GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 01/17/2020 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 6457275 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 01/08/2020 | final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | DANE | DANE | | B= | P | 6447334 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 12/23/2019 | Temp CO: Temp CO 1-9 11, 12, 16-18 ( Expires: 1/22/2020 12:00:00 AM) | JANE | JANE | | B= | P | 6435742 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 11/22/2019 | Temp CO: Temp CO: Blocks 1-18 ( Exclude 10) ( Expires: 12/22/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6408722 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 10/24/2019 | block 6 and block 17 corrections complete/complete other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6379416 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 10/23/2019 | Temp CO: Temp CO: Blocks 1-12 and 16( Exclude 10) ( Expires: 11/22/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6377376 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 10/16/2019 | final re-inspection of all remaining items at all blocks / Block 6 (level 2 north) - still need international symbol of accessibility on accessible patient rooms 2122 and 2124 at east end of north corridor by east stair tower / block 17 (EVS by old loading docks) - need accessible levers on locks to both office doors in staff break room / all other items corrected at all other blocks pending other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6370555 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/15/2019 | EVS area at old loading docks building final for this area OK pending other finals | DANE | DANE | | BSP | P | 6368570 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/08/2019 | framing for new office walls inside of room AG226 by old loading dock OK pending other roughs | DANE | DANE | | BFR | P | 6361600 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 09/24/2019 | Temp CO: Temp CO: Blocks 1-12 and 16( Exclude 10) ( Expires: 10/24/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6345457 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 09/03/2019 | inspection called on wrong permit / met contractor at site office to discuss permit M46366 | DANE | DANE | | BSP | R | 6322095 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 08/26/2019 | Temp CO: Temp CO: Blocks 1-12( Exclude 10) ( Expires: 9/25/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6313503 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 08/19/2019 | reinspection of all items at all blocks to this date // Blocks 1 2 3 7 8 9 11 12 13 14 16 and 18 all complete pending other finals (block 10 is exterior site work and block 15 is EVS with no building scope) // block 4 (level 0 north) - still need sign with international symbol of accessibility at restroom CG615 - fire barrier at room CG511 now complete / block 5 (level 1 north) - still need sign with international symbol of accessibility at staff restroom 1521 at east end by conference room / block 6 (level 3 north) - still need signs with international symbol of accessibility at accessible patient rooms 2122 and 2124 at northeast corner of floor by east stair enclosure and at staff restroom 2123 at east end of floor by east stair enclosure / block 2 (lower level of west addition) - exterior drainage now corrected / block 7 (level 3 north) items corrected / block 16 - all items from previous inspection corrected / block 8 (link) - items corrected / only blocks left are 4 5 6 and 17 - Still need to do all inspections at block 17 (remodel has not started) and need to reinspect items for blocks 4 5 and 6 / all other Blocks OK pending other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6305542 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 08/13/2019 | Block 16 final inspection (first final for this block) / need single action latch at door between clean and dirty sides of sterilization rooms in the direction of egress / hand sanitizer in east corridor is higher than 48" to control / need offset throw on lock at west office on east side of east corridor and at door from doctor lounge to general lounge / soap dispenser at doctor lounge is too high at the sink / benches at both mens and womens locker rooms are too low / need signs at mens and womens locker rooms installed / need to install the spring closers on the rated access doors in the ceiling of soiled linen room / need to fire caulk the flex conduit into the north side of the fire barrier at the west end of the room at the loading docks -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6298956 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/01/2019 | above ceiling at remainder of Block 16 / remainder of new above ceiling penetrations OK at all walls in block 16 | DANE | DANE | | BSP | P | 6285324 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/31/2019 | above ceiling at block 16 in corridor BG220 and rooms AG311 AG311A AG311B and BG220A all OK / still need to do corridor AG16C smoke partitions on both sides from doors by physician lounge to doors at corridor BG220 - tiles installed and need to be removed so that all new penetrations can be seen | DANE | DANE | | BSP | P | 6284253 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/30/2019 | room AG305 final layer of rock at bottom side of ceiling assembly installed OK pending splice into plans to use UL I503 in lieu of UL I506 / all penetrations at wall and ceiling assemblies OK / remainder of rock at fire barrier at east end of room BG220A and corridor BG220 OK / still need to inspect above ceiling at this fire barrier on both sides | DANE | DANE | | BSP | P | 6281416 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/29/2019 | first layer of rock OK at bottom side UL I503 assembly at soiled utility room AG305 | DANE | DANE | | BSP | P | 6279790 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 07/29/2019 | need mechanical inspector to look at damper openings | DANE | DANE | | BFR | R | 6279788 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 07/26/2019 | Face layer at AG305 not ready for inspection | DAKOTAB | DAKOTAB | | BSP | R | 6278133 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/25/2019 | 2nd layer of rock in room AG305 installed above joist with laps staggered and fire tape OK pending splice of UL I506 | DAKOTAB | DAKOTAB | | BSP | P | 6276531 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/24/2019 | remainder of rock installed OK at east end of fire barrier between room BG220A and corridor BG220 / still need to inspect all above ceiling penetrations and labeling at this wall / room AG305 ceiling assembly UL I503 framing now complete and OK pending mechanical inspection of damper framing - remainder of 1st and 2nd layers of rock above joists staggers and installation OK - still need to splice in the use of the UL I503 assembly in room AG305 as last splice called for UL I506 | DANE | DANE | | BSP | P | 6275071 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/23/2019 | remainder of framing OK at fire barrier at east end of BG220A OK pending other roughs / no change at ceiling of AG305 ceiling assembly | DANE | DANE | | BSP | P | 6273155 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 07/23/2019 | Temp CO: Temp CO: Blocks 1-12( Exclude 10) ( Expires: 8/22/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6272914 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/22/2019 | room AG305 ceiling / 2nd layer and laps to first layer at assembly UL I503 OK at room AG305 at east 1/2 of ceiling / OK to stock remainder of needed rock above ceiling and re-frame remainder of ceiling assembly / discussed need for mechanical inspection for damper framing when ready / discussed need for above ceiling inspection at corridor for final with GE rep | DANE | DANE | | BSP | P | 6271911 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/19/2019 | room AG305 / first layer of rock at east end of top side of joists installed and staggers OK per the UL I503 that still needs to be spliced in as the assembly for the ceiling of that room ILO the UL I506 | DANE | DANE | | BSP | P | 6269684 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/18/2019 | room AG305 / all rock has been removed on top of joists at ceiling assembly that was being built as a UL I506 and west 1/3 of joists have been removed so that the 48" wide sheeds of rock can be stocked on top of the ceiling that are required for the UL I503 assembly that allows for damper openings in the assembly / need to splice in UL I503 assembly as the one being used for this ceiling assembly in this room - note: the UL I503 assembly is already in the plans but not called out for this room / need to have damper framing reinspected after the joists have been reinstalled on the west end that have been removed to stock the rock / met on site with contractor and drywall sub-contractor and discussed rock brand and joint staggers and layout of sheets for the UL I503 assembly | DANE | DANE | | BSP | P | 6268420 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/17/2019 | fire barrier framing between room BG220A and corridor BG220 OK from west wall to corner at east end of barrier - still need to complete framing from east corner to north wall / first piece of vertical rock from floor up installed OK - still need to install rock at top 18" of wall on both sides / nothing new to inspect at room AG305 / discussed this inspection on phone with GE Johnson rep Gary | DANE | DANE | | BSP | P | 6266551 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/16/2019 | ceiling assembly at room AG305 / 1/2 of 2nd layer of USG type C rock installed OK at top side of horizontal assembly over soiled linen AG305 room / all joints on first layer have been taped and attached per UL I503 / 2nd layer still needs to be taped per UL I503 and need to splice in change of assembly for the ceiling assembly from the UL I506 to the UL I503 and need stamped letter for the sheets that have been cut in 1/2 and taped back together to make the full 48" wide sheets that are required buy the UL I503 / pending other roughs | DANE | DANE | | BSP | P | 6264749 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/15/2019 | Base layer of drywall - top side,1/2 ceiling and 2nd layer staggered - top side, 1/4 ceiling in Room AG305 OK per UL L506. | CHUCK | CHUCK | | BSP | P | 6263579 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 07/12/2019 | first layer of lay on rock at top side of joists not installed yet and not ready for inspection at room AG305 for UL I506 assembly | DANE | DANE | | BSP | R | 6262279 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/11/2019 | framing for rated lid at room AG305 soiled linen room - UL I506 framing OK pending other roughs - discussed with mechanical inspector Nancy S the OK to start the rock on the top of the ceiling joists | DANE | DANE | | BFR | P | 6260506 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/10/2019 | met contractor on site to discuss spliced in listed horizontal assembly UL I506 for soiled linen room AG305 and inspection process for the 2 hour version of the assembly and also discussed how to construct the assembly per the listing | DANE | DANE | | BSP | P | 6258600 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 06/25/2019 | UL U415 listed assembly that has been spliced into the plans for the ceiling of the AG305 soiled linen in block 16 is a vertical wall assembly and it can not be used for a horizontal assembly / plan still calls out for a UL I503 assembly for that lid - either need to remove shaft liner lid and replace with UL I503 assembly or need to splice in a horizontal assembly that matches what has been built on site and need to have inspected once correct assembly has been spliced or installed | DANE | DANE | | BSP | R | 6243353 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/25/2019 | 2nd layer of rock installed OK at wider door opening at room CG500 - verified mud between layers | DANE | DANE | | BSP | P | 6243330 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/24/2019 | dry storage room CG500 - first layer of rock and attachments and staggers at U411 wall where door opening was enlarged OK (note - room CG500 walls are rated for other than IBC) | DANE | DANE | | BSP | P | 6241131 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/21/2019 | enlarged door opening framing OK at room CG500 pending other roughs / UL U411 wall is rated for other than IBC | DANE | DANE | | BFR | P | 6240000 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 06/21/2019 | Temp CO: Temp CO: Blocks 1-12( Exclude 10) ( Expires: 7/21/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6239104 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 06/13/2019 | wrong assembly built at lid of soiled linen AG305 in SPD area - splice dated 5/21/19 calls for UL I503 assembly / above ceiling areas at smoke barriers at rooms AG311 AG311A and AG311B are not ready for inspection and need to be protected as a fire barrier not just against the passage of smoke / met with contractor and drywall sub-contractor and showed them the plans and discussed where smoke barriers are and where smoke partitions are and discussed the lid in room AG305 | DANE | DANE | | BSP | R | 6230156 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/04/2019 | fir out walls at foundation walls in room CG500 shell - future food service OK / above ceiling at stair enclosure at southwest corner of Central Sterile (block 16) now OK | DANE | DANE | | BFR | P | 6219406 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/29/2019 | Central Sterile - SPD (block 16) above ceiling at interior side of smoke partitions and barriers / need to label the smoke barrier wall above ceiling at stair enclosure at southwest corner with correct label and complete the top of wall / all other areas of interior sides of all smoke partitions and smoke barriers OK inside of central sterile / still need to inspect all above ceilings of these walls on outside when ready / all grid-X framing in central sterile OK pending other roughs | DANE | DANE | | BSP | P | 6213067 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 05/20/2019 | Temp CO: Temp CO: Blocks 1-12( Exclude 10) ( Expires: 6/19/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6204365 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/16/2019 | SPD area (block 16) / smoke partition at framing complete at south wall of BG220 corridor / still need to build fire barrier at room BG220A and still need to splice in changes for room AG305 soiled linen as the north fire barrier can not be built to the deck of the floor above as there are too many mechanical obstructions - still need to re-inspect when splice is complete / met with superintendent John with GE Johnson to discuss the need for the splice | DANE | DANE | | BSP | P | 6201465 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 05/16/2019 | Blocks 13 14 and 18 / Block 18 (OBDE) and Block 13 (Cart park) and Block 14 (BioMed) final inspections / block 18 - room C3317 all above ceiling corrected and now OK and complete pending other finals and room C3303 now complete and all other areas of block 18 OK pending other finals / Blocks 13 and 14 both complete and OK pending other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, US ENGINEERING COMPANY Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6201444 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/02/2019 | interior light gauge framing for block 16 - SPD and locker room area and level 1 / stil need to build the fire barrier for storage room BG220A and need to complete the infills at the smoke partition at the south wall of corridor BG220 / room AG305 soiled linen - north fire barrier does not go all the way to the under side of the rated assembly above it - will need to reinspect after splice is completed / discussed penetrations in all types of rated assemblies and discussed labeling of walls above ceilings and discussed accessible elements / all other interior light gauge framing at this area OK pending other roughs | DANE | DANE | | BFR | P | 6185251 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/30/2019 | above ceiling at room C3317 behind nurses station / need to fix all penetrations on door wall and penetration at north side of surface mount electrical box on west wall / all other penetrations in fire barriers in room C3317 OK | DANE | DANE | | BFR | P | 6182487 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/24/2019 | above ceiling at rooms C3301 C3301A C3214 C3212 C3210 C3208 C3209 C3216 and C3-13 all OK pending other roughs / shell space C3222 drywall screws and penetrations in fire barriers OK | DANE | DANE | | BFR | P | 6176462 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/19/2019 | Temp CO: Temp CO blocks 1-8 and 11-12 ( Expires: 5/19/2019 12:00:00 AM) | JANE | JANE | | B= | P | 6171796 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/12/2019 | Block 18 -- Still need to do above lid inspection on new penetrations at fire barrier -- New framed light gauge frame at C3301, C3214, C3212, C3210, C3209, C3218A OK pending other rough inspections -- Reviewed accessible elements | DAKOTAB | DAKOTAB | | BFR | P | 6163649 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/05/2019 | blocks 4 5 6 and 7 / (level 0) block 4 - still need to inspect restroom signs with international symbol of accessibility at restrooms - still need to inspect the completion of the fire barrier at room CG511 / (level 1) block 5 - still need to inspect restroom signs with international symbol of accessibility at restrooms / (level 2) block 6 - still need to inspect restroom signs with international symbol of accessibility at restrooms / (level 3) block 7 - still need to inspect restroom signs with international symbol of accessibility at restrooms / all other items from previous inspection at these blocks (4 5 6 and 7) have been corrected / (block 2) west addition - still need drainage outside between existing stair tower and addition / (block 8) the link - still need to complete east end at all levels / block 9 and 13) remodels at existing - still need to do finals / finals complete at blocks 1, 3, 11 and 12 -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, US ENGINEERING COMPANY Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6156083 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 03/19/2019 | Temp CO: Temp CO: Extension for Blocks 1-8 and 11 and 12( Expires: 4/18/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6136657 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 03/12/2019 | block 12 - Dry storage area final OK all penetrations corrected (north portion of block 12) - still need to do south portion of block 12 (room BG 212 kitchen office) -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, US ENGINEERING COMPANY Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6131314 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 02/20/2019 | reinspect of previous items level 1 Common rest room signage okay, room 1110 grab bars okay / level 2 - room 2122 sign and grab bars in shower okay, Room 2124 Sign and grab bars in shower okay / Level 3 - room 3112 sign okay , room 3110 sign and bathroom grab bars okay, room 3123 rest room grab bars okay, room 3413 bathroom grab bars okay, room3204 grab bars okay, room 3302 Sign, 27" clear space at apron on sink and grab bars okay / room 3315 grab bars okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspecti | BOBF | BOBF | | B= | P | 6111735 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 02/19/2019 | Temp CO: Temp CO: Extension for Blocks 1-7 and 11 ( Expires: 3/21/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6110502 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/11/2019 | above ceiling at block 12 (rooms BG210 and BG210A) / still need to fix penetrations and label fire barrier wall at west wall in BG210 and at smoke partition over door from corridor in BG210 / still need to complete fixing penetrations and label east smoke barrier above ceiling inside of dry storage room BG210A / rest of above ceilings at remainder of this area OK | DANE | DANE | | BSP | P | 6103132 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 02/08/2019 | Block 5 (level 1) reinspection / Still need to install all code compliant restroom signs at all restrooms / restroom 1110 - vertical grab bar still needs to be corrected -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, MAUI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, US ENGINEERING COMPANY Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6101652 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/08/2019 | above ceiling at won dor at connection between existing building and addition at level 1 OK | DANE | DANE | | BFR | P | 6101651 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 01/18/2019 | Temp CO: Extension for Blocks 1-7 and 11 ( Expires: 2/17/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6082989 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 01/18/2019 | final reinspection of blocks 6 and 7 / Block 6 (level 2) - still need to install restroom signs with int. symbol of access. and braille - rooms 2122 and 2124 need accessible signs and need to install all grab bars / block 7 (level 3) - staff toilet 3315 - vertical bar in wrong position - rooms 3302 3112 and 3110 still need signs with int. symbol of accessibility on them - room 3302 - still need seat in roll in shower or longer bar on valve wall and bar on wall at end - missing horiz bar at toilet - need min 27" from floor to sink apron / room 3204 - side wall bar in wrong position / room 3110 - side wall bar must extend to min 54" from corner at toilet - missng lower grab bar at tub and bar at valve wall / bathroom 3413 - still need shorter grab bar at rear wall of roll in shower with seat / staff toilet 3123 - side wall bar is in wrong position - need all restroom signs installed -- Schedule a new Building Final when above items are complete. Additional Inspections Required (compu | DANE | DANE | | B= | P | 6082770 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 01/18/2019 | building final reinspection of blocks 4, and 5 / block 4 (level 0) - still need to install restroom signs with int. symbol of accessibility and braille - still need to compete fire barrier at shell space CG511 - not completed to provide temp power to construction areas / block 5 (level 1) - still need to install restroom signs with int. symbol of accessibility and braille / still need knee protection under sink at locker room / confrence room 1209 - still need 27" from floor to sink apron for knee space - public restrooms by public elevators are still missing vertical grab bars in accessible toilet spaces - restroom 1232 north end of infusion still missing vertical grab bar - restroom 1110 vertical grab bar still too low -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed ye | DANE | DANE | | B= | P | 6082727 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/14/2019 | area C at level 00 north / framing at dry storage BG210a and BG210c and receiving BG210 and walk in cooler area BG210b in existing area OK / all existing smoke barriers are OK and in tact - need to do above ceiling above new doors through smoke barrier when ready / new framing OK pending other roughs | DANE | DANE | | BFR | P | 6077213 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/04/2019 | level 01 north addition southeast corner / shaft liner framing and shaft liner OK pending other roughs per AER 09-038 at southeast corner of level 01 at smoke barrier between new and old buildings at won door - light gauge framing for ceiling drop on both sides of won door OK and wall framing around where won door sets in open position on west side OK pending other roughs / still need to inspect hard lid after it is installed | DANE | DANE | | BSP | P | 6068486 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 12/21/2018 | Temp CO: ok for TCO for blocks 6 & 7 ( Expires: 1/20/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6060872 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 12/21/2018 | Temp CO: Ok for renewal per Bert W. for blocks 1,2,3,4,5,11 ( Expires: 1/20/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6060869 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 12/20/2018 | FINAL INSPECTION AT BLOCK 7 (level 3) / staff toilet 3315 missing vertical grab bar / units 3302 3112 and 3110 all need international symbol of accessibility on their signs / room 3302 - need seat in roll in shower or need longer bar on valve wall and bar on wall at vanity end - missing horizontal bar at toilet side wall - need minimum 32" opening at door to bathroom - need minimum 27" above floor at vanity apron at knee space / restroom 3204 side wall grab bar is in wrong position / room 3110 - side wall grab bar needs to extend to 54" from corner - missing grab bars at rear tub wall at 9" above tub deck - missing grab bar at valve wall / bathroom 3413 - need shorter bar at rear wall in roll in shower or need to remove seat and install end wall grab bar - no mirror installed at this time in this bathroom / staff toilet 3123 - side wall horiz grab bar is in wrong position / all restroom signs need to be installed -- Schedule a new Building Final when above items are complete. Addi | DANE | DANE | | B= | P | 6059603 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 12/20/2018 | FINAL INSPECTION FOR BLOCK 6 (level 2) / all pending other finals / all accesses to future shell spaces need to have self closing doors / need to install all signs at all restrooms with international symbol of accessibility on them / rooms 2124 and 2122 need international symbol of accessibility on their signs / still need to check all handrails mounted to concrete walls in all stair towers -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, MAUI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Ins | DANE | DANE | | B= | P | 6059571 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/17/2018 | fire protection of east walls of link levels 2 and 3 not ready, west wall of link levels 2 and 3 okay, still need to compete splice per previous inspection | BOBF | BOBF | | BFR | P | 6054730 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/10/2018 | LINK ABOVE CEILING WEST END LEVELS 1 2 AND 3 / level 1 all items corrected at west end above ceiling now OK / level 2 - need to complete head of wall and need to fox hole in rock under blue conduit on north side over door / level 3 - need to complete fire tape and head of wall and need to fix hole cut for 4x4 box above center of door / penetrations in shaft liner over south door inside of level 3 east stair enclosure for med gas lines now OK - still need to splice additions of these into plans | DANE | DANE | | BSP | P | 6047399 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/06/2018 | courtesy walk through for accessible elements on levels 2 and 3 / discussed roll in showers minimum size / discussed all grab bar placements | DANE | DANE | | BSP | P | 6044963 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/06/2018 | NORTH ADDITION -engineer observation report for footing and foundation and open hole and piers and mono-coat and welding and bolting and structural steel on file | DANE | DANE | | BFR | P | 6044251 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/05/2018 | SHAFT LINER INSIDE STAIR TOWERS FOR MED GAS LINES / level 3 - east stair tower - shaft liner and shaft liner framing OK at new horizontal and vertical assemblies over south exit enclosure door inside of exit enclosure pending other roughs and splice into plans - need to fire caulk 2 conduits and 1 wire - built per AER 09-038 // level 2 - north stair tower - shaft liner and shaft liner framing OK at new horizontal and vertical assemblies around med gas lines at south door inside of exit enclosure pending splice into plans and other roughs - built per AER 09-038 | DANE | DANE | | BSP | P | 6043379 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/05/2018 | LINK LEVELS 1 AND 2 / level 1 link need to fire tape west wall above ceiling and need to fire caulk 2 conduits through west wall - one on south side of door and one on north side of door - Grid X ceiling framing at level 1 OK from west end to east columns but still need from east columns to east wall / level 2 - west end of link - shaft liner and framing at south side of door OK | DANE | DANE | | BSP | P | 6043359 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/03/2018 | LEVEL 02 AND 03 ABOVE CEILING RE-INSPECTION / level 02 - IDF room 2303 inside of shell space 2304 need to fix penetrations at inside at east wall / room 2304 - need to complete fire tape at north wall and north 1/2 of east wall / electric room 2113 - no access - still need to fix PVC and conduit penetrations at north fire barrier - need to fix penetration at sprinkler pipe at west fire barrier - need to fire block all floor and ceiling penetrations // level 03 - still need to replace acoustical caulk with fire caulk at penetrations over west side of doors in north 1/2 of smoke barrier (by door to north stair tower) / still need to install service access door above door at south smoke partition outside of service elevator lobby // all other items from previous above ceiling inspections at level 02 and 03 corrected | DANE | DANE | | BFR | P | 6041076 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 11/30/2018 | Temp CO: TEMP CO: OK for Blocks 3/4/5 ( 1/2 Extension) ( Expires: 12/30/2018 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6040387 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/30/2018 | ABOVE CEILING AT REMAINDER OF LEVEL 3 / 3204 - fix penetration at conduit at west wall inside / 3202 - fix pen at center of inside of wall / need to replace smoke caulking with fire caulking over north doors at fire partition between grid lines N3 and N5 / 3117 - patch holes in wall around south door on inside / 3109 - need fire caulking at blue conduit north of door outside / 3107 - need fire caulking at all penetrations at west fire barrier / need to install access panel at south wall of service elevator lobby / 3120 - fix holes at smoke partition above left side of inside of door / 3116 - fix holes in smoke partition over left side door on inside / 3103 - need fire caulk at outside of fire barrier at IDF 3103 at blue conduit at outside right of door / no access inside of IDF 3103 or electric 3113 / need to label most walls still on inside and outside of walls | DANE | DANE | | BFR | P | 6039575 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 11/30/2018 | BLOCK 3 FINAL / block 3 