CQL-2000 CONSTRUCTORS, LLC. | B= | C | 09/14/2017 | final ok | DANE | DANE | | B= | C | 5625545 |
CQL-2000 CONSTRUCTORS, LLC. | B= | P | 09/01/2017 | Temp CO: pending mechanical final ( Expires: 10/1/2017 12:00:00 AM) | MINDY | MINDY | | B= | P | 5614344 |
CQL-2000 CONSTRUCTORS, LLC. | B= | P | 08/25/2017 | final OK pending all other finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, WESTECH MECHANICAL INC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5607589 |
CQL-2000 CONSTRUCTORS, LLC. | BFR | P | 08/25/2017 | hard lid over baking area OK | DANE | DANE | | BFR | P | 5607579 |
CQL-2000 CONSTRUCTORS, LLC. | BFR | P | 07/14/2017 | partition walls and bathroom walls ok / soffit framing ok / discussed with Barry the site contact the need for having a mechanical inspection done on the pizza oven before drywall / Demising wall is existing / need to inspect hard lid over baking area / Need other rough inspections completed / | ERICR | ERICR | | BFR | P | 5565188 |
SYSTEMS ELECTRIC, INC. | E= | C | 08/24/2017 | | RANDY | RANDY | | E= | C | 5606363 |
SYSTEMS ELECTRIC, INC. | E= | P | 08/22/2017 | see notes | RANDY | RANDY | | E= | P | 5603237 |
SYSTEMS ELECTRIC, INC. | ER | P | 08/22/2017 | still need to look at front area lights------check for 15 amp breaker for exhaust fan------gfci breakers for front work area-------- | RANDY | RANDY | | ER | P | 5603233 |
SYSTEMS ELECTRIC, INC. | ER | L | 08/21/2017 | not ready, canceled at call a head | GARYL | GARYL | | ER | L | 5601554 |
SYSTEMS ELECTRIC, INC. | ES | C | 08/09/2017 | Commercial Service: 400 amp 3 phase: ok to energize------------- variance for working space at meter approved by Jaimin withCSU | MATTHEW | MATTHEW | | ES | C | 5589964 |
SYSTEMS ELECTRIC, INC. | ES | R | 08/08/2017 | need variance for working clearance for meter socket | MATTHEW | MATTHEW | | ES | R | 5588735 |
SYSTEMS ELECTRIC, INC. | ER | P | 07/14/2017 | all walls, hard lid in mech, bath and beverage station ok | MATTHEW | MATTHEW | | ER | P | 5564882 |
SYSTEMS ELECTRIC, INC. | EUG | P | 06/16/2017 | (2) feeder conduits relocated | MATTHEW | MATTHEW | | EUG | P | 5538524 |
WESTECH MECHANICAL INC | H= | C | 09/14/2017 | CONSULTED WITH BUILDING FOR 24 x 24 ACCESS DOOR NOT INSTALLED PER DETAIL ON PAGE A-402 FOR PIZZA OVEN . BUILDING DOES NOT REQUIRE THIS TO BE INSTALLED . THE ACCESS TO THE CONTROLS WILL BE THROUGH THE FRONT . ACCESS DOOR FOR GAS SHUT OF VALVE IS INSTALLED .Note :Interlocks have been verified . | LIDO | LIDO | | H= | C | 5625491 |
WESTECH MECHANICAL INC | H= | P | 09/01/2017 | REVISE PRINTS TO REFLECT ACCESS TO PIZZA OVEN CONTROLS IS NO LONGER ON THE SIDE OF THE PIZZA OVEN AND WERE THE NEW ACCESS WILL BE , Received test and balance report . REST OK . | LIDO | LIDO | | H= | P | 5613730 |
WESTECH MECHANICAL INC | HD | P | 09/01/2017 | REVISE PRINTS TO REFLECT ACCESS TO PIZZA OVEN CONTROLS IS NO LONGER ON THE SIDE OF THE PIZZA OVEN AND WERE THE NEW ACCESS WILL BE , Received test and balance report . REST OK . | LIDO | LIDO | | HD | P | 5613729 |
WESTECH MECHANICAL INC | H= | P | 08/25/2017 | REVISE PRINTS TO REFLECT ACCESS TO PIZZA OVEN CONTROLS IS NO LONGER ON THE SIDE OF THE PIZZA OVEN AND WERE THE NEW ACCESS WILL BE , MISSING INSULATION ON 4 S/A BRANCH ELBOWS OVER KITCHEN FROM RTU -12 , Received test and balance report need to review .(( Added to notes 8/28/17 Tab report ok,)) REST OK. | LIDO | LIDO | | H= | P | 5607797 |
