ED GREEN & SON CONSTRUCTION | B= | C | 12/03/2019 | | BRIANB | BRIANB | | B= | C | 6414852 |
ED GREEN & SON CONSTRUCTION | B= | P | 11/21/2019 | pending approved plan splice for additional exterior door at the north east corner of the building not found on the approved design -- Schedule a new Building Final when above items are complete. | BRIANB | BRIANB | | B= | P | 6407317 |
ED GREEN & SON CONSTRUCTION | BIN | P | 11/18/2019 | stamped insulation observation letter on file | BRIANB | BRIANB | | BIN | P | 6401915 |
ED GREEN & SON CONSTRUCTION | B= | R | 11/06/2019 | missing design professional stamp on insulation observation letter to complete insulation inspection / no inspection performed | BRIANB | BRIANB | | B= | R | 6389747 |
ED GREEN & SON CONSTRUCTION | BFR | P | 11/04/2019 | observation letter for structural steel members on file | BRIANB | BRIANB | | BFR | P | 6386654 |
ED GREEN & SON CONSTRUCTION | BFR | R | 10/31/2019 | structural components covered prior to inspection / structural observation letter uploaded to inspection request / observation letter references grid lines between "A & E" and "3 & 5" - need observation letter to reference complete structure - missing grid lines 1 & 3 / call with Cory from Ed Green Construction and went over letter | BRIANB | BRIANB | | BFR | R | 6384383 |
ED GREEN & SON CONSTRUCTION | B= | R | 10/30/2019 | met site superintendent John and went over inspection history / need to complete frame and insulation inspection / no inspection performed | BRIANB | BRIANB | | B= | R | 6383988 |
ED GREEN & SON CONSTRUCTION | BFR | R | 07/25/2019 | incorrect permit requested | SCOTTS | SCOTTS | | BFR | R | 6276458 |
ED GREEN & SON CONSTRUCTION | BSP | T | 04/09/2019 | PAID (REC#1616826) ADDITIONAL PLAN REVIEW TIME: $50 From: BECKYA add smoke dampers | BECKYA | BECKYA | | BSP | T | 6159739 |
ED GREEN & SON CONSTRUCTION | BE | L | 12/04/2018 | Renewed at 12/4/2018 12:34:17 PM | TERRI | TERRI | | BE | L | 6042329 |
ED GREEN & SON CONSTRUCTION | BBB | C | 03/16/2018 | Bond beam at top of wall OK / plans reviewed onsite | RICHB | RICHB | | BBB | C | 5790986 |
ED GREEN & SON CONSTRUCTION | BBB | P | 03/12/2018 | Bond beam & #5 verts at elevation 24'-0" OK | RICHB | RICHB | | BBB | P | 5785939 |
ED GREEN & SON CONSTRUCTION | BBB | R | 03/09/2018 | canceled at cub not ready. | NATHAN | NATHAN | | BBB | R | 5785504 |
ED GREEN & SON CONSTRUCTION | BBB | P | 03/07/2018 | Bond beam & #5 verts at 16'-0" elevation OK / plans reviewed onsite | RICHB | RICHB | | BBB | P | 5782867 |
ED GREEN & SON CONSTRUCTION | BBB | P | 03/02/2018 | bond beam at 8' level and vertical reinforcement okay at south wall. | NATHAN | NATHAN | | BBB | P | 5779244 |
ED GREEN & SON CONSTRUCTION | BFN | P | 01/29/2018 | Retaining wall at SE corner - forms & rebar OK / plans reviewed onsite | RICHB | RICHB | | BFN | P | 5750699 |
ED GREEN & SON CONSTRUCTION | BFT | C | 01/23/2018 | All footings complete | JEREMYA | JEREMYA | | BFT | C | 5744821 |
ED GREEN & SON CONSTRUCTION | BFN | P | 01/16/2018 | Tie-wall OK // Dock wall not complete | JEREMYA | JEREMYA | | BFN | P | 5738000 |
ED GREEN & SON CONSTRUCTION | BFI | C | 01/03/2018 | Balance of foundation insulation complete | JEREMYA | JEREMYA | | BFI | C | 5727319 |
ED GREEN & SON CONSTRUCTION | BFN | P | 12/19/2017 | Balance of foundation wall complete pending retaining wall at end of loading dock | JEREMYA | JEREMYA | | BFN | P | 5716911 |
ED GREEN & SON CONSTRUCTION | BFT | P | 12/05/2017 | Footing and pads at south wall and remainder of east wall OK // Still need to see footing at south retaining wall | JEREMYA | JEREMYA | | BFT | P | 5702484 |