final OK pending other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, MAUI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, US ENGINEERING COMPANY Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6039496 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/29/2018 | Bert W training with Dane | BERTW | BERTW | | BSP | P | 6038695 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 11/29/2018 | BLOCK 4 - level 01 north / post sign for temp emergency path at temp door at link / C1318 - seal penetrations at base of smoke partition - door from C1318 to corridor by counters is not single action / need minimum 27" to under side of sink face for knee space at room 1209 / controls on walls in C1311 are too high for accessible reach range / missing vertical grab bars and mirrors ar too high at men's and women's public restrooms by elevators / restroom C1232 at north end of infusion missing vert grab bar / need min. 32" opening at all sliding doors / need knee protection at locker room sink / restroom 1110 - vertical grab bar is too low -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Comple | DANE | DANE | | B= | P | 6038453 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 11/29/2018 | BLOCK 5 final (level 00) / room CG601 - still need to fix penetrations at cast pipes 1/2 in wall at southeast corner of room on south wall (all other above ceiling items have been corrected throughout level 00) / need to install all self closers on all accessed door to all shell spaces / need to install all signs at all restrooms / CG609 - need in-active leaf of door head and foot bolts to auto disengage when active side opens / CG511 - shell space is to provide temp power to rest of construction so west wall still needs to be completed but all other components of the room are complete / south stairs from level 00 to 01 guards at landings are too low and need 1 1/2" finger space at upper end of south handrail at transition to landing / north and east stair towers from level 00 to 01 have several hand rails that are less than 34" above the plain of the nose of the stairs and guards on landings are lower than 42" tall -- Schedule a new Building Final when above items are complete. Ad | DANE | DANE | | B= | P | 6038426 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/28/2018 | LEVEL 01 ABOVE CEILING REINSPECTION / still need to repair hole in shaft wall at conduit at north end of room 1209 / still need to complete the rated joint system to the deck above at the walls at shell space 1134 / still need to complete the head of wall at the fire barrier at the exit enclosure inside of the south stair enclosure at the northeast corner at the east beam / need to fix penetration at the north wall at PVC pipe and all floor penetrations at electric room 1410 / still need to complete the fire tape at the northeast corner of shaft and fix hole in floor in shell 1411 / still need to complete south end of corridor C1-1 from the exit enclosure to where it joins existing building at grid line NG south / all other items from previous level 1 above ceiling inspection corrected | DANE | DANE | | BSP | P | 6036439 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/28/2018 | level 2 smoke partition wall framing at west end of link - shaft wall framing and shaft liner OK at west end of link on north side of door at smoke partition - still need to do south side of door | DANE | DANE | | BFR | P | 6036432 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 11/20/2018 | Temp CO: Ok for block 11 extension per JW ( Expires: 12/20/2018 12:00:00 AM) | JANE | JANE | | B= | P | 6030889 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/20/2018 | met on site with John F. of GE Johnson to discuss TCO process and inspection items and need for reinspections of above ceiling items that have been noted and need for all engineer observations and stamped copies of all changes and EJ's such as the EJs for the continuity of the shaft walls and changes to the landings in the stair enclosures | DANE | DANE | | BSP | P | 6030797 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/19/2018 | framing at soffits and column fir outs OK at link at levels 01 02 and 03 / still need to inspect grid-X after installed on level 01 | DANE | DANE | | BFR | P | 6029264 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 11/16/2018 | courtesy walk through for final inspection at levels 00 and 01 with Eric of GE Johnson / still need to complete splice for continuity of shaft walls that land at under side of beams and not at under side of deck above / still need to complete all corrections for above ceiling inspections at levels 00 01 and 02 / still need all engineer observations for footing foundation welding and bolting and mono-coat and for changes at landings / too many items need correction to list / discussed need for all knee protection at sinks / discussed need to have all locks and latches completed / discussed need for egress outside of exterior doors / discussed several mirrors were not at right height / discussed need for all exit signs to be installed / discussed need for hand rails at correct heights in stair towers / discussed several vertical grab bars missing | DANE | DANE | | BSP | R | 6028210 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 11/14/2018 | met with Gary of GE Johnson to discuss need to have 30" wide clear floor space at all accessible water fountains - the accessible water fountain at level 00 does not have the required clear floor space for forward approach but all other water fountains are OK | DANE | DANE | | BSP | R | 6025348 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/09/2018 | above ceiling inspection Level 00 Area E corridors, CG5, CG7 and CG8 missing fire caulk at new penetrations from low volt, rest of corridors and staff elevator vestibule okay | BOBF | BOBF | | BFR | P | 6021379 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/09/2018 | SHaft wall framing for Stair 1 level 0 on northside and west side addition level 1 next to trauma, CH channel with 1" USG shaft liner per U438 okay at stair 1, CH channel with1" Shaft liner per U 438 okay install okay, need to fire protect 6 penetrations before covering | BOBF | BOBF | | BSP | P | 6021371 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 11/02/2018 | Temp CO: TEMP CO: Block 1 and Block 2 Extension ( Expires: 12/2/2018 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6014301 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/02/2018 | 2nd layer of rock at fire barriers at level 1 east stair enclosure OK - still need to inspect penetrations after completed | DANE | DANE | | BSP | P | 6014151 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 11/02/2018 | Block 11 final OK pending other finals (lab) - need to complete mechanical final -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, MAUI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, US ENGINEERING COMPANY Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6014144 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 10/31/2018 | level 2 above ceiling at remainder of level 2 / equipment room 2117 - fix penetration of multiple penetrations at gang of conduits at outside of fire barrier - fix penetration at single conduit at north fire barrier on inside and outside room 2117 - fix penetrations on inside of 2117 on west and south fire barriers at conduits / electric room 2113 - seal penetrations at PVC pipe and conduit at north fire barrier and at sprinkler pipe at west fire barrier and also need to fire block all holes in floor for conduits / 2111 - to fix penetration at sprinkler line on outside of north wall - no access to inside of room / room 2109 - fix pen at conduit over label on outside of east wall / IDF 2103 - fix penetration at north wall at conduit on outside - west wall has several penetration at outside of wall at conduits / service elevator lobby - need to seal against the passage of smoke at ducts in smoke partition over door / still need reinspection of all items from inspections dated 10/30/18 | DANE | DANE | | BFR | R | 6011795 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/31/2018 | east stair enclosure level 1 / first layer of rock and staggers of joints between 1st and 2nd layers OK at east stair enclosure fire barrier at level 1 | DANE | DANE | | BSP | P | 6011742 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/31/2018 | met with Eric of GE Johnson to discuss stair landings in north stair enclosure and need for stamped copy of draws that were discussed with architect on 9/26/18 on phone for the continuity of the east shaft at level 0 and the elevator door wall at the service elevator at level 3 and also discussed need for stamped design for landing extensions at north stair enclosure | DANE | DANE | | BSP | P | 6011734 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 10/30/2018 | 2nd floor above ceiling continued from previous entry / east stair tower - need to fix penetration at conduit over door at fire barrier / 2121 - fix penetration at east wall at conduit in fire barrier / 2142 - fix penetration at conduit over door in smoke partition / 2122 - fix penetration in smoke partition over door at conduit / still need to inspect all rated assemblies above ceiling between corridors C2-6 and C2-4 from grid lines N5 to N10 | DANE | DANE | | BSP | R | 6010549 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 10/30/2018 | level 2 north above ceiling / corridor C2-6 - need fire caulk at penetration above door and at smoke barrier west of door / service elevator lobby - need to fix penetrations in smoke partitions and fire barrier including duct penetrations in smoke partitions / north start tower - need to fix penetration over door in fire barrier / south stair tower - need to fix penetrations over door in fire barrier / IDF 2303 - fix penetration inside and out at east wall / shell 2304 - fix penetrations in west side shaft - fix penetration at north smoke partition at west end and center / shell 2302 - south fire barrier is labeled wrong and should be 2 hour and need to complete head of wall and penetrations and fore tape - need to caulk sprinkler pipe at smoke partition west wall / corridor C2 - 10 - need to for penetration over door in smoke partition / room 2212F - need to seal penetration at south smoke partition / inspection continued on next entry | DANE | DANE | | BSP | R | 6010517 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/30/2018 | level 1 above ceiling reinspection / corridor C1-1 all OK except from bulkhead at grid line NE1 to the south (this section not ready) / need to complete inside of exit enclosure at south stairs / public elevator lobby south wall not complete at top of wall / IDF 1301 - hole in south wall on inside / still need to complete service elevator lobby / still need to fix penetration at west wall and hole in floor at shell 1411 / all other items corrected | DANE | DANE | | BSP | P | 6010462 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/24/2018 | ABOVE CEILING AT LEVEL 00 AT GRID LINE N5 EAST TO LINK / smoke barrier wall not in this inspection as not ready / room CG608 - need to fix penetration at conduit at south wall / CG607 - need to fix penetrations at pipes at south wall north of door on both sides of wall / CG601 - need to fix penetration at northeast corner at cast pipe 1/2 in wall - need to fix penetration at cast pipe at northwest corner - fix blank hole at east wall by south door at both sides of wall / corridor CG10 - need to fix penetration at cast pipe over door to CG601 on corridor side - need to replace acoustical caulk with fire caulk above both sides of door at smoke barrier at west end of corridor CG10 and change label to 1 HR smoke barrier / all fire barriers OK at inside and outside of rooms CG616 CG617 CG618 CG614 CG606 and CG609 / did courtesy walk of northwest stair tower with super | DANE | DANE | | BSP | P | 6004677 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/23/2018 | site canceled - not ready and actually wanted inspection for 10-24 per Eric | DANE | DANE | | BSP | P | 6003107 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/19/2018 | ABOVE CEILING AT LAB / above ceiling OK at level 00 in LAB inside of existing building (block 11) | DANE | DANE | | BFR | P | 6000109 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 10/18/2018 | inspection site canceled per Erik of GE Johnson for above ceiling at level 0 - Erik stated not ready and would recall for Monday | DANE | DANE | | BFR | R | 5998942 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/18/2018 | level 01 above ceiling at all rated assemblies / no access to electric room 1410, IDF room C1301, or IDF room C1201 and rooms 1029 and 1301- still need to inspect / exit enclosure fire barriers at inside of south stairs not ready / need to fix holes in outside of south stair exit enclosure on west and north walls / need to fix holes in smoke barrier at south end of corridor C1-1 / need to complete joints in walls of shell space 1134 / hole in shaft wall at room 1209 / fix hole at metal conduit hanger at smoke barrier at 1239 / need to seal holes at smoke partition at wall outside of receiving C1303 / ned to lable the fire barrier wall at IDF room at service elevator lobby / need to seal conduits at south wall of serv elev lobby / need to fix pen at conduits at restroom alcove across from public elevators / need to complete top of wall at south wall of public elevator lobby /need to complete fire tape at smk par south of restroom alcove / shell 1411 fix hole in floor and fire tape shaft | DANE | DANE | | BFR | P | 5998929 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/17/2018 | 1st floor public elevator / outer layer of rock at rate assembly at 1st floor public elevator OK / EJ for joint detail for steel column in wall at 1st floor elevator received / discussed need for above ceiling inspection at all rated assemblies on all floors before tile is dropped with John F. of GE Johnson | DANE | DANE | | BFR | P | 5997171 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/11/2018 | first layer of rock at level 3 public elevator door wall OK / still need listing for post 1/2 in and 1/2 out of wall at level 1 | DANE | DANE | | BSP | P | 5991987 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 10/10/2018 | stucco lath at south side patio lid and columns OK | DANE | DANE | | BLA | P | 5991551 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/08/2018 | 1st layer of rock at public elevator door walls / still need to reinspect levels 1 and 3 / Level 0 - 1st layer OK / Level 1- still need listing for post 1/2 in and 1/2 out of wall at level 1 - Hilti listing provided is for 3 5/8" stud wall with 2 layers of rock on both sides not a shaft liner wall assembly - rest of 1st layer OK / level 2 - 1st layer OK / level 3 - no access to public elevators so not inspected | DANE | DANE | | BSP | P | 5988483 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/08/2018 | service elevator door wall level 2 - shaft wall was rebuilt and is now OK / still need continuity from rated floor to under side of roof deck at level 3 service elevator where shaft wall stops at under side of beam under roof deck | DANE | DANE | | BSP | P | 5988469 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 10/03/2018 | Temp CO: TCO for Block 1 and Block 2 ( Expires: 11/2/2018 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 5984716 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/03/2018 | SHAFT WALLS AT DOOR SIDE OF PUBLIC ELEVATORS / shaft wall framing and shaft liner OK at levels 3 2 and 0 / level 1 shaft liner framing and liner OK from west end to one stud bay east of east door after that need listed assembly for structural post 1/2 in and 1/2 out of the shaft wall and how to join them / basement east shaft at room 616 north wall shaft wall framing and shaft liner OK pending letter from architect for the continuity of the shaft wall under the beam and pending 3rd party inspection for replaced mono coat at beam per listing AER 09038 | DANE | DANE | | BSP | P | 5984499 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 09/28/2018 | Building final inspection at Block 1 OK pending other finals // Building final inspection at Block 2 OK pending other finals / all interior items from previous inspections for blocks 1 and 2 have been corrected // still need exterior drainage at corner by existing stair tower and northeast corner of addition - this can be inspected with later block finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, MAUI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet, THYSS | DANE | DANE | | B= | P | 5980238 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/28/2018 | first layer of rock at west smoke barrier at room CG523 OK / still need to splice in engineer judgement drawing for east shaft bottom on level 0 - need to re-apply mono-coat at beam to track per AER 09 038 and drawing from architect on inside and outside of shaft where shaft liner wall meets beam | DANE | DANE | | BSP | P | 5980237 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 09/28/2018 | stucco lath at loading docks on north side of north addition OK | DANE | DANE | | BLA | P | 5980236 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | R | 09/27/2018 | stucco lath at loading docks not ready | DANE | DANE | | BLA | R | 5978572 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/26/2018 | LEVEL 3 - horizontal assembly at room C3303 penetrations at shaft liner now OK | DANE | DANE | | BSP | P | 5977274 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/26/2018 | LEVEL 0 - riser room 2 hour walls have been built per listing U411 but are marked as not per IBC - first layer of rock and staggers to 2nd layer OK at inside of room and outside of room / fire barrier at corridor wall of room CG510 from east corner of corridor wall to east side of door, framing and shaft liner OK per AER - 09 - 038 | DANE | DANE | | BSP | P | 5977272 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/26/2018 | met on site with superintendent Eric Kellstrom to discuss issue with bottom of shaft continuity at the east mechanical shaft at level 0 - also spoke on phone to project Architect John Goodman and discussed this same issue and the issue of the shaft wall at the 3rd floor service elevator door wall that is lacking continuity to the roof deck | DANE | DANE | | BSP | P | 5977255 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 09/24/2018 | Block 1 and Block 2 final inspection / Block 1 still need to complete drainage at east corner of north wall between existing stair tower and new building / all other items at Block 1 corrected // Block 2 - still need to install glass at doors to rooms 1502 1504 1506 1508 1512 1514 1516 and 1518 / grab bars at staff bathroom A1517 now OK -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, MAUI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR COR | DANE | DANE | | B= | P | 5974956 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 09/24/2018 | building final at block 1 and block 2 // block 1 - still need to seal all penetrations in smoke partition inside of mechanical room AG409 / need to fix hole in east wall of electrical room AG403 / need to complete drainage at east corner of north wall between existing stair enclosure and new addition // BLOCK 2 - still need to install glass in doors to rooms 1502 1504 1506 1508 1512 1514 1516 and 1518 / staff toilet room A1517 rear grab bar and vertical grab bar are still in wrong positions // all other items from previous inspection corrected -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ENCORE ELECTRIC, INC. Electrical F | DANE | DANE | | B= | P | 5974155 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 09/24/2018 | SOUTH STAIR ENCLOSURE LEVEL 1 - all rock is to be installed vertically per listed assembly UL U425 at portion of enclosure that has doors to exterior / room C3303 HORIZONTAL ASSEMBLY - need to seal all penetrations at sprinkler pipes and electrical wires at shaft liner / framing at horizontal assembly and shaft liner at horizontal assembly OK | DANE | DANE | | BFR | R | 5974140 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 09/24/2018 | thermal insulation at ceiling over patio at level 1 OK | DANE | DANE | | BIN | P | 5974123 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 09/21/2018 | Block 1 and Block 2 final inspection // BLOCK 1 - need to insulate foundation wall between corridor and crawl space / need to label fore barriers at all 4 walls of shell room AG420 / need to label fire barrier walls at IDF 407 / mechanical room AG409 - need to seal penetrations in smoke partition // BLOCK 2 - soiled work room AG1519 need to label smoke barriers at all walls / staff toilet A1517 - rear grab bar and vertical grab bar are both in wrong positions and need to lable fire barrier at north wall above ceiling / room A1513 need to label east wall as fire barrier an rest are smoke partitions / room 1511 need to label fire barriers above ceiling at all walls / CT room 1402 need to label both shafts and all fire barriers above ceiling / need to install glass in doors in rooms 1502 1504 1506 1508 1512 1514 1516 and 1518 -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT | DANE | DANE | | B= | P | 5972722 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/20/2018 | engineer letter of compliance for west addition for excavation, drilled piers and foundation reinforcing steel placement, pier caps foundation concrete and slab concrete, masonry construction, fire proofing and structural steel | DANE | DANE | | BSP | P | 5970759 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/19/2018 | hard lid framing at ceiling of patio area at south side of level 1 OK / fur out walls around posts at patio area at south side of level 1 OK | DANE | DANE | | BFR | P | 5969763 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 09/19/2018 | thermal insulation at overhang outside of the loading docks at level 0 OK | DANE | DANE | | BIN | P | 5969757 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/19/2018 | met in construction office with Eric of GE Johnson to discuss need for continuity of shaft enclosure wall at level 0 east shaft in room CG616 and at service elevator door wall at 3rd floor. These 2 areas both have shaft enclosures walls that should be built as fire barriers per IBC 708.1 but they stop at the under side of the supporting beams above and not at the under side of the deck of the floor or roof above. | DANE | DANE | | BSP | P | 5969748 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/17/2018 | 3rd floor above ceiling corrections from previous inspection dated 9/13 - room C3224 still need to label smoke barrier wall above ceiling / all other items from previous inspection have been corrected / all other walls from previous inspection have been labeled OK | DANE | DANE | | BSP | P | 5966833 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/17/2018 | LEVEL 0 SHAFTS / room CG601 first layer of rock on sides OK / faming for fire barrier between rooms CG601 and CG607 OK pending other roughs / room CG520 3rd layer of rock on bottom of shaft OK and 1st layer of rock on sides of shaft in room CG520 OK / room CG500 3rd layer of rock on bottom of shaft and 1st layer of rock of sides of shaft OK - all shaft components are per listed assembly AER-09038 - all shaft inspections are OK pending stamped letter for attachment to deck above / room CG616 - 2nd layer of rock OK at south east and west sides pending attachment letter - north side has been removed and still need letter to address continuity of this shaft wall as it stops at bottom of supporting beam and not at bottom of deck of floor above | DANE | DANE | | BFR | P | 5966816 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/13/2018 | LEVEL 0 SHAFTS AND LEVEL 3 HARD LIDS / level 0 - shaft in room CG 520 - 1st and 2nd layers of bottom OK / shaft in room CG616 - 1st layer of rock on sides of shaft OK pending stamped letter for attachment to ceiling / 2nd layer of rock at door wall at service elevator level 0 OK // LEVEL 3 Grid-X and above ceiling / still need above ceiling labeling at all rooms - can be seen through accesses / C3313 grid-x OK - need to fix penetrations at south west and north fire barriers / C3309 - soffits framing OK - above ceiling penetrations not ready / C3220 - Grid-X and above ceiling penetrations not ready / C3224 grid-x and above ceiling penetrations OK / C3303 - Grid-X and above ceiling penetrations OK / C3302 and C3302A and C3302T - Grid-X and above ceiling penetrations OK / C3209 - Grid-X and above ceiling penetrations OK / C3207 - soffit framing and Grid-X and above ceiling penetrations OK | DANE | DANE | | BFR | P | 5964112 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/12/2018 | Level 00 - Pending receipt of stamped letter Rooms Cg 616, CG 601, CG 520 and CG 500, install of Hilti X U16 12" oc supporting Channel okay, 2nd layer drywall install horizontal shaft lid rooms CG 616, CG 601 and CG 500 okay, 1st layer drywall install of horizontal lid at shaft room CG520 okay | BOBF | BOBF | | BFR | P | 5962516 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/07/2018 | west 00-or corridor north and south door way framing for smoke barrier okay / Med gas room AG277, need clarification for nor shafts for exhoust and supply air in room, pending splice walls and ceiling framing okay / level 3 Corridors C3-12 and C3-13 (grid lines NC -NH and N1- N3) light metal framing for smoke partitions okay , level 3 room IDF 3305 type x on exterior all 4 sides okay | BOBF | BOBF | | BSP | P | 5958057 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/30/2018 | level 0 north - service elevator door wall - 1st layer of rock OK | DANE | DANE | | BSP | P | 5951018 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/30/2018 | Lab BG206 in existing west-center level 00 - new interior light gauge framing OK including window opening in smoke partition to existing corridor BG-3 and at P-tube area and new bulkhead and several other small wall extensions - pending other rough inspections | DANE | DANE | | BFR | P | 5950999 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/28/2018 | Level 0 shaft bottoms / east shaft - 1st layer of rock at bottom of horizontal assembly at shaft OK - still need to rock verticals after attachments to floor above have been confirmed per pending stamped letter / Bottom of shaft in room CG601 1st layer of rock OK at horizontal assembly - still need to confirm attachments to deck above / bottom of shaft in shell CG500 1st layer of rock OK - still need to confirm attachments at vertical assemblies / 1st layer of rock OK at shaft at north side of service elevators OK / remainder of shaft liner wall framing and liner OK at west fire barrier /(inspection added on site at the request of Carl of Advance drywall) | DANE | DANE | | BSP | P | 5948058 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/27/2018 | west addition - level 01 - rated floor expansion joint between new addition and existing building installed OK per listing in images / wall expansion joint over floor expansion at staff lounge A1329 OK per listing in images / discussed need for above ceiling inspection at all fire barriers, smoke barriers and smoke partitions before ceilings go in an discussed need for above ceiling wall labeling | DANE | DANE | | BSP | P | 5946465 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/24/2018 | north addition / level 0 - door wall at service elevator framing and shaft liner and penetrations now OK / shaft at north side of elevator shaft wall framing and shaft liner and penetrations now OK / level 2 - south exit enclosure from corridor door to precast at stairs first layer of rock and staggers OK / level 2 - south mechanical shaft 1st layer and staggers OK / level 3 - east exit enclosure from corridor door to precast 1st layer of rock and staggers OK / Room C3302 - wall framing and in-wall floor penetrations OK | DANE | DANE | | BSP | P | 5945107 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/21/2018 | level 0 - 2nd layer of rock at ceiling of east elevator shaft OK / level 3 - framing and in wall penetrations OK in rooms C3301, C3304, C3306, C3308 and C3310 / Level 3 - 1st layer of rock at shaft at north side of service elevator OK | DANE | DANE | | BSP | P | 5941033 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 08/21/2018 | level 0 - service elevator door wall and shaft wall at shaft north of service elevator - need to fire caulk all penetrations at shaft liner before rock can be installed / Level 0 - hanging shaft walls and horizontal assembly in room CG500 need stamped letter for how to attach top track of hanging walls and still need all fire caulking / level 2 - 5/8" rock at first layers is not lining up from top to bottom as upper shaft wall is not in line with lower shaft wall with doors in it - need EJ to have walls 3/4" out of line with each other and having a gap between layers of rock / 3rd floor service elevator door wall is still lacking continuity to bottom of roof deck - first layer of rock has been installed to bottom of steel beam and has correct screw pattern and rock but lacks continuity to roof deck | DANE | DANE | | BSP | R | 5941009 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/17/2018 | East elevator control room - first layer of type C rock at ceiling of east elevator control room OK at level 0 | DANE | DANE | | BFR | P | 5937520 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/16/2018 | level 0 - north wall of shaft in room 616 needs to extend to bottom of floor deck above not bottom of beam under deck / level 3 - door wall at service elevator shaft needs to extend to bottom of floor deck above not bottom of beam under deck / level 1 - soffit at pharmacy OK - shaft wall framing and shaft liner OK at service elevator door wall / level 2 - need to patch around beam between doors at shaft wall at service elevator door wall - first layer of rock at outside of room 2303 OK - shaft liner and framing OK at south mechanical shaft / level 3 - 1st layer of rock at south shaft OK - 2nd layer of rock at north, south and east walls of mechanical shaft by public elevator OK - north wall of this shaft has plumbing pipe 1/2 in and 1/2 out of it at bottom of wall -- shaft liner and framing OK at shaft on north side of service elevator shaft | DANE | DANE | | BFR | P | 5936969 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/13/2018 | pending other required inspections - West addition Smoke barrier framing between lines 8 and 9, using 4" CH channel adjacent to existing building okay / North expansion Horizontal shaft in elev equip