WESTECH MECHANICAL INC | HSP | P | 08/22/2017 | REFRIGERATION CONTRACTOR NEEDS TO ATTACH TO PERMIT. EQUIPMENT SCHEDULE CALLS FOR REMOTE SMOKE INDICATORS IN S/A AND R/A . | LIDO | LIDO | | HSP | P | 5602727 |
WESTECH MECHANICAL INC | HV | P | 08/21/2017 | Training with Jeff B 65 minutes . THE CONNECTION TO THE GREASE DUCT ON TOP OF THE PIZZA OVEN IS SINGLE WALL AND HAS NO PROTECTION ENGINEER WILL NEED TO ADDRESS THIS ISSUE THIS CONNECTION WILL HAVE TO BE PROTECTED . GREASE DUCT IS GRADING THE WRONG WAY .Still need to inspect roof. | LIDO | LIDO | | HV | P | 5601744 |
WESTECH MECHANICAL INC | HD | P | 08/21/2017 | Training with Jeff B 65 minutes . THE CONNECTION TO THE GREASE DUCT ON TOP OF THE PIZZA OVEN IS SINGLE WALL AND HAS NO PROTECTION ENGINEER WILL NEED TO ADDRESS THIS ISSUE THIS CONNECTION WILL HAVE TO BE PROTECTED . GREASE DUCT IS GRADING THE WRONG WAY .EXHAUST DUCT IS NOT COMPLETE ABOVE HARD LID BATHROOMS .WERE ARE THE DAMPERS FOR THE EXHAUST , RTU- 12 R/A S/A TRUNK LINE AND BRANCHES OK .NEED TO CHECK FINAL CONNECTIONS TO R/A AND S/A REGISTERS . RTU-13 DUCT ROUGH OK .BY FINAL NEED TEST AND BALANCE REPORT AND REMOTE SMOKE INDICATERS INSTALLED FOR RTU 1-2 AND RTU -13.Still need to inspect roof. | LIDO | LIDO | | HD | P | 5601738 |
WESTECH MECHANICAL INC | H16 | C | 08/10/2017 | STOPPED BY JOB SITE AND TALKED TO GENERAL CONTRACTOR TO SEE WHAT STAGE THE JOB IS AT , GC WILL CALL DUCT ROUGH INSPECTION THE BEGINNING OF NEXT WEEK. GREASE DUCT NOT INSTALLED FOR PIZZA OVEN YET THE DUCT WILL BE PRE MANUFACTURED FROM CAPTIVE AIR . | LIDO | LIDO | | H16 | C | 5592105 |
WESTECH MECHANICAL INC | HC | C | 08/08/2017 | METER RELEASE . | LIDO | LIDO | | HC | C | 5588724 |
WESTECH MECHANICAL INC | HI | P | 07/19/2017 | Need medium pressure letter by final.( 10 LB TEST OK.) NEED ALL REQUIRED ACCESS TO APPLIANCE TO BE PER PLAN REFER TO SHEET A-401/ M-101 ,WERE IS THE REGULATOR GOING TO BE INSTALLED ? NEED PRINT REVISED TO SHOW M/P GAS BEING INSTALLED ,ALL MEDIUM PRESSURE GAS NEEDS TO BE LABELED . | LIDO | LIDO | | HI | P | 5569601 |
WESTECH MECHANICAL INC | H16 | C | 07/17/2017 | DISCUSSED WITH BUILDING SUPERINTENDENT ABOUT THE INSTALLATION REQUIREMENTS FOR PIZZA OVEN , MUST ABIDE TO ALL REQUIRED CLEARANCES PER INSTALLATION MANUAL PAGES 7,8,9 RECALL INSPECTION WHEN READY TO VERIFY CLEARANCES ,CONTRACTOR WANTS TO USE OVEN FRONT ACCESS PANEL TO ACCESS GAS SHUT OFF VALVE AND CONTROLS , MAY HAVE TO REVISE PLANS , REMOVAL OF SIDE ACCESS DOOR MAY CONFLICT WITH APPLIANCE MAINTENANCE . MECHANICAL CONTRACTOR TO ADD ALL EQUIPMENT INCLUDING OVEN .. | LIDO | LIDO | | H16 | C | 5566576 |
WILKINSON PLUMBING & HEATING, | P= | C | 08/23/2017 | tenant finish | TED | TED | | P= | C | 5604165 |
WILKINSON PLUMBING & HEATING, | PTO | C | 07/14/2017 | correction made | TED | TED | | PTO | C | 5564258 |
WILKINSON PLUMBING & HEATING, | PTO | P | 07/12/2017 | dwv ok, water piping not sized to plan | TED | TED | | PTO | P | 5561545 |
WILKINSON PLUMBING & HEATING, | PB | C | 06/20/2017 | ok for all grease and sanitary base lines, test and design ok. | JOHNS | JOHNS | | PB | C | 5541152 |