R.G. BRINKMANN COMPANY | B= | C | 02/13/2018 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 5764233 |
R.G. BRINKMANN COMPANY | B= | P | 02/06/2018 | Third party reports on file / core & shell complete pending other Finals. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | RICHB | RICHB | | B= | P | 5758005 |
R.G. BRINKMANN COMPANY | BFR | C | 02/06/2018 | Stamped observations for all structural framing received | RICHB | RICHB | | BFR | C | 5757794 |
R.G. BRINKMANN COMPANY | BFT | C | 02/05/2018 | Stamped observation received | RICHB | RICHB | | BFT | C | 5756533 |
R.G. BRINKMANN COMPANY | BFN | C | 02/05/2018 | Stamped observation on file | RICHB | RICHB | | BFN | C | 5756529 |
R.G. BRINKMANN COMPANY | B= | P | 01/31/2018 | Core & Shell OK pending third party reports and other Finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | RICHB | RICHB | | B= | P | 5753683 |
R.G. BRINKMANN COMPANY | BFR | P | 01/31/2018 | Need stamped structural steel reports to complete BFR - spoke with Contractor - final report forthcoming | RICHB | RICHB | | BFR | P | 5753670 |
R.G. BRINKMANN COMPANY | BFN | P | 01/31/2018 | Need stamped reports to complete BFN - spoke with Contractor - final report forthcoming | RICHB | RICHB | | BFN | P | 5753658 |
R.G. BRINKMANN COMPANY | BFT | P | 01/31/2018 | Need stamped reports to complete BFT - spoke with Contractor - final report forthcoming | RICHB | RICHB | | BFT | P | 5753654 |
R.G. BRINKMANN COMPANY | BIN | C | 01/31/2018 | Insulation complete | RICHB | RICHB | | BIN | C | 5753650 |
R.G. BRINKMANN COMPANY | BSP | P | 01/30/2018 | Stamped detail for sealing around bar joist received | RICHB | RICHB | | BSP | P | 5751046 |
R.G. BRINKMANN COMPANY | BSP | P | 01/25/2018 | Received updated listing for rated assembly construction - materials verified / received penetrations details for firestopping - all penetrations OK except bar joists - still need approved detail for this condition | RICHB | RICHB | | BSP | P | 5747990 |
R.G. BRINKMANN COMPANY | BSP | P | 01/23/2018 | Discussed required detail for bar joist penetration through rated wall assembly - still need to inspect firestopping at rated walls / discussed UL listing discrepancy previously noted | RICHB | RICHB | | BSP | P | 5744683 |
R.G. BRINKMANN COMPANY | BIN | P | 01/09/2018 | Wall insulation at concrete panels approx 95% complete - need to inspect south wall at doors, etc where it's not yet pinned & trimmed | RICHB | RICHB | | BIN | P | 5732805 |
R.G. BRINKMANN COMPANY | BFR | P | 01/09/2018 | Discussed outstanding items from previous inspection with Dillon (Brinkmann) - previously requested items are all being obtained / discussed B= requirements ///// ADDITIONAL COMMENT (SAME DAY) - need plans updated showing relocation of non-rated demising wall from Grid 6 to Grid 5 | RICHB | RICHB | | BFR | P | 5732785 |
R.G. BRINKMANN COMPANY | BFR | P | 12/12/2017 | Framing for rated walls at riser & elec room OK / NOTE - rated walls called out as UL U419 (see sheet A7.5) - American Gypsum is being installed, which is not in listing / will need to inspect head-of-wall construction per details 8 & 9 on A7.5 / discussed penetration protection in rated partition - will need details for all penetrations (fire sprinkler, conduit, roof truss, etc) - see IBC 713.3.1 / glazing ongoing - verified safety glazing in some areas (scope not complete yet) / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5709975 |
R.G. BRINKMANN COMPANY | BSP | P | 11/15/2017 | Courtesy inspection of roof insulation & membrane progress / also discussed the full-height partition (on Grid 6) - penetrations not required to be firestopped (non-rated wall) / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5686075 |
R.G. BRINKMANN COMPANY | BFR | P | 11/15/2017 | Framing for non-bearing, non-rated full-height demising wall OK - no roughs located in this wall per plans / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5686051 |
R.G. BRINKMANN COMPANY | BSP | P | 10/18/2017 | Courtesy inspection to check progress of work and third party inspections - steel inspections ongoing / will need copies of all third party inspections for structure prior to completing BFR inspection | RICHB | RICHB | | BSP | P | 5659417 |
R.G. BRINKMANN COMPANY | B16 | P | 10/10/2017 | Met with Dillon & Cody (Brinkmann) / discussed third party inspection requirements (hard copies logged onsite) / discussed upcoming schedule & features of work requiring PPRBD inspections / permit set reviewed onsite | RICHB | RICHB | | B16 | P | 5649942 |
BIBLE ELECTRIC, INC. | E= | C | 01/30/2018 | site lighting ok , ( east end of building finished on permit # L23709 ) | TOMC | TOMC | | E= | C | 5751956 |