room framing with 4" CH channel okay / Level 03 east shaft C 2117 2nd layer type X at equip room walls east West and South sides okay / Level 03 Light metal framing at rated walls corridor3C lines N-6 to N11 and lines NI to NJ okay / Level 03 South Shaft framing with 6" CH channel okay | BOBF | BOBF | | BFR | P | 5931849 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 08/09/2018 | need listing for smoke barrier in corridor using 4" C-h channel that allows for verticle and horizontal use / room G 309 missing fire caulk at Conduit in horizontal shaft | BOBF | BOBF | | BFR | R | 5928921 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/06/2018 | Level 2 - fire blocking at bottom of exterior walls at remainder of level OK / first layer of corridor side rock at fire barriers at both sides of corridor C2-1 OK /// Level 3 - fire blocking at bottom of walls at remainder of exterior walls OK - All floor penetrations inside walls OK at grid line N5 east to east wall - first layer of rock at south and west walls OK at service elevator OK - center shaft by IDF room first layer of rock OK - east shaft by electric room 2nd layer of rock OK at shaft and electric room - public elevators 1st layer of rock at south east and west sides OK - shaft just south of public elevator 1st layer of rock OK at north east and west sides | DANE | DANE | | BFR | P | 5924769 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 08/02/2018 | west addition smoke barrier at level 01 - smoke barrier between old portion and new addition at grid lines 8 and 9 from WB to WF is not built per the listed assembly - south portion that is setting on floor can not be angled back at the top to the bottom of the structure above as this is not how the assembly is said to be built - north portion that is setting on top of the high concrete wall must extend to the bottom of the rated assembly above and can not change direction to a horizontal assembly to extend to the old portion of the building - discussed the issues with this wall with Gary of GE Johnson and discussed option for engineer judgment to build the smoke barriers in another way than how the current assembly calls to be built | DANE | DANE | | BFR | R | 5921937 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/02/2018 | west addition / level 00 - horizontal assembly at bottom of shaft at top of mechanical room AG409 framing and shaft liner OK pending other roughs | DANE | DANE | | BFR | P | 5921907 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/31/2018 | level 3 north addition east wing shafts / east shaft - shaft wall framing and shaft liner OK pending other roughs / first layer of rock at south side of outside of east electrical room OK / center shaft at east wing of north addition - shaft framing and shaft liner OK at south and west sides pending other roughs | DANE | DANE | | BFR | P | 5919168 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/26/2018 | north addition level 1 - 2nd layer of rock at elevator lobby at northwest elevator OK / shaft wall framing and shaft liner OK at room C1229 - mono coat replaced at Z clips at south smoke barrier // north addition level 2 - first layer of rock at mech shaft by corridor C2-10 OK // west addition level 0 - exterior wall insulation in crawl space OK // west addition level 1 - rock at shaft liner soffit at A1329 OK - rock at smoke barrier at north wall at alcove A1-12 alcove OK - shaft liner and framing OK at alcove A1-37a OK - north wall at EMS A1242 framing OK - hard lid grid-X OK at rooms A1404b A1502 A1512 A1514 A1516 and A1518 | DANE | DANE | | BFR | P | 5914868 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 07/23/2018 | exterior wall insulation OK at 3rd floor east wing at grid lines N4 to N12 | DANE | DANE | | BIN | P | 5910815 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/23/2018 | level 1 - 2nd layer of rock at smoke barrier at grid line NG OK / level 2 - fire blocking at bottom of exterior walls at north wall from north stair tower to west corner and at west wall from north corner to shell space wall / level 3 - fire blocking at bottom of exterior wall and exterior wall insulation at east wing at grid lines N4 to N12 OK | DANE | DANE | | BFR | P | 5910814 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/19/2018 | north addition - level 01 shaft on north side of elevator shaft at grid line NI shaft liner and framing OK pending other roughs / level 01 - smoke barrier shaft wall at grid line NG first layer of rock OK / north addition level 3 - partition walls between rooms framing OK where there are no MEP's and OK to double side at areas where there are no MEP's so that the head and foot panels can be set at grid lines NK to NJ from N11 to N5 and NI to NH from N11 to N5 / north addition level 3 - elevator shaft at grid lines NA.2 and N3 shaft liner and framing OK at west east and south sides / WEST ADDITION / level 01- smoke partition at alcove A1-12A OK at top of wall pending damper framing inspection adn other roughs / level 01 west shaft liner soffit at staff lounge A1329 OK / level 01 west - shaft liner and framing and first layer of rock OK at shaft in CT storage | DANE | DANE | | BFR | P | 5907895 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/16/2018 | level 01 smoke barrier at elevator lobby 1st layer of rock OK at south and west 1/2 of west wall / level 1 2nd layer of east side of south mechanical shaft now OK / level 2 2nd layer of rock at east and west mechanical shafts in postpartum OK | DANE | DANE | | BFR | P | 5903362 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/11/2018 | screws at 2nd layer of rock OK at smoke barrier on grid line N3 on level 1 OK / south mechanical shaft at west side of north addition 2nd layer of rock OK and 1st layer of rock now OK at east side / shaft wall framing and shaft liner OK at south smoke barrier on grid line NG at level 1 - need to fix mono coat removed for wall attachment / east shaft at level 1 1st st layer of rock OK / east shaft 1st layer of rock at level 2 OK / west shaft at level 2 in postpartum 1st layer of rock OK / north shaft at level 2 at core space shaft liner and framing OK | DANE | DANE | | BFR | P | 5899352 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/06/2018 | framing at center of floor at postpartum at grid lines N3.5 to N11 from NJ to NI // room C2121 west fire barrier is built as a double wall and the assembly is for a single wall - need to splice in new assembly for double wall assembly / equipment room C2117 - fire barrier is built as a double wall and the assembly is for a single wall - need to splice in new assembly for double wall assembly / electric room 2113 - need to seal all penetrations through floor outside of walls and at column in corner / room clean C2109 - west fire barrier is built as a double wall and the assembly is for a single wall - need to splice in new assembly for double wall assembly / IDF room 2103 - need putty pad at electrical box facing into room right of door on corridor side / remainder of framing and shaft walls at this area OK pending other roughs | DANE | DANE | | BFR | P | 5895365 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/06/2018 | 1st layer of rock at curved wall smoke barrier at approximate grid line N3 OK / first layer of rock at shaft at N3 between NE1 and NE OK except wall on N3 line that is missing screws / all floor penetrations inside of walls at level 01 now OK in all areas / floor penetrations at rooms C2124 and C2122 now OK | DANE | DANE | | BSP | P | 5895346 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 06/27/2018 | at IDF room C1201 the rock can not be run horizontally / need to fire block the drain pipes through floor at room C1134 / room C2122 need to seal penetration at pipe at floor by the door / room C2124 - need to seal penetration at pipe at east wall at wall base / south wall of room 2113 electric room 1st layer of rock OK / shaft liner and framing for shaft wall OK at shaft by corridors C1-6 and C1-3 / all wall framing at 2nd floor postpartum rooms OK at grid lines NH to NK from N5 to N12 | DANE | DANE | | BFR | R | 5887496 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/26/2018 | met on site with Eric of GE Johnson and Carl the lead framer to discuss deficiencies at east elevator control room in north addition and rated walls in level 00 that rock was installed the wrong direction / also discussed getting a plan from architect that shows walls that are rated for IBC and not for IBC | DANE | DANE | | BFR | P | 5885668 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/22/2018 | west addition / rooms AG404 AG412 and AG414 hard lid grid X framing OK and above ceiling OK at fire partitions at these rooms / fire partitions at above ceilings OK at all fire partitions at level 00 at grid lines WB to WE // level 01 all wall framing for to rock OK at grid lines WA to WG from W1 to W7 pending other roughs / need a stamped detail for how to attach all soffits to deck above for all areas of additions / outer layers of rock at both shafts in OR's OK but still need to fix penetrations | DANE | DANE | | BFR | P | 5883229 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/21/2018 | remainder of bottom of exterior wall fire stopping and insulation OK at postpartum from east wall to grid line N4 / exterior wall fire stopping and insulation OK at west wall of room 2212C / first layer of rock OK at shaft at 2nd floor that is south of west elevator lobby / all floor penetrations now OK at grid lines N1 to N3.1 from NH1 to NE / level 1 - west side of smoke barrier 1st layer of rock installed OK / shaft liner and framing at shell space at grid lines N8 to N9 OK to install 1st layer of 5/8" rock pending other roughs | DANE | DANE | | BFR | P | 5882033 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/21/2018 | west addition inspection site canceled | DANE | DANE | | BFR | P | 5882001 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/13/2018 | LEVEL 01 MECHANICAL SHAFTS AND LEVEL 02 FIRE STOPPING AT BOTTOM OF WALL / east shaft all shaft liner framing and shaft liner gyp OK pending other roughs - OK to install outer layers of rock pending other roughs / west shaft south of elevator lobby OK for framing and shaft liner - OK to install outer rock pending other roughs / center shaft just south of north stairs is not ready for inspection yet / level 02 bottom of exterior wall fire stopping is OK at north wall from north stairs to east stairs and at south wall from east end to 1/2 to corner - bottom of wall fire stopping OK at rooms 2102 2104 2105 2108 2110 2112 2114 2116 2118 2120 2122 2124 2126 2128 3130 2132 2134 2136 and 2140 | DANE | DANE | | BFR | P | 5873226 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/13/2018 | met at job site office to meet with John of GE Johnson to discuss inspection precess and job deficiencies that are outstanding and discussed need to have a rep of GE Johnson accompanying the framer and I on inspections | DANE | DANE | | BFR | P | 5873187 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/12/2018 | level 00 - fur out walls at north exterior walls at loading docks OK / fire caulking at angle iron at shaft liner at north shaft by elevators at level 01 now OK | DANE | DANE | | BFR | P | 5871621 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/11/2018 | LEVELES 01 02 AND 03 / level 01 - shaft liner at north wall of room C1209 OK / level 02 - room dividing walls at north side postpartum rooms at grid lines NH to NI from N5 to N10 OK pending other roughs / level 3 - insulation at north wall east end to north stairs OK and at west wall and at south elevation at top 8' only / level 03 - need to splice in new horizontal assembly at smoke barrier at alcove C3-6D in corridor C3-6 - framing of horizontal assembly OK pending other roughs - need to splice in horizontal assemblies at C3109 and C3111 and C3411 - framing OK pending other roughs | DANE | DANE | | BFR | P | 5870306 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/06/2018 | LEVEL 02 AT GRID LINES N11 TO N6 FROM NJ TO NK AND SOFFIT UNDER ROOF OVERHANG AT LOADING DOCKS / all common walls where beds set between postpartum rooms framing OK pending other roughs - OK to rock both sides to install head walls pending other roughs / light gauge framing at soffit over loading docks is done OK but all mono-coat that has been removed needs to be replaced at all heavy steel supports | DANE | DANE | | BFR | P | 5866293 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/06/2018 | LEVEL 01 AREA B AT GRID LINES N1 TO N3 FROM NH.1 TO NE WALL FRAMING / need rated washer box at fore barrier for clean linen storage room in room C1213 / need to fire block the PVC pipe through floor by the column in room C1213 / need to fire block 4" copper at floor by column in room C1229 / missing rock on inside of wall at column at fire barrier at room C1229 / pipe is 1/2 in and 1/2 out of north column wall at room C1229 fire barrier / need to fire block pipes through floor by north column in room C1229 / seal penetrations at angle iron through shaft liner at shaft by northwest elevator lobby / still need to complete shaft walls at shaft by northwest elevator lobby / all other interior light gauge framing at this area OK pending other roughs | DANE | DANE | | BFR | P | 5866277 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/06/2018 | LEVEL 01 AREA C / top of wall framing OK at rooms C1133 C1135 C1134 C1136 and C1138 OK / remainder exterior wall insulation and fire blocking at bottom of wall OK at west exterior walla and north wall from west corner to north stair tower | DANE | DANE | | BFR | P | 5866247 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/06/2018 | LEVEL 00 WALL FRAMING / fire barrier wall framing at shell CG511 CG513 and CG516 OK / corridors CG7 (south wall) and CG8 (east wall) assembly U411 calls for USG ULIX to be vertical but was installed horizontal - must be USG SHX or FRX-G to be installed horizontally | DANE | DANE | | BFR | P | 5866237 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/29/2018 | fur out wall on inside of exterior radius wall at south side of level 01 OK pending other roughs | DANE | DANE | | BFR | P | 5857481 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/25/2018 | first layer of type C rock at lid of west elevator equipment room OK at level 00 north | DANE | DANE | | BFR | P | 5856394 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/25/2018 | final inspection for Lab 00 at grid lines N1 to N2 and NE to NG that include the rooms BG206B BG206C BG206D BC206E BC206F / building final inspection for these rooms are complete and OK pending all other final inspection including state final inspections / if project is going to be finaled in phases there will need to be a phased TCO plan submitted to John Welton for approval | DANE | DANE | | BSP | P | 5856391 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/24/2018 | conference room C1520 - drywall joint that was behind the soffit has been fore taped OK / elevator equipment room CG527A (east) has been rocked without inspection completed - need to remove bottom rock to reinspect shaft liner and shaft liner framing above / elevator equipment room CG522A (west) shaft liner framing OK pending damper framing inspection- still need to splice in assembly | DANE | DANE | | BFR | P | 5854685 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 05/24/2018 | INSULATION NORTH and WEST ADDITIONS / exterior wall top 8' of insulation OK at north wall from north stair tower to west corner and west wall all the way across and south wall from west corner to corridor / fire blocking at bottom of wall OK at north wall from north stair tower to east end / WEST - top 8' of insulation at room A1409 OK and fire blocking at bottom of wall in same room OK | DANE | DANE | | BIN | P | 5854659 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/21/2018 | NORTH ADDITION WALL FRAMING LEVELS 00 AND 01 EAST END // LEVEL 01 - grid lines N8 to N11 and NH to NK / conference room C1520 soffit is framed too low to be able to tape the drywall joist - need engineer letter stating how to attach all soffits / room C 1506 need to fix mono coat at steel column / room C 1601 - need to fix mono coat at all columns at west side of room - need to seal penetrations at pipes in floor in west wall and around columns / room C1316 - need to seal penetrations in the floor at the column at the northeast corner / LEVEL 00 - grid lines N11 to N5 from NH to NK - room CG 619 - need to patch tight around conduits at 1st layer of rock for corridor / walls in tunnel to children's framing OK / still need to do all above ceiling and top of wall inspections / WEST ADDITION - 1st floor O.R. putty pads now OK | DANE | DANE | | BFR | P | 5850741 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/11/2018 | WEST ADDITION SHAFTS / shaft liner and studs OK at both shafts at future shell room A1402 | DANE | DANE | | BFR | P | 5842396 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 05/11/2018 | NORTH AND WEST ADDITIONS / north addition insulation at infill wall above red iron at canopy OK / north - insulation at curved wall at south exterior wall at line N14 on level 01 / north addition - level 02 south elevation exterior wall top 8' of insulation OK / north addition - top 8' of insulation at north elevation from east end to north stair tower / west addition level 01 exterior insualtion completed and fire blocking at floor line at exterior walls is OK | DANE | DANE | | BIN | P | 5842390 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 05/08/2018 | INSULATION NORTH AND WEST ADDITIONS / NORTH addition - exterior wall insulation at north wall at level 01 at east end of wall to north stair tower OK // WEST ADDITION - exterior wall insulation at 1st floor clean supply AG422 from grid line WE to WA OK / WEST ADDITION 2nd floor exterior wall insulation at west wall OK pending fire blocking completion at bottom of wall that still need to be completed - exterior wall insulation OK at east wand west walls at rooms exam 1506 and exam 1504 and all exterior walls at exam 1502 pending other roughs | DANE | DANE | | BIN | P | 5838686 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 05/08/2018 | NORTH AND WEST ADDITION PARTIAL FRAMING / NORTH ADDITION - south canopy infill wall between red iron and roof framing OK pending other roughs // WEST ADDITION - 1st floor still need engineer letter for fire barrier at crawl space that is not fully setting on the foundation / soffits and walls OK at grid line WE from W1 to W7 pending other roughs / head of wall and penetrations at fire barrier at grid line WE from W1 to W7 OK / OR AG 414 is missing putty pads at north wall at back to back boxes and boxes larger than 16 sq" - all other walls in OR AG414 OK pending other roughs / clean core AG412 - missing putty pads at north and south walls - need to splice in the removal of the expansion joints and installation of shaft liner soffit in place of the expansion joints at connection of old to new at grid line W7 at OR AG414 and clean core AG412 / OR AG404 walls OK pending other roughs / future AG402 walls OK pending other roughs / future shell AG420 walls OK pending other roughs | DANE | DANE | | BFR | R | 5838662 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/01/2018 | met on site with reps of GE Johnson and Carl of Advanced to discuss need for listed assembly for the ceilings of the level 0 elevator control rooms / discussed need to have damper framing inspected as well as assembly framing inspected before any further work is done. | DANE | DANE | | BFR | P | 5832024 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/27/2018 | met on site with reps of GE Johnson to discuss need for listed assembly for the ceilings of the level 0 elevator control rooms | DANE | DANE | | BFR | P | 5829302 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 04/26/2018 | LEVEL 0 ELEVATOR CONTROL ROOMS / need listed assembly for ceilings for both elevator control rooms / these listings will need to spliced into the plans as there is no assembly for them currently in the plans | DANE | DANE | | BFR | R | 5828346 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/26/2018 | WALLS LEVEL 1 / remainder of wall framing at level 1 east wing from east exterior wall to grid line N3 and north exterior wall to grid line N4 OK | DANE | DANE | | BFR | P | 5828344 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/26/2018 | FIRE BLOCKING AT ROOFS / fire blocking at upper roof at east end now complete / fire blocking at level 2 roof at south side curved wall OK | DANE | DANE | | BFR | P | 5828330 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/20/2018 | interior light gauge framing at area C level 00 OK at grid lines NE to NG from N1 to N2 | DANE | DANE | | BFR | P | 5823196 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/19/2018 | fire blocking between roof deck and parapet walls all the way around the north addition at the upper roof OK except at grid line N11 between NI to NJ.1 (east end) where the parapet walls is not completed and fire blocking is not done yet. (also noted on back of yellow permit card) | DANE | DANE | | BFR | P | 5821467 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/16/2018 | NORTH ADDITION ROOF AND 1ST FLOOR / mineral wool and fire spray at roof line at parapet walls OK at north addition at southwest corner north to 1/2 way down north wall (grid line NF on line 6.4 to N1 NH corner and NH line from N1 to N8 on north wall) / framing for stair dog house and duct dog house on north addition roof OK / 1ST FLOOR FRAMING / remainder of light gauge wall framing OK at grid lines N11 to N4.1 from NL to south foundation - (only need wall and door at loading docks between N6 and N7) / remainder of light gauge framing OK at grid lines NE to NG from N1 to N3 (except still need wing walls and doors at south end of corridor CG7 to connect to existing) / drywall behind fur out walls in room BG206C (staff work room) OK / need to fix drywall at plumbing pipes at north wall of biomed work room CG510 - fur out wall framing OK in biomed work room CG510 OK | DANE | DANE | | BFR | P | 5817597 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/09/2018 | Top of wall inspection at 2nd floor, gridlines NC to N and N7 to N10 OK, all mineral wool in place // 1st floor top of wall at secondary walls on gridlines NH.1 to NG OK, mineral wool in place. | JEREMYA | JEREMYA | | BFR | P | 5811446 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/26/2018 | SCREWS AT RATED ASSEMBLIES level 01 / screws at first layer of rock OK at area F OK / screws at 2nd layer of rock at area E OK / except at area E per UL U419 horizontal joints must be staggered minimum 12" and currently have 6" stagger / walls framed on roof at level 02 at south end between old and new areas OK | DANE | DANE | | BFR | P | 5798633 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/12/2018 | on site meeting with state division of fire prevention inspector Shane Kakavas to discuss inspection process | DANE | DANE | | BSP | P | 5786456 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/09/2018 | PRIORITY WALLS LEVEL 01 NORTH / priority wall framing at all walls marked on floor plan received and to be scanned into images / walls at tunnel link walls at floor 0 at area F OK / rock at 10' up to deck installed OK at all priority walls at level 00 area F / shaft liner wall framing and liner on inside and liner around steel posts inside walls OK at level 00 area E at west east and north sides at public elevators and at north and east sides at service elevator | DANE | DANE | | BFR | P | 5784766 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 03/01/2018 | R19 insulation at top 10' of exterior walls at level 01 area A OK / walls fully insulated OK at rooms A1403 and A1407 | DANE | DANE | | BIN | P | 5777342 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 03/01/2018 | R10 insulation at north side of link between buildings OK | DANE | DANE | | BFI | P | 5777331 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/28/2018 | PRIORITY WALLS AREA A LEVEL 01 / fire safeing at bottom of wall at electric room A1403 and IDF room A1407 OK - EJ from Hilti is on site in folder by plans and will be picked up for scanning / wall framing at priority walls at area A level 01 OK pending other roughs / walls have been marked on floor plan to be scanned into images / site visit with Senior Building Inspector Jeremy A. | DANE | DANE | | BFR | P | 5776351 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | R | 02/28/2018 | R10 foundation insulation at north side of link that goes between addition and Children's is not installed yet | DANE | DANE | | BFI | R | 5776324 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | R | 02/21/2018 | no insulation ready to be inspected | DANE | DANE | | BIN | R | 5770238 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/21/2018 | PRIORITY WALLS LEVEL 0 AREA E AND F / interior wall framing at priority walls at area E OK pending other roughs at rooms future food service 500, bio med work room 510, future oncology rooms 511 513 523, IDF service entry 512, mech room 514, shell 516, elevator control 522A, mech 524, IDF 603, RCRA waste 609, service elevator lobby 527, mail boxes 520, corridors 4 5 6 7 10 / interior wall framing at priority walls at area F OK pending other roughs - walls in area F are marked on floor plan layout that is scanned into images / interior wall of corridor 10 and 15 , electrical room 614, and several walls along corridor 12 / training with Lonny S. | DANE | DANE | | BFR | P | 5770237 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/21/2018 | training with inspector Dane S. on I-2 type I-A construction framing , top out framing for mechanical , slip track application and use , 1 and 2 hour wall assemblies and doors , reviewed plans and tracking for future inspections | LONNYS | LONNYS | | BSP | P | 5770216 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 02/15/2018 | INSULATION AT LEVEL 00 AT AREA A at 10' above finished floor to deck above - R19 installed OK / ComCheck calls for R25 but R19 installed - need to revise ComCheck and splice into permit | DANE | DANE | | BIN | P | 5766546 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/15/2018 | AREA A LEVEL 00 INTERIOR WALLS 10' AFF TO DECK / interior wall framing at W3 to W6 and WA to WE at 10' above floor to deck above OK ( elect room, IDF room, mech room, equip room, shell future, and clean supply) / walls one sided and screws OK per UL U419 / fire barrier at south end of area A level 00 needs to have supporting construction at east and west ends of wall / all walls inspected are marked in yellow on page bA100A at plan table in construction office | DANE | DANE | | BFR | P | 5766538 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/12/2018 | fire safeing at grid lines WA to WG and W2 to W9 (all the way around the roof ine) at roof line inside parapet wall stud bays OK per Hilti EJ 28439A - hard copy of EJ to follow | DANE | DANE | | BSP | P | 5763075 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 02/07/2018 | foundation insulation at N7 to ND on east side at radius N13 OK | DANE | DANE | | BFI | P | 5759287 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 12/12/2017 | foundation insulation at grid line NJ.2 from N7 to N11 and all of radius N13 | DANE | DANE | | BFI | P | 5709831 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 12/04/2017 | foundation insulation OK at grid line NH from N5 to N8 | DANE | DANE | | BFI | P | 5701242 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 11/07/2017 | foundation insulation OK at grid line NH1 from N1 to N3.1 | DANE | DANE | | BFI | P | 5678625 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 10/24/2017 | foundation insulation OK at grid line N3.7 from NE1 to NG | DANE | DANE | | BFI | P | 5665070 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 10/16/2017 | foundation insulation and water proofing at grid WE from W4 to W6.5 OK and water proofing at grid ND to NE on N4 OK | DANE | DANE | | BFI | P | 5656243 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 10/11/2017 | foundation insulation OK at grid lines W4 to W6.5 on WA or at WE from W3 to W4 | DANE | DANE | | BFI | P | 5652485 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | R | 10/11/2017 | foundation insulation not ready at grid lines W4 to W6.5 on WA or at WE from W3 to W4 / need to recall inspection when ready | DANE | DANE | | BIN | R | 5651330 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 10/09/2017 | R10 foundation insulation at grid lines W4 to WD at southwest corner of hospital OK | DANE | DANE | | BFI | P | 5649069 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 10/06/2017 | foundation insulation OK at east stair tower at grid lines N11 to N12 and NH to NI | DANE | DANE | | BFI | P | 5648241 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFI | P | 09/01/2017 | R10 foundation insulation at south stair tower OK at grid line N4 at NF to NG / met Ben Schlick on site and discussed job progress and inspection coordination and need for pre construction meeting approximately 3rd or 4th week of October after upgrade to finish permit is ready. | DANE | DANE | | BFI | P | 5613948 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFD | P | 08/25/2017 | Talked with Ben GE job super,I gave ok to use engineer to do the drain components inspections,damproofing and waterproofing also,with observation reports to be picked up by inspector/RBD will inspect the rigid foam insulation per Ben | BERTW | BERTW | | BFD | P | 5607004 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | P | 07/31/2017 | met Ben at my desk ok to use engineer to do footing and foundations with observation reports to be picked up by inspector @ drain inspections which RBD will inspect | BERTW | BERTW | | BFN | P | 5581185 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFT | P | 07/31/2017 | met Ben at my desk ok to use engineer to do footing and foundations with observation reports to be picked up by inspector @ drain inspections which RBD will inspect | BERTW | BERTW | | BFT | P | 5581183 |
ENCORE ELECTRIC, INC. | E= | C | 10/11/2019 | see notes | RANDY | RANDY | | E= | C | 6365878 |
ENCORE ELECTRIC, INC. | E= | C | 10/11/2019 | FIRE ALARM INSPECTION: | RANDY | RANDY | | E= | C | 6365828 |
ENCORE ELECTRIC, INC. | E= | C | 10/11/2019 | FIRE ALARM INSPECTION: Block 15 complete------EVS breakroom and manager office | RANDY | RANDY | | E= | C | 6365827 |
ENCORE ELECTRIC, INC. | ER | C | 10/11/2019 | | RANDY | RANDY | | ER | C | 6365778 |
ENCORE ELECTRIC, INC. | ER | P | 10/08/2019 | EVS break room ceilings | RANDY | RANDY | | ER | P | 6361790 |
