GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 08/18/2017 | letters on file for structural and monocoat components | SCOTTS | SCOTTS | | B= | C | 5600430 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 08/17/2017 | provide 3rd party observation for monocoat/provide letter for structural steel above ceiling including welding observations -- Schedule a new Building Final when above items are complete. | SCOTTS | SCOTTS | | B= | P | 5599568 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | R | 08/17/2017 | Call-ahead number is main office - no one on-site 3:31-3:46 / call to main office resulted in transfer to voicemail / please provide call ahead for personnel available to be on-site for inspection | RICHB | RICHB | | B= | R | 5599427 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 08/16/2017 | PAID (REC#1446815) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 8-16-17 | TCRIPPEN | TCRIPPEN | | BSP | T | 5597714 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/06/2017 | All above ceiling penetrations sealed in area of work | JEREMYA | JEREMYA | | BSP | P | 5556572 |
OLSON PLUMBING & HEATING COMPANY | BSP | P | 06/30/2017 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: removed radiation dampers | DALEH | DALEH | | BSP | P | 5552802 |
STURGEON ELECTRIC CO INC | BSP | P | 06/30/2017 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revisions pertaining to rating of Instrument Room - Instrument Room went from rated to non-rated. | BERTHA | BERTHA | | BSP | P | 5552741 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 06/30/2017 | PAID (REC#1436721) PLAN SPLICE FEE: $50 by: DANM for Construction: Removed fire rating from Instrument Room and minor revision to layout | DANM | DANM | | BSP | T | 5552709 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 06/28/2017 | need to seal penetrations in smoke partition walls / need to remove spray foam from flutes in floor deck above walls and use approved draft stop material / need a letter to derate smoke barriers to smoke partitions or need to treat walls as 1 hr rated assembly and build them per listing and seal all penetrations and headwall details so that 1 hour fire rating is maintained | ERICR | ERICR | | BSP | R | 5549177 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/09/2017 | operating room wall framing ok / pending other rough inspections / talked with Chad on site contact about getting clarification on smoke barriers and smoke partitions and which walls were de rated / spoke to him about mono coat repairs need third party observation of mono coat repairs | ERICR | ERICR | | BFR | P | 5530585 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 06/08/2017 | need call ahead number for access | ERICR | ERICR | | BFR | R | 5529519 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 05/19/2017 | PAID (REC#1430090) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Revised layout | DALEH | DALEH | | BSP | T | 5511442 |
STURGEON ELECTRIC CO INC | E= | C | 07/20/2017 | | BRET | BRET | | E= | C | 5570193 |
STURGEON ELECTRIC CO INC | ER | P | 07/19/2017 | All lighting above hard lid in OR #16 OK--Lighting and raceways in hall and adjacent room above ceilings OK---Panels for OR # 16 OK---Feeders and breakers for OR #16 panels OK--- | ROB | ROB | | ER | P | 5568812 |
STURGEON ELECTRIC CO INC | ER | P | 06/22/2017 | O.R #16 hard lid ok will need to inspect light fixtures thru 4 access panels. | BRET | BRET | | ER | P | 5543424 |
STURGEON ELECTRIC CO INC | ER | P | 06/08/2017 | O.R. walls,except one switch on s.w.wall,see plan | JOHNN | JOHNN | | ER | P | 5529238 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 08/16/2017 | PIPING FINAL OK. | NANCY | NANCY | | H= | C | 5597819 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 08/07/2017 | PIPING FINAL OK PENDING REVISED/APPROVED PRINTS. | NANCY | NANCY | | H= | P | 5587316 |
