COLORADO STRUCTURES INC | B= | C | 06/06/2018 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 5865526 |
COLORADO STRUCTURES INC | B= | P | 05/09/2018 | pending other final inspections. Additional Inspections Required (computer generated): COLORADO MECHANICAL SYSTEMS,INC Mechanical Final Inspection is not Completed yet, INTERSTATE MECHANICAL, INC. Plumbing Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 5839482 |
COLORADO STRUCTURES INC | B= | P | 04/09/2018 | Temp CO: paritials ( Expires: 5/9/2018 12:00:00 AM) | JANE | JANE | | B= | P | 5811363 |
COLORADO STRUCTURES INC | B= | P | 03/09/2018 | Temp CO: variance denied ( Expires: 4/8/2018 12:00:00 AM) | JANE | JANE | | B= | P | 5785136 |
COLORADO STRUCTURES INC | B= | P | 02/07/2018 | Temp CO: One extension sub trade finals still pending ( Expires: 3/9/2018 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 5759997 |
COLORADO STRUCTURES INC | BSP | P | 01/09/2018 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical | SHELBY | SHELBY | | BSP | P | 5733596 |
COLORADO STRUCTURES INC | B= | P | 01/09/2018 | Temp CO: Finals are done-pending ( Expires: 2/8/2018 12:00:00 AM) | GITA | GITA | | B= | P | 5732306 |
INTERSTATE MECHANICAL, INC. | BSP | P | 01/08/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 1-8-2018 | TCRIPPEN | TCRIPPEN | | BSP | P | 5732186 |
COLORADO STRUCTURES INC | B= | P | 01/08/2018 | Building final complete pending other finals // No return needed. Additional Inspections Required (computer generated): COLORADO MECHANICAL SYSTEMS,INC Mechanical Final Inspection is not Completed yet, INTERSTATE MECHANICAL, INC. Plumbing Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5731878 |
COLORADO STRUCTURES INC | BSP | T | 01/08/2018 | PAID (REC#1475025): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Changed from M to B occupancy. | BPHILLIPS | BPHILLIPS | | BSP | T | 5731268 |
COLORADO STRUCTURES INC | BFR | P | 12/08/2017 | Interior wall framing OK // Discussed accessible elