J. J. O'DONNELL CONSTRUCTION LTD | B= | C | 12/06/2017 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 5704522 |
CASEBIER MECHANICAL CONTRACTORS | BSP | T | 11/02/2017 | PAID (REC#1463501) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 11-2-2017 | TCRIPPEN | TCRIPPEN | | BSP | T | 5674848 |
J. J. O'DONNELL CONSTRUCTION LTD | B= | P | 10/18/2017 | Detail on file for framing / Sink dropped / Need all other finals complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), CASEBIER MECHANICAL CONTRACTORS Plumbing Final Inspection is not Completed yet, M W MECHANICAL INC Mechanical Final Inspection is not Completed yet, SPECTRUM INC DBA SPECTRUM LIGHTING MAINT Electrical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5659942 |
J. J. O'DONNELL CONSTRUCTION LTD | B= | P | 10/17/2017 | Need to drop one sink to 34" for accessibility / Need detail for framing per last frame inspection / Need all other finals complete -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), CASEBIER MECHANICAL CONTRACTORS Plumbing Final Inspection is not Completed yet, M W MECHANICAL INC Mechanical Final Inspection is not Completed yet, SPECTRUM INC DBA SPECTRUM LIGHTING MAINT Electrical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5658407 |
M W MECHANICAL INC | BSP | T | 10/11/2017 | PAID (REC#1458602) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised location of HRV and new details and notes | JUSTINC | JUSTINC | | BSP | T | 5651630 |
J. J. O'DONNELL CONSTRUCTION LTD | B16 | P | 07/31/2017 | met JJ at my desk reviewed with Nick ok to provide wall detail at a later date before final | BERTW | BERTW | | B16 | P | 5580323 |
J. J. O'DONNELL CONSTRUCTION LTD | BFR | P | 07/28/2017 | Need detail from architect showing what wall 1 and 2 are for frame ( to structure, gage, oc spacing, ect. ) / Need detail for soffit framing / Need all MEP's complete / Need to attach mechanical / Reviewed accessible elements | NICK | NICK | | BFR | P | 5579863 |
SPECTRUM, INC. | E= | C | 10/20/2017 | | BRET | BRET | | E= | C | 5661850 |
SPECTRUM, INC. | E= | R | 10/18/2017 | bond neutral in old ct cabinet., gfci receptacles within 6' of sink in both treatment rooms, gfci protect water cooler. install gfci breaker for vending machine receptacle, need access to roof for new equipment. have plans on site. | BRET | BRET | | E= | R | 5659035 |
SPECTRUM, INC. | E= | R | 10/12/2017 | COMPLETE REINAPECT----------NEED TO REMOVE THE PARALLEL NEUTRAL FROM CT TO DISCONNECT 5----NEED TO BOND THE NEUTRAL TO DISCONNECT 5----BONDING BUSHINGS OR LOOSE ----NEED ENGRAVED LABELS FOR THE SERVICES--- 1 LABEL TO SAY SERVICE DISCONNECTS 1-4 OF 5 --THE OTHER TO SAY 5 OF 5-----STRAP THE EMT FROM THE CT TO THE DISCONNECTS----INTERSYSTEM BOND-----NEED GFCI PROTECTION ON ALL OUTLETS WITH IN 6' OF SINKS-----NO POWER TO OUTLET ON CIRCUIT 16--NEED LIGHTS OR BLANKS ON BATHROOM LIGHTS------- | BRIAN | BRIAN | | E= | R | 5653556 |
SPECTRUM, INC. | ER | P | 09/27/2017 | suspended ceilings complete | BRET | BRET | | ER | P | 5638314 |
SPECTRUM, INC. | ER | R | 09/22/2017 | CEILINGS-----NOT READY--- | BRIAN | BRIAN | | ER | R | 5633982 |
SPECTRUM, INC. | ES | P | 09/22/2017 | Commercial Service: 800 AMP 4-W ---OK FOR CONTRACTOR TO SCH WITH CSU TO DO THE SWITCH OVER FROM OVER HEAD TO UNDER GROUND----------------------NOTE -- THE RTU PANEL IS 4 HANDLES---NO MAIN ---- | BRIAN | BRIAN | | ES | P | 5633964 |