COLORADO SHEET METAL CO., INC. | H= | C | 08/04/2017 | TAB REPORT - ALL CORRECTIONS MADE - RETAINAGE / BREAK AWAY AND ACCESS DOOR OK | JERRYF | JERRYF | | H= | C | 5586386 |
COLORADO SHEET METAL CO., INC. | H= | R | 08/03/2017 | NO CORRECTIONS MADE - NO CALL AHEAD GIVEN | JERRYF | JERRYF | | H= | R | 5585415 |
COLORADO SHEET METAL CO., INC. | H= | P | 08/02/2017 | DAMPER FRAMING IN SHAFT WALL OK. ANNULAR SPACE OK. INSTALL RETAINING ANGLES AND DAMPER ACCESS DOOR. REMOVE INSULATION FROM DUCT SO BREAK AWAY CONNECTION CAN BE SEEN. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5584052 |
COLORADO SHEET METAL CO., INC. | H= | P | 07/21/2017 | NEED TAB REPORT - COMPLETE F/SD FRAMING AT CAFETERIA DAMPER AT SHAFT WALL IN CEILING | JERRYF | JERRYF | | H= | P | 5572449 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 07/19/2017 | SUPPLY AND CONDENSATE STEAM LINES FOR TWO HUMIDIFIERS OK, OK TO INSULATE AND LABEL. NEED REVISED/APPROVED PRINTS FOR RELOCATED PIPING. | NANCY | NANCY | | H= | P | 5568915 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 07/03/2017 | PRESSURE TEST OK ON CONDENSATE AND HEAT LINES TO 2 HUMIDIFIERS - STILL NEED ALL FINAL CONNECTIONS | JERRYF | JERRYF | | HWP | P | 5553609 |
COLORADO SHEET METAL CO., INC. | HD | P | 06/26/2017 | ABOVE CEILING SA / RA OK TO WRAP ON THE FOLLOWING - OPERATING ROOM 16 - CAV 15 - CAV 14 - INSTRUMENT ROOM - HALLWAY OK TO WRAP - STILL NEED HUMIDIFIERS | JERRYF | JERRYF | | HD | P | 5546461 |
COLORADO SHEET METAL CO., INC. | HD | P | 06/01/2017 | CAFETERIA DUCT UP TO CAV-13 OK, OK TO WRAP. 32 X 14 SUPPLY DUCT OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5522654 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 05/26/2017 | CONTRACTOR INSTALLING DUCTS ETC NEEDS TO ATTACH TO PERMIT. 2 INCH HOT WATER SUPPLY AND RETURN LINES TO CAV15 OK. OK TO INSULATE. NEED REVISED/APPROVED PRINTS BY FINAL SHOWING ALL NEW PIPING LAYOUT. | NANCY | NANCY | | HWP | P | 5518151 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 07/21/2017 | ok. scrub sink tempered and back flow protected | JOHNS | JOHNS | | P= | C | 5572537 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 07/21/2017 | ok for tie ins @ scrub sink | JOHNS | JOHNS | | PTO | C | 5572534 |
OLSON PLUMBING & HEATING COMPANY | PRD | C | 06/22/2017 | | TAYLOR | TAYLOR | | PRD | C | 5543544 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 06/16/2017 | ok for all PRD tie ins. note: still need overflow drains inspected. | JOHNS | JOHNS | | PRD | P | 5537814 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 06/15/2017 | partial roof drains at cafeteria ok minus tie in, note: revise plans to show 4 inch roof drain at west side on 2nd floor by final. | TAYLOR | TAYLOR | | PRD | P | 5536496 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 06/09/2017 | in wall roof drains ok. | TAYLOR | TAYLOR | | PRD | P | 5530672 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/09/2017 | in wall DWV and H2O ok at scrub sink. | TAYLOR | TAYLOR | | PTO | P | 5530663 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 06/01/2017 | relocation of roof drains above hallway ok, minus tie in's. | TAYLOR | TAYLOR | | PRD | P | 5522413 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/26/2017 | ok for reloacating domestic water lines for operating room. Note: PLEASE ADD RELOCATING OF WATER AND ROOF DRAINS TO SCOPE OF WORK, currently only showing (1) sink.---PARK AND ACCESS THROUGH SOUTH WEST LOADING DOCK PER MIKE @ OLSON--- | JOHNS | JOHNS | | PTO | P | 5518210 |