ENCORE ELECTRIC, INC. | ER | P | 09/17/2019 | Electrical point of contact is Jeremy 303 - 242 - 2441 / Walls only in EVS break room and EVS storage room, No patient care in either of these rooms | JOSEPH | JOSEPH | | ER | P | 6337734 |
ENCORE ELECTRIC, INC. | E= | P | 08/12/2019 | FIRE ALARM INSPECTION: red card signed | RANDY | RANDY | | E= | P | 6297131 |
ENCORE ELECTRIC, INC. | ER | P | 08/12/2019 | FIRE ALARM INSPECTION: red card signed | RANDY | RANDY | | ER | P | 6297121 |
ENCORE ELECTRIC, INC. | E= | P | 08/09/2019 | FIRE ALARM INSPECTION: Block 16 FA complete | RANDY | RANDY | | E= | P | 6295390 |
ENCORE ELECTRIC, INC. | ER | P | 08/09/2019 | FIRE ALARM INSPECTION: Block 16 FA rough ok | RANDY | RANDY | | ER | P | 6295389 |
ENCORE ELECTRIC, INC. | E= | P | 08/09/2019 | Block 16 complete | RANDY | RANDY | | E= | P | 6295387 |
ENCORE ELECTRIC, INC. | ER | P | 08/09/2019 | no rough | RANDY | RANDY | | ER | P | 6295386 |
ENCORE ELECTRIC, INC. | ER | P | 08/07/2019 | SPD hallway marked on plans | RANDY | RANDY | | ER | P | 6291776 |
ENCORE ELECTRIC, INC. | ER | P | 08/07/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6291764 |
ENCORE ELECTRIC, INC. | ER | P | 07/24/2019 | FIRE ALARM INSPECTION: see notes | RANDY | RANDY | | ER | P | 6274993 |
ENCORE ELECTRIC, INC. | ER | P | 07/24/2019 | called at 10:40 left message had to keep moving | RANDY | RANDY | | ER | P | 6274984 |
ENCORE ELECTRIC, INC. | E= | P | 06/21/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | E= | P | 6240378 |
ENCORE ELECTRIC, INC. | ER | P | 06/21/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6240377 |
ENCORE ELECTRIC, INC. | E= | P | 06/21/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | E= | P | 6240374 |
ENCORE ELECTRIC, INC. | ER | P | 06/21/2019 | room finals and ceilings marked on plans | RANDY | RANDY | | ER | P | 6240371 |
ENCORE ELECTRIC, INC. | ER | P | 06/10/2019 | FIRE ALARM INSPECTION: Above ceilings okay--area hi-lighted on prints | CHIPO | CHIPO | | ER | P | 6226069 |
ENCORE ELECTRIC, INC. | ER | P | 06/10/2019 | Above ceiling okay--area hi-lighted on prints | CHIPO | CHIPO | | ER | P | 6226068 |
ENCORE ELECTRIC, INC. | ER | P | 05/31/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6216407 |
ENCORE ELECTRIC, INC. | ER | P | 05/31/2019 | ceilings in SPD area marked on plans | RANDY | RANDY | | ER | P | 6216402 |
ENCORE ELECTRIC, INC. | ER | P | 05/16/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6201901 |
ENCORE ELECTRIC, INC. | ER | P | 05/16/2019 | SPD area----need latest stamped plans on site | RANDY | RANDY | | ER | P | 6201898 |
ENCORE ELECTRIC, INC. | E= | P | 05/14/2019 | room C3317 final ok | RANDY | RANDY | | E= | P | 6197937 |
ENCORE ELECTRIC, INC. | ER | P | 05/14/2019 | no rough | RANDY | RANDY | | ER | P | 6197936 |
ENCORE ELECTRIC, INC. | E= | P | 05/10/2019 | block 18 OBED final ok | RANDY | RANDY | | E= | P | 6195216 |
ENCORE ELECTRIC, INC. | ER | P | 05/10/2019 | no rough | RANDY | RANDY | | ER | P | 6195209 |
ENCORE ELECTRIC, INC. | ER | P | 05/07/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6190708 |
ENCORE ELECTRIC, INC. | ER | P | 05/07/2019 | ceilings in rm 3317 postpartum, MRI storage rm ok | RANDY | RANDY | | ER | P | 6190706 |
ENCORE ELECTRIC, INC. | ER | P | 04/30/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6182668 |
ENCORE ELECTRIC, INC. | ER | P | 04/30/2019 | ceilings in OBED marked on plans | RANDY | RANDY | | ER | P | 6182667 |
ENCORE ELECTRIC, INC. | E= | P | 04/24/2019 | block 13 complete---book signed | RANDY | RANDY | | E= | P | 6176709 |
ENCORE ELECTRIC, INC. | ER | P | 04/24/2019 | no rough | RANDY | RANDY | | ER | P | 6176674 |
ENCORE ELECTRIC, INC. | ER | P | 04/23/2019 | walls in storage rm marked on plans | RANDY | RANDY | | ER | P | 6175171 |
ENCORE ELECTRIC, INC. | ER | P | 04/18/2019 | switch height for ADA requirements was addressed | RANDY | RANDY | | ER | P | 6170337 |
ENCORE ELECTRIC, INC. | ER | P | 04/12/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6163987 |
ENCORE ELECTRIC, INC. | ER | P | 04/12/2019 | Biomed walls------OBED hardlid ceilings | RANDY | RANDY | | ER | P | 6163979 |
ENCORE ELECTRIC, INC. | ER | P | 04/10/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6161594 |
ENCORE ELECTRIC, INC. | ER | P | 04/10/2019 | 3rd fl OBED walls----basement kitchen walls----marked on plans | RANDY | RANDY | | ER | P | 6161592 |
ENCORE ELECTRIC, INC. | E= | P | 03/12/2019 | final for block 12----book signed and dated | RANDY | RANDY | | E= | P | 6131842 |
ENCORE ELECTRIC, INC. | ER | P | 03/12/2019 | no rough | RANDY | RANDY | | ER | P | 6131820 |
ENCORE ELECTRIC, INC. | E= | P | 02/21/2019 | main lobby floor outlets | RANDY | RANDY | | E= | P | 6113668 |
ENCORE ELECTRIC, INC. | ER | P | 02/21/2019 | no rough | RANDY | RANDY | | ER | P | 6113660 |
ENCORE ELECTRIC, INC. | ER | P | 02/19/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6111192 |
ENCORE ELECTRIC, INC. | ER | P | 02/19/2019 | ceilings on 1st fl marked on plans-----new cooler ok-----corrections made on temp sterilizer trailer gear | RANDY | RANDY | | ER | P | 6111172 |
ENCORE ELECTRIC, INC. | E= | P | 02/15/2019 | 600 amp service for sterile temp trailer -------need to bond to water pipe and seal nipple between gear and disconnect | RANDY | RANDY | | E= | P | 6109501 |
ENCORE ELECTRIC, INC. | ER | P | 02/15/2019 | see final notes | RANDY | RANDY | | ER | P | 6109498 |
ENCORE ELECTRIC, INC. | E= | P | 02/14/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | E= | P | 6107571 |
ENCORE ELECTRIC, INC. | ER | P | 02/14/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6107570 |
ENCORE ELECTRIC, INC. | E= | P | 02/14/2019 | north rooftop units 501,502,503,504 | RANDY | RANDY | | E= | P | 6107565 |
ENCORE ELECTRIC, INC. | ER | P | 02/14/2019 | north rooftop rough | RANDY | RANDY | | ER | P | 6107564 |
ENCORE ELECTRIC, INC. | E= | P | 02/13/2019 | air handler 301 302 ------lights and outlets on rooftop | RANDY | RANDY | | E= | P | 6106170 |
ENCORE ELECTRIC, INC. | ER | P | 02/13/2019 | rough for rooftop unit and light+gfcis | RANDY | RANDY | | ER | P | 6106166 |
ENCORE ELECTRIC, INC. | ER | P | 02/11/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6103317 |
ENCORE ELECTRIC, INC. | ER | P | 02/11/2019 | ceiling 2nd fl marked on plans | RANDY | RANDY | | ER | P | 6103314 |
ENCORE ELECTRIC, INC. | EUG | P | 01/29/2019 | trenches for pole lights south entrance marked on plans | RANDY | RANDY | | EUG | P | 6091079 |
ENCORE ELECTRIC, INC. | ER | P | 01/23/2019 | level 00 area C one new wall marked on plans | RANDY | RANDY | | ER | P | 6085815 |
ENCORE ELECTRIC, INC. | ER | P | 01/15/2019 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 6078871 |
ENCORE ELECTRIC, INC. | ER | P | 01/15/2019 | level 1 area C ceiling | RANDY | RANDY | | ER | P | 6078862 |
ENCORE ELECTRIC, INC. | ER | P | 01/09/2019 | level 1 area C won door----level 00 area C wall---marked on plans | RANDY | RANDY | | ER | P | 6073868 |
ENCORE ELECTRIC, INC. | ER | P | 01/09/2019 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6073773 |
ENCORE ELECTRIC, INC. | E= | P | 01/09/2019 | see rough notes | RANDY | RANDY | | E= | P | 6073772 |
ENCORE ELECTRIC, INC. | ER | P | 01/09/2019 | wrong address called for this inspection | RANDY | RANDY | | ER | P | 6073771 |
ENCORE ELECTRIC, INC. | EUG | P | 01/07/2019 | underground trenches for pole light------2nd fl remodel walls marked on plans | RANDY | RANDY | | EUG | P | 6070479 |
ENCORE ELECTRIC, INC. | E= | P | 12/21/2018 | PHASE 8 FINAL OK----BOOK SIGNED | RANDY | RANDY | | E= | P | 6060785 |
ENCORE ELECTRIC, INC. | E= | P | 12/19/2018 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | E= | P | 6058867 |
ENCORE ELECTRIC, INC. | E= | P | 12/19/2018 | BLOCK 7 OK-----BOOK SIGNED | RANDY | RANDY | | E= | P | 6058866 |
ENCORE ELECTRIC, INC. | E= | P | 12/18/2018 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | E= | P | 6057175 |
ENCORE ELECTRIC, INC. | E= | P | 12/18/2018 | Block 7 finals partial 3rd fl | RANDY | RANDY | | E= | P | 6057174 |
ENCORE ELECTRIC, INC. | ER | P | 12/17/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6054964 |
ENCORE ELECTRIC, INC. | ER | P | 12/17/2018 | 02 and 03 ceilings for the links | RANDY | RANDY | | ER | P | 6054957 |
ENCORE ELECTRIC, INC. | E= | P | 12/13/2018 | BLOCK 6 FINALS----ALL OK EXCEPT SHELL SPACE LIGHTING | RANDY | RANDY | | E= | P | 6052066 |
ENCORE ELECTRIC, INC. | E= | P | 12/13/2018 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | E= | P | 6052060 |
ENCORE ELECTRIC, INC. | EUG | P | 12/10/2018 | 5 pole bases south.north upper lot eug ( lighting conduits to building ) | BRET | BRET | | EUG | P | 6048038 |
ENCORE ELECTRIC, INC. | ER | P | 12/07/2018 | FIRE ALARM INSPECTION: Grid in area previously inspected for temp level 00 as marked on plans | SHELBY | SHELBY | | ER | P | 6046906 |
ENCORE ELECTRIC, INC. | ER | P | 12/07/2018 | Transformers not ready | SHELBY | SHELBY | | ER | P | 6046905 |
ENCORE ELECTRIC, INC. | ER | P | 12/04/2018 | 01 link ok | RANDY | RANDY | | ER | P | 6042923 |
ENCORE ELECTRIC, INC. | ER | P | 12/04/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6042749 |
ENCORE ELECTRIC, INC. | ER | P | 12/03/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6041321 |
ENCORE ELECTRIC, INC. | ER | P | 12/03/2018 | 3rd floor ceilings areas E,F | RANDY | RANDY | | ER | P | 6041319 |
ENCORE ELECTRIC, INC. | ER | P | 11/30/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6039973 |
ENCORE ELECTRIC, INC. | ER | P | 11/30/2018 | BLOCK 3 COMPLETE---3rd fl corridors and rooms ceilings marked on plans | RANDY | RANDY | | ER | P | 6039928 |
ENCORE ELECTRIC, INC. | ER | P | 11/29/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6038354 |
ENCORE ELECTRIC, INC. | ER | P | 11/29/2018 | ceilings 3rd fl rooms and corridors area E | RANDY | RANDY | | ER | P | 6038350 |
ENCORE ELECTRIC, INC. | ER | P | 11/28/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6036876 |
ENCORE ELECTRIC, INC. | ER | P | 11/28/2018 | 3rd fl ceilings marked on plans | RANDY | RANDY | | ER | P | 6036871 |
ENCORE ELECTRIC, INC. | ER | P | 11/27/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6035065 |
ENCORE ELECTRIC, INC. | ER | P | 11/27/2018 | corridor ceilings area F-----rooms 3rd fl ceilings area E | RANDY | RANDY | | ER | P | 6035062 |
ENCORE ELECTRIC, INC. | E= | P | 11/20/2018 | FIRE ALARM INSPECTION: no finals | RANDY | RANDY | | E= | P | 6030684 |
ENCORE ELECTRIC, INC. | ER | P | 11/20/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6030683 |
ENCORE ELECTRIC, INC. | E= | P | 11/20/2018 | no finals | RANDY | RANDY | | E= | P | 6030682 |
ENCORE ELECTRIC, INC. | ER | P | 11/20/2018 | 3rd fl corridors marked on plans | RANDY | RANDY | | ER | P | 6030675 |
ENCORE ELECTRIC, INC. | E= | P | 11/19/2018 | FIRE ALARM INSPECTION: no finals | RANDY | RANDY | | E= | P | 6029605 |
ENCORE ELECTRIC, INC. | ER | P | 11/19/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6029582 |
ENCORE ELECTRIC, INC. | E= | P | 11/19/2018 | no finals | RANDY | RANDY | | E= | P | 6029579 |
ENCORE ELECTRIC, INC. | ER | P | 11/19/2018 | 3rd fl LDR ceilings marked on prints | RANDY | RANDY | | ER | P | 6029576 |
ENCORE ELECTRIC, INC. | E= | P | 11/16/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 6028432 |
ENCORE ELECTRIC, INC. | ER | P | 11/16/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6028431 |
ENCORE ELECTRIC, INC. | E= | P | 11/16/2018 | BLOCK 4 AND 5 ok ----marked and dated on plans | RANDY | RANDY | | E= | P | 6028430 |
ENCORE ELECTRIC, INC. | ER | P | 11/16/2018 | ceilings on 03, north LDR'S---marked on plans | RANDY | RANDY | | ER | P | 6028428 |
ENCORE ELECTRIC, INC. | E= | P | 11/15/2018 | BLOCK 4 FINALS--- MARKED ON PLANS | RANDY | RANDY | | E= | P | 6026915 |
ENCORE ELECTRIC, INC. | ER | P | 11/15/2018 | above ceilings elevator lobby | RANDY | RANDY | | ER | P | 6026902 |
ENCORE ELECTRIC, INC. | E= | P | 11/15/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 6026820 |
ENCORE ELECTRIC, INC. | ER | P | 11/15/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6026800 |
ENCORE ELECTRIC, INC. | E= | P | 11/14/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 6025350 |
ENCORE ELECTRIC, INC. | ER | P | 11/14/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6025343 |
ENCORE ELECTRIC, INC. | E= | P | 11/14/2018 | area 00 rooms marked on plans | RANDY | RANDY | | E= | P | 6025261 |
ENCORE ELECTRIC, INC. | EUG | P | 11/14/2018 | trenches for pole lights SE side of building | RANDY | RANDY | | EUG | P | 6025260 |
ENCORE ELECTRIC, INC. | E= | P | 11/13/2018 | see notes | RANDY | RANDY | | E= | P | 6024028 |
ENCORE ELECTRIC, INC. | ER | P | 11/13/2018 | ceilings 3rd fl area F marked on plans------trenches marked on site plan------MAC ok---MVP needs #8s pulled | RANDY | RANDY | | ER | P | 6024022 |
ENCORE ELECTRIC, INC. | E= | P | 11/13/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 6024021 |
ENCORE ELECTRIC, INC. | ER | P | 11/13/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6024013 |
ENCORE ELECTRIC, INC. | E= | P | 11/12/2018 | no finals this inspection | RANDY | RANDY | | E= | P | 6022975 |
ENCORE ELECTRIC, INC. | ER | P | 11/12/2018 | ceilings 1st fl marked on plans | RANDY | RANDY | | ER | P | 6022958 |
ENCORE ELECTRIC, INC. | E= | P | 11/12/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 6022957 |
ENCORE ELECTRIC, INC. | ER | P | 11/12/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6022948 |
ENCORE ELECTRIC, INC. | E= | P | 11/09/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 6021693 |
ENCORE ELECTRIC, INC. | ER | P | 11/09/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6021692 |
ENCORE ELECTRIC, INC. | E= | P | 11/09/2018 | no finals this inspection | RANDY | RANDY | | E= | P | 6021676 |
ENCORE ELECTRIC, INC. | ER | P | 11/09/2018 | ceilings area F south | RANDY | RANDY | | ER | P | 6021672 |
ENCORE ELECTRIC, INC. | E= | P | 11/08/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 6020250 |
ENCORE ELECTRIC, INC. | ER | P | 11/08/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6020246 |
ENCORE ELECTRIC, INC. | E= | P | 11/08/2018 | BLOCK 4 AND 8--- finals marked and dated on plans | RANDY | RANDY | | E= | P | 6020245 |
ENCORE ELECTRIC, INC. | ER | P | 11/08/2018 | ceilings area F marked on plans | RANDY | RANDY | | ER | P | 6020231 |
ENCORE ELECTRIC, INC. | ER | P | 11/05/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6015840 |
ENCORE ELECTRIC, INC. | ER | P | 11/05/2018 | rooms finals marked on plans in orange | RANDY | RANDY | | ER | P | 6015829 |
ENCORE ELECTRIC, INC. | ER | P | 11/02/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6014845 |
ENCORE ELECTRIC, INC. | ER | P | 11/02/2018 | need gfci on outlets within 6' of sink in lab block 11 everything else ok--------nurse station 3rd fl block E | RANDY | RANDY | | ER | P | 6014813 |
ENCORE ELECTRIC, INC. | E= | P | 11/01/2018 | see notes | RANDY | RANDY | | E= | P | 6013208 |
ENCORE ELECTRIC, INC. | ER | P | 11/01/2018 | field cancelled | RANDY | RANDY | | ER | P | 6013206 |
ENCORE ELECTRIC, INC. | ER | P | 10/31/2018 | FIRE ALARM INSPECTION: field cancelled | RANDY | RANDY | | ER | P | 6011855 |
ENCORE ELECTRIC, INC. | ER | P | 10/31/2018 | field cancelled | RANDY | RANDY | | ER | P | 6011854 |
ENCORE ELECTRIC, INC. | ER | P | 10/30/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6010960 |
ENCORE ELECTRIC, INC. | ER | P | 10/30/2018 | level 1 common area ceiling------level 2 ceilings area 2 | RANDY | RANDY | | ER | P | 6010959 |
ENCORE ELECTRIC, INC. | ER | P | 10/29/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6009138 |
ENCORE ELECTRIC, INC. | ER | P | 10/29/2018 | 01 common space ceilings ok | RANDY | RANDY | | ER | P | 6009131 |
ENCORE ELECTRIC, INC. | ER | P | 10/26/2018 | FIRE ALARM INSPECTION: field cancelled | RANDY | RANDY | | ER | P | 6007818 |
ENCORE ELECTRIC, INC. | ER | P | 10/26/2018 | field cancelled | RANDY | RANDY | | ER | P | 6007815 |
ENCORE ELECTRIC, INC. | ER | P | 10/25/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6006024 |
ENCORE ELECTRIC, INC. | ER | P | 10/25/2018 | level 3 area E ceilings marked on plans | RANDY | RANDY | | ER | P | 6006017 |
ENCORE ELECTRIC, INC. | ER | P | 10/24/2018 | FIRE ALARM INSPECTION: no FA this inspection | RANDY | RANDY | | ER | P | 6004568 |
ENCORE ELECTRIC, INC. | EP | P | 10/24/2018 | looked at panel CCLBA3 | RANDY | RANDY | | EP | P | 6004565 |
ENCORE ELECTRIC, INC. | ER | P | 10/23/2018 | 2nd fl ceilings and 3rd fl nurse station | RANDY | RANDY | | ER | P | 6003432 |
ENCORE ELECTRIC, INC. | ER | P | 10/23/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6003428 |
ENCORE ELECTRIC, INC. | ES | C | 10/23/2018 | Commercial Service: 4000 amp 4/w 277/480 -------ok to set meter | RANDY | RANDY | | ES | C | 6003319 |
ENCORE ELECTRIC, INC. | ER | P | 10/22/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6001974 |
ENCORE ELECTRIC, INC. | ER | P | 10/22/2018 | 2nd fl area E ceilings | RANDY | RANDY | | ER | P | 6001959 |
ENCORE ELECTRIC, INC. | ER | P | 10/19/2018 | FIRE ALARM INSPECTION: ceilings at second floor nurses station and corridor and room 2209 | MATTHEW | MATTHEW | | ER | P | 6000946 |
ENCORE ELECTRIC, INC. | ER | P | 10/19/2018 | (5) pole bases marked on plans---- ceiling second floor nurses station, ceiling second floor corridor, room 2209 ceiling | MATTHEW | MATTHEW | | ER | P | 6000945 |
ENCORE ELECTRIC, INC. | ER | P | 10/18/2018 | FIRE ALARM INSPECTION: same area as electrical rough | BRET | BRET | | ER | P | 5998617 |
ENCORE ELECTRIC, INC. | ER | P | 10/18/2018 | corridor suspended ceiling 1772, cg14, cg15. room suspended ceiling 2102, 2012, 2120, g16 and g18. | BRET | BRET | | ER | P | 5998612 |
ENCORE ELECTRIC, INC. | ER | P | 10/17/2018 | loading dock lot lighting eug complete | BRET | BRET | | ER | P | 5997128 |
ENCORE ELECTRIC, INC. | ER | P | 10/15/2018 | FIRE ALARM INSPECTION: lab 6206 ceiling ok | BRET | BRET | | ER | P | 5994586 |
ENCORE ELECTRIC, INC. | ER | P | 10/15/2018 | 8 roof exhaust fan disconnects fuses and motor make up. 2 12 amp relief fan disconnect and motor make ok. lab b6206 ceiling ok except j-box above panel and power pole power whips | BRET | BRET | | ER | P | 5994585 |
ENCORE ELECTRIC, INC. | ER | R | 10/12/2018 | FIRE ALARM INSPECTION: inspection cancelled | BRET | BRET | | ER | R | 5993118 |
ENCORE ELECTRIC, INC. | ER | R | 10/12/2018 | inspection cancelled not ready per Nate | BRET | BRET | | ER | R | 5993112 |
ENCORE ELECTRIC, INC. | ER | P | 10/11/2018 | FIRE ALARM INSPECTION: Fa with electric | RANDY | RANDY | | ER | P | 5992338 |
ENCORE ELECTRIC, INC. | ER | P | 10/11/2018 | RTUs on roof ok | RANDY | RANDY | | ER | P | 5992330 |
ENCORE ELECTRIC, INC. | ER | P | 10/10/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5991088 |
ENCORE ELECTRIC, INC. | ER | P | 10/10/2018 | area E drop ceilings | RANDY | RANDY | | ER | P | 5991085 |
ENCORE ELECTRIC, INC. | ER | P | 10/09/2018 | FIRE ALARM INSPECTION: FA marked on plans with electric | RANDY | RANDY | | ER | P | 5990185 |
ENCORE ELECTRIC, INC. | ER | P | 10/09/2018 | drop ceilings only marked on plans | RANDY | RANDY | | ER | P | 5990184 |
ENCORE ELECTRIC, INC. | ER | P | 10/08/2018 | FIRE ALARM INSPECTION: FA marked on electric plan | RANDY | RANDY | | ER | P | 5989036 |
ENCORE ELECTRIC, INC. | EUG | P | 10/08/2018 | pole light trench marked on plans | RANDY | RANDY | | EUG | P | 5989035 |
ENCORE ELECTRIC, INC. | ER | P | 10/05/2018 | FIRE ALARM INSPECTION: FA marked on plans | RANDY | RANDY | | ER | P | 5987673 |
ENCORE ELECTRIC, INC. | ER | P | 10/05/2018 | trenches marked on plans | RANDY | RANDY | | ER | P | 5987672 |
ENCORE ELECTRIC, INC. | ER | P | 10/04/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5986113 |
ENCORE ELECTRIC, INC. | ER | P | 10/04/2018 | nurse stations level 2 marked on plans | RANDY | RANDY | | ER | P | 5986104 |
ENCORE ELECTRIC, INC. | ER | P | 10/03/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5984354 |
ENCORE ELECTRIC, INC. | ER | P | 10/03/2018 | 2 nurse stations marked on plans | RANDY | RANDY | | ER | P | 5984342 |
ENCORE ELECTRIC, INC. | ER | P | 10/02/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5983331 |
ENCORE ELECTRIC, INC. | ER | P | 10/02/2018 | outside lights marked on plans | RANDY | RANDY | | ER | P | 5983330 |
ENCORE ELECTRIC, INC. | ER | P | 10/01/2018 | FIRE ALARM INSPECTION: FA marked on plans | RANDY | RANDY | | ER | P | 5981889 |
ENCORE ELECTRIC, INC. | ER | P | 10/01/2018 | 1 ceiling 1st fl marked on plans-----trenches for light poles | RANDY | RANDY | | ER | P | 5981887 |
ENCORE ELECTRIC, INC. | E= | P | 09/28/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 5980966 |
ENCORE ELECTRIC, INC. | ER | P | 09/28/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5980682 |
ENCORE ELECTRIC, INC. | E= | P | 09/28/2018 | gfci corrections made | RANDY | RANDY | | E= | P | 5980681 |
ENCORE ELECTRIC, INC. | ER | P | 09/28/2018 | nurse stations marked on plans | RANDY | RANDY | | ER | P | 5980679 |
ENCORE ELECTRIC, INC. | ER | P | 09/27/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5978861 |
ENCORE ELECTRIC, INC. | ER | P | 09/27/2018 | gfci outlets within 6' of sinks block 2 marked on plans------10 pole bases marked on plans | RANDY | RANDY | | ER | P | 5978859 |
ENCORE ELECTRIC, INC. | ER | P | 09/26/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5977287 |
ENCORE ELECTRIC, INC. | ER | P | 09/26/2018 | rooftop units 501 RF-510 A,B,C,D-----SF-501 A,B,C,D-----RF-502 A,B,C,D-----SF-502 A,B,C,D----RF-503 A,B,C,D-----SF-503 A,B,C,D-----VFDS-------WALLS MARKED ON PLANS | RANDY | RANDY | | ER | P | 5977265 |
ENCORE ELECTRIC, INC. | ER | P | 09/25/2018 | wall rough by stairs marked on plans | RANDY | RANDY | | ER | P | 5975654 |
ENCORE ELECTRIC, INC. | ER | P | 09/25/2018 | FIRE ALARM INSPECTION: FA wall rough by stair wall | RANDY | RANDY | | ER | P | 5975652 |
ENCORE ELECTRIC, INC. | ER | P | 09/24/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5974861 |
ENCORE ELECTRIC, INC. | E= | P | 09/24/2018 | finals in block 1 | RANDY | RANDY | | E= | P | 5974859 |
ENCORE ELECTRIC, INC. | E= | P | 09/21/2018 | FIRE ALARM INSPECTION: no final at this time | RANDY | RANDY | | E= | P | 5973110 |
ENCORE ELECTRIC, INC. | ER | P | 09/21/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5973109 |
ENCORE ELECTRIC, INC. | E= | P | 09/21/2018 | no final at this time | RANDY | RANDY | | E= | P | 5973101 |
ENCORE ELECTRIC, INC. | ER | P | 09/21/2018 | ceilings in rooms A1248 and A1329----also talked about selective coordination | RANDY | RANDY | | ER | P | 5973100 |
ENCORE ELECTRIC, INC. | E= | P | 09/20/2018 | see notes | RANDY | RANDY | | E= | P | 5971965 |
ENCORE ELECTRIC, INC. | ER | P | 09/20/2018 | OR rooms will need to comply with 517.20 | RANDY | RANDY | | ER | P | 5971958 |
ENCORE ELECTRIC, INC. | E= | P | 09/20/2018 | FIRE ALARM INSPECTION: see notes | RANDY | RANDY | | E= | P | 5971957 |
ENCORE ELECTRIC, INC. | ER | P | 09/20/2018 | FIRE ALARM INSPECTION: FA 1st floor final | RANDY | RANDY | | ER | P | 5971953 |
ENCORE ELECTRIC, INC. | ER | P | 09/18/2018 | FIRE ALARM INSPECTION: no FA | RANDY | RANDY | | ER | P | 5969165 |
ENCORE ELECTRIC, INC. | EUG | P | 09/18/2018 | pole light trench marked on plans | RANDY | RANDY | | EUG | P | 5969164 |
ENCORE ELECTRIC, INC. | ER | P | 09/17/2018 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 5967297 |
ENCORE ELECTRIC, INC. | ER | P | 09/17/2018 | cup rough | RANDY | RANDY | | ER | P | 5967262 |
ENCORE ELECTRIC, INC. | ER | P | 09/14/2018 | FIRE ALARM INSPECTION: FA marked on plans with electric | RANDY | RANDY | | ER | P | 5965760 |
ENCORE ELECTRIC, INC. | ER | P | 09/14/2018 | can lights in front east side--marked on plans | RANDY | RANDY | | ER | P | 5965756 |
ENCORE ELECTRIC, INC. | ER | P | 09/13/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5964331 |
ENCORE ELECTRIC, INC. | ER | P | 09/13/2018 | headwalls and doghouse marked on plans | RANDY | RANDY | | ER | P | 5964326 |
ENCORE ELECTRIC, INC. | ER | P | 09/12/2018 | walls and ceilings marked on plans | RANDY | RANDY | | ER | P | 5962581 |
ENCORE ELECTRIC, INC. | ER | P | 09/12/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5962567 |
ENCORE ELECTRIC, INC. | ER | P | 09/11/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5961531 |
ENCORE ELECTRIC, INC. | ER | P | 09/11/2018 | ceilings and headwalls 3rd floor--------pole light trenches marked on plans | RANDY | RANDY | | ER | P | 5961529 |
ENCORE ELECTRIC, INC. | ER | P | 09/10/2018 | drop ceilings marked on plans | RANDY | RANDY | | ER | P | 5960487 |
ENCORE ELECTRIC, INC. | ER | P | 09/10/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5960481 |
ENCORE ELECTRIC, INC. | ER | P | 09/07/2018 | area 01 ceilings-------02 headwalls marked on plans | RANDY | RANDY | | ER | P | 5958664 |
ENCORE ELECTRIC, INC. | ER | P | 09/07/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5958659 |
ENCORE ELECTRIC, INC. | ER | P | 09/06/2018 | ceilings and walls 3rd fl----1st fl ceilings all marked on plans | RANDY | RANDY | | ER | P | 5956794 |
ENCORE ELECTRIC, INC. | ER | P | 09/05/2018 | FIRE ALARM INSPECTION: FA marked on plans | RANDY | RANDY | | ER | P | 5955696 |
ENCORE ELECTRIC, INC. | ER | P | 09/05/2018 | hardlids, trenches marked on plans | RANDY | RANDY | | ER | P | 5955694 |
ENCORE ELECTRIC, INC. | ER | P | 09/04/2018 | FA 3rd fl marked with electric | RANDY | RANDY | | ER | P | 5954193 |
ENCORE ELECTRIC, INC. | ER | P | 09/04/2018 | 3rd fl ceilings marked on plans | RANDY | RANDY | | ER | P | 5954190 |
ENCORE ELECTRIC, INC. | ER | P | 08/31/2018 | field cancelled | RANDY | RANDY | | ER | P | 5953129 |
ENCORE ELECTRIC, INC. | ER | P | 08/31/2018 | FIRE ALARM INSPECTION: field cancelled | RANDY | RANDY | | ER | P | 5953118 |
ENCORE ELECTRIC, INC. | ER | P | 08/30/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5951224 |
ENCORE ELECTRIC, INC. | ER | P | 08/30/2018 | lab walls-----ceilings on level 0----marked on plans | RANDY | RANDY | | ER | P | 5951223 |
ENCORE ELECTRIC, INC. | ER | P | 08/29/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5950293 |
ENCORE ELECTRIC, INC. | ER | P | 08/29/2018 | new radiation detecting devices and wall rough changes marked on plans----also looked at 7 pole lights marked on site plan | RANDY | RANDY | | ER | P | 5950289 |
ENCORE ELECTRIC, INC. | EP | P | 08/28/2018 | 3rd floor electric room up to mains marked on plans | RANDY | RANDY | | EP | P | 5947963 |
ENCORE ELECTRIC, INC. | ER | P | 08/27/2018 | FIRE ALARM INSPECTION: FA marked with wlectric | RANDY | RANDY | | ER | P | 5946654 |
ENCORE ELECTRIC, INC. | ER | P | 08/27/2018 | basement electric rooms up to main only marked on plans-----trenches for pole lights marked on plans | RANDY | RANDY | | ER | P | 5946643 |
ENCORE ELECTRIC, INC. | EP | P | 08/24/2018 | level 2 electric room marked on plans | RANDY | RANDY | | EP | P | 5945459 |
ENCORE ELECTRIC, INC. | EP | P | 08/23/2018 | level 1 electric rm marked on plans | RANDY | RANDY | | EP | P | 5943705 |
ENCORE ELECTRIC, INC. | ER | P | 08/22/2018 | FA marked with electric | RANDY | RANDY | | ER | P | 5942635 |
ENCORE ELECTRIC, INC. | ER | P | 08/22/2018 | walls and hardlids marked on plans | RANDY | RANDY | | ER | P | 5942631 |
ENCORE ELECTRIC, INC. | ER | P | 08/21/2018 | walls hardlids and soffit level 3 area E | RANDY | RANDY | | ER | P | 5941264 |
ENCORE ELECTRIC, INC. | ER | P | 08/21/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5941263 |
ENCORE ELECTRIC, INC. | ER | P | 08/20/2018 | FIRE ALARM INSPECTION: FA marked on electric plans | RANDY | RANDY | | ER | P | 5939340 |
ENCORE ELECTRIC, INC. | ER | P | 08/20/2018 | walls marked on plans----1 can light in hardlid | RANDY | RANDY | | ER | P | 5939316 |
ENCORE ELECTRIC, INC. | ER | P | 08/17/2018 | walls and ceilings marked and dated on plans | RANDY | RANDY | | ER | P | 5938252 |
ENCORE ELECTRIC, INC. | EUG | P | 08/16/2018 | 9 pole bases ok | RANDY | RANDY | | EUG | P | 5936684 |
ENCORE ELECTRIC, INC. | ER | P | 08/16/2018 | walls and hardlids marked on plans | RANDY | RANDY | | ER | P | 5936679 |
ENCORE ELECTRIC, INC. | ER | P | 08/16/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5936678 |
ENCORE ELECTRIC, INC. | ER | P | 08/15/2018 | FIRE ALARM INSPECTION: walls and hard lids as marked on prints 2nd and 3rd floor | MATTHEW | MATTHEW | | ER | P | 5935621 |
ENCORE ELECTRIC, INC. | ER | P | 08/15/2018 | walls and hard lids marked on prints 2nd and 3rd floor | MATTHEW | MATTHEW | | ER | P | 5935618 |
ENCORE ELECTRIC, INC. | ER | P | 08/14/2018 | FIRE ALARM INSPECTION: fire alarm in first floor corridor marked on plans | MATTHEW | MATTHEW | | ER | P | 5934201 |
ENCORE ELECTRIC, INC. | ER | P | 08/14/2018 | first floor corridor ceiling, bereavement room walls and 1 can light; all marked on plans | MATTHEW | MATTHEW | | ER | P | 5934200 |
ENCORE ELECTRIC, INC. | EUG | P | 08/09/2018 | 8 pole lights SW corner marked on plans---also looked at can lights and door holders marked on plans | RANDY | RANDY | | EUG | P | 5929013 |
ENCORE ELECTRIC, INC. | ER | P | 08/08/2018 | FIRE ALARM INSPECTION: fire alarm marked on plans with electric | RANDY | RANDY | | ER | P | 5927391 |
ENCORE ELECTRIC, INC. | ER | P | 08/08/2018 | level 1 area -----level 2 area A,E | RANDY | RANDY | | ER | P | 5927388 |
ENCORE ELECTRIC, INC. | ER | P | 08/03/2018 | walls on 02, hardlids on 03 marked on plans | RANDY | RANDY | | ER | P | 5923457 |
ENCORE ELECTRIC, INC. | ER | P | 08/03/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5923453 |
ENCORE ELECTRIC, INC. | ER | P | 08/02/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5921965 |
ENCORE ELECTRIC, INC. | ER | P | 08/02/2018 | area 01 walls and hardlids marked on plans | RANDY | RANDY | | ER | P | 5921951 |
ENCORE ELECTRIC, INC. | ER | P | 08/01/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5920594 |
ENCORE ELECTRIC, INC. | ER | P | 08/01/2018 | walls and ceilings marked on plans | RANDY | RANDY | | ER | P | 5920593 |
ENCORE ELECTRIC, INC. | ER | P | 07/31/2018 | FIRE ALARM INSPECTION: 1 wall marked with electric | RANDY | RANDY | | ER | P | 5919952 |
ENCORE ELECTRIC, INC. | ER | P | 07/31/2018 | 2 walls marked on plans | RANDY | RANDY | | ER | P | 5919951 |
ENCORE ELECTRIC, INC. | ER | P | 07/27/2018 | inspection cancelled | RANDY | RANDY | | ER | P | 5915991 |
ENCORE ELECTRIC, INC. | ER | P | 07/26/2018 | changes to walls 3rd fl---already marked on plans | RANDY | RANDY | | ER | P | 5914663 |
ENCORE ELECTRIC, INC. | ER | P | 07/26/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5914662 |
ENCORE ELECTRIC, INC. | ER | P | 07/25/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5913779 |
