BUILTRITE BUILDERS | B= | C | 06/12/2018 | All other required Final inspections are complete. (This is a computer generated result) | SCOTTS | SCOTTS | | B= | C | 5872270 |
BUILTRITE BUILDERS | B= | P | 05/31/2018 | correction complete. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 5861130 |
BUILTRITE BUILDERS | BFD | C | 05/31/2018 | drain observation on file | SCOTTS | SCOTTS | | BFD | C | 5861128 |
BUILTRITE BUILDERS | BFN | C | 05/31/2018 | footing/foundation observations on file/eufer noted | SCOTTS | SCOTTS | | BFN | C | 5861126 |
BUILTRITE BUILDERS | BFT | C | 05/31/2018 | soils/open ex on file | SCOTTS | SCOTTS | | BFT | C | 5861125 |
BUILTRITE BUILDERS | B= | R | 05/29/2018 | Complete BFT, BFN and BFD with all foundation paperwork and observations / Handrail missing at stairs. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | SHAUN | SHAUN | | B= | R | 5857566 |
BUILTRITE BUILDERS | BIN | C | 01/11/2018 | | SCOTTS | SCOTTS | | BIN | C | 5735444 |
BUILTRITE BUILDERS | BFR | C | 01/11/2018 | corrections from previous inspection complete | SCOTTS | SCOTTS | | BFR | C | 5735441 |
BUILTRITE BUILDERS | BFR | P | 01/08/2018 | front powder room not built per plan - missing THJ26 / strap top plate at front entrance on EE and top / front window calls for 4Ts and 3Ks under B11X girder / strap plate break in N bedroom closet / master bedroom missing THJ26s (other hard wear used) / clean out B-vent chase / glue shims in basement / nail off hanger in basement at walkout door / secure post to large beam / all A-note ST22s OK on exterior / OK to insulate | LONNYS | LONNYS | | BFR | P | 5732159 |
BUILTRITE BUILDERS | BLA | C | 01/04/2018 | lath okay | LUKES | LUKES | | BLA | C | 5729312 |
BUILTRITE BUILDERS | BSP | P | 12/12/2017 | rear deck frame, posts and lid OK | LONNYS | LONNYS | | BSP | P | 5709733 |
BUILTRITE BUILDERS | BSP | R | 11/15/2017 | BC6s at top of bottom deck post can not be deformed per simpson guidelines plans call for 6x6 post/ missing (2) ST22s at outer posts to deck lid / missing ST22s on both sides at 2x6 posts for deck lid / front porch lid and post OK | LONNYS | LONNYS | | BSP | R | 5685846 |
BUILTRITE BUILDERS | BFI | P | 08/09/2017 | 2" R-10 Ridged foam OK / Still need all foundation paperwork | JUSTINL | JUSTINL | | BFI | P | 5590346 |
BUILTRITE BUILDERS | BFD | P | 06/14/2017 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFD | P | 5534987 |
BUILTRITE BUILDERS | BFN | P | 06/14/2017 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFN | P | 5534985 |
BUILTRITE BUILDERS | BFT | P | 06/14/2017 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFT | P | 5534986 |
POSITIVE ELECTRIC, LLC | E= | C | 05/21/2018 | | TOMC | TOMC | | E= | C | 5850886 |
POSITIVE ELECTRIC, LLC | E= | R | 05/18/2018 | AFCI for great room won't hold ------ 1 - 20 a/c , 1 - 30 a/c | TOMC | TOMC | | E= | R | 5849577 |
POSITIVE ELECTRIC, LLC | ES | C | 01/10/2018 | Residential Underground: 200 amp 3w new res meter in need reseal | JOSEPH | JOSEPH | | ES | C | 5734901 |
POSITIVE ELECTRIC, LLC | EUG | C | 01/10/2018 | | JOSEPH | JOSEPH | | EUG | C | 5734873 |
POSITIVE ELECTRIC, LLC | ER | C | 12/14/2017 | Finished basement -------- UFER is ir --------- No vac --------- 14/3 --------- 6/3 cu ------------ 4 - 10/3 ------- 6/3 al ------ 2 - 8/3 al | JOSEPH | JOSEPH | | ER | C | 5712842 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 05/24/2018 | | DUSTINS | DUSTINS | | H= | C | 5854186 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 05/18/2018 | NEED RETURN AIR PATHWAYS AT BOTH UPPER LEVEL BEDROOMS AND AT LOWER LEVEL NORTH BEDROOM. OK TO ATTACH PICTURE AT NEXT INSPECTION REQUEST. PERFORMANCE TEST RECEIVED. NOTE: FINISHED BASEMENT, 2 FULL A/C'S, 2- 6" OUTSIDE AIRS TO RETURN DUCTS, HIGH/LOW GRILLES AT MECHANICAL ROOM | BILLS | BILLS | | H= | P | 5849836 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 01/05/2018 | RELEASE METER | PAULO | PAULO | | HC | C | 5729619 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 01/05/2018 | correction made. NEEDED BY FINAL-- PERFORMANCE TEST. note: finished basement, 6" outside air to each furnace return, 2- indirect vent furnaces, no a/c's to either furnace, performance test. | PAULO | PAULO | | HRR | C | 5729615 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | P | 01/02/2018 | need to remove lighting canister in R.A. in basement. rest ok. NEEDED BY FINAL-- PERFORMANCE TEST. note: finished basement, 6" outside air to each furnace return, 2- indirect vent furnaces, no a/c's to either furnace, performance test. | PAULO | PAULO | | HRR | P | 5726599 |
NASRALLAH PLUMBING & HEATING, INC. | HO | C | 11/13/2017 | 10# test ok. note: 3/4" poly at 220' to home, tracer wire installed. L.P. | PAULO | PAULO | | HO | C | 5683444 |
RIDGEVIEW PLUMBING | HI | C | 11/13/2017 | 10# test ok. note: 1" main at 50' to 2- furnaces, 2- water heaters, 1- range, 1- fire place and 1- dryer. L.P. | PAULO | PAULO | | HI | C | 5683440 |
RIDGEVIEW PLUMBING | P= | C | 05/15/2018 | correction made, certificate of potable water to scanning | TED | TED | | P= | C | 5845905 |
RIDGEVIEW PLUMBING | P= | P | 04/27/2018 | need potable water certification, leak at left hand basement bathroom toilet. set tempering at upstairs hall bath tub, support water line to well tank at wall and blue pex to water heater in ceiling, pvb to low, rest ok note: finished basement(2 baths), pvb installed | JOSEPHD | JOSEPHD | | P= | P | 5829350 |
HOMEOWNER | PWO | C | 11/17/2017 | note: potable water certification by final | JOSEPHD | JOSEPHD | | PWO | C | 5688998 |
RIDGEVIEW PLUMBING | PTO | C | 11/13/2017 | note: finished basement, aav @ wet bar, kitchen, mixing valve @ basement bedroom closet under master bathroom | JOSEPHD | JOSEPHD | | PTO | C | 5682942 |
RIDGEVIEW PLUMBING | PB | C | 08/18/2017 | dwv ok,no water in at this point. | CRADE | CRADE | | PB | C | 5600522 |