SPECTRUM, INC. | ES | R | 09/19/2017 | bonding jumper undersized, need neutral bond in rtu panel. at time of shutdown bond neutral to can of old ct cabinet. | BRET | BRET | | ES | R | 5629664 |
SPECTRUM, INC. | ER | P | 09/18/2017 | suspended ceilings back 3 rooms. close j-boxes for rough. | BRET | BRET | | ER | P | 5628430 |
SPECTRUM, INC. | ER | P | 07/28/2017 | CORRECTIONS MADE---- | BRIAN | BRIAN | | ER | P | 5578908 |
SPECTRUM, INC. | ER | R | 07/27/2017 | need to meet electricians on site, bring nail plate for east wall , old wiring not removed if in conduit remove conductors, if mc cut conductors in box and top of wall. | BRET | BRET | | ER | R | 5577656 |
SPECTRUM, INC. | ER | R | 07/26/2017 | remove old wiring | JOHNN | JOHNN | | ER | R | 5576099 |
SPECTRUM, INC. | ER | P | 07/24/2017 | WALLS --OK | BRIAN | BRIAN | | ER | P | 5573226 |
SPECTRUM, INC. | ER | R | 07/21/2017 | install far side box supports | BRET | BRET | | ER | R | 5571461 |
M W MECHANICAL INC | H= | C | 12/06/2017 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 5704521 |
M W MECHANICAL INC | H= | P | 10/17/2017 | NEED BALANCE REPORT | JON | JON | | H= | P | 5658148 |
M W MECHANICAL INC | H= | P | 10/13/2017 | NEED THE FOLLOWING - SECURE EXTERIOR INLET AND OUTLET - SEAL EXHAUST IN BASEMENT CEILING TO PEDI. CHAIRS - UNDER CUT DOORS FOR RA PATH - TAB REPORT | JERRYF | JERRYF | | H= | P | 5654466 |
M W MECHANICAL INC | HD | P | 09/11/2017 | CHANGED INSPECTION TO HD - NOT READY FOR FINAL - NEED MECH PLAN REVISED BEFORE NEXT INSPECTION - 4" DUCT UNDER PLATFORM STILL MISSING SEAL AT BACK OF PLATFORM - STOPPED INSPECTION | JERRYF | JERRYF | | HD | P | 5621331 |
M W MECHANICAL INC | H= | R | 09/07/2017 | INSTALL DOES NOT MATCH PLAN - STOPPED INSPECTION - RE INSPECT - WILL NEED WOOD PLATFORM REMOVED TO VERIFY PIPING AND SEAL AT FLOOR EXHAUST | JERRYF | JERRYF | | H= | R | 5618617 |
CASEBIER MECHANICAL CONTRACTORS | P= | C | 11/03/2017 | corrections made. | TAYLOR | TAYLOR | | P= | C | 5675634 |
CASEBIER MECHANICAL CONTRACTORS | P= | P | 10/17/2017 | need 1 sink to comply with accessibility requirements, revise plans as previously noted, rest ok. | TAYLOR | TAYLOR | | P= | P | 5657435 |
CASEBIER MECHANICAL CONTRACTORS | PTO | C | 10/17/2017 | aav's at all shampoo sinks and pedicure sinks, revise plans to show new 50 gallon water heater, 3/4 backflow and 3/4 connecting to water heater. | TAYLOR | TAYLOR | | PTO | C | 5657431 |
CASEBIER MECHANICAL CONTRACTORS | P= | R | 10/12/2017 | need approved plans on site, vacuum breakers are not listed at shampoo sinks, need to raise aav's and install mixing valves at pedicure sinks, may need to revise plans to show new electric water heater, re- inspect all. | TAYLOR | TAYLOR | | P= | R | 5652758 |
CASEBIER MECHANICAL CONTRACTORS | PWO | P | 09/08/2017 | See PTO notes | SHANEN | SHANEN | | PWO | P | 5619685 |
CASEBIER MECHANICAL CONTRACTORS | PTO | P | 09/08/2017 | Need contractor to contact inspector to discuss scope of work, no approved plans on site | SHANEN | SHANEN | | PTO | P | 5619684 |
CASEBIER MECHANICAL CONTRACTORS | PTO | L | 08/25/2017 | call complete at 8:40, nobody on site at 9:15, building locked. | TAYLOR | TAYLOR | | PTO | L | 5606667 |
CASEBIER MECHANICAL CONTRACTORS | PTO | P | 07/27/2017 | in walls H2O and DWV ok. | TAYLOR | TAYLOR | | PTO | P | 5577461 |
M W MECHANICAL INC | XMS | T | 02/12/2018 | PLAN SPLICE FEE: $50 by: DALEH for Mechanical: added bath fan and one elctric on demand water heater | DALEH | DALEH | | XMS | T | 5762939 |