ENCORE ELECTRIC, INC. | ER | P | 07/25/2018 | level 0 area A, level 1 area A,E, level 2 area E | RANDY | RANDY | | ER | P | 5913745 |
ENCORE ELECTRIC, INC. | EP | P | 07/23/2018 | looked at panels WU-LBA,WU-L1A | RANDY | RANDY | | EP | P | 5910960 |
ENCORE ELECTRIC, INC. | ER | P | 07/23/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5910959 |
ENCORE ELECTRIC, INC. | ER | P | 07/23/2018 | bathrooms marked on plans | RANDY | RANDY | | ER | P | 5910950 |
ENCORE ELECTRIC, INC. | ER | P | 07/20/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5909545 |
ENCORE ELECTRIC, INC. | ER | P | 07/20/2018 | hardlids area A- 1 wall marked on plans | RANDY | RANDY | | ER | P | 5909544 |
ENCORE ELECTRIC, INC. | ER | P | 07/17/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5905201 |
ENCORE ELECTRIC, INC. | ER | P | 07/17/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5905196 |
ENCORE ELECTRIC, INC. | ER | P | 07/17/2018 | 3rd floor walls marked on plans | RANDY | RANDY | | ER | P | 5905159 |
ENCORE ELECTRIC, INC. | EP | P | 07/16/2018 | inspected transformers WET1A-- WNT1A---WCT1A distribution panels WN-LDB1A---WC-LDB1A panels WE-L1A---WN-L1A---WN-L1B---WC-L1B---WC-L1A corrections: need 100 amp main breaker for panel WE-L1A ------ #3 SSBJ too small for distribution panel WC-LDB1A------- feeder changed from 500 al to 300cu for WC-LDB1A --------- panel bonds need to be continuous between normal and critical panels serving same patient care areas | MATTHEW | MATTHEW | | EP | P | 5903392 |
ENCORE ELECTRIC, INC. | ER | P | 07/13/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5902121 |
ENCORE ELECTRIC, INC. | ER | P | 07/13/2018 | walls 3rd floor no head walls as of now---marked on plans | RANDY | RANDY | | ER | P | 5902055 |
ENCORE ELECTRIC, INC. | EP | P | 07/13/2018 | panels LBA ,B,and C---WU-LBA | RANDY | RANDY | | EP | P | 5902048 |
ENCORE ELECTRIC, INC. | ER | P | 07/10/2018 | FA marked with electric plans | RANDY | RANDY | | ER | P | 5897796 |
ENCORE ELECTRIC, INC. | ER | P | 07/10/2018 | walls and hardlids marked on plans | RANDY | RANDY | | ER | P | 5897794 |
ENCORE ELECTRIC, INC. | EP | P | 07/05/2018 | WC-LA,B,C--WCLDBBA---WC-TBA---WN-LBA,B-----WN-LDBBA----WN-HDBBA---WE-HDBBA SECTION 1 AND 2----WNTBA----did not look at ups panel------check wn-hdbba at final for 300amp and we-hdbba | RANDY | RANDY | | EP | P | 5894118 |
ENCORE ELECTRIC, INC. | ER | P | 07/02/2018 | FA marked with electric | RANDY | RANDY | | ER | P | 5891149 |
ENCORE ELECTRIC, INC. | ER | P | 07/02/2018 | walls and bathroom hard lids marked on plans | RANDY | RANDY | | ER | P | 5891146 |
ENCORE ELECTRIC, INC. | ER | P | 06/29/2018 | FIRE ALARM INSPECTION: FA marked on plans with electric | RANDY | RANDY | | ER | P | 5889586 |
ENCORE ELECTRIC, INC. | ER | P | 06/29/2018 | ceilings marked on plans | RANDY | RANDY | | ER | P | 5889585 |
ENCORE ELECTRIC, INC. | ER | P | 06/26/2018 | FA marked on plans with electric | RANDY | RANDY | | ER | P | 5885534 |
ENCORE ELECTRIC, INC. | ER | P | 06/26/2018 | walls soffits and bathroom hard lids marked an plans | RANDY | RANDY | | ER | P | 5885524 |
ENCORE ELECTRIC, INC. | ER | P | 06/25/2018 | FA in ceiling marked with electric | RANDY | RANDY | | ER | P | 5884047 |
ENCORE ELECTRIC, INC. | ER | P | 06/25/2018 | walls and ceiling marked on plans | RANDY | RANDY | | ER | P | 5884042 |
ENCORE ELECTRIC, INC. | ER | P | 06/21/2018 | FIRE ALARM INSPECTION: no FA on this inspection | RANDY | RANDY | | ER | P | 5881400 |
ENCORE ELECTRIC, INC. | ER | P | 06/21/2018 | change in walls already marked on plans | RANDY | RANDY | | ER | P | 5881397 |
ENCORE ELECTRIC, INC. | ER | P | 06/19/2018 | ceilings marked on plans | RANDY | RANDY | | ER | P | 5878624 |
ENCORE ELECTRIC, INC. | ER | P | 06/19/2018 | FA marked on plans with electric | RANDY | RANDY | | ER | P | 5878623 |
ENCORE ELECTRIC, INC. | ER | P | 06/15/2018 | FA marked on plans with electric | RANDY | RANDY | | ER | P | 5876017 |
ENCORE ELECTRIC, INC. | ER | P | 06/15/2018 | 2nd floor walls only marked on plans | RANDY | RANDY | | ER | P | 5876016 |
ENCORE ELECTRIC, INC. | ER | P | 06/11/2018 | FIRE ALARM INSPECTION: walls and soffit marked on plans | MATTHEW | MATTHEW | | ER | P | 5870807 |
ENCORE ELECTRIC, INC. | ER | P | 06/11/2018 | walls and soffit marked on plans | MATTHEW | MATTHEW | | ER | P | 5870803 |
ENCORE ELECTRIC, INC. | ER | P | 06/05/2018 | FIRE ALARM INSPECTION: future CT room---area A | RANDY | RANDY | | ER | P | 5864459 |
ENCORE ELECTRIC, INC. | ER | P | 06/05/2018 | CT room and future CT room + bathroom - shaft wall-- area A | RANDY | RANDY | | ER | P | 5864457 |
ENCORE ELECTRIC, INC. | ER | P | 05/30/2018 | 00 west electric room soffit | RANDY | RANDY | | ER | P | 5859272 |
ENCORE ELECTRIC, INC. | ER | P | 05/25/2018 | corridor and bathrooms marked on plans | RANDY | RANDY | | ER | P | 5856575 |
ENCORE ELECTRIC, INC. | ER | P | 05/24/2018 | FIRE ALARM INSPECTION: walls in area O1A marked with electric plans | RANDY | RANDY | | ER | P | 5854544 |
ENCORE ELECTRIC, INC. | ER | P | 05/24/2018 | walls in area O1A marked on plans in trailer-----soffit on first floor marked in pink | RANDY | RANDY | | ER | P | 5854541 |
ENCORE ELECTRIC, INC. | ER | P | 05/23/2018 | FIRE ALARM INSPECTION: partial final for temp labs | RANDY | RANDY | | ER | P | 5853590 |
ENCORE ELECTRIC, INC. | ER | P | 05/23/2018 | partial final for temp labs | RANDY | RANDY | | ER | P | 5853572 |
ENCORE ELECTRIC, INC. | ER | P | 05/18/2018 | temp lab marked on separate plan in job trailer marked in orange | RANDY | RANDY | | ER | P | 5849204 |
ENCORE ELECTRIC, INC. | ER | P | 05/18/2018 | fire alarm marked with electric for temp lab | RANDY | RANDY | | ER | P | 5849201 |
ENCORE ELECTRIC, INC. | ER | P | 05/17/2018 | FIRE ALARM INSPECTION: no fire alarm to look at | RANDY | RANDY | | ER | P | 5847977 |
ENCORE ELECTRIC, INC. | ER | P | 05/17/2018 | 1st floor walls marked on plans | RANDY | RANDY | | ER | P | 5847967 |
ENCORE ELECTRIC, INC. | ER | P | 05/16/2018 | 1st floor walls marked on plans | RANDY | RANDY | | ER | P | 5846729 |
ENCORE ELECTRIC, INC. | ER | P | 05/16/2018 | FIRE ALARM INSPECTION: 1st floor walls marked on plans | RANDY | RANDY | | ER | P | 5846727 |
ENCORE ELECTRIC, INC. | ER | P | 05/04/2018 | OR rooms first floor marked on plans | RANDY | RANDY | | ER | P | 5836429 |
ENCORE ELECTRIC, INC. | ER | P | 05/04/2018 | FIRE ALARM INSPECTION: OR rooms first floor marked on plans | RANDY | RANDY | | ER | P | 5836428 |
ENCORE ELECTRIC, INC. | ER | P | 04/24/2018 | FIRE ALARM INSPECTION: 1st floor areas E and F marked an plans with electrical | RANDY | RANDY | | ER | P | 5825344 |
ENCORE ELECTRIC, INC. | ER | P | 04/23/2018 | FIRE ALARM INSPECTION: fire alarm marked with electric 1st floor | RANDY | RANDY | | ER | P | 5824113 |
ENCORE ELECTRIC, INC. | ER | P | 04/23/2018 | 1st floor rooms and corridor marked and dated in blue | RANDY | RANDY | | ER | P | 5824109 |
ENCORE ELECTRIC, INC. | ER | P | 04/20/2018 | all idf and electric rooms areas E and F north-----walls marked and dated on plans
| RANDY | RANDY | | ER | P | 5822882 |
ENCORE ELECTRIC, INC. | ER | P | 04/19/2018 | FIRE ALARM INSPECTION: 1st floor walls area c marked and dated on plans -----also looked at electrical | RANDY | RANDY | | ER | P | 5821402 |
ENCORE ELECTRIC, INC. | ER | P | 04/04/2018 | walls on first floor marked on prints in trailer also looked at fire alarm | RANDY | RANDY | | ER | P | 5807530 |
ENCORE ELECTRIC, INC. | ER | P | 03/15/2018 | 1 outlet in mech room E wing | RANDY | RANDY | | ER | P | 5789534 |
ENCORE ELECTRIC, INC. | EUG | P | 02/12/2018 | floor boxes marked on plans | RANDY | RANDY | | EUG | P | 5763926 |
ENCORE ELECTRIC, INC. | EUG | P | 02/12/2018 | floor boxes marked on plans | RANDY | RANDY | | EUG | P | 5763910 |
ENCORE ELECTRIC, INC. | ESL | P | 11/30/2017 | marked on plans EC' s prints | CRAIG | CRAIG | | ESL | P | 5763909 |
ENCORE ELECTRIC, INC. | ESL | P | 11/30/2017 | marked on plans EC' s prints | CRAIG | CRAIG | | ESL | P | 5763925 |
ENCORE ELECTRIC, INC. | ESL | P | 11/08/2017 | slab and eug, 2 areas, marked/dated on EC's prints | GARYL | GARYL | | ESL | P | 5763924 |
ENCORE ELECTRIC, INC. | ESL | P | 11/08/2017 | slab and eug, 2 areas, marked/dated on EC's prints | GARYL | GARYL | | ESL | P | 5763908 |
ENCORE ELECTRIC, INC. | EUG | P | 10/24/2017 | underground for east wing complete-----40' duct bank marked on plans | RANDY | RANDY | | EUG | P | 5763907 |
ENCORE ELECTRIC, INC. | EUG | P | 10/24/2017 | underground for east wing complete-----40' duct bank marked on plans | RANDY | RANDY | | EUG | P | 5763923 |
ENCORE ELECTRIC, INC. | EUG | P | 10/19/2017 | marked and dated | GARYL | GARYL | | EUG | P | 5763922 |
ENCORE ELECTRIC, INC. | EUG | P | 10/19/2017 | marked and dated | GARYL | GARYL | | EUG | P | 5763906 |
ENCORE ELECTRIC, INC. | EUG | P | 10/10/2017 | Marked/dated on encores print | GARYL | GARYL | | EUG | P | 5763905 |
ENCORE ELECTRIC, INC. | EUG | P | 10/10/2017 | Marked/dated on encores print | GARYL | GARYL | | EUG | P | 5763921 |
ENCORE ELECTRIC, INC. | EUG | P | 09/29/2017 | Photos ok for tranistion to wall from ug conduits marked on prints | GARYL | GARYL | | EUG | P | 5763920 |
ENCORE ELECTRIC, INC. | EUG | P | 09/29/2017 | Photos ok for tranistion to wall from ug conduits marked on prints | GARYL | GARYL | | EUG | P | 5763904 |
ENCORE ELECTRIC, INC. | EUG | P | 09/25/2017 | PVC ran for power, marked and dated on their print | GARYL | GARYL | | EUG | P | 5763903 |
ENCORE ELECTRIC, INC. | EUG | P | 09/25/2017 | PVC ran for power, marked and dated on their print | GARYL | GARYL | | EUG | P | 5763919 |
ENCORE ELECTRIC, INC. | EUG | P | 08/28/2017 | marked/dated-- pole light trenching and conduit | GARYL | GARYL | | EUG | P | 5763918 |
ENCORE ELECTRIC, INC. | EUG | P | 08/28/2017 | marked/dated-- pole light trenching and conduit | GARYL | GARYL | | EUG | P | 5763902 |
ENCORE ELECTRIC, INC. | ER | P | 08/23/2017 | Underground for parking lot lighting and pole bases--Initialed areas on print--/ | ROB | ROB | | ER | P | 5763917 |
ENCORE ELECTRIC, INC. | ER | P | 08/23/2017 | Underground for parking lot lighting and pole bases--Initialed areas on print--/ | ROB | ROB | | ER | P | 5763901 |
ENCORE ELECTRIC, INC. | ER | P | 08/17/2017 | 8 trenches for pole lights ---marked on prints | RANDY | RANDY | | ER | P | 5763900 |
ENCORE ELECTRIC, INC. | ER | P | 08/17/2017 | 8 trenches for pole lights ---marked on prints | RANDY | RANDY | | ER | P | 5763916 |
ENCORE ELECTRIC, INC. | EUG | P | 07/11/2017 | trenches marked on prints in trailer | RANDY | RANDY | | EUG | P | 5763897 |
ENCORE ELECTRIC, INC. | EUG | P | 07/11/2017 | trenches marked on prints in trailer | RANDY | RANDY | | EUG | P | 5763913 |
ENCORE ELECTRIC, INC. | EUG | P | 07/06/2017 | pole lights marked on prints in trailer | RANDY | RANDY | | EUG | P | 5763912 |
ENCORE ELECTRIC, INC. | EUG | P | 07/06/2017 | pole lights marked on prints in trailer | RANDY | RANDY | | EUG | P | 5763896 |
ENCORE ELECTRIC, INC. | EUG | P | 06/29/2017 | 6 pole lights marked on prints | RANDY | RANDY | | EUG | P | 5763895 |
ENCORE ELECTRIC, INC. | EUG | P | 06/29/2017 | 6 pole lights marked on prints | RANDY | RANDY | | EUG | P | 5763911 |
ENCORE ELECTRIC, INC. | ER | P | 10/25/2016 | 1 " and 1 1/2" pvc for site lights for east and west parking lots ok | CRAIG | CRAIG | | ER | P | 5763915 |
ENCORE ELECTRIC, INC. | ER | P | 10/25/2016 | 1 " and 1 1/2" pvc for site lights for east and west parking lots ok | CRAIG | CRAIG | | ER | P | 5763899 |
ENCORE ELECTRIC, INC. | ER | P | 10/20/2016 | site lights for east and west parking lots 1"pvcs ok | RANDY | RANDY | | ER | P | 5763914 |
ENCORE ELECTRIC, INC. | ER | P | 10/20/2016 | site lights for east and west parking lots 1"pvcs ok | RANDY | RANDY | | ER | P | 5763898 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 01/08/2020 | MECHANICAL FINAL OK. SPD AND REMODEL AREA TEST AND BALANCE REPORT RECEIVED. "OR" AIR FLOW VERIFICATION REPORT RECEIVED. ENGINEER LETTER APPROVING TEST AND BALANCE REPORT RECEIVED. SEE IMAGES FOR ALL. | NANCY | NANCY | | H= | C | 6446898 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 10/16/2019 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 6370757 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | C | 08/15/2019 | ELEVATORS COMPLETE | ERIC | ERIC | | HE= | C | 6301728 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 08/09/2019 | BLOCK 16: MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. CCD24 DRY STORAGE: MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. BLOCK 17: STILL NEED TO INSPECT. | NANCY | NANCY | | H= | P | 6295592 |
THYSSENKRUPP ELEVATOR CORPORATION | HE | L | 08/06/2019 | Renewed for No Fee at 8/6/2019 9:28:17 AM | ERIC | ERIC | | HE | L | 6289586 |
US ENGINEERING COMPANY | HD | P | 08/04/2019 | bM100.A (BDA 1125) - FRAMED DAMPER OPENINGS IN SOILED ROOM ARE SHEET ROCKED PER UL I503 LISTING. ( SEE IMAGES) | LIDO | LIDO | | HD | P | 6287547 |
US ENGINEERING COMPANY | HD | P | 07/31/2019 | FIELD CANCELED BY CONTRACTOR. | LIDO | LIDO | | HD | P | 6284028 |
US ENGINEERING COMPANY | HD | P | 07/26/2019 | bM100.A (BDA 1125) - PROPERLY INSTALL SHEET ROCK IN FRAMED DAMPER OPENINGS PER UL I503 LISTING. MUD AND TAPE CORNERS OF DAMPER OPENINGS AFTER ROCKED. | NANCY | NANCY | | HD | P | 6278695 |
US ENGINEERING COMPANY | HD | P | 07/25/2019 | NEED REVISED/APPROVED PRINT FOR SOILED AG305, LATEST SPLICE CCD 38 SHOWS CEILING IS TO BE UL I506, CEILING IS INSTALLED PER UL I503. SPLICE TO SHOW ARCHITECTURAL AND MECHANICAL CHANGES IN THIS ROOM. bM100.A (BDA 1125) - TWO FRAMED DAMPER IN SOILED AG305 CEILING OK PER UL I503. OK TO LINE OPENINGS WITH SHEET ROCK PER NOTE 5 OF LISTING. PROPERLY INSTALL FLEX AT SUPPLY DIFFUSERS IN EVS. ONE DAMPER ALL OK. ABOVE CEILING OK, DIFFUSERS OK. bM100.3 (BDA 1126) - PROPERLY INSTALL FLEX TO DIFFUSERS IN STERILE STORAGE/ASSEMBLY PREP. REST OF ABOVE CEILING OK. | NANCY | NANCY | | HD | P | 6277474 |
US ENGINEERING COMPANY | HD | P | 07/16/2019 | FRAMED DAMPER OPENINGS IN SOILED CEILING OK. INSTALL 5/8 INCH ROCK IN OPENING PER NOTE 5 OF THE UL I503 LISTING. THIS CEILING MUST STAY UL I503, IF IT IS CHANGED TO UL I506 NO DAMPER PENETRATIONS ALLOWED. | NANCY | NANCY | | HD | P | 6265728 |
US ENGINEERING COMPANY | HD | P | 07/11/2019 | PROPERLY FRAME DAMPER OPENING IN SOILED CEILING. SEE NOTE "D" REGARDING REINFORCEMENT CHANNELS TO BE A MINIMUM OF 12 INCHES LONG. ALSO NOTE SCREW PATTERN REQUIRED. | NANCY | NANCY | | HD | P | 6260411 |
US ENGINEERING COMPANY | HD | P | 06/21/2019 | bM100.E (BDA 1456) - DAMPER FRAMING ABOVE DOOR OK. NEED TO SEE BOTTOM ANGLE REINSTALLED WHEN SHEET ROCK IS BACK IN PLACE. STILL NEED PERMANENT LABEL ON VAV AND T-STAT INSTALLED. | NANCY | NANCY | | HD | P | 6239825 |
US ENGINEERING COMPANY | HD | P | 06/18/2019 | bM100.E (BDA 1456) - PROPERLY FRAME DAMPER OPENING ABOVE DOUBLE DOORS. | NANCY | NANCY | | HD | P | 6235727 |
US ENGINEERING COMPANY | HWP | P | 06/13/2019 | bM200.E (BDA 1456) - IS THIS AREA UNDER BLOCK 4 OR A NEW BLOCK PLAN? INSTALL T-STAT PER PLAN. HOT WATER SUPPLY/RETURN INSTALLED AND UNDER WORKING PRESSURE. NO VISIBLE LEAKS. INSULATION AND LABELS OK. | NANCY | NANCY | | HWP | P | 6230244 |
US ENGINEERING COMPANY | HD | P | 06/13/2019 | bM100.E (BDA 1456) - IS THIS AREA STILL UNDER BLOCK 4 OR IS THIS A NEW BLOCK? DOOR INTO DRY STORAGE IS NOW BEING FRAMED OUT AS A DOUBLE WIDE DOOR. WILL NEED TO SEE FRAMING, BOX HEADER AND DAMPER KING STUDS ATTACHED TO HEADER BEFORE SHEET ROCK IS INSTALLED. PERMANENTLY LABEL VAV. THREE DAMPERS ALL OK. SUPPLY/RETURN ALL OK. | NANCY | NANCY | | HD | P | 6230243 |
US ENGINEERING COMPANY | HD | P | 05/31/2019 | NEED REVISED/APPROVED PRINTS FOR NEW WORK IN LEVEL 0 AREA "E" CCD-24. WORKING OFF CONTRACTOR PRINTS ON SITE. THREE DAMPER FRAMES OK. LOW PRESSURE SUPPLY TRUNK LINE OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 6216433 |
US ENGINEERING COMPANY | HD | P | 05/30/2019 | NEED REVISED/APPROVED PRINT FOR NEW WORK BEING INSTALLED IN LEVEL 0 AREA "E". PROPERLY FRAME DAMPER OPENINGS IN WALLS PER MANUFACTURER'S INSTRUCTIONS. | NANCY | NANCY | | HD | P | 6215270 |
US ENGINEERING COMPANY | HWP | P | 05/29/2019 | PROVIDE RFI'S APPROVING CHANGES TO PIPING FOR VAV'S IN AREA C (bM200.C). bM200.C (BDA 1155) - HOT WATER SUPPLY/RETURN TO VAV'S ALREADY UNDER WORKING PRESSURE, NO VISIBLE LEAKS. INSULATION AND LABELING OK. | NANCY | NANCY | | HWP | P | 6213255 |
US ENGINEERING COMPANY | HD | P | 05/29/2019 | bM100.A (BDA 1125) - SEVEN DAMPERS ALL OK. SUPPLY AND EXHAUST DUCTS ABOVE CEILING OK. bM100.C (BDA 1126) - ONE DAMPER ALL OK. SUPPLY AND EXHAUST DUCTS ABOVE CEILING OK. | NANCY | NANCY | | HD | P | 6213244 |
US ENGINEERING COMPANY | HD | P | 05/06/2019 | bM103.E (BDA 1450) - INSTALL SUPPLY IN TOILET C3210. TWO DAMPERS ALL OK. bM106.A (BDA 1125) - THREE DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 6188599 |
US ENGINEERING COMPANY | HD | P | 05/01/2019 | bM100.A (BDA 1125) - ONE DAMPER FRAME OK, OK TO INSTALL DAMPER. | NANCY | NANCY | | HD | P | 6183959 |
US ENGINEERING COMPANY | HD | P | 04/29/2019 | PLEASE PROVIDE REVISED/APPROVED PRINTS FOR CHANGES ON LEVELS 00 AND 03, NEW DAMPERS INSTALLED, LOCATION OF RATED WALLS AND CEILINGS CHANGING. bM100.A (BDA 1125) - FOUR DAMPER FRAMES OK, OK TO INSTALL DAMPERS. SUPPLY OK, OK TO WRAP. bM100.C (BDA 1126) - ONE DAMPER FRAME OK, OK TO INSTALL DAMPER. SUPPLY OK, OK TO WRAP. bM103.E (BDA 1146) WORKING OFF OF CONTRACTOR PRINT ON SITE CCD-30. TWO DAMPER FRAMES OK, OK TO INSTALL DAMPERS. SUPPLY/RETURN OK, OK TO WRAP SUPPLY. | NANCY | NANCY | | HD | P | 6181560 |
US ENGINEERING COMPANY | HD | P | 04/19/2019 | bM103.E (BDA 1146) - NEED REVISED/APPROVED PRINTS SHOWING THREE NEW BATHROOMS, NEW EXHAUST DUCTS, NEW SUPPLY AND REMOVAL OF FIRE DAMPER FROM RETURN AIR DUCT DUE TO WALL NO LONGER BEING RATED. CONTRACTOR WORKING OFF OF PLANS ON SITE. SUPPLY/EXHAUST ABOVE CEILING INSTALLED AS PER SITE PLANS. RETURN DAMPER REMOVED. bM100.A (BDA 1125) - NEED REVISED/APPROVED PRINT FOR CHANGES TO WALL AND CEILING OF EVS/SOILED AREAS. RATED WALL BETWEEN EVS AND SOILED DOES NOT GO TO DECK BUT PLANS SHOW A DAMPER BEING INSTALLED IN WALL. bM100.C (BDA 1126) - NEED REVISED/APPROVED PRINT SHOWING CHANGES TO RETURN DUCTS ABOVE OPEN OFFICE. CENTRAL STERILE SUPPLY/EXHAUST OK, OK TO WRAP SUPPLIES. BIOMED SUPPLY/RETURN OK, OK TO WRAP | NANCY | NANCY | | HD | P | 6171847 |
US ENGINEERING COMPANY | HD | P | 04/10/2019 | bM100.A AND bM100.C (BDA 1124 AND 1125) - SUPPLY AND EXHAUST DUCTS OK, OK TO WRAP SUPPLIES. | NANCY | NANCY | | HD | P | 6161704 |
US ENGINEERING COMPANY | HWP | P | 04/10/2019 | bM200.A AND bM200.C (BDA 1153 AND 1155) - 100 LB TEST OK ON HIGH PRESSURE STEAM AND HIGH PRESSURE CONDENSATE. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 6161696 |
US ENGINEERING COMPANY | H= | P | 03/20/2019 | ENGINEER APPROVED TEST AND BALANCE REPORT RECEIVED AND SCANNED, SEE IMAGES. THIS REPORT IS FOR BLOCKS 1 THROUGH 12 EXCEPT FOR BLOCKS 9 AND 10 WHICH HAVE NO MECHANICAL WORK IN THEM. | NANCY | NANCY | | H= | P | 6138727 |
US ENGINEERING COMPANY | H= | P | 03/13/2019 | BLOCK 12 MECHANICAL FINAL OK PENDING APPROVAL OF TEST AND BALANCE REPORT BY ENGINEER. | NANCY | NANCY | | H= | P | 6132995 |
US ENGINEERING COMPANY | HSP | P | 03/13/2019 | 3/20/19: ENGINEER APPROVED TEST AND BALANCE REPORT RECEIVED FOR BLOCKS 1 THROUGH 12 EXCEPT FOR BLOCKS 9 AND 10 WHICH HAVE NO MECHANICAL WORK. BLOCKS THAT HAVE BEEN COMPLETED/DATE COMPLETED/STATUS OF T&B. BLOCK 12: 3/13/19, WAITING ON ENGINEER APPOVAL OF TEST AND BALANCE REPORT. BLOCK 11: 11/13/18, NO TEST AND BALANCE REPORT YET. BLOCK 1: 10/9/18, BALANCE REPORT RECEIVED. BLOCK 2: 10/9/18, BALANCE REPORT RECEIVED. BLOCK 4: 11/26/19, NO TEST AND BALANCE REPORT YET. BLOCK 6: 11/26/18: NO TEST AND BALANCE REPORT YET. BLOCK 3: 11/19/18, NO TEST AND BALANCE REPORT YET. BLOCK 5: 1/18/19: Condensate drain all ok. No test and balance report yet. 11/30/18. PENDING CONDENSATE DRAIN ON FCU N204 WHEN FLOOR IS CORE DRILLED. NO TEST AND BALANCE REPORT YET. BLOCK 7: 11/30/18. NO TEST AND BALANCE REPORT YET. BLOCK 8: 12/26/18. NO TEST AND BALANCE REPORT YET. TEMP HISTOLOGY (NOT IN ANY BLOCK): 1/3/19. NO TEST AND BALANCE REPORT YET. | NANCY | NANCY | | HSP | P | 6132994 |
US ENGINEERING COMPANY | H= | P | 02/19/2019 | BLOCK 12: MECHANICAL FINAL OK PENDING APPROVAL OF TEST AND BALANCE REPORT BY ENGINEER. | NANCY | NANCY | | H= | P | 6110854 |
MAUI MECHANICAL, INC. | H= | C | 02/19/2019 | REFRIGERATION FINAL OK. | NANCY | NANCY | | H= | C | 6110843 |
US ENGINEERING COMPANY | H= | P | 02/19/2019 | BLOOD IRRADIATOR: NEED REVISED/APPROVED PRINTS SHOWING INSTALLATION OF NEW PIPING, PUMP ETC. COMPLETE ALL INSULATION OF PIPING, SEAL AROUND PIPES AT MECHANICAL ROOM WALL. IRRADIATOR IS LOCATED IN BLOCK 11. BLOCK 11 HAD PREVIOUSLY BEEN NOTED AS COMPLETE EXCEPT FOR APPROVAL BY ENGINEER OF TEST AND BALANCE REPORT. BLOCK 11 NOW NEEDS CORRECTIONS AS NOTED AND REVISED/APPROVED PRINTS PLUS BALANCE REPORT TO BE COMPLETE. | NANCY | NANCY | | H= | P | 6110836 |
US ENGINEERING COMPANY | H= | P | 02/15/2019 | bM200.C AND bM100.C ( BDA 1155 AND BDA 1126) - BLOCK 12: MECHANICAL PIPING, ABOVE CEILING AND TWO DAMPERS ALL OK. TO COMPLETE BLOCK 12 NEED REFRIGERATION FINAL, TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 6109061 |
US ENGINEERING COMPANY | HWP | P | 02/15/2019 | NEED REVISED/APPROVED PRINT FOR CHILLED WATER RETURN FROM EXISTING MECHANICAL ROOM TO BLOOD IRRADIATOR. LINES UNDER WORKING PRESSURE, NO VISIBLE LEAKS. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 6109060 |
US ENGINEERING COMPANY | HD | P | 02/01/2019 | bM100.C (BDA 1162 SPLICE) - TWO DAMPERS ALL OK. SUPPLY/RETURN OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 6095083 |
US ENGINEERING COMPANY | H= | P | 01/18/2019 | bM101.E (BDA 415) - BLOCK 5 MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. CONDENSATE DRAIN FOR FCU N204 INSTALLED AND ALL OK. | NANCY | NANCY | | H= | P | 6082835 |
US ENGINEERING COMPANY | HD | P | 01/03/2019 | bM100.C (BDA 1162 SPLICE) - TWO DAMPER FRAMES IN RECEIVING OK. bM100.E (BDA 412) - TEMP HISTOLOGY ALL COMPLETE EXCEPT STILL NEED TEST AND BALANCE REPORT. | NANCY | NANCY | | HD | P | 6067743 |
US ENGINEERING COMPANY | H= | P | 12/26/2018 | bM100.F, bM101.F, bM102.F, bM103.F bM200.F, bM201.F, bM202.F AND bM203.F (BDA 817, 416,418,420,424,428,430 AND 432) - BLOCK 8 MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. BOOK SIGNED. | NANCY | NANCY | | H= | P | 6062815 |
US ENGINEERING COMPANY | HD | P | 12/17/2018 | bM103.F (BDA 420) - ABOVE CEILING IN LINK ALL OK. | NANCY | NANCY | | HD | P | 6055448 |
US ENGINEERING COMPANY | HD | P | 12/14/2018 | bM102.F (BDA 418) - SUPPLIES/RETURN ABOVE CEILING IN LINK ALL OK. bM100.A (BDA 1449 SPLICE) - EF W102 IN MECHANICAL ROOM OK. SEAL LOUVER WHEN BRICKS ARE INSTALLED. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | HD | P | 6053317 |
US ENGINEERING COMPANY | HD | P | 12/11/2018 | bM100.A (SPLICE DATED 12/11/18, NOT SCANNED ONTO PERMIT YET) - DAMPER FRAMING IN IDF/MECHANICAL ROOM WALL OK. | NANCY | NANCY | | HD | P | 6049174 |
US ENGINEERING COMPANY | HD | P | 12/10/2018 | bM100.E (BDA 412) - TEMP HISTOLOGY: LABEL ALL DAMPERS AND DAMPER ACCESS DOORS. PROVIDE TEST AND BALANCE REPORT. SUPPLIES/EXHAUST OK. | NANCY | NANCY | | HD | P | 6047589 |
US ENGINEERING COMPANY | HD | P | 12/07/2018 | LINK LEVELS 2 AND 3 ROUGH DUCTS HAVE ALREADY BEEN INSPECTED, WAITING FOR CEILING GRID. CALL FOR INSPECTION OF TEMP HISTOLOGY ON LEVEL 00, NEED TO SEE FLEX AND DIFFUSERS. | NANCY | NANCY | | HD | P | 6046553 |
US ENGINEERING COMPANY | HD | P | 12/04/2018 | bM101.F (BDA 416) - DUCTS ABOVE CEILING IN LINK OK. INSTALL DIFFUSERS AND AIR CURTAIN (BLOCK 8: LINK ALL LEVELS). | NANCY | NANCY | | HD | P | 6042368 |
US ENGINEERING COMPANY | H= | P | 11/30/2018 | WILL HIGHLIGHT PRINTS AT NEXT INSPECTION. BLOCK 5 MECHANICAL FINAL OK PENDING COMPLETION OF CONDENSATE DRAIN ON FCU N204 WHEN FLOOR IS CORE DRILLED, RECEIPT OF TEST AND BALANCE REPORT. SIGNED BOOK. BLOCK 7 MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. SIGNED BOOK. | NANCY | NANCY | | H= | P | 6040107 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | P | 11/29/2018 | TRACTION ELEVATORS 8 AND 9 MAY BE USED FOR PUBLIC USE FOR FLOORS B AND 1 ONLY. NEED TO RESOLVE CARD READERS, HOSPITAL PRIORITY SERVICE ( CODE BLUE). CORRECT BRAILLE ISSUES, IN CAR NUMBERING, EMERGENCY POWER SELECTOR SWITCH NUMBERS, COMPLETE SECURITY WIRING IN CONTROL ROOM | ERIC | ERIC | | HE= | P | 6038465 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | P | 11/29/2018 | HYDRAULIC ELEVATORS #10 AND #11 OK FOR PUBLIC USE FOR FLOORS B AND 1 ONLY. MUST BE USED ON CONSTRUCTION OPERATION FOR FLOORS 2 AND 3. STILL NEED TO RESOLVE CARD READER AND HOSPITAL PRIORITY SERVICE (CODE BLUE). CORRECT IN CAR NUMBER PLACARDS, EMERGENCY POWER SELECTOR SWITCH NUMBERS AND PROPERLY SUPPORT TRAVELING CABLE UNDER CAR | ERIC | ERIC | | HE= | P | 6038438 |
US ENGINEERING COMPANY | HWP | P | 11/28/2018 | bM203.E (BDA 431) - INSTALL 7 MISSING T-STATS/CONTROLS. bM203.F (BDA 432) - INSTALL 4 MISSING T-STATS. | NANCY | NANCY | | HWP | P | 6037254 |
US ENGINEERING COMPANY | H= | P | 11/26/2018 | MECHANICAL FINAL OK FOR BLOCK 4, bM100.E, bM100.F, bM200.E AND bM200.F (BDA 412,817,423 AND 424),ALL CUH'S IN STAIRS AND ROOF PENDING RECEIPT OF TEST AND BALANCE REPORT. SIGNED BOOK. MECHANICAL FINAL OK FOR BLOCK 6, bM202.E, bM202.F, bM102.E AND bM102.F(BDA 429,430, 417 AND 418) PENDING RECEIPT OF TEST AND BALANCE REPORT. SIGNED BOOK. | NANCY | NANCY | | H= | P | 6034009 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | P | 11/21/2018 | TRACTION ELEVATORS---NEED TO PROPERLY NUMBER ALL ELEVATORS AND COMPONENTS, NEED EGRESS LANDING STAR INDICATOR AT PROPER LANDING, COMPLETE OR REMOVE HOSPITAL EMERGENCY SERVICE, COMPLETE SECURITY SYSTEM CARD READERS AND WIRING. | ERIC | ERIC | | HE= | P | 6033186 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | P | 11/21/2018 | HYDRAULIC ELEVATORS---PROPERLY NUMBER ELEVATORS AND ALL COMPONENTS, NEED GFCI OUTLETS IN PITS, PROPERLY SUPPORT TRAVELING CABLE, PROGRAM EMERGENCY PHONES, INSURE PROPER FIRE SERVICE PHASE 2 OPERATION, COMPLETE SECURITY SYSTEM WIRING. GENERATOR TESTING COMPLETE FOR ALL CARS | ERIC | ERIC | | HE= | P | 6033197 |
US ENGINEERING COMPANY | H= | P | 11/19/2018 | BLOCK 3 MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. REPORT DUE BY END OF PROJECT. BOOK SIGNED TODAY. | NANCY | NANCY | | H= | P | 6029718 |
US ENGINEERING COMPANY | HSP | P | 11/14/2018 | AREA 01F: TO COMPLETE PIPING NEEDS TO FINISH CUH IN STAIRS, DUCTS ARE COMPLETE. AREA 01E: TO COMPLETE PIPING NEEDS TO LOCKOUT/TAGOUT COOLING TO FCU N204 UNTIL CONDENSATE DRAIN IS COMPLETE. DUCTS NEEDS TO INSTALL HOODS IN PHARMACY. | NANCY | NANCY | | HSP | P | 6025372 |
US ENGINEERING COMPANY | HWP | P | 11/14/2018 | bM200.E (BDA 423) - MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. THIS AREA IS PART OF BLOCK 4, CANNOT SIGN OFF BLOCK 4 UNTIL CUH'S IN STAIRS ARE COMPLETE. bM200.F (BDA 424) - MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. THIS AREA IS PART OF BLOCK 4. CANNOT SIGN OFF BLOCK 4 UNTIL CUH'S IN STAIRS ARE COMPLETE. | NANCY | NANCY | | HWP | P | 6025365 |
US ENGINEERING COMPANY | HSP | P | 11/14/2018 | BLOCKS THAT HAVE BEEN COMPLETED/DATE COMPLETED/STATUS OF T&B. BLOCK 11: 11/13/18, NO TEST AND BALANCE REPORT YET. BLOCK 1: 10/9/18, BALANCE REPORT RECEIVED. BLOCK 2: 10/9/18, BALANCE REPORT RECEIVED. BLOCK 4: 11/26/19, NO TEST AND BALANCE REPORT YET. BLOCK 6: 11/26/18: NO TEST AND BALANCE REPORT YET. BLOCK 3: 11/19/18, NO TEST AND BALANCE REPORT YET. BLOCK 5: 1/18/19: Condensate drain all ok. No test and balance report yet. 11/30/18. PENDING CONDENSATE DRAIN ON FCU N204 WHEN FLOOR IS CORE DRILLED. NO TEST AND BALANCE REPORT YET. BLOCK 7: 11/30/18. NO TEST AND BALANCE REPORT YET. BLOCK 8: 12/26/18. NO TEST AND BALANCE REPORT YET. TEMP HISTOLOGY (NOT IN ANY BLOCK): 1/3/19. NO TEST AND BALANCE REPORT YET. | NANCY | NANCY | | HSP | P | 6024872 |
US ENGINEERING COMPANY | HD | P | 11/13/2018 | bM101.A (BDA 413) - ONE DAMPER FRAME AND ANNULAR SPACING AT EXISTING RESUS EXAM WALL OK. | NANCY | NANCY | | HD | P | 6024261 |
US ENGINEERING COMPANY | H= | P | 11/13/2018 | Block 11: Mechanical final ok pending receipt of test and balance report. Report due by end of project. Signed book. | NANCY | NANCY | | H= | P | 6024243 |
US ENGINEERING COMPANY | HWP | P | 11/12/2018 | bM200.E (BDA 423) - PIPING FINAL OK PENDING COMPLETION OF CUH N-102, INSTALLATION OF T-STAT ON WALL OUTSIDE OF SHELL SPACE, TEST AND BALANCE REPORT. bM200.F (BDA 424) - PIPING FINAL OK PENDING INSTALLATION OF T-STAT IN HALLWAY NEAR LINK. | NANCY | NANCY | | HWP | P | 6023042 |
US ENGINEERING COMPANY | HD | P | 11/09/2018 | bM101A (BDA413) ONE DAMPER FRAME NOT FRAMED PER INSTALLATION INSTRUCTIONS IN EXISTING RESUS EXAM # A1246 . NEED TO RE-INSPECT. | LIDO | LIDO | | HD | P | 6021862 |
US ENGINEERING COMPANY | HWP | P | 11/08/2018 | bM201.E (BDA 427) - TO COMPLETE THIS AREA INSTALL T-STATS IN IDF AND AT FCU N-204. REINSTALL CONDENSATE DRAIN FOR FCU N-204. bM201.F (BDA 428) - TO COMPLETE THIS AREA INSTALL CUH AND T-STAT IN HALL NEAR LINK. LINK IS NOT INCLUDED IN THIS BLOCK. bM202.E (BDA 429) - TO COMPLETE THIS AREA INSTALL T-STATS AND CUH. | NANCY | NANCY | | HWP | P | 6020556 |
US ENGINEERING COMPANY | HD | P | 11/07/2018 | M104.F ( SPLICE 1149 ) M104.E ( BDA 378) ROOF COMPLETE. | LIDO | LIDO | | HD | P | 6018717 |
US ENGINEERING COMPANY | HD | P | 11/06/2018 | bM101.E (BDA 415) - TO COMPLETE DUCT PORTION IN THIS AREA INSTALL HOODS IN PHARMACY. ABOVE CEILING ALL OK. | NANCY | NANCY | | HD | P | 6017358 |
US ENGINEERING COMPANY | H= | P | 11/02/2018 | Block -11 bM100.C ( BDA411) mechanical final ok pending hood installed at grossing station and test and balance report . Report to be submitted at end of project. | LIDO | LIDO | | H= | P | 6014664 |
US ENGINEERING COMPANY | HD | P | 11/02/2018 | bM100-E (BDA412) SUPPLY , RETURN GRILLS AND REGISTERS FINAL CONNECTIONS OK bM102-E ( BDA 417) TWO DAMPER ALL OK, REMAINING SLOT GRILLS OK, GRILLS IN IDF ROOM OK. bM103-E ( BDA 419) THREE DAMPERS ALL OK, SUPPLY RETURN GRILLS AND REGISTERS FINAL CONNECTIONS OK, STILL NEED FCU-N405 IN STAIRWELL C-1. | LIDO | LIDO | | HD | P | 6014649 |
US ENGINEERING COMPANY | HD | P | 10/30/2018 | bM100-E (BDA 412) THREE DAMPERS COMPLETE , THREE DAMPERS ALL OK . THREE FCU UNITS OK, ONE VAV OK. SUPPLY, RETURN, EXHAUST GRILLS AND REGISTERS FINAL CONNECTIONS OK bM101-E (BDA415) 14 -SUPPLY AIR SLOTS FINAL CONNECTIONS OK . | LIDO | LIDO | | HD | P | 6010406 |
US ENGINEERING COMPANY | HD | P | 10/29/2018 | bM101-E (BDA 415) SUPPLY, RETURN, EXHAUST GRILLS , REGISTERS FINAL CONNECTIONS OK. H-1311b, SAV-C1311b, EV-C1311 OK. bM101-F (BDA 416) SUPPLY, RETURN, EXHAUST GRILLS , REGISTERS FINAL CONNECTIONS OK.VAV-C1-18-E, VAV-C1-22 OK .
