COMPANY | PWO | C | 06/05/2017 | Note:ok,H20 from well to pit,from pit sleeved under footer.Need certificate of potable water by final. | CRADE | CRADE | | PWO | C | 5526035 |
HOGAN MECHANICAL, INC. | PB | C | 06/02/2017 | dwv ok,No water in at this point. | CRADE | CRADE | | PB | C | 5524476 |