BIBLE ELECTRIC, INC. | ER | C | 01/25/2018 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | ER | C | 5748051 |
BIBLE ELECTRIC, INC. | E= | C | 01/25/2018 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | E= | C | 5748052 |
BIBLE ELECTRIC, INC. | E= | C | 01/25/2018 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | E= | C | 5747692 |
BIBLE ELECTRIC, INC. | E= | C | 01/25/2018 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | E= | C | 5747691 |
BIBLE ELECTRIC, INC. | ER | C | 01/25/2018 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | ER | C | 5747690 |
BIBLE ELECTRIC, INC. | ER | P | 01/09/2018 | FIRE ALARM INSPECTION: pump controller | TOMC | TOMC | | ER | P | 5732889 |
BIBLE ELECTRIC, INC. | ES | C | 01/09/2018 | Commercial Service: 200 amp 480 volt meter for fire pump ----- ok to set meter and seal | TOMC | TOMC | | ES | C | 5732875 |
BIBLE ELECTRIC, INC. | ES | P | 01/04/2018 | Commercial Service: Bldg 2570 1600 amp service 480 volt Bldg 2570 suite 100 ---- 800 amp 480 volt CT meter ---- ok to energize Bldg 2570 house 200 amp 480 volt direct meter ------ ok to energize | TOMC | TOMC | | ES | P | 5728778 |
BIBLE ELECTRIC, INC. | EUG | P | 09/22/2017 | 1" pvc for site lighting | TOMC | TOMC | | EUG | P | 5633931 |
BIBLE ELECTRIC, INC. | EUG | P | 08/30/2017 | 7 - 3" , 2 - 1" , 2 - 2.5" to future tenant finish | TOMC | TOMC | | EUG | P | 5611607 |
BIBLE ELECTRIC, INC. | EUG | P | 08/29/2017 | uffer chipped in and attached to bottom most re bar-----OK | CRAIGS | CRAIGS | | EUG | P | 5609888 |
BIBLE ELECTRIC, INC. | EUG | R | 08/28/2017 | CAN NOT MAKE YOUR OWN UFER ---NEED TO CHIP INTO THE FOUNDATION AND FIND THE REBAR---- | BRIAN | BRIAN | | EUG | R | 5609109 |
BOCHNAK MECHANICAL, INC. | H= | C | 02/08/2018 | CORRECTIONS MADE | MARKB | MARKB | | H= | C | 5760837 |
CBA MECHANICAL LLC | H= | C | 02/06/2018 | Correction made | MARKB | MARKB | | H= | C | 5758149 |
CBA MECHANICAL LLC | HV | C | 02/05/2018 | Still need engineer to address height change for unit heaters, OTHER CORRECTIONS MADE | MARKB | MARKB | | HV | C | 5756620 |
CBA MECHANICAL LLC | H= | P | 01/31/2018 | FINAL PENDING - Completion of "HV" inspection and plan splice showing middle heaters in unit #100 raised to 30'. | MARKB | MARKB | | H= | P | 5752927 |
CBA MECHANICAL LLC | HV | P | 01/31/2018 | UNIT HEATER VENTS ON SOUTH SIDE LACK SUPPORT. EXTEND VENTS ABOVE PARAPET PER CODE. | MARKB | MARKB | | HV | P | 5752925 |
CBA MECHANICAL LLC | HD | C | 01/31/2018 | MAU, UNITS HEATERS AND BUILDING RELIEF PER PLAN. | MARKB | MARKB | | HD | C | 5752923 |
BOCHNAK MECHANICAL, INC. | H= | P | 01/25/2018 | Gas stubs at meter need to be tagged with suite numbers. Need medium pressure stickers at meter. Regulator vents on roof need to be pointed down per install instructions. Rest OK. | MARKB | MARKB | | H= | P | 5747535 |
BOCHNAK MECHANICAL, INC. | HC | C | 12/13/2017 | RELEASE METER for suite #100 and 180 | MARKB | MARKB | | HC | C | 5711672 |
BOCHNAK MECHANICAL, INC. | HI | C | 12/13/2017 | 10 PSI PRESSURE TEST AND PIPING PER PLAN OK FOR SUITE # 100 & 180. Still need medium pressure stickers and regulators installed | MARKB | MARKB | | HI | C | 5711671 |
BOCHNAK MECHANICAL, INC. | P= | C | 02/08/2018 | core and shell | TED | TED | | P= | C | 5760429 |
BOCHNAK MECHANICAL, INC. | PRD | C | 02/08/2018 | west canopy drain | TED | TED | | PRD | C | 5760422 |
BOCHNAK MECHANICAL, INC. | PRD | P | 01/30/2018 | 2-north west roof drains ok | TED | TED | | PRD | P | 5751226 |
BOCHNAK MECHANICAL, INC. | PTO | P | 01/30/2018 | backflow R.P. device for water meter protection outside above meter pit, will need freeze protection by final | TED | TED | | PTO | P | 5751224 |
BOCHNAK MECHANICAL, INC. | PRD | P | 01/25/2018 | 2- center north drains | TED | TED | | PRD | P | 5747242 |
BOCHNAK MECHANICAL, INC. | PRD | P | 01/12/2018 | 2- north east drains and south east canopy drain ok | TED | TED | | PRD | P | 5736418 |
BOCHNAK MECHANICAL, INC. | PTO | P | 12/05/2017 | Test and design for domestic water ok, overhead piping to mechanical room drop columns A-E and 5-13, drawings marked (P1.1 and P1.2). | DANR | DANR | | PTO | P | 5702334 |
BOCHNAK MECHANICAL, INC. | PB | P | 08/22/2017 | deep base and risers from 9 line to outside building ok | TED | TED | | PB | P | 5602748 |
BOCHNAK MECHANICAL, INC. | PB | P | 08/16/2017 | deep base and clean outs from 5 line to 9 line test and design ok | TED | TED | | PB | P | 5596967 |
BOCHNAK MECHANICAL, INC. | PB | P | 08/04/2017 | ok for floor clean outs @1 line to 5 line test and design ok. note: floor clean outs every 100' max | JOHNS | JOHNS | | PB | P | 5585781 |