| LIDO | LIDO | | HD | P | 6009171 |
US ENGINEERING COMPANY | HRP | P | 10/26/2018 | bM203.E (BDA 431) - ABOVE CEILING ALL OK. TO COMPLETE THIS AREA INSTALL T-STATS AND CHECK FIN TUBES IN SHELL AREA. bM203.F (BDA 432) - ABOVE CEILING ALL OK. TO COMPLETE THIS AREA INSTALL T-STATS AND COMPLETE EVS ROOM. | NANCY | NANCY | | HRP | P | 6007691 |
US ENGINEERING COMPANY | HD | P | 10/26/2018 | bM103.E (BDA 419) - MECHANICAL DUCT COMPLETE IN THIS AREA EXCEPT NEED TO SEE GRILLS IN IDF, INSTALL TWO SLOT DIFFUSERS IN PUBLIC ELEVATOR LOBBY AND LOOK AT ACCESS DOOR AND LABEL ON DAMPER IN SHELL C3222 (LIDO, I CLOUDED ITEMS THAT STILL NEED LOOKED AT). TWELVE DAMPERS ALL OK. bM103.F (BDA 419) - MECHANICAL DUCT COMPLETE IN THIS AREA EXCEPT FOR LINK. bM100.E (BDA 412) - DUCT, WRAP AND ANGLES FOR FUME EXHAUST AT SHAFT ALL OK. | NANCY | NANCY | | HD | P | 6007576 |
US ENGINEERING COMPANY | HD | P | 10/25/2018 | bM100.C (BDA 411) - ONE HOOD INSTALLATION OK. STILL NEED HOOD INSTALLED AT GROSSING STATION, TEST AND BALANCE REPORT. | NANCY | NANCY | | HD | P | 6005967 |
US ENGINEERING COMPANY | HD | P | 10/25/2018 | bM100.E (BDA 412) - INSTALLATION OF FYRE WRAP ON FUME EXHAUST DUCT AT SHAFT WALL OK. STILL NEED TO SEE ANGLES INSTALLED. | NANCY | NANCY | | HD | P | 6005597 |
US ENGINEERING COMPANY | HD | P | 10/24/2018 | bM103.E (BDA 419) - ABOVE CEILING OK. bM103.F (BDA 420) - ABOVE CEILING OK. TO COMPLETE MECHANICAL IN THIS AREA COMPLETE ELECTRICAL ROOM AND INSTALL ONE EXHAUST GRILL. | NANCY | NANCY | | HD | P | 6004762 |
US ENGINEERING COMPANY | HWP | P | 10/24/2018 | bM202.E (BDA 429) - ABOVE CEILING ALL OK. TO COMPLETE MECHANICAL PIPING IN THIS AREA INSTALL T-STATS, EUH'S, CUH AND COMPLETE EVS ROOM. | NANCY | NANCY | | HWP | P | 6004703 |
US ENGINEERING COMPANY | HD | P | 10/22/2018 | bM100.F (BDA 817) - THIS AREA COMPLETE FOR MECHANICAL DUCT. FOR TOTAL MECHANICAL COMPLETION IN THIS AREA STILL NEED T-STATS AND EUH, SEE bM200.F (BDA 424). bM100.E (BDA 412) - ONE DAMPER ALL OK IN BLOWER ROOM CG521. bM102 F (BDA 418) - MECHANICAL DUCT IN THIS AREA ALL COMPLETE EXCEPT FOR LINK. FOR COMPLETION OF MECHANICAL IN THIS AREA STILL NEED T-STATS AND CUH, SEE bM202.F (BDA 430). bM102.E (BDA 417) - SIX DAMPERS ALL OK. ABOVE CEILING OK EXCEPT FOR IDF, ELEVATOR LOBBY AND A FEW SLOT DIFFUSERS. | NANCY | NANCY | | HD | P | 6002482 |
US ENGINEERING COMPANY | HD | P | 10/17/2018 | WILL HIGH LIGHT PRINTS AT NEXT INSPECTION. bM100.E (BDA 412) - ABOVE CEILING OK. bM100.F (BDA 817) - INSTALL RETURN IN SECURE HOLD. REST ABOVE CEILING OK. STILL NEED TO SEE IF LATEST SPLICE HAS BEEN SUBMITTED AND APPROVED. | NANCY | NANCY | | HD | P | 5997939 |
US ENGINEERING COMPANY | HWP | P | 10/17/2018 | WILL HIGH LIGHT PRINTS AT NEXT INSPECTION. bM200.E (BDA 423 AND 1157 SPLICE) - INSTALL CUH'S, EUH'S AND THREE T-STATS TO COMPLETE THIS AREA. bM200.F (BDA 424) - COMPLETE SNOW MELT CONNECTIONS IN SHELL SPACE, INSTALL EUH AND TWO T-STATS TO COMPLETE THIS AREA. | NANCY | NANCY | | HWP | P | 5997931 |
US ENGINEERING COMPANY | HD | P | 10/16/2018 | bM101.E ( BDA 415) - DAMPER AT PUBLIC ELEVATOR LOBBY OK, CHECK ACCESS DOOR AND LABEL. bM102.E (BDA 417) - ABOVE CEILING IN CORRIDOR OK. TWO DAMPERS IN IDF ALL OK. bM102.F (BDA 418) - ABOVE CEILING OK EXCEPT STILL NEED ELECTRICAL ROOM COMPLETED. | NANCY | NANCY | | HD | P | 5996379 |
US ENGINEERING COMPANY | HD | P | 10/12/2018 | bM101.E (BDA 415) - FRAMING FOR RELOCATED DAMPER IN PUBLIC ELEVATOR LOBBY OK. | NANCY | NANCY | | HD | P | 5993458 |
MAUI MECHANICAL, INC. | HRP | P | 10/11/2018 | PROPERLY PROTECT ALL PENETRATIONS THROUGH RATED ASSEMBLIES. ISOLATE GALVANIZED HANGERS FROM COPPER REFRIGERATION LINES. ARE YOU INSTALLING A LABEL AND QR CODE ON EQUIPMENT? CHECK WITH GE JOHNSON ABOUT LABELING. 200 LB TEST OK ON LINES FROM CONDENSER TO FREEZER LOCATION. NO FREEZER INSTALLED YET. NOTE: FREEZER LOCATED IN LEVEL 00 AREA E. | NANCY | NANCY | | HRP | P | 5992260 |
US ENGINEERING COMPANY | HD | P | 10/10/2018 | bM100.C (BDA 411) - HISTOLOGY ABOVE CEILING ALL OK. STILL NEED HOODS AND CONTROLS INSTALLED. bM101.E (BDA 415) - THREE DAMPERS ALL OK. ONLY DAMPER LEFT TO INSPECT IN THIS AREA IS THE SUPPLY AIR IN PUBLIC ELEVATOR LOBBY. bM101.F (BDA 416) - ALL DAMPERS IN THIS AREA OK EXCEPT STILL NEED TO SEE TWO DAMPERS AT LINK. | NANCY | NANCY | | HD | P | 5991197 |
US ENGINEERING COMPANY | H= | P | 10/09/2018 | Test and balance report for West Expansion (Blocks 1 and 2) received and scanned, see images. | NANCY | NANCY | | H= | P | 5989566 |
US ENGINEERING COMPANY | HD | P | 10/08/2018 | bM101.F (BDA 416) - TWO DAMPERS ALL COMPLETE. bM103.F (BDA 420) - ABOVE CEILING OK. INSTALL MISSING LABEL ON VAV C3117. | NANCY | NANCY | | HD | P | 5989210 |
US ENGINEERING COMPANY | HD | P | 10/05/2018 | bM103.F (BDA 420) - SEVENTEEN DAMPERS ALL OK. bM103.E (BDA 419) - FOURTEEN DAMPERS ALL OK. | NANCY | NANCY | | HD | P | 5987715 |
US ENGINEERING COMPANY | HWP | P | 10/04/2018 | bM200.F (BDA 424) - INSTALL TWO T-STATS, TWO FIN TUBE HEATERS AND EUH CG619. IS THERE A HEATER BEING INSTALLED IN THE STAIRS? bM200.E (BDA 423) - INSTALL MISSING LABELS, T-STATS, CABINET UNIT HEATER AND ELECTRIC UNIT HEATERS. | NANCY | NANCY | | HWP | P | 5986308 |
US ENGINEERING COMPANY | HWP | P | 10/03/2018 | M204.E (BDA 392) - CHILLED/HEATING WATER SUPPLY/RETURN IN UNITS COMPLETE. M204.F (BDA 393) - CHILLED/HEATING WATER SUPPLY/RETURN IN UNIT COMPLETE. | NANCY | NANCY | | HWP | P | 5984947 |
US ENGINEERING COMPANY | HD | P | 10/03/2018 | bM102.F (BDA 418) - ALL DAMPERS IN THIS AREA COMPLETE. STILL NEED REST OF ABOVE CEILING. | NANCY | NANCY | | HD | P | 5984913 |
US ENGINEERING COMPANY | HD | P | 10/02/2018 | 1st FIRST FLOOR bM101.F ( BDA416) TWO DAMPERS COMPLETE/ STILL NEED ACCESS DOORS AND LABELS. 3RD FLOOR bM103.F /bM103.A ( BDA 420 / 419 ) SUPPLY,RETURN,EXHAUST GRILLS AND REGISTERS FINAL CONNECTIONS OK. | LIDO | LIDO | | HD | P | 5982995 |
US ENGINEERING COMPANY | HWP | P | 10/01/2018 | bM203.F (BDA 432) - ABOVE CEILING OK EXCEPT NEED TO LABEL PIPING TO VAV'S AND INSTALL LABEL ON VAV C3117. | NANCY | NANCY | | HWP | P | 5981693 |
US ENGINEERING COMPANY | H= | P | 09/28/2018 | Block 2 mechanical final ok pending receipt of test and balance report. Report to be submitted at end of project. | NANCY | NANCY | | H= | P | 5980649 |
US ENGINEERING COMPANY | HD | P | 09/28/2018 | BLOCK 2 MECHANICAL FINAL OK PENDING ACCESS TO DAMPER AND RECEIPT OF TEST AND BALANCE REPORT. BALANCE REPORT TO BE PROVIDED AT COMPLETION OF PROJECT. | NANCY | NANCY | | HD | P | 5980352 |
US ENGINEERING COMPANY | HWP | P | 09/27/2018 | bM203.E (BDA 431) - ABOVE CEILING OK EXCEPT NEED TO INSTALL MISSING LABELS. | NANCY | NANCY | | HWP | P | 5978925 |
US ENGINEERING COMPANY | HD | P | 09/27/2018 | bM101.E (BDA 415) - TWO DAMPERS AT IDF OK, INSTALL GRILLS AND LABELS. bM102.E (BDA 417) - TWO DAMPERS ALL OK. SUPPLY/RETURN/EXHAUST OK. | NANCY | NANCY | | HD | P | 5978904 |
US ENGINEERING COMPANY | HD | P | 09/26/2018 | bM103.E (BDA 419) - TWO DAMPERS IN CEILING OF SOILED WORK OK, INSTALL GRILLS AND LABELS. bM100.E (BDA 412) - DAMPER FRAMING, SLEEVE EXTENSION, ANGLES AND BREAKAWAY CONNECTION OK AT NEW RATED WALL IN BIOMED WORKROOM. INSTALL GRILL AND LABEL. SUPPLY AIR ABOVE HARD LID OK. | NANCY | NANCY | | HD | P | 5977862 |
US ENGINEERING COMPANY | HWP | P | 09/26/2018 | bM200.C ( BDA 422) - VAV BG216 UNDER WORKING PRESSURE, NO VISIBLE LEAKS. INSULATION AND LABELS OK. | NANCY | NANCY | | HWP | P | 5977624 |
US ENGINEERING COMPANY | H= | P | 09/25/2018 | Note added 9/28/18 by NS: Balance report to be provided at completion of project. Block 1 mechanical final ok pending receipt of test and balance report. | NANCY | NANCY | | H= | P | 5975655 |
US ENGINEERING COMPANY | HD | P | 09/25/2018 | bM101.E (BDA 415) - FOUR DAMPERS ALL OK. ABOVE CEILING OK. | NANCY | NANCY | | HD | P | 5975647 |
US ENGINEERING COMPANY | HWP | P | 09/24/2018 | bM202.E (BDA 429) - ABOVE CEILING ALL OK EXCEPT COMPLETE INSULATION AT VAV - C2221a, INSTALL MISSING LABELS AND COMPLETE SECONDARY DRAINS ON HUMIDIFIERS. | NANCY | NANCY | | HWP | P | 5974958 |
US ENGINEERING COMPANY | HD | P | 09/24/2018 | bM100.A (BDA 411) - MECHANICAL FINAL OK FOR BLOCK 1 PENDING REVISED/APPROVED PRINT FOR MED GAS BOTTLE STORAGE ROOM AND RECEIPT OF TEST AND BALANCE REPORT. bM103.E (BDA 419) - EXHAUST DAMPER FRAMING IN SOILED WORK CEILING OK. M102 A (BDA 373) - ROOF ALL OK EXCEPT FOR SEAL TITE INSTALLED THROUGH EF GE-W301. | NANCY | NANCY | | HD | P | 5974957 |
US ENGINEERING COMPANY | HWP | P | 09/21/2018 | bM201.E (BDA 427) - ABOVE CEILING ALL OK. bM202.F (BDA 430) - ABOVE CEILING ALL OK. | NANCY | NANCY | | HWP | P | 5972857 |
US ENGINEERING COMPANY | HD | P | 09/21/2018 | bM100.E (BDA 412) - SEVEN DAMPERS ALL OK. bM101.E (BDA 415) - ABOVE ACOUSTIC CEILINGS ALL OK. bM103 E (BDA 419) - SUPPLY DAMPER FRAMING IN CEILING OF SOILED WORK OK. | NANCY | NANCY | | HD | P | 5972843 |
US ENGINEERING COMPANY | HD | P | 09/19/2018 | bM100.E (BDA 412) - TWENTY DAMPERS ALL COMPLETE. | NANCY | NANCY | | HD | P | 5970505 |
US ENGINEERING COMPANY | HWP | P | 09/19/2018 | bM200.A (BDA 421) - Mechanical piping all complete in this area. bM201.A (BDA 425) - Mechanical piping all complete in this area. bM201.E (BDA 427) - ABOVE CEILING ALL OK EXCEPT COMPLETE INSULATION AT VAV'S C1203 AND C1207. bM201.F (BDA 428) - ABOVE CEILING ALL OK. | NANCY | NANCY | | HWP | P | 5970390 |
US ENGINEERING COMPANY | HWP | P | 09/18/2018 | bM201.F (BDA 428) - ABOVE CEILING OK. COMPLETE INSULATION AT VAV C1308 AND HC 1311A | NANCY | NANCY | | HWP | P | 5969033 |
US ENGINEERING COMPANY | HD | P | 09/18/2018 | bM102.E (BDA 417) - NEED REVISED/APPROVED PRINT FOR CHANGING ROOM. ABOVE CEILING OK. NINETEEN DAMPERS ALL OK. | NANCY | NANCY | | HD | P | 5968996 |
US ENGINEERING COMPANY | HD | P | 09/17/2018 | bM100.F (BDA 817) - TWELVE DAMPERS ALL COMPLETE. | NANCY | NANCY | | HD | P | 5967664 |
US ENGINEERING COMPANY | HWP | P | 09/17/2018 | bM200.E (BDA 423) - 100 LB TEST OK ON VAV'S BG206b,c,and d. | NANCY | NANCY | | HWP | P | 5967651 |
US ENGINEERING COMPANY | HWP | P | 09/14/2018 | bM200.F (BDA 424) - ABOVE CEILING ALL OK. | NANCY | NANCY | | HWP | P | 5965823 |
US ENGINEERING COMPANY | HD | P | 09/14/2018 | bM100.E (BDA 412) - BIOMED WORKROOM GETTING RATED WALL, WILL NEED TO SEE DAMPER SLEEVE EXTENSION AND INSTALLATION OF SLEEVE AND ANGLES. bM102.F (BDA 418) - SUPPLY DUCT IN LINK OK. SUPPLY DAMPER IN LINK COMPLETE. ANGLES AND BREAK AWAY CONNECTION ON BUILDING SIDE OF RETURN DAMPER IN LINK OK. bM103.F (BDA 420) - SUPPLY DUCT IN LINK OK. SUPPLY AND RETURN DAMPERS IN LINK COMPLETE. | NANCY | NANCY | | HD | P | 5965808 |
US ENGINEERING COMPANY | HWP | P | 09/13/2018 | bM202.A CHILLED AND HEATING WATER SUPPLY/RETURN IN UNITS W301 AND W302 OK. NO VISIBLE LEAKS. INSULATION AND LABELS OK. INSTALL BACK ORDERED THERMOMETERS WHEN THEY ARRIVE ON SITE. | NANCY | NANCY | | HWP | P | 5964395 |
US ENGINEERING COMPANY | HD | P | 09/13/2018 | bM100.E (BDA 412) - ONE DAMPER FRAME AND ANNULAR SPACING OK. bM101.A (BDA 413) - ABOVE CEILING ALL OK EXCEPT NEED ACCESS TO RETURN DAMPER AT SHAFT. | NANCY | NANCY | | HD | P | 5964307 |
US ENGINEERING COMPANY | HWP | P | 09/11/2018 | bM200.A (BDA 421) - ABOVE CEILING ALL OK. CONTROLS ALL INSTALLED. STILL NEED TO SEE MECHANICAL ROOM COMPLETED. | NANCY | NANCY | | HWP | P | 5961627 |
US ENGINEERING COMPANY | HD | P | 09/11/2018 | bM100.A (BDA 411) - SUPPLY AND CSP EXHAUST OK, OK TO WRAP. bM101.E (BDA 415) - FIVE DAMPERS ALL COMPLETE. bM101.F ( BDA 416) - SIX DAMPERS ALL COMPLETE. | NANCY | NANCY | | HD | P | 5961624 |
US ENGINEERING COMPANY | HWP | P | 09/10/2018 | bM201.A (BDA 425) - ABOVE CEILING ALL OK. LABELS FOR FCU W-201? STILL NEED TO SEE T-STATS INSTALLED. | NANCY | NANCY | | HWP | P | 5960223 |
US ENGINEERING COMPANY | HD | P | 09/10/2018 | bM101.F (BDA 416) - TWO BREAKAWAYS AND RETAINING ANGLES AT LINK ON BUILDING SIDE OK. THREE DAMPERS COMPLETE. bM103. E (BDA 419) - TWO SLOT DIFFUSERS IN POST PARTUM ISO OK. | NANCY | NANCY | | HD | P | 5960195 |
US ENGINEERING COMPANY | HSP | P | 09/10/2018 | bM100.A (BDA 410) - MED GAS ROOM IS MED GAS BOTTLE STORAGE. CONTRACTOR TO PROVIDE ENGINEER RESPONSE CONFIRMING THIS. WILL NEED REVISED/APPROVED PRINT FOR DELETING DAMPERS IN WALLS AND INSTALLING DAMPER IN CEILING. DAMPER FRAMING IN CEILING OK, TOP RETAINING ANGLES OK. STILL NEED TO SEE BOTTOM ANGLES. | NANCY | NANCY | | HSP | P | 5959382 |
US ENGINEERING COMPANY | HWP | P | 09/07/2018 | SEE RECORDS OF TEST DATED 9/7/18. bM200.A (BDA 421) - 80 LB HYDRO TEST ON FCU W-101 OK, NO VISIBLE LEAKS, OK TO INSULATE AND LABEL. bM200.E (BDA 423) - 100 LB TEST OK ON SNOW MELT SUPPLY/RETURN, GAUGE IN MECHANICAL ROOM.. OK TO INSULATE AND LABEL. bM201.A (BDA 425) - 80 LB HYDRO TEST ON NEW VAV IN CT SCAN OK, NO VISIBLE LEAKS. OK TO INSULATE AND LABEL. bM201.F (BDA 428) - 80 LB HYDRO TEST ON FCU N-203 OK, NO VISIBLE LEAKS, OK TO INSULATE AND LABEL. CONDENSATE TERMINATES WHERE? | NANCY | NANCY | | HWP | P | 5958281 |
US ENGINEERING COMPANY | HD | P | 09/06/2018 | bM101.E (BDA 415) - SIX DAMPERS COMPLETE. SUPPLY/RETURN/EXHAUST/VAV'S/FCU ABOVE CEILING OK. | NANCY | NANCY | | HD | P | 5957226 |
US ENGINEERING COMPANY | HD | P | 09/05/2018 | bM100.A (BDA 410) - MED GAS ROOM NOW HAS RATED CEILING. SPLICE DOES NOT SHOW ANY DETAIL ABOUT THIS ROOM EXCEPT THAT IS RATED AT CEILING. NEED STAMPED DETAILED DRAWING/DESCRIPTION OF WHAT IS CHANGING IN MED GAS ROOM, TYPE OF FRAMING, DAMPER BEING INSTALLED, DAMPERS IN WALLS BEING REMOVED ETC. bM100.E (BDA 412) - RETURN AIR DAMPER NEAR ELEVATOR CONTROL ROOM WAS ORIGINALLY COMPLETED ON 6/20/18 IN STUD WALL FRAMING. THIS IS NOW A SHAFT WALL THAT DOES NOT GO TO FLOOR. WHY THE CHANGE? HAS BUILDING INSPECTOR LOOKED AT AND APPROVED THIS WALL? bM101.E (BDA 415) - TWO DAMPERS COMPLETE. SUPPLY/RETURN/EXHAUST/VAV'S ABOVE CEILING ALL OK. | NANCY | NANCY | | HD | P | 5956197 |
US ENGINEERING COMPANY | HD | P | 09/04/2018 | bM101.F (BDA 416) - TWO DAMPER FRAMES AT LINK NOW OK. ONE DAMPER AT SHAFT COMPLETE INCLUDING ACCESS DOOR AND SMOKE DETECTOR. | NANCY | NANCY | | HD | P | 5954247 |
US ENGINEERING COMPANY | HWP | P | 09/04/2018 | bM200.E, bM201.E, bM202.E, bM203.E (BDA 423, 427, 429 AND 431) - 80 LB HYDRO TEST OK ON FCU'S N-106, N-202, N-302 AND N-402. NO VISIBLE LEAKS. COMPLETE INSULATION AND LABELS. | NANCY | NANCY | | HWP | P | 5954182 |
US ENGINEERING COMPANY | HD | P | 08/31/2018 | NEED TO HIGH LIGHT HARD COPY OF PRINTS AT NEXT INSPECTION. bM100.A (BDA 410) - NEED REVISED/APPROVED PRINTS FOR CHANGES TO MED GAS ROOM. CEILING NOW RATED AND BEING BUILT LIKE SHAFT PARTITION. WILL NEED TO SEE DAMPER FRAMING AND TYPE OF DAMPER BEING INSTALLED. BUILDING INSPECTOR WILL NEED TO SEE ALL FRAMING PRIOR TO SHEET ROCK. bM100.C (BDA 411) - SUPPLY AND EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5952368 |
US ENGINEERING COMPANY | HD | P | 08/30/2018 | bM102.E (BDA 417) - TWO DAMPERS AT IDF COMPLETE. ONE DAMPER AT EXHAUST SHAFT COMPLETE, CHECK ACCESS DOORS AND SMOKE DETECTOR. bM101.A ( BDA 413) - ONE DAMPER COMPLETE IN CT SIM STORAGE, CHECK ACCESS DOOR. bM100.A (BDA 411) - TWO DAMPERS IN CRAWL SPACE COMPLETE. FCU-W101 IN MECHANICAL ROOM OK. | NANCY | NANCY | | HD | P | 5951352 |
US ENGINEERING COMPANY | HD | P | 08/28/2018 | bM100.F (BDA 817) - REFRAMED SUPPLY DAMPER OPENING AT LINK OK. RETURN DAMPER FRAME AT LINK OK. bM101.F (BDA 416) - SUPPLY/RETURN/EXHAUST ABOVE CEILING OK. bM102.E (BDA 417) - SUPPLY/RETURN/EXHAUST IN SHELL C2304 OK. | NANCY | NANCY | | HD | P | 5948371 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | P | 08/28/2018 | Hydraulic elevators #1 and #2 ok for construction use | ERIC | ERIC | | HE= | P | 5981079 |
US ENGINEERING COMPANY | HWP | P | 08/24/2018 | SEE RECORD OF TEST DATED 8/24/18. bM201.E (BDA 427) - CHILLED WATER SUPPLY/RETURN TO FCU'S 201 AND 204 UNDER WORKING PRESSURE, NO VISIBLE LEAKS, OK TO INSULATE AND LABEL. CONDENSATE DRAIN FOR FCU 201 OK. bM202.E (BDA 429) - CHILLED WATER SUPPLY/RETURN TO FCU 301 UNDER WORKING PRESSURE, NO VISIBLE LEAKS, OK TO INSULATE AND LABEL. FCU 301 CONDENSATE DRAIN OK, NO AFTER COOLER YET. bM203.E (BDA 431) - CHILLED WATER SUPPLY/RETURN TO FCU'S 401 AND 403 UNDER WORKING PRESSURE, NO VISIBLE LEAKS, OK TO INSULATE AND LABEL. BOTH CONDENSATE DRAINS OK. | NANCY | NANCY | | HWP | P | 5945602 |
US ENGINEERING COMPANY | HD | P | 08/24/2018 | bM103.E (BDA 419) - THREE DAMPERS COMPLETE. bM103.F (BDA 420) - ONE DAMPER COMPLETE, CHECK ACCESS DOOR. bM102.E (BDA 417) - ONE DAMPER COMPLETE. | NANCY | NANCY | | HD | P | 5945541 |
US ENGINEERING COMPANY | HD | P | 08/23/2018 | bM101.E (BDA 415) - ABOVE CEILING ALL OK. bM100.A (BDA 411) - TWO DAMPERS AT SHAFT COMPLETE. | NANCY | NANCY | | HD | P | 5943890 |
US ENGINEERING COMPANY | HSP | P | 08/23/2018 | INSTALLATION INSTRUCTIONS FOR 3M FIRE BARRIER DUCT WRAP 615 AT SHAFT WALL RECEIVED AND SCANNED, SEE IMAGES. | NANCY | NANCY | | HSP | P | 5943359 |
US ENGINEERING COMPANY | HSP | P | 08/23/2018 | ENGINEER LETTER PROVIDING WRITTEN DETAIL ON HOW TO FRAME FIRE/SMOKE DAMPERS IN SHAFTS THAT DO NOT EXTEND TO THE FLOOR RECEIVED AND SCANNED, SEE IMAGES. | NANCY | NANCY | | HSP | P | 5943354 |
US ENGINEERING COMPANY | HSP | P | 08/23/2018 | RFC 210 FROM ENGINEER VERIFYING THAT WRAP FOR FUME EXHAUST DUCT OK TO INSTALL THROUGH WALL AND NOT BACK TO TOP OF HOOD RECEIVED AND SCANNED, SEE IMAGES. | NANCY | NANCY | | HSP | P | 5943336 |
US ENGINEERING COMPANY | HD | P | 08/22/2018 | bM103.F (BDA 420) - TWO BREAK AWAY CONNECTIONS AND ANGLES AT LINK OK. STILL NEED TO SEE BREAK AWAY CONNECTIONS ON LINK SIDE OF WALL. SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. bM103.E (BDA 419) - TWO DAMPERS AT EXHAUST SHAFT COMPLETE. CHECK ACCESS DOORS AND SMOKE DETECTORS. M104.F (BDA 379) - ALL EQUIPMENT INSTALLED ON ROOF. SEE KEYNOTE 2. REVISED PRINTS/RFI APPROVING UTILITY SET FANS FOR C-SECTION EXHAUST? M104.E ( BDA 378) - ALL EQUIPMENT INSTALLED ON ROOF. SEE KEYNOTE 4. COMPLETE ALL SEALING OF DUCTS, INSTALLATION OF CLIPS ETC. | NANCY | NANCY | | HD | P | 5942562 |
US ENGINEERING COMPANY | HD | P | 08/21/2018 | bM100.F AND bM 101.F (BDA 817 AND BDA 416) - THREE DAMPER FRAMES AT LINK HAVE BEEN DAMAGED AND NEED TO BE REPAIRED. NEED TO SEE FRAMING AGAIN BEFORE SHEET ROCK IS INSTALLED. bM100.F (BDA 817) - NEED REVISED/APPROVED PRINT. SPLICE DATED 8/10/18 (CCD 05 3/30/18) DOES NOT SHOW LATEST REVISION OF CEILINGS IN CLEAN LINEN AND STAT SUPPLY ROOM. bM100.E (BDA 412) - THREE FRAMES AND ANNULAR SPACING AT SHAFTS OK. TWO BREAK AWAY CONNECTIONS AT SHAFT OK. | NANCY | NANCY | | HD | P | 5941638 |
US ENGINEERING COMPANY | HSP | P | 08/21/2018 | COMPLETE SPLICE ATTACHED TO SHARED MEMORIAL HOSPITAL FULL SET OF PLANS 8/21/18. MECHANICAL IS ON PAGES 1118 - 1201. | NANCY | NANCY | | HSP | P | 5940833 |
US ENGINEERING COMPANY | HD | P | 08/20/2018 | LEVEL 3 -bM103F ( BDA 420) ONE DAMPER COMPLETE / NEED ACCESS DOORS AND LABELS . LEVEL 2- bM102F / bM102E ( BDA 418 / BDA417) SUPPLY, RETURN. EXHAUST GRILLS AND REGISTER FINAL CONNECTIONS OK . LEVEL 00- bM100F ( BDA817) ONE DAMPER COMPLETE/ NEED ACCESS DOORS AND LABELS . | LIDO | LIDO | | HD | P | 5939885 |
US ENGINEERING COMPANY | HWP | P | 08/20/2018 | LEVEL 00- bM200F bM200F ( BDA 423 / BDA 424) SEE RECORD OF TEST - 100lb TEST FOR HIGH PRESSURE CONDENSATE OK / INSTALLED PER PLAN OK TO WRAP AND LABEL .