ED GREEN & SON CONSTRUCTION | BFN | P | 08/28/2017 | Retaining wall on NE corner - rebar OK, forms OK, need 3" weeps @ 8' max per Detail P on S-3 / plans reviewed electronically | RICHB | RICHB | | BFN | P | 5608481 |
ED GREEN & SON CONSTRUCTION | BFN | P | 08/23/2017 | Retaining wall at NE end of project, footing OK // Northa nd Center Tie Beam reinforcing OK pending engineer report stating that the mechanical connections are good in lieu of the welded connections on the plans | JEREMYA | JEREMYA | | BFN | P | 5604325 |
ED GREEN & SON CONSTRUCTION | BFR | P | 08/23/2017 | Wrong inspection | JEREMYA | JEREMYA | | BFR | P | 5604318 |
ED GREEN & SON CONSTRUCTION | BFI | P | 08/16/2017 | R10 @ 3' along north wall and north half of east wall OK | JEREMYA | JEREMYA | | BFI | P | 5597345 |
ED GREEN & SON CONSTRUCTION | BFN | P | 08/02/2017 | Foundation walls OK on Grid 1 from A-E, Grid E from 1-3, to include horizontal dowels at east pilasters for beam tie in | JEREMYA | JEREMYA | | BFN | P | 5583406 |
ED GREEN & SON CONSTRUCTION | BFT | P | 07/26/2017 | Open Hole on file | JEREMYA | JEREMYA | | BFT | P | 5575872 |
ED GREEN & SON CONSTRUCTION | BFT | P | 07/25/2017 | Footings and pads OK on Grid 1 from A-E, Grid E from 1-3 // Still need open hole letter // No one on site, plans reviewed electronically | JEREMYA | JEREMYA | | BFT | P | 5574723 |
ED GREEN & SON CONSTRUCTION | BSP | P | 07/24/2017 | Changed from BFT to BSP / discussed inspection scheduling with Corey (Ed Green & Son) / need Open Hole Observation / permit set reviewed on site | RICHB | RICHB | | BSP | P | 5573197 |
RIVIERA ELECTRIC, LLC | E= | C | 02/06/2019 | corrections okay | CHIPO | CHIPO | | E= | C | 6098947 |
RIVIERA ELECTRIC, LLC | E= | R | 01/29/2019 | missing cover on 4sq j-box--missing cover on 2 inch LB--need KO filler for 1/2 inch KO in j-box above panel--need KO filler for 3/4 inch hole on side of panel-------okay to upload images with next inspection request | CHIPO | CHIPO | | E= | R | 6090892 |
RIVIERA ELECTRIC, LLC | ER | C | 01/29/2019 | | CHIPO | CHIPO | | ER | C | 6090885 |
RIVIERA ELECTRIC, LLC | EE | L | 10/10/2018 | Renewed online for 1/2 Fee at 10/10/2018 2:28:02 PM (RECEIPT #: 1546258) | WEBSITE | WEBSITE | | EE | L | 5991289 |
KENT SHEET METAL, INC | H= | C | 04/12/2018 | PER CHAPTER 11 OF THE IBC, T-STATS NOT REQUIRED TO BE BELOW 48 INCHES. | NANCY | NANCY | | H= | C | 5814951 |
KENT SHEET METAL, INC | H= | P | 03/30/2018 | Thermostats mounted above 48" require lock boxes. Rest OK. Note: 4 unit heaters per plan. | MARKB | MARKB | | H= | P | 5803670 |
KENT SHEET METAL, INC | HV | C | 03/30/2018 | Venting for 4 unit heaters per plan complete. | MARKB | MARKB | | HV | C | 5803663 |
KENT SHEET METAL, INC | HV | P | 03/29/2018 | No inspections have been called in for site visit - see images for roof penetration. | MARKB | MARKB | | HV | P | 5802162 |
PRESTIGE MECHANICAL CONTRACTORS,INC | H= | C | 03/12/2018 | Contractors scope complete | MARKB | MARKB | | H= | C | 5785977 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HC | C | 03/12/2018 | RELEASE METER - Adding 540k to meter. | MARKB | MARKB | | HC | C | 5785976 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HI | C | 03/12/2018 | 10 PSI PRESSURE TEST OK. PIPING PER PLAN. Note: 7" W.C. | MARKB | MARKB | | HI | C | 5785973 |
ED GREEN & SON CONSTRUCTION | XBS | T | 11/27/2019 | PAID (REC#1647147) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Added exterior landing | SHELLEY | SHELLEY | | XBS | T | 6411624 |