| LIDO | LIDO | | HWP | P | 5939882 |
US ENGINEERING COMPANY | HWP | P | 08/17/2018 | SEE RECORD OF TEST DATED 8-17-18. 100 LB TEST ON CHILLED WATER SUPPLY AND RETURN OK, OK TO INSULATE AND LABEL. THIS WAS WALKED BY NANCY ON 8-16-18. | DUSTINS | DUSTINS | | HWP | P | 5938568 |
US ENGINEERING COMPANY | HWP | P | 08/16/2018 | CONTRACTOR NEEDS TO CALL FOR INSPECTION NEXT WEEK TO GO OVER WHAT HAS AND HAS NOT BEEN INSPECTED UP TO THIS DATE, THANKS. bM200.E, bM200.F, bM201.E, bM201.F, bM202.E, bM202.F, bM203.E, bM203.F, M204.E AND M204.F: CHILLED WATER SUPPLY/RETURN INSTALLED AS PER PRINT. STILL NEED TO SEE PRESSURE TEST ON ALL PIPING LOOKED AT TODAY. | NANCY | NANCY | | HWP | P | 5936902 |
US ENGINEERING COMPANY | HD | P | 08/16/2018 | bM100.E (BDA 412) - HOW DOES FUME HOOD EXHAUST DUCT OPENING AT SHAFT GET PROTECTED? NEED ENGINEER DRAWING OR DETAIL SHOWING WHERE AND HOW WRAP IS SUPPOSED TO STOP AT SHAFT. STILL NEED ENGINEER LETTER APPROVING FUME HOOD DUCT WRAP ONLY GOING FROM SHAFT THROUGH WALL AND NOT ALL THE WAY TO HOOD. bM101.A (BDA 413) - MARKED DIFFUSERS COMPLETE. bM103.E (BDA 419) - ONE DAMPER AT IDF ROOM COMPLETE, CHECK ACCESS DOOR. | NANCY | NANCY | | HD | P | 5936761 |
US ENGINEERING COMPANY | HD | P | 08/15/2018 | bM103.F (BDA 420) - FIVE DAMPERS COMPLETE. CHECK ACCESS DOORS AND SMOKE DETECTORS. bM103.E (BDA 419) - FOUR DAMPERS COMPLETE, CHECK ACCESS DOORS AND SMOKE DETECTORS. bM102.E (BDA 417) - TWO DAMPER FRAMES AND ANNULAR SPACING OK AT EXHAUST SHAFT. bM100.F ( BDA 817) - TWO DAMPER FRAMES AND ANNULAR SPACING AT SHAFT OK. bM100.A (BDA 411) - ABOVE CEILING OK, TWO CORRIDORS ABOVE CEILING COMPLETE. | NANCY | NANCY | | HD | P | 5935576 |
US ENGINEERING COMPANY | HD | P | 08/14/2018 | bM100.A (BDA 411) - ABOVE CEILING IN TWO CORRIDORS COMPLETE. bM101.A (BDA 413) - SUPPLY/RETURN/EXHAUST AND DIFFUSERS OK. | NANCY | NANCY | | HD | P | 5933844 |
US ENGINEERING COMPANY | HD | P | 08/09/2018 | LEVEL -00 bM100A ( BDA 410) SUPPLY, RETURN, EXHAUST GRILLS AND REGISTERS FINAL CONNECTIONS OK . LEVEL 03 bM103E ( BDA419) THREE DAMPERS COMPLETE AT SHAFT FOR RTU-502 . | LIDO | LIDO | | HD | P | 5929418 |
US ENGINEERING COMPANY | HD | P | 08/08/2018 | 3RD FLOOR AREA-E - bM103E ( BDA419) ONE DAMPER COMPLETE / NEED ACCESS DOORS AND LABELS, ONE FRAME OK.2ND FLOOR bM102-E (BDA417) ABOVE CEILING RETURN AIR DUCT ROUGH OK - OK TO WRAP. 2ND FLOOR bM102-F (BDA418) ONE DAMPER AT SHAFT COMPLETE./ STILL NEED ACCESS DOORS AND LABELS. | LIDO | LIDO | | HD | P | 5927848 |
US ENGINEERING COMPANY | HD | P | 08/07/2018 | LEVEL 3 AREA -E- bM103E (BDA 419) ONE FRAME AT SHAFT OK . SIX DAMPERS COMPLETE/ NEED ACCESS DOORS AND LABELS . LEVEL 3 AREA -F- bM103F (BDA 420) ABOVE CEILING SUPPLY, RETURN, EXHAUST DUCT ROUGH OK - OK TO WRAP. | LIDO | LIDO | | HD | P | 5926310 |
US ENGINEERING COMPANY | HD | P | 08/06/2018 | LEVEL 00 bM100A AREA -A SUPPLY AND RETURN FINAL CONNECTIONS TO GRILLS AND REGISTERS IN THE OR'S OK. LEVEL -2 - bM101-F - AREA F -ONE DAMPER COMPLETE / NEED ACCESS DOORS AND LABELS.TWO FRAMES OK. 3RD FLOOR AREA -E - TWO FRAMES AT SHAFT OK / ONE BREAK AWAY AT SHAFT OK , FC - N403 INSTALLED . | LIDO | LIDO | | HD | P | 5925297 |
US ENGINEERING COMPANY | HD | P | 08/03/2018 | 3RD FLOOR bM1.02 (BDA419) AREA -E- ONE FRAME AT SHAFT OK , ONE DAMPER COMPLETE. ABOVE CEILING SUPPLY , RETURN, EXHAUST DUCT ROUGH OK - OK TO WRAP . | LIDO | LIDO | | HD | P | 5923792 |
US ENGINEERING COMPANY | HD | P | 08/02/2018 | bM103.E ( BDA 419) - FIVE DAMPERS COMPLETE, CHECK FOR ACCESS DOORS. SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. bM103.F (BDA 420) - THREE DAMPERS COMPLETE, CHECK ACCESS DOORS. | NANCY | NANCY | | HD | P | 5921935 |
US ENGINEERING COMPANY | HD | P | 08/01/2018 | bM102.E ( BDA 417) - ONE DAMPER FRAME AND ANNULAR SPACING OK. SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. ONE DAMPER COMPLETE, CHECK ACCESS DOOR. bM103.E (BDA 419) - TWO DAMPERS COMPLETE, CHECK ACCESS DOORS. bM103.F ( BDA 420) - NINE DAMPERS COMPLETE, CHECK ACCESS DOORS. | NANCY | NANCY | | HD | P | 5920547 |
US ENGINEERING COMPANY | HD | P | 07/31/2018 | bM102.E (BDA 417) - SEVEN DAMPERS COMPLETE, CHECK FOR ACCESS DOORS AND SMOKE DETECTORS. bM102.F (BDA 418) - EXHAUST DUCT OK, NOW INSTALLED AS PER PRINT. bM103.E (BDA 419) - TWO DAMPER FRAMES AT SHAFTS OK. bM103.F (BDA 420) - ONE DAMPER FRAME AT SHAFT OK. | NANCY | NANCY | | HD | P | 5919054 |
US ENGINEERING COMPANY | HD | P | 07/30/2018 | 3RD FLOOR AREA -E- bM103-E (BDA419) ONE FRAME AND ANNULAR SPACING AT SHAFT OK . ABOVE CEILING SUPPLY , RETURN , EXHAUST DUCT ROUGH OK - OK TO INSULATE . | LIDO | LIDO | | HD | P | 5918117 |
US ENGINEERING COMPANY | HWP | P | 07/30/2018 | LEVEL- 00 -bM200-E (BDA423) SEE RECORD OF TEST - 100 lb TEST OK FOR HEAT WATER SUPPLY AND RETURN FOR MECHANICAL ROOM / PIPE INSTALLED PER PLAN - OK TO INSULATE AND LABEL . | LIDO | LIDO | | HWP | P | 5918088 |
US ENGINEERING COMPANY | HD | P | 07/26/2018 | bM100.A (BDA 411) - ONE DAMPER FRAME AND ANNULAR SPACING AT SHAFT OK. bM103.E (BDA 419) - ONE DAMPER FRAME AND ANNULAR SPACING AT SHAFT OK. bM103.F (BDA 420) - TWO BREAK AWAY CONNECTIONS AT SHAFT OK. ONE DAMPER FRAME AND ANNULAR SPACING AT SHAFT OK. RETAINING ANGLES ON INSIDE OF SHAFT OK. | NANCY | NANCY | | HD | P | 5915698 |
US ENGINEERING COMPANY | HD | P | 07/24/2018 | bM101.A (BDA 413) - ONE DAMPER FRAME AND ANNULAR SPACING OK. bM103.E (BDA 419) - ONE DAMPER FRAME AND ANNULAR SPACING OK. ONE DAMPER COMPLETE, NEED ACCESS DOOR. | NANCY | NANCY | | HD | P | 5912391 |
US ENGINEERING COMPANY | HWP | P | 07/23/2018 | SEE RECORD OF TEST DATED 7/23/18. bM200.E AND bM200.F (BDA 423 AND 424) - 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN. 100 LB TEST OK ON PUMPED CONDENSATE. OK TO INSULATE AND LABEL ALL. | NANCY | NANCY | | HWP | P | 5911285 |
US ENGINEERING COMPANY | HD | P | 07/23/2018 | bM100.A (BDA 411) - FOUR BREAK AWAY CONNECTIONS AND ONE DAMPER FRAME AT SHAFT OK. | NANCY | NANCY | | HD | P | 5911239 |
US ENGINEERING COMPANY | HD | P | 07/20/2018 | bM101.E (BDA 415) - THREE DAMPER FRAMES AT SHAFT OK. bM101.F (BDA 416) -ONE DAMPER FRAME AT SHAFT OK. | NANCY | NANCY | | HD | P | 5909111 |
US ENGINEERING COMPANY | HWP | P | 07/20/2018 | SEE RECORD OF TEST FOR LEVEL - 02 BM-202-E (BDA 429) 100 LB TEST FOR LOW PRESSURE STEAM AND CONDENSATE FOR HUMIDIFIER - H-N302 AND H-N301 OK - OK TO INSULATE AND LABEL / STILL NEED FINAL CONNECTIONS . 12 LB TEST FOR COOLED CONDENSATE AND DUCT DRAIN OK - OK TO INSULATE AND LABEL / STILL NEED FINAL CONNECTIONS . | LIDO | LIDO | | HWP | P | 5909101 |
US ENGINEERING COMPANY | HWP | P | 07/19/2018 | bM100.A AND bM201.A (BDA 421 AND 425) - CONNECTIONS TO VAV'S UNDER WORKING PRESSURE, NO VISIBLE LEAKS. bM201.A (BDA 425) - SHELL FUTURE CT AREA NOW BEING FINISHED WITH BATHROOM AND NEW VAV. NEED REVISED/APPROVED PRINT AND INSPECTIONS IN THIS AREA. | NANCY | NANCY | | HWP | P | 5908750 |
US ENGINEERING COMPANY | HD | P | 07/19/2018 | bM100.C (BDA 411) - SUPPLY/EXHAUST OK, OK TO WRAP. AREA CLOUDED IN RED COMPLETE EXCEPT STILL NEED TO SEE HOOD INSTALLED AND CONNECTION TO HOOD. | NANCY | NANCY | | HD | P | 5908749 |
US ENGINEERING COMPANY | HD | P | 07/17/2018 | bM102.F (BDA 418) - TWO DAMPER FRAMES AT SHAFT OK. ONE BREAK AWAY AT SHAFT OK. SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5905787 |
US ENGINEERING COMPANY | HWP | P | 07/17/2018 | SEE RECORD OF TEST DATED 7/17/18. bM200.A, bM200.C, M202.A (BDA 421, 425 AND 387) - 100 LB TEST OK ON HEATING WATER SUPPLY/RETURN LEVELS 00, 01 UP TO ROOF AHU'S 301/302. | NANCY | NANCY | | HWP | P | 5905454 |
US ENGINEERING COMPANY | HD | P | 07/16/2018 | bM102.E (BDA 417) - TWO DAMPER FRAMES AT SHAFT OK. | NANCY | NANCY | | HD | P | 5904048 |
US ENGINEERING COMPANY | HWP | P | 07/16/2018 | SEE RECORD OF TEST DATED 7/16/18. bM200.A AND bM201.A (BDA 421 AND 425) - CHILLED WATER SUPPLY/RETURN AND HEATING WATER SUPPLY/RETURN AT FAN COILS OK. ALREADY UNDER WORKING PRESSURE, NO VISIBLE LEAKS. OK TO LABEL. | NANCY | NANCY | | HWP | P | 5903731 |
US ENGINEERING COMPANY | HWP | P | 07/13/2018 | SEE RECORD OF TEST DATED 7/13/18. M202.A (BDA 387) - 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN, WEST EXPANSION, LEVELS 00, 01 UP TO ROOF FOR RTU'S 301 AND 302. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5902341 |
US ENGINEERING COMPANY | HD | P | 07/13/2018 | bM101.E (BDA 415) - ONE ANGLES, ACCESS DOOR AND SMOKE DETECTOR OK AT SHAFT. DAMPER FRAME AT SHAFT NEVER INSPECTED. bM103.E (BDA 419) - THREE BREAK AWAY CONNECTIONS AT EXHAUST SHAFT OK. STILL NEED TO SEE FRAMING AROUND DAMPERS AT SHAFT. bM103.F (BDA 420) - THREE DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5902207 |
US ENGINEERING COMPANY | HD | P | 07/12/2018 | bM103.F (BDA 420) - ONE DAMPER FRAME AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5900480 |
US ENGINEERING COMPANY | HD | P | 07/10/2018 | bM103.E (BDA 419) - ONE DAMPER FRAME AND ANNULAR SPACING OK. SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5898421 |
US ENGINEERING COMPANY | HD | P | 07/09/2018 | bM103.F (BDA 420) - SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. bM103.E (BDA 419) - ONE BREAK AWAY CONNECTION AT SHAFT OK. | NANCY | NANCY | | HD | P | 5896587 |
US ENGINEERING COMPANY | HD | P | 07/05/2018 | bM103.E (BDA 419) - THREE DAMPER FRAMES AND ANNULAR SPACING OK. SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5894164 |
US ENGINEERING COMPANY | HD | P | 07/02/2018 | bM103.F (BDA 420) - ONE DAMPER FRAME AND ANNULAR SPACING OK. SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. bM100.C (BDA 411) - SUPPLY OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5891274 |
US ENGINEERING COMPANY | HWP | P | 07/02/2018 | bM200.C (BDA 422) - HEATING WATER SUPPLY/RETURN ALREADY UNDER WORKING PRESSURE, NO VISIBLE LEAKS. OK TO INSULATE AND LABEL. SEE RECORDS OF TEST DATED 7/2/18. bM200.E (BDA 423) - 100 LB TEST OK ON HIGH PRESSURE STEAM. 100 LB TEST OK ON LOW PRESSURE STEAM. LOW PRESSURE CONDENSATE OK. OK TO LABEL ALL.. bM200.F (BDA 424) - 100 LB TEST OK ON HIGH PRESSURE STEAM. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5891270 |
US ENGINEERING COMPANY | HWP | P | 06/28/2018 | SEE RECORD OF TEST DATED 6/28/18. bM201.E AND bM201.F (BDA 427 AND 428) - 100 LB TEST OK ON LOW PRESSURE STEAM. 100 LB TEST OK ON LOW PRESSURE CONDENSATE. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5889220 |
US ENGINEERING COMPANY | HD | P | 06/27/2018 | bM103.E (BDA 419) - FOUR BREAKAWAY CONNECTIONS OK, STILL NEED TO SEE ANGLES. RETURN DUCT OK, OK TO WRAP. ONE DAMPER FRAMING AND ANNULAR SPACING OK. bM102.E (BDA 417) - FOUR BREAKAWAY CONNECTIONS OK AT SHAFT, OK TO BUILD SHAFT WALLS. EXHAUST DUCT INSIDE SHAFT OK. | NANCY | NANCY | | HD | P | 5887117 |
US ENGINEERING COMPANY | HWP | P | 06/26/2018 | SEE RECORD OF TEST DATED 6/26/18. bM203.E ( BDA 431) - FOUR 100 LB TESTS OK ON CHILLED WATER SUPPLY/RETURN AND HEATING WATER SUPPLY/RETURN. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5885792 |
US ENGINEERING COMPANY | HD | P | 06/26/2018 | bM103.F (BDA 420) - SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5885784 |
US ENGINEERING COMPANY | HD | P | 06/25/2018 | bM103.E (BDA 419) - THREE DAMPER FRAMES AND ANNULAR SPACING OK. bM100.E (BDA 412) - FOUR DAMPERS COMPLETE, NEED ACCESS DOORS. SUPPLY OK, OK TO WRAP. bM100.F (BDA 817) - SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5884580 |
US ENGINEERING COMPANY | HD | P | 06/22/2018 | bM100.A (BDA 411) - HEADER OK AT CRAWL SPACE ENTRANCE. DAMPER FRAMING AT CRAWL SPACE WALL OK. bM100.E (BDA 412) - THREE DAMPERS COMPLETE, STILL NEED ACCESS DOORS. bM100.C (BDA 411) - NEED REVISED/APPROVED PRINT FOR DELETED DAMPER AND NEW SUPPLY LOCATION. SUPPLY/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5883165 |
US ENGINEERING COMPANY | HD | P | 06/21/2018 | LEVEL - 00 AREA -E - bM100-E (BDA 412) THREE FIRE DAMPERS IN ELEVATOR CONTROL ROOM COMPLETE / STILL NEED ACCESS DOORS AND LABELS / Need to consult with primary inspector .LEVEL-01 AREA E - bM101-E /F - (BDA415) DUCT ROUGH AND EXHAUST DUCT ABOVE HARD LIDS OK .TWO DAMPER BREAKAWAY CONNECTIONS AT SHAFT INSIDE AND OUTSIDE OK . LEVEL 02 AREA -E- bM102-E (BDA417 TWO BREAKAWAY CONNECTIONS OK AT SHAFT INSIDE AND OUTSIDE. | LIDO | LIDO | | HD | P | 5881643 |
US ENGINEERING COMPANY | HD | P | 06/20/2018 | bM101.E (BDA 415) - NINE DAMPERS COMPLETE, NEED ACCESS DOORS. THREE BREAK AWAY CONNECTIONS AT EXHAUST SHAFT OK. bM100.E (BDA 412) - SIX DAMPERS COMPLETE, NEED ACCESS DOORS.bM100.F (BDA 817) - ONE DAMPER COMPLETE, NEED ACCESS DOOR. TWO DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5880403 |
US ENGINEERING COMPANY | HWP | P | 06/19/2018 | SEE RECORD OF TEST DATED 6/19/18. bM203. E AND bM203. F (BDA 431 AND 432) - 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN AND HEATING WATER SUPPLY/RETURN. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5879085 |
US ENGINEERING COMPANY | HD | P | 06/18/2018 | STILL NEED TO SEE DAMPER FRAMING ON LEVEL ZERO, AREAS E AND F. | NANCY | NANCY | | HD | P | 5877834 |
US ENGINEERING COMPANY | HD | P | 06/15/2018 | bM101.E (BDA 415) - ONE DAMPER FRAME AND ANNULAR SPACING OK. bM101.F (BDA 416) - THREE DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5875984 |
US ENGINEERING COMPANY | HWP | P | 06/15/2018 | SEE RECORD OF TEST DATED 6/15/18: bM203.E AND bM203.F (BDA 431 AND 432) - 100 LB TEST OK ON LOW PRESSURE STEAM, LOW PRESSURE CONDENSATE AND GRAVITY DRAIN. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5875982 |
US ENGINEERING COMPANY | HD | P | 06/14/2018 | bM102.E (BDA 417) - SIXTEEN DAMPERS COMPLETE, NEED ACCESS DOORS. SIX BREAK AWAY CONNECTIONS AT SHAFTS OK, OK TO BUILD SHAFT WALLS. SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5874720 |
US ENGINEERING COMPANY | HWP | P | 06/13/2018 | SEE RECORD OF TEST DATED 6/13/18. (BDA 423) - 100 LB TEST OK ON HEATING WATER SUPPLY/RETURN. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5873594 |
US ENGINEERING COMPANY | HD | P | 06/13/2018 | bM100.E (BDA 412) SEVENTEEN DAMPERS COMPLETE, NEED ACCESS DOORS. SIX BREAK AWAY CONNECTIONS AT SHAFTS OK, OK TO FRAME SHAFT WALLS. bM100.F ( BDA 817) - SEVEN DAMPERS COMPLETE, NEED ACCESS DOORS. TWO DAMPERS IN CLEAN LINEN NEVER HAD FRAMING LOOKED AT. FOUR BREAK AWAY CONNECTIONS AT SHAFTS OK, OK TO BUILD SHAFT WALLS. | NANCY | NANCY | | HD | P | 5873590 |
US ENGINEERING COMPANY | HD | P | 06/12/2018 | bM100.A (BDA 410) - ONE DAMPER COMPLETE, STILL NEED ACCESS DOOR. bM100.E (BDA 412) - ONE DAMPER FRAME AND ANNULAR SPACING OK. bM101.E ( BDA 415) - ONE DAMPER (RELOCATED EXHAUST) COMPLETE, STILL NEED ACCESS DOOR. | NANCY | NANCY | | HD | P | 5871757 |
US ENGINEERING COMPANY | HD | P | 06/08/2018 | 3rd LEVEL bM103F ( BDA420) TREE BREAKAWAY CONNECTIONS AT SHAFT OK - Still need angles. 3rd LEVEL bM103E ( BDA419) ONE BREAKAWAY CONNECTIONS AT SHAFT OK - Still need angles. | LIDO | LIDO | | HD | P | 5868982 |
US ENGINEERING COMPANY | HD | P | 06/06/2018 | bM101.E (BDA 415) - TWO DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5866629 |
US ENGINEERING COMPANY | HD | P | 06/05/2018 | bM102 F (BDA 418) - THIRTEEN DAMPERS COMPLETE, STILL NEED ACCESS DOORS. THREE BREAKAWAY CONNECTIONS OK, OK TO BUILD SHAFT WALLS. | NANCY | NANCY | | HD | P | 5865127 |
US ENGINEERING COMPANY | HD | P | 06/04/2018 | bM101.E( BDA 415) - TWO DAMPERS COMPLETE, STILL NEED ACCESS DOORS. bM101.F (BDA 416) - ONE DAMPER COMPLETE. STILL NEED ACCESS DOOR. | NANCY | NANCY | | HD | P | 5863159 |
US ENGINEERING COMPANY | HSP | P | 06/04/2018 | TEMP HISTOLOGY. PROVIDE BALANCE REPORT FOR HOOD. PLEASE SEND ME THE EMAIL FROM ENGINEER APPROVING INSTALLATION IN TEMP HISTOLOGY. ABOVE CEILING ALL OK UNTIL TEMP HISTOLOGY MOVES BACK INTO THEIR PERMANENT SPACE. | NANCY | NANCY | | HSP | P | 5863143 |
US ENGINEERING COMPANY | HD | P | 06/01/2018 | bM101.E (BDA 415) - FIVE DAMPER FRAMES COMPLETE. bm101.F (BDA 416) - FOUR DAMPER FRAMES COMPLETE. STILL NEED ACCESS DOORS FOR ALL. | NANCY | NANCY | | HD | P | 5862581 |
US ENGINEERING COMPANY | HWP | P | 05/31/2018 | SEE RECORD OF TEST DATED 5/31/18. bM202.E (BDA 429) - 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5860465 |
US ENGINEERING COMPANY | HD | P | 05/31/2018 | BM103.F (BDA 420) - ONE DAMPER FRAME AND ANNULAR SPACING OK. RETURN AIR DUCT COMING OUT OF SHAFT OK. THREE BREAK AWAY CONNECTIONS AT SHAFT OK. ANGLES INSTALLED ON DUCTS OVER 90 INCHES ON INSIDE OF SHAFT. STILL NEED TO SEE FRAMING AT SHAFTS. bM103.E (BDA 419) - EIGHT BREAK AWAY CONNECTIONS AT SHAFT OK. ANGLES INSTALLED IN SHAFT ON ALL DUCTS OVER 90 INCHES. STILL NEED TO SEE FRAMING AT SHAFTS. bM101.E (BDA 415) - TWO DAMPERS COMPLETE, STILL NEED ACCESS DOORS. SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. bM101. F ( BDA 416) - ONE DAMPER COMPLETE, STILL NEED ACCESS DOOR. SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5860446 |
US ENGINEERING COMPANY | HD | P | 05/30/2018 | bM101.E ( BDA 415) - SEVEN DAMPERS COMPLETE, STILL NEED TO SEE ACCESS DOORS. FOUR BREAK AWAY CONNECTIONS AT SHAFT OK, STILL NEED TO SEE FRAMING. bM101,F (BDA 416) - THREE DAMPERS COMPLETE, STILL NEED TO SEE ACCESS DOORS. ONE BREAK AWAY AT SHAFT OK, STILL NEED TO SEE FRAMING. SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5859061 |
US ENGINEERING COMPANY | HD | P | 05/29/2018 | bM103.E (BDA 419) - TWO DAMPER FRAMES AND ANNULAR SPACING OK. bM101.E (BDA 415) - TWO BREAK AWAY CONNECTIONS ON OUTSIDE OF SHAFT OK. STILL NEED TO SEE FRAMING. | NANCY | NANCY | | HD | P | 5857533 |
US ENGINEERING COMPANY | HD | P | 05/25/2018 | bM101.E (BDA 415) - THREE BREAK AWAY CONNECTIONS OK. | NANCY | NANCY | | HD | P | 5856039 |
US ENGINEERING COMPANY | HWP | P | 05/24/2018 | bM200. E AND bM200.F (BDA 423 AND 424) - LOW TEST ON HEATING WATER SUPPLY/RETURN. 100 LB TEST OK ON SNOW MELT. NEED REVISED/APPROVED PRINT FOR SNOW MELT AND HEATING WATER. bM202.E (BDA 429) - 100 LB TEST OK ON LOW PRESSURE STEAM, LOW PRESSURE CONDENSATE AND HEATING WATER SUPPLY/RETURN. OK TO INSULATE ALL. | NANCY | NANCY | | HWP | P | 5855594 |
US ENGINEERING COMPANY | HD | P | 05/24/2018 | bM100.E ( BDA 412) - TWO DAMPER FRAMES AND ANNULAR SPACING IN ELEVATOR EQUIPMENT ROOM CEILING OK. bM102.E AND bM102.F (BDA 417 AND 418) - SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. bM101. F (BDA 416) - ONE BREAK AWAY CONNECTION ON SUPPLY DUCT AT SHAFT OK. OK TO FRAME SHAFT. | NANCY | NANCY | | HD | P | 5855593 |
US ENGINEERING COMPANY | HD | P | 05/23/2018 | bM103.E (BDA 419) - ONE DAMPER FRAME AND ANNULAR SPACING OK. VERIFY LOCATION OF DAMPER, PRINT SHOWS CRD BEING INSTALLED IN CEILING OF SOILED WORK ROOM. SUPPLY DUCT OK, OK TO WRAP. bM100.A (BDA 410) - SUPPLY/RETURN/CUH OK, OK TO WRAP. QUESTIONING ACCESS TO FCU-W102. | NANCY | NANCY | | HD | P | 5853745 |
US ENGINEERING COMPANY | HWP | P | 05/21/2018 | SEE RECORD OF TEST DATED 5/21/18. bM200 (BDA 421) - NEED REVISED/APPROVED PRINT SHOWING HIGH PRESSURE STEAM AND HIGH PRESSURE CONDENSATE INTO CLEAN CORE/AG412. 100 LB TEST OK ON HIGH PRESSURE STEAM AND HIGH PRESSURE CONDENSATE. OK TO INSULATE AND LABEL AT OWN RISK DUE TO NOT SHOWN ON APPROVED PRINT. | NANCY | NANCY | | HWP | P | 5850995 |
US ENGINEERING COMPANY | HSP | P | 05/21/2018 | Temp Histology for US Engineering. Provide RFI from engineer regarding change to work station hood exhaust termination, RTU return air termination and now using 100% outside air. Install p-trap on unit. Above ceiling ok except still need to see blanket on supply diffusers and exhaust connection at hood. Ok to move hood and move in per mechanical only. | NANCY | NANCY | | HSP | P | 5850873 |
US ENGINEERING COMPANY | HWP | P | 05/18/2018 | SEE RECORD OF TEST DATED 5/18/18. M700 (BDA 395) - 100 LB TEST OK ON LOW PRESSURE STEAM AND LOW PRESSURE CONDENSATE IN SHAFT. M701 (BDA 396) - 100 LB TEST OK ON HEATING WATER SUPPLY/RETURN IN SHAFT. M702 ( BDA 397) - 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURNIN SHAFT. OK TO INSULATE AND LABEL ALL. | NANCY | NANCY | | HWP | P | 5849927 |
US ENGINEERING COMPANY | HD | P | 05/18/2018 | bM102.F (BDA 418) - GENERAL EXHAUST INTO EVCC 2139 DELETED? SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5849916 |
US ENGINEERING COMPANY | HD | P | 05/17/2018 | bM100.A ( BDA 410 ) 1- DAMPER FRAMING AND ANNULAR SPACING OK . | LIDO | LIDO | | HD | P | 5848449 |
US ENGINEERING COMPANY | HWP | P | 05/16/2018 | SEE RECORD OF TEST DATED 5/16/18. bM200.E (BDA 423) - 100 LB TEST OK ON HEATING WATER SUPPLY/RETURN. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5846526 |
US ENGINEERING COMPANY | HD | P | 05/16/2018 | bM100.E (BDA 412) - MECH ONE ABOVE CEILING OK. STILL NEED US ENGINEERING TO COMPLETE TEMP HISTOLOGY. ONE RETAINING ANGLE AND BREAK AWAY CONNECTIONS OK, STILL NEED ACCESS DOOR. bM101.E (BDA 415) - ONE DAMPER FRAME AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5846516 |
US ENGINEERING COMPANY | HD | P | 05/15/2018 | bM102.E (BDA 417) - ONE DAMPER FRAME AND ANNULAR SPACING OK. bM102.F (BDA 418) - SUPPLY/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5845162 |
US ENGINEERING COMPANY | HD | P | 05/14/2018 | bM101.A (BDA 413) - TWO DAMPER FRAMES AND ANNULAR SPACING OK AT SHAFTS. SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. ACCESS TO VAV -A1-31? | NANCY | NANCY | | HD | P | 5843916 |
US ENGINEERING COMPANY | HD | P | 05/11/2018 | bM101.A (BDA 413) - BREAK AWAY CONNECTION ON SUPPLY IN SHAFT OK. NO DAMPER FRAMING YET. bM101.F (BDA 416) - ONE DAMPER FRAME AND ANNULAR SPACING OK. bM100.A ( BDA 100.A) - NEED REVISED/APPROVED PRINT FOR TWO NEW DAMPERS. ONE DAMPER FRAME OK, OK TO INSTALL DAMPER THROUGH OPENING, NEED TO SEE FRAMING AT ENTRY HEADER. PROPERLY FRAME SECOND DAMPER. | NANCY | NANCY | | HD | P | 5842337 |
US ENGINEERING COMPANY | HD | P | 05/09/2018 | bM102.F (BDA 418) - SUPPLY/EXHAUST OK, OK TO WRAP. bM103.E (BDA 419) - TWO DAMPER FRAMES AND ANNULAR SPACING OK. bM103.F (BDA 420) - TWO DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5839798 |
US ENGINEERING COMPANY | HD | P | 05/08/2018 | bM100.E (BDA 412) - SUPPLY/RETURN/EXHAUST OK. OK TO WRAP. | NANCY | NANCY | | HD | P | 5838624 |
US ENGINEERING COMPANY | HWP | P | 05/07/2018 | SEE FOUR RECORDS OF TEST DATED 5/7/18. bM 202.E (BDA 429) AND bM202.F (BDA 430) - 100 LB TEST OK ON HEATING WATER SUPPLY/RETURN. bM200.A (BDA 421) - FIVE 100 LB TESTS OK ON CHILLED WATER SUPPLY/RETURN, HIGH PRESSURE STEAM, HIGH PRESSURE CONDENSATE AND CHILLED CONDENSATE. M702 (BDA 397) 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN IN SHAFT. bM200.E (BDA 423) - 100 LB TEST OK ON 1O INCH CHILLED WATER SUPPLY/RETURN AND 4 INCH CHILLED WATER SUPPLY/RETURN IN SHAFT FROM LEVEL 01 TO LEVEL 03. OK TO INSULATE AND LABEL ALL. | NANCY | NANCY | | HWP | P | 5838044 |
US ENGINEERING COMPANY | HD | P | 05/07/2018 | bM103.F (BDA 420) - TWO DAMPER FRAMES AND ANNULAR SPACING OK. bM103.E (BDA 419) - FIVE DAMPER FRAMES AND ANNULAR SPACING OK. bM101.E (BDA 415) - SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5837985 |
US ENGINEERING COMPANY | HD | P | 05/04/2018 | bM102.E (BDA 417) - FOUR DAMPER FRAMES AND ANNULAR SPACING OK. bM100.E (BDA 412) - THREE DAMPER FRAMES AND ANNULAR SPACING OK IN ELEVATOR CONTROL ROOM. TWO WALL DAMPER FRAMES AND ANNULAR SPACING OK. FIVE RETAINING ANGLES AND BREAK AWAY CONNECTIONS OK. STILL NEED DAMPER ACCESS DOORS. | NANCY | NANCY | | HD | P | 5836534 |
US ENGINEERING COMPANY | HWP | P | 05/04/2018 | bM201.F (BDA 428) - SEE RECORD OF TEST DATED 5/4/18. 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN. OK TO INSULATE AND LABEL. bM202.E (BDA 429) AND bM202.F (BDA 430) - LOW TEST ON HEATING WATER SUPPLY/RETURN. | NANCY | NANCY | | HWP | P | 5836526 |
US ENGINEERING COMPANY | HWP | P | 05/02/2018 | SEE FOUR RECORDS OF TEST DATED 5/2/18. bM200.F (BDA 424), bM201.F (BDA 428), bM202.F (BDA 430) - 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN IN SHAFT FROM LEVEL 00 TO LEVEL 02. bM201.E (BDA 427), bM201.F (BDA 428) - 100 LB TEST OK ON LOW PRESSURE STEAM AND LOW PRESSURE CONDENSATE. bM201.E (BDA 427) - 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN. bM200.E (BDA 423) - 100 LB TEST OK ON HIGH PRESSURE CONDENSATE. OK TO INSULATE AND LABEL ALL. | NANCY | NANCY | | HWP | P | 5833632 |
US ENGINEERING COMPANY | HD | P | 05/02/2018 | bM100.E (BDA 412) - ONE DAMPER FRAME AND ANNULAR SPACING OK. bM101.F (BDA 416) - ONE DAMPER FRAME AND ANNULAR SPACING OK. bM101.E (BDA 415) - ONE DAMPER FRAME AND ANNULAR SPACING OK. SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5833627 |
US ENGINEERING COMPANY | HWP | P | 04/30/2018 | SEE RECORDS OF TEST DATED 4/30/18. bM200.A (BDA 421) - FIVE 100 LB TESTS OK ON CHILLED WATER SUPPLY/RETURN, HIGH PRESSURE STEAM, HIGH PRESSURE CONDENSATE AND PUMPED CONDENSATE. OK TO INSULATE AND LABEL. bM201. E (BDA 427) - 100 LB TEST OK ON HEATING WATER SUPPLY/RETURN. OK TO INSULATE AND LABEL. bM201.F (BDA 428) - 100 LB TEST OK ON HEATING WATER SUPPLY/RETURN. ALL HEATING WATER IN AREA "F" OK EXCEPT FOR FIVE EB-1. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5831404 |
US ENGINEERING COMPANY | HD | P | 04/30/2018 | bM103.F (BDA 420) - THREE DAMPER FRAMES AND ANNULAR SPACING OK. bM 103.E (BDA 419) - TWO DAMPER FRAMES AND ANNULAR SPACING OK. bM102.E (BDA 417) - SUPPLY/RETURN OK, OK TO WRAP. bM102.F (BDA 418) - SUPPLY/RETURN/EXHAUST OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5831389 |
US ENGINEERING COMPANY | HD | P | 04/27/2018 | TEMP HISTOLOGY: TWO DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5830313 |
US ENGINEERING COMPANY | HWP | P | 04/27/2018 | M702 (BDA 397) - SEE RECORD OF TEST DATED 4/28/18. 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN RISER. OK TO INSULATE AND LABEL. SEE RECORD OF TEST DATED 4/28/18. bM201.E (BDA 427) - 100 LB TEST OK ON HEATING WATER SUPPLY/RETURN. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5830312 |
US ENGINEERING COMPANY | HD | P | 04/26/2018 | bM100.F (BDA 412) - ONE DAMPER FRAME AND ANNULAR SPACING OK. bM101.E (BDA 415) - THREE DAMPER FRAMES AND ANNULAR SPACING OK. bM100.E (BDA 411) - NEED TO SEE FIRE WRAP ON FUME EXHAUST THROUGH RATED WALLS. BUILDING INSPECTOR WILL ALSO NEED TO SEE THESE PROTECTED PENETRATIONS. TEMP HISTOLOGY: PROPERLY FRAME TWO DAMPER OPENINGS. | NANCY | NANCY | | HD | P | 5828621 |
US ENGINEERING COMPANY | HD | P | 04/25/2018 | bM103.F (BDA 420) - ONE DAMPER FRAME AND ANNULAR SPACING OK. SUPPLY/RETURN DUCTS IN SHAFT OK. bM103.E (BDA 419) - SUPPLY/RETURN/EXHAUST DUCTS IN SHAFT OK, OK TO WRAP. bM102.F (BDA 418) - SUPPLY/RETURN DUCTS IN SHAFT OK, OK TO WRAP. bM102.E (BDA 417) - THREE DAMPER FRAMES AND ANNULAR SPACING OK. SUPPLY/RETURN/EXHAUST DUCTS IN SHAFTS OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5827214 |
US ENGINEERING COMPANY | HD | P | 04/24/2018 | bM101.E (BDA 415) - SUPPLY/RETURN DUCTS IN SHAFT OK, OK TO WRAP. MEDIUM AND LOW PRESSURE SUPPLY DUCTS OK, OK TO WRAP. bM101.F ( BDA 416) - ONE DAMPER DELETED AT SHAFT WALL, NEED REVISED/APPROVED PRINT. SUPPLY/RETURN DUCTS IN SHAFT OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5825778 |
US ENGINEERING COMPANY | HD | P | 04/23/2018 | bM103.E (BDA 419) - TWO DAMPER FRAMES AND ANNULAR SPACING OK. bM103.F (BDA 420) - TWO DAMPER FRAMES AND ANNULAR SPACING OK. bM101.E ( BDA 415) - TWO DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5824177 |
US ENGINEERING COMPANY | HD | P | 04/20/2018 | bM101.A (BDA 413) - TWELVE RETAINING ANGLES AND BREAKAWAY CONNECTIONS OK. STILL NEED ACCESS DOORS. ONE BREAKAWAY CONNECTION OK, NO SHAFT FRAMING YET. bM100.A (BDA 410) - NEED ENGINEER DRAWING FOR BOTTOM OF SHAFT/DAMPER SUPPORT FOR 22 X 60 RETURN AIR DUCT. DRAWING ALSO TO STATE SUPPORT MEETS DAMPER MANUFACTURERS INSTALLATION INTENT. ONE DAMPER FRAME AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5822906 |
US ENGINEERING COMPANY | HD | P | 04/19/2018 | bM100.E ( BDA 412) - PROVIDE INSTALLATION INSTRUCTION FOR CEILING RADIATION DAMPERS IN ELEVATOR CONTROL ROOMS. INSTRUCTIONS TO SHOW HOW DAMPERS ARE TO BE INSTALLED IN THIS CEILING ASSEMBLY. ARE ELEVATOR CONTROL ROOM SYSTEMS STATIC OR DYNAMIC? DAMPER APPROVED FOR WHICH TYPE OF SYSTEM? FCU N104 ELECTRICAL BOX TOO CLOSE TO WALL. SUPPLY/RETURN DUCTS OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5821585 |
US ENGINEERING COMPANY | HWP | P | 04/19/2018 | bM200.A (BDA 421) - SEE RECORD OF TEST DATED 4/19/18. FIVE 100 LB TESTS OK ON CHILLED WATER SUPPLY/RETURN, HIGH PRESSURE STEAM, HIGH PRESSURE CONDENSATE AND PUMPED CONDENSATE. OK TO COMPLETE INSULATION, PROVIDE ACCESS OR PICTURES TO SHOW INSULATION HAS BEEN PROPERLY INSTALLED. | NANCY | NANCY | | HWP | P | 5821577 |
US ENGINEERING COMPANY | HD | P | 04/18/2018 | bM100.E (BDA 412) - FIVE DAMPER FRAMES AND ANNULAR SPACING OK. bM102.E (BDA 417) - SIX DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5820698 |
US ENGINEERING COMPANY | HD | P | 04/16/2018 | bM100.E (BDA 412) - INSTALL SINGLE LAYER OF 3M FIRE BARRIER DUCT WRAP 615+ PER MANUFACTURERS INSTRUCTIONS. SEE FIGURE 20 FOR THRU WALL PENETRATIONS, PAGE 9 FOR PINNING AND PAGE 10 FOR SUPPORT. NEED ENGINEER LETTER APPROVING STOPPING WRAP JUST PAST WALL INSTEAD OF GOING ALL THE WAY TO HOOD FROM SHAFT. FUME EXHAUST OK TO GO THROUGH FLEX DUCT CONNECTOR? bM101.A (BDA 413) - ONE DAMPER FRAME AND ANNULAR SPACING OK. SUPPLY DUCT OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5818013 |
US ENGINEERING COMPANY | HD | P | 04/13/2018 | DAMPER FRAMING NOT READY. | NANCY | NANCY | | HD | P | 5816259 |
US ENGINEERING COMPANY | HWP | P | 04/12/2018 | SEE RECORD OF TEST DATED 4/12/18. bM200.E (BDA 423) - 100 LB TEST OK ON PUMPED CONDENSATE. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5815793 |
US ENGINEERING COMPANY | HD | P | 04/11/2018 | bM102. E ( BDA 417) - FOUR DAMPER FRAMES AND ANNULAR SPACING OK. bM102. F (BDA 418) - TWO DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5814018 |
US ENGINEERING COMPANY | HWP | P | 04/11/2018 | bM201.A (BDA 425) - SEE RECORD OF TEST DATED 4/11/18. TWO 100 LB TESTS OK ON LOW PRESSURE STEAM AND LOW PRESSURE CONDENSATE. TEST GAUGES ON ROOF AND LINES CAPPED IN MECHANICAL ROOM CEILING. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5814011 |
US ENGINEERING COMPANY | HD | P | 04/10/2018 | bM101.E (BDA 415) - NEED REVISED/APPROVED PRINT FOR RELOCATED VAV C1-1N. SUPPLY, RETURN AND EXHAUST DUCTS OK, OK TO WRAP. bM101.F (BDA 416) - SUPPLY/RETURN DUCTS OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5812648 |
US ENGINEERING COMPANY | HWP | P | 04/09/2018 | bM200.E (BDA 423) - SEE TWO RECORDS OF TEST DATED 4/9/18. SEVEN 100 LB TESTS OK HEATING WATER SUPPLY/RETURN, CHILLED WATER SUPPLY/RETURN, HIGH PRESSURE STEAM, HIGH PRESSURE CONDENSATE AND PUMP CONDENSATE. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5811997 |
US ENGINEERING COMPANY | HD | P | 04/09/2018 | bM101.A (BDA 413) - FOUR DAMPER FRAMES AND ANNULAR SPACING OK. SUPPLY AND EXHAUST DUCTS OK. | NANCY | NANCY | | HD | P | 5811994 |
US ENGINEERING COMPANY | HD | P | 04/06/2018 | bM100.E (BDA 411) - SEVEN DAMPER FRAMES AND ANNULAR SPACING OK. bM100.F (BDA 412) - FIVE DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5810529 |
US ENGINEERING COMPANY | HD | P | 04/05/2018 | bM101.E (BDA 415) - THREE DAMPER FRAMES AND ANNULAR SPACING OK. bM102.F (BDA 418) - FIVE DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5809328 |
US ENGINEERING COMPANY | HD | P | 04/04/2018 | bM102.E (BDA 417) - THREE DAMPER FRAMES AND ANNULAR SPACING OK. bM102.F (BDA 418) - SIX DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5807527 |
US ENGINEERING COMPANY | HWP | P | 04/02/2018 | bM200.A (BDA 421) - SEE RECORD OF TEST DATED 4/2/18. 100 LB TEST OK ON HOT WATER SUPPLY/RETURN. 1 1/4 INCH PIPING HAS BEEN INCREASED TO 1 1/2 INCH PER PLAN. 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN. bM201.A (BDA 425) - NEED REVISED/APPROVED PRINT FOR RELOCATED FCU W201 INTO CT SIM STORAGE. SEE RECORD OF TEST DATED 4/2/18. 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN. 100 LB TEST OK ON HOT WATER SUPPLY/RETURN. OK TO INSULATE AND LABEL ALL. | NANCY | NANCY | | HWP | P | 5805357 |
US ENGINEERING COMPANY | HD | P | 03/29/2018 | bM101.E (BDA 415) - SUPPLY, RETURN AND EXHAUST OK. OK TO WRAP. | NANCY | NANCY | | HD | P | 5803167 |
US ENGINEERING COMPANY | HWP | P | 03/28/2018 | bM200.A (BDA 421) - SEE RECORD OF TEST DATED 3/28/18. FIVE 100 LB TESTS OK ON CHILLED WATER SUPPLY/RETURN, HIGH PRESSURE STEAM, HIGH PRESSURE CONDENSATE AND PUMP CONDENSATE. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5801488 |
US ENGINEERING COMPANY | HD | P | 03/28/2018 | bM101.A (BDA 413) - SUPPLY/RETURN DUCTS OK, OK TO WRAP. bM101.E (BDA 415) - ONE DAMPER FRAME AND ANNULAR SPACING OK. bM101.F (BDA 416) - ONE DAMPER FRAME AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5801366 |
US ENGINEERING COMPANY | HD | P | 03/27/2018 | WALKED THROUGH LEVEL 1 AREAS "E" AND "F", MULTIPLE DAMPERS STILL NEED TO BE PROPERLY FRAMED AND INSPECTED PRIOR TO SHEET ROCK BEING INSTALLED. | NANCY | NANCY | | HD | P | 5800059 |
US ENGINEERING COMPANY | HD | P | 03/26/2018 | bM100.A (BDA 409) - EIGHTEEN BREAKAWAY CONNECTIONS AND ANGLES OK. | NANCY | NANCY | | HD | P | 5799331 |
US ENGINEERING COMPANY | HD | P | 03/23/2018 | bM101.E (BDA 415) - TWO DAMPER FRAMES AND ANNULAR SPACING OK. NEED REVISED/APPROVED PRINT FOR NEW DAMPER. bM101.F (BDA 416) - THREE DAMPER FRAMES AND ANNULAR SPACING OK. NEED REVISED/APPROVED PRINT FOR RELOCATED DAMPER. | NANCY | NANCY | | HD | P | 5798194 |
US ENGINEERING COMPANY | HD | P | 03/21/2018 | bM101.E (BDA 415) - NEED REVISED/APPROVED PRINT FOR NEW AND RELOCATED DAMPERS. THREE DAMPER FRAMES AND ANNULAR SPACING OK. bM101.F (BDA 416) - ONE DAMPER FRAME AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5795356 |
US ENGINEERING COMPANY | HD | P | 03/20/2018 | bM100.A (BDA 409) - ONE BREAKAWAY CONNECTION AND RETAINING ANGLE OK. bM101.A (BDA 413) - NEED REVISED/APPROVED PRINT FOR RELOCATED DAMPER TWO DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5794019 |
US ENGINEERING COMPANY | HWP | P | 03/20/2018 | bM200.A (BDA 421) - SEE RECORD OF TEST DATED 3/20/18. 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN, HIGH PRESSURE STEAM, HIGH PRESSURE CONDENSATE AND PUMP CONDENSATE. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5794016 |
US ENGINEERING COMPANY | HWP | P | 03/19/2018 | LEFT TWO VOICE MAILS FOR STEVE, NO REPLY. POSSIBLY IN A MEETING? | NANCY | NANCY | | HWP | P | 5792843 |
US ENGINEERING COMPANY | HD | P | 03/16/2018 | bM100.A ( BDA 409) - FOUR DAMPER FRAMES AND ANNULAR SPACING OK. bM101.A (BDA 413) - SUPPLY/RETURN AIR TRUNK LINES OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5791866 |
US ENGINEERING COMPANY | HD | P | 03/14/2018 | bM101.A (BDA 413) - TOP AND SIDES OF ONE DAMPER FRAME OK. NEED TO SEE BOTTOM OF FRAMING WHEN DAMPER IS INSTALLED. ONE FRAME AND ANNULAR SPACING IN IDF OK, NEED REVISED/APPROVED PRINT FOR RELOCATED DAMPER. bM100 A (BDA 409) - SUPPLY/RETURN DUCTS OK, OK TO WRAP. STILL NEED TO SEE FOUR DAMPER FRAMES. NO INSPECTION OF ANY RETAINING ANGLES OR BREAK AWAY CONNECTIONS YET. | NANCY | NANCY | | HD | P | 5788893 |
US ENGINEERING COMPANY | HD | P | 03/13/2018 | bM100.F (BDA 412) - ONE DAMPER FRAMING AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5787718 |
US ENGINEERING COMPANY | HD | P | 03/12/2018 | bM100.A (BDA 409) - TWO DAMPER FRAMES AND ANNULAR SPACING OK. NEED DOOR HEADER INSTALLED. | NANCY | NANCY | | HD | P | 5785845 |
US ENGINEERING COMPANY | HD | P | 03/09/2018 | bM101.E (BDA 415) - CLEAN SUPPLY C1215 NOW HAS FIRE DAMPER IN RETURN AIR, NEED REVISED/APPROVED PRINT. FIVE DAMPER FRAMES AND ANNULAR SPACING OK. bM101.F (BDA 416) - ONE DAMPER FRAME AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5785218 |
US ENGINEERING COMPANY | HSP | P | 03/07/2018 | ALL HIGH LIGHTS FROM PRIORITY WALL PLAN HAVE BEEN COPIED TO FULL SET. PRIORITY WALL PLAN HAS BEEN REMOVED FROM ONE DRIVE SHARED FOLDER. | NANCY | NANCY | | HSP | P | 5783015 |
US ENGINEERING COMPANY | HWP | P | 03/07/2018 | bM200.C (BDA 422) - SEE RECORD OF TEST DATED 3/7/18 FOR BUSINESS MANAGEMENT, INSIDE HOSPITAL, PHASE TWO PIPING. 100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN, HIGH PRESSURE STEAM, HIGH PRESSURE CONDENSATE AND PUMPED CONDENSATE. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5782390 |
US ENGINEERING COMPANY | HD | P | 03/07/2018 | bM101.E (BDA 415) - TWO DAMPER FRAMES AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5782382 |
US ENGINEERING COMPANY | HSP | P | 03/07/2018 | HIGH LIGHTED PLANS AND NOTES FROM 3/2/18 THAT WERE PUT ON PRIORITY WALL PLANS HAVE BEEN TRANSFERRED TO FULL SET OF PLANS. ON FULL SET bM100.E IS BDA 411, bM101.A IS BDA 413 AND bM101.E IS BDA 415. | NANCY | NANCY | | HSP | P | 5781924 |
US ENGINEERING COMPANY | HD | P | 03/02/2018 | FULL SET OF PLANS HAS BEEN SAVED TO ONE DRIVE MECHANICAL SHARED PLANS. WILL TRANSFER ALL HIGH LIGHTS FROM PRIORITY WALL SHARED PLANS TO FULL SET. bM100.A (BDA 409 FULL SET). DAMPER OPENINGS OK. NEED HEADERS INSTALLED ABOVE DOUBLE DOORS AS PER ENGINEERS SPECIFICATIONS. bM101.A (BDA 39 PRIORITY WALLS PLAN) TWO DAMPER FRAMES ON TOP AND SIDES ONLY OK. CONTRACTOR TO SLIDE DAMPERS INTO PLACE AND PROPERLY FRAME BOTTOM OF OPENINGS, CALL FOR INSPECTION WHEN READY. bM100.E (BDA 37 PRIORITY WALLS PLAN) - DAMPER FRAMING OK. bM101.E (BDA 41 PRIORITY WALLS PLAN) - WHY IS THERE NO DAMPER ON RETURN AIR GOING THROUGH RATED WALL AT CLEAN SUPPLY C1215? TWO DAMPER FRAMES OK. | NANCY | NANCY | | HD | P | 5778770 |
US ENGINEERING COMPANY | HWP | P | 03/02/2018 | bM200.A (BDA 421, FULL SET OF PLANS) REPLACE 1 1/4 INCH PIPING WITH 1 1/2 INCH AS PER PLAN, RETEST ALL. SEE RECORD OF TEST DATED 3/2/18. 100 LB TEST OK ON HOT WATER SUPPLY/RETURN. OK TO INSULATE AND LABEL EXCEPT PART WHERE LINES ARE BEING REPLACED. | NANCY | NANCY | | HWP | P | 5778655 |
US ENGINEERING COMPANY | HD | P | 02/26/2018 | bM101.A (BDA 39). NEED REVISED/APPROVED PRINTS SHOWING CHANGES TO ELECTRICAL (NOT RATED?), IDF, FCU-W201 AND CT SIM STORAGE. DAMPER FRAMING AND ANNULAR SPACE OK. | NANCY | NANCY | | HD | P | 5774638 |
US ENGINEERING COMPANY | HSP | P | 02/26/2018 | ENGINEER LETTER REGARDING FRAMING FOR DAMPERS SCANNED, SEE IMAGES. | NANCY | NANCY | | HSP | P | 5773555 |
US ENGINEERING COMPANY | HSP | P | 02/23/2018 | LETTER FROM ENGINEER APPROVING FRAMING OF DAMPERS ABOVE DOUBLE DOORS RECEIVED. WILL SCAN ONTO PERMIT MONDAY MORNING. | NANCY | NANCY | | HSP | P | 5772715 |
US ENGINEERING COMPANY | HD | P | 02/23/2018 | bM100.E (BDA 37). DAMPER FRAMING AND ANNULAR SPACING OK. bM100.F (BDA 38), DAMPER FRAMING AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5772683 |
US ENGINEERING COMPANY | HWP | P | 02/22/2018 | bM200.C (BDA 44), (PHASE 1 INTERIOR PIPING). SEE RECORD OF TEST DATED 2/22/18100 LB TEST OK ON CHILLED WATER SUPPLY/RETURN, STEAM CONDENSATE, PUMP CONDENSATE AND HIGH PRESSURE STEAM. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5771299 |
US ENGINEERING COMPANY | HD | P | 02/21/2018 | bM100.E. (BDA 37) CHECK SIZING ON THREE 54 X 16 RETURN AIR FIRE DAMPERS. DAMPER FRAMING AND ANNULAR SPACING OK. | NANCY | NANCY | | HD | P | 5770221 |
US ENGINEERING COMPANY | HD | P | 02/16/2018 | PROVIDE ENGINEER DRAWING FOR ALL DAMPERS INSTALLED ABOVE DOUBLE DOORS OR ANYWHERE THAT IS DIFFERENT FROM THE MANUFACTURERES INTALLATION CRITERIA. WILL ALSO NEED LETTER FROM ENGINEER STATING DRAWING MEETS DAMPER MANUFACTURERES INTENT FOR THE UL LISTING. bM100.A. TEN DAMPER FRAMES OK. | NANCY | NANCY | | HD | P | 5767625 |
US ENGINEERING COMPANY | HD | P | 02/14/2018 | 3/12/18 Note added by NS: dampers installed above double wide doors will need an engineer stamped drawing. There are some doors in this project that are single doors but frames are over 32 inches, will use damper manufacturers instructions for these doors. ANY DAMPERS INSTALLED ABOVE ANY DOOR WIDER THAN THE STANDARD 32 INCH WILL NEED AN ENGINEER STAMPED DRAWING. bM100.A: FOUR DAMPER FRAMES OK. | NANCY | NANCY | | HD | P | 5766067 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 11/22/2019 | revised plans ok. | TAYLOR | TAYLOR | | P= | C | 6407916 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 10/25/2019 | still need to revise plans for underground plumbing and re- route of 3 inch main at basement/ 1st floor. | TAYLOR | TAYLOR | | P= | P | 6380094 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 10/16/2019 | all ok, pending revised plans. | TAYLOR | TAYLOR | | P= | P | 6370029 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 08/12/2019 | BLOCK 16 ok, MINUS sterilizers (x2), cart wash, and 3 comp sink, need air gap @ ultra sonic cleaner, WILL VERIFY PLAN REVISIONS @ NEXT INSPECTION | JOHNS | JOHNS | | P= | P | 6297782 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 06/10/2019 | **NEED to add 2 booster pumps to scope of work **BY FINAL, upload water entry piping for 2 booster pumps to plans ok for 2 booster pumps and piping only @ water entry. NOTE: this completes all PTO phases | JOHNS | JOHNS | | PTO | C | 6225668 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/13/2019 | ok for block 16 test / design | JOHNS | JOHNS | | PTO | P | 6196470 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 05/09/2019 | BLOCK 18 ok | JOHNS | JOHNS | | P= | P | 6194193 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/01/2019 | ok for test / design @ BLOCK 16 above ceiling water / vent, ok to insulate. NOTE: vtr (existing) check ALL bfp's @ final **STILL NEED in wall h20 / | JOHNS | JOHNS | | PTO | P | 6183551 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 04/10/2019 | ok for test / design @ area C. NOTE: this completes all PB phases | JOHNS | JOHNS | | PB | C | 6162151 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/05/2019 | BLOCK 18 3rd floor OBED ok for test / design @ in wall dwv / h20 @ rm#'s 3301 / 3301a / 3214 / 3212 / 3210 / 3218a
BLOCK 17 ok for water stub outs @ rm# BG226 (evs break sink) | JOHNS | JOHNS | | PTO | P | 6156158 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 03/20/2019 | block 12 ok (rm #'s dry storage BG201A abd BG210C) | JOHNS | JOHNS | | P= | P | 6138048 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/20/2019 | ok for test / design for dwv under floor @ rm #'s C3301 and C3301a | JOHNS | JOHNS | | PTO | P | 6111667 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/19/2019 | **NEED to revise plans to show added baths @ 3rd floor @ rm#'s C3301, C3301a, C3210, C3212, AND C3218a, ok for test / design @ under floor dwv piping only for 3rd floor @ grid NB1 up to NA | JOHNS | JOHNS | | PTO | P | 6110254 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/05/2019 | ok fot test / design @ rm# BG226 (evs break sink) for in wall / ceiling, **STILL NEED h20 stub outs @ this location. NOTE: vtr (existing) | JOHNS | JOHNS | | PTO | P | 6097613 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 02/05/2019 | ok for test / design @ rm# BG226 (evs break sink) | JOHNS | JOHNS | | PB | P | 6097608 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/11/2019 | block 11 ok looked at sink in BG210C, design ok, will need plan splice for new location of sink | JOSEPHD | JOSEPHD | | PTO | P | 6076484 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 12/19/2018 | BG210 venting ok | JOSEPHD | JOSEPHD | | PTO | P | 6057509 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 12/17/2018 | block 9 ok | JOSEPHD | JOSEPHD | | P= | P | 6054580 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 12/11/2018 | need plan splice for change in BG210 under ground, up sized to 4" and now sink from C1133 draining into area, under ground test ok | JOSEPHD | JOSEPHD | | PB | P | 6048890 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 12/06/2018 | block 7,8 ok | JOSEPHD | JOSEPHD | | P= | P | 6044543 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 12/05/2018 | 3102-3112 ok 3403-3409 ok 3119-3127 ok | JOSEPHD | JOSEPHD | | P= | P | 6043102 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 12/04/2018 | 3118 shower crossed, 3408-3226 ok less 3118 note: blocks 1,2,3,4,5,6 OK | JOSEPHD | JOSEPHD | | P= | P | 6042338 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 11/30/2018 | BLOCKS 3,4,AND 5 OK. | JOSEPHD | JOSEPHD | | P= | P | 6040340 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 11/30/2018 | 002 ok | JOSEPHD | JOSEPHD | | P= | P | 6039081 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 11/26/2018 | 2219 toilet lacking 5ft clear floor space to sink, 2148,2221,2146,2140,2142,2138,2136,2139,2130,2128,2126 ok | JOSEPHD | JOSEPHD | | P= | P | 6033529 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 11/20/2018 | units 2102-2120 ok | JOSEPHD | JOSEPHD | | P= | P | 6031074 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 11/15/2018 | drinking fountain 00 ok | JOSEPHD | JOSEPHD | | P= | P | 6026375 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 11/12/2018 | corrections in block 5 01 less C1133 sink, rest ok, need to do more research for drinking fountain clearance on 00 | JOSEPHD | JOSEPHD | | P= | P | 6022675 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 11/08/2018 | c1103 sink to high, c1100 sink to close to left hand side wall, c1133 need to see sink completed, mens public rest room urinal to high to front lip, womens public rest room toilet to far off side wall note: block 3 ok | JOSEPHD | JOSEPHD | | P= | P | 6020153 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 10/31/2018 | block 11 ok | JOSEPHD | JOSEPHD | | P= | P | 6011739 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/03/2018 | looked at utility room lvl 00 ok | JOSEPHD | JOSEPHD | | PTO | P | 5984227 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 09/24/2018 | blocks 1 & 2 plumbing complete | JOSEPHD | JOSEPHD | | P= | P | 5974748 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 09/21/2018 | block 1 sinks in rooms A1516 & A1514 to high, need trap guards thru out | JOSEPHD | JOSEPHD | | P= | P | 5972511 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 09/10/2018 | looked at plans splice for underground in addition ok | JOSEPHD | JOSEPHD | | PB | P | 5960098 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 09/06/2018 | 2" water service line to Linac building ok note A1512,A1514,A1516,A1518 sink clearance ok | JOSEPHD | JOSEPHD | | PB | P | 5956697 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 08/28/2018 | lav phase L00 area C and in wall ok, floor drain in area C ok | JOSEPHD | JOSEPHD | | PB | P | 5948046 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/21/2018 | rest ok 3rd floor area E water pipe complete, | JOSEPHD | JOSEPHD | | PTO | P | 5940879 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 08/14/2018 | check in morning for plans revisions | JOSEPHD | JOSEPHD | | PB | P | 5934037 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/14/2018 | need to see water pipe to room 3302, water pipe in c1133 ok, 3rd floor area E venting and water pipe ok | JOSEPHD | JOSEPHD | | PTO | P | 5934025 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/03/2018 | room 3110 accessible bathroom tub valve not in correct position, 3rd floor area F water pipe in center of floor ok, 1402A and 1402B CT rooms water pipe ok | JOSEPHD | JOSEPHD | | PTO | P | 5923910 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/24/2018 | 3rd floor area F water pipe and venting ok plans marked | JOSEPHD | JOSEPHD | | PTO | P | 5912658 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/19/2018 | 3rd floor area F water pipe mains only ok plans marked | JOSEPHD | JOSEPHD | | PTO | P | 5907700 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/10/2018 | level 2 area E water ok corrections made from previous inspection, plans marked | JOSEPHD | JOSEPHD | | PTO | P | 5898227 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/02/2018 | cant have a horizontal dry vent at C2307, not vented correctly at toilet and floor drain C2206 and C2212 rest of area E O2 looked at for drain, plans marked | JOSEPHD | JOSEPHD | | PTO | P | 5891647 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/29/2018 | water pipe 02 east area E and 02 all area F | JOSEPHD | JOSEPHD | | PTO | P | 5889675 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/25/2018 | C34132 shower s-traped, still need to see tubs connected at tested on 02, all other DWV on 02 run and tested , will need to check toilet clearances on 03, all water mains on floor run and tested and piping run to north rooms, will need water lines run at south rooms, will still need to see water run at rooms C2122, C2124, will need to talk to senior inspector about shower valve locations | JOSEPHD | JOSEPHD | | PTO | P | 5884718 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/20/2018 | water pipe on 01 area A water distribution ok | JOSEPHD | JOSEPHD | | PTO | P | 5879816 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/18/2018 | main water risers floor 00-03 ok, 00 area E, 01 area E water pipe ok, except for rooms CG520, CG514, CG524, CL209, CL133, will need plan splice for change at 3" cold water main re-rout 01 near corridor C1-12 | JOSEPHD | JOSEPHD | | PTO | P | 5877847 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/01/2018 | corrections made at level 2 area F, DWV from grid line NB-1 north ok at level area F. | TAYLOR | TAYLOR | | PTO | P | 5861619 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 05/24/2018 | sink at room BG 206C ok. | TAYLOR | TAYLOR | | P= | P | 5854454 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/24/2018 | level 00 area F H2O ok, level 1 area F vents ok. | TAYLOR | TAYLOR | | PTO | P | 5854453 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/21/2018 | Level 2 area F DWV - cannot use horizontal san cross and horizontal san tee for drainage, correct and re-test, ( all showers and sinks ), level 1 area F N4 - N7 to NA - NH domestic water test OK, level 00 area F restroom CG615 in wall water low test design OK | SHANEN | SHANEN | | PTO | P | 5851261 |
OLSON PLUMBING & HEATING COMPANY | PRD | C | 05/01/2018 | Roof drains complete | SHANEN | SHANEN | | PRD | C | 5833004 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/01/2018 | Level 00 area A water distribution test OK | SHANEN | SHANEN | | PTO | P | 5833001 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/25/2018 | 4" secondary feed from water entry to existing mech room test OK | SHANEN | SHANEN | | PTO | P | 5827517 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 04/20/2018 | Roof drain test third floor through roof OK, need to complete and test roof drains for link from third floor through roof | SHANEN | SHANEN | | PRD | P | 5822404 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 04/18/2018 | Area E & F level 02 -03 roof drains test OK | SHANEN | SHANEN | | PRD | P | 5820787 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/18/2018 | Area E & F Level 00 - 01 DWV test OK except rooms EVS 78 and clean linen | SHANEN | SHANEN | | PTO | P | 5820779 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/16/2018 | Area E level 00-01 DWV test OK, room BG206C water in wall test OK | SHANEN | SHANEN | | PTO | P | 5817470 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 04/16/2018 | Area E & F level 00-01 test OK | SHANEN | SHANEN | | PRD | P | 5817466 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 04/13/2018 | Area E & F level 00 - 01 test OK | SHANEN | SHANEN | | PRD | P | 5816167 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/10/2018 | Area A level 01 DWV test OK except rooms 1501 and 1503 | SHANEN | SHANEN | | PTO | P | 5812412 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 04/06/2018 | First floor area A storm drains test OK, NOTE: sanitary area A level 00 up to first floor except AG 412 and AG 409 test OK | SHANEN | SHANEN | | PRD | P | 5809761 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 04/04/2018 | Area A level 00 : roof drain test OK | SHANEN | SHANEN | | PRD | P | 5808033 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/04/2018 | Area F level 00 : sanitary riser column N8 line NI test OK | SHANEN | SHANEN | | PTO | P | 5808030 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 04/03/2018 | Area A level 0 : washer box, floor drain, hub drain, floor clean out , ( all 4" underground, tied-in to 4" sanitary ) column W6 line WC, design and test OK, revise plans to reflect | SHANEN | SHANEN | | PB | P | 5805903 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 11/22/2017 | Area E OK pending approved revisions | SHANEN | SHANEN | | PB | P | 5693608 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 11/22/2017 | Area F OK pending approved revisions | SHANEN | SHANEN | | PRD | P | 5693602 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 11/17/2017 | Area F: Storm ok up to area between N10 and N11-NI and NJ. | SHANEN | SHANEN | | PRD | P | 5688540 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 11/17/2017 | Area F except 4" lateral at N5 between NH and NI, ok pending revisions, COVER AT OWN RISK. | SHANEN | SHANEN | | PB | P | 5688532 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 11/03/2017 | Grid NA - N4 area E - F 6" storm trunk OK | SHANEN | SHANEN | | PRD | P | 5675633 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 11/03/2017 | Grid lines NA - N4 area E - F, 6" sanitary trunk and 2" and 4" branch OK pending plan revisions, cover at own risk | SHANEN | SHANEN | | PB | P | 5675631 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 10/31/2017 | Area E sanitary complete pending approved revisions | SHANEN | SHANEN | | PB | P | 5671814 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 10/26/2017 | Grid ND - N 3.1 : Underground roof drain OK pending approved revisions | SHANEN | SHANEN | | PRD | P | 5667756 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 10/26/2017 | Grid ND - N 3.1 : DWV underground test and design OK pending approved revisions | SHANEN | SHANEN | | PB | P | 5667753 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 10/23/2017 | Partial pending approved revisions - Test OK on 4" sanitary lateral at grid ND and 2" sanitary lateral at grid NE | SHANEN | SHANEN | | PB | P | 5663474 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 10/18/2017 | Test OK, need revisions to show 4"laterals (plans show 6") and added stacks, cover at own risk | SHANEN | SHANEN | | PRD | P | 5659160 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 10/18/2017 | Need revisions showing changes in DWV sizing and stacks, test OK, cover at own risk | SHANEN | SHANEN | | PB | P | 5659145 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 10/06/2017 | 4" sanitary main, (3) laterals, (3) stubs, (1 ) 4" end of line cleanout | JOHNS | JOHNS | | PB | P | 5647096 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 10/04/2017 | changed inspection to PRD under ground 6'' area "E" grid lines NE and NE.1 o.k, revise plans to show 3 new 4'' branches on this line | JOEL | JOEL | | PRD | P | 5645310 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 09/19/2017 | 8 INCH MAIN , 4 STUBS , 4 LATERAL , ON TEST . PLANS MARKED | GABE | GABE | | PB | P | 5629838 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 09/15/2017 | 8 INCH SANITARY AT GRID LINE NB OUT OF BUILDING , ON TEST ,PLANS ARE MARKED | GABE | GABE | | PB | P | 5627662 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 09/12/2017 | 4 AND 6 INCH STORM ON TEST , BETWEEN 3 AND N2 , NE AND NE.1 . PLANS ARE MARKED | GABE | GABE | | PB | P | 5622787 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 08/31/2017 | storm drains , between line wa and ek , column w1 to w6 on test to plan , plans are marked | GABE | GABE | | PB | P | 5612565 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 08/28/2017 | NOTE : STORM ONLY , 8 INCH TO PLAN , ON TEST . LINE W1 TO W7 BETWEEN EN AND WE PLANS ARE MARKED | GABE | GABE | | PB | P | 5609378 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 11/21/2019 | PAID (REC#1646096) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 11/21/19: Delta 8 revisions bP100.E revised level 00 plumbing floor plan area E. Delta 6 revisions bP101.E revised level 01 plumbing floor plan area E. Delta 11 revisions PU100.E revised underfloor plan area E | SHANEN | SHANEN | | XPS | T | 6406528 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 10/21/2019 | PAID (REC#1639799) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 10/21/19: Page bP100.E delta 7 revisions added booster pumps and piping, delta 5 revisions bP101.E mobile eye wash, delta 8 revisions PU100.E relocated 2" domestic water, delta 5 revisions bP801 added booster pump detail, delta 10 revisions bP902 update booster pump schedule, | SHANEN | SHANEN | | XPS | T | 6374961 |
ENCORE ELECTRIC, INC. | XES | P | 08/06/2019 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised peak load. | BERTHA | BERTHA | | XES | P | 6290532 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 08/06/2019 | PAID (REC#1620181) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised horizontal assembly at soiled linen room | LBENNETT | LBENNETT | | XBS | T | 6290406 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 07/02/2019 | PAID (REC#1611221) PLAN SPLICE FEE: $50 by: DANM for Construction: Fire barriers around Soiled (AG305) to terminate at new 2-hr horizontal assembly | DANM | DANM | | XBS | T | 6251916 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 06/25/2019 | PAID (REC#1609157) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised listed assembly for soiled linen room | LBENNETT | LBENNETT | | XBS | T | 6242665 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 06/12/2019 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing | TCRIPPEN | TCRIPPEN | | XPS | P | 6228177 |
ENCORE ELECTRIC, INC. | XES | P | 06/06/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: As builts | SHELBY | SHELBY | | XES | P | 6222840 |
US ENGINEERING COMPANY | XMS | P | 06/05/2019 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Mechanical: new mechanical splice added ducts and fire dampers removed heater, new supply lines adjusted schedules | TCRIPPEN | TCRIPPEN | | XMS | P | 6221518 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 06/05/2019 | PAID (REC#1604783) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Add finished space | MICHAELA | MICHAELA | | XBS | T | 6221344 |
ENCORE ELECTRIC, INC. | XES | P | 05/22/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: As builts | SHELBY | SHELBY | | XES | P | 6207765 |
US ENGINEERING COMPANY | XMS | T | 05/21/2019 | PAID (REC#1600823) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: deltas 8 , 9 and 1 | DALEH | DALEH | | XMS | T | 6206504 |
ENCORE ELECTRIC, INC. | XES | P | 05/02/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: As builts and bathroom additions. | SHELBY | SHELBY | | XES | P | 6185867 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 05/01/2019 | PAID (REC#1595244) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Several revisions to floor plan and ceilings | SHELLEY | SHELLEY | | XBS | T | 6184420 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 04/16/2019 | PAID (REC#1594724) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 4/16/19: Page bP102 delta 6 revisions keynotes 4-6, page bP103 delta 4 revisions keynotes 6-14, page bP203.E delta 3 revisions | SHANEN | SHANEN | | XPS | T | 6167732 |
US ENGINEERING COMPANY | XMS | P | 02/21/2019 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: delta 2-4 on sheet bm200.c...delta 2-7 on sheet bm911 | DALEH | DALEH | | XMS | P | 6112837 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 12/27/2018 | PAID (REC#1568553) PLAN SPLICE FEE: $100 by: TCRIPPEN for Plumbing: plumbing splice 2018 for elevator sump disgharge to the exterior | TCRIPPEN | TCRIPPEN | | XPS | T | 6064060 |
US ENGINEERING COMPANY | XMS | T | 12/11/2018 | PAID (REC#1563663) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: Mechanical splice 12/11/18 | TCRIPPEN | TCRIPPEN | | XMS | T | 6049064 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 11/20/2018 | PAID (REC#1557776) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise rated assembly | MICHAELA | MICHAELA | | XBS | T | 6030881 |
US ENGINEERING COMPANY | XMS | P | 09/25/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised med gas room damper layout | JUSTINC | JUSTINC | | XMS | P | 5975492 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 08/24/2018 | PAID (REC#1530791) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Move a door and add rated ceiling. | BPHILLIPS | BPHILLIPS | | XBS | T | 5945592 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 08/14/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 8-14-18 | TCRIPPEN | TCRIPPEN | | XPS | P | 5933874 |
US ENGINEERING COMPANY | XMS | P | 08/10/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | XMS | P | 5930803 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | P | 07/25/2018 | PLAN SPLICE: (No Fee) by: DANM for Construction: Entire set resubmitted with multiple revisions throughout | DANM | DANM | | XBS | P | 5914215 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | P | 04/04/2018 | PLAN SPLICE: (No Fee) by: JAY for Construction: N/A for construction. | JAY | JAY | | XBS | P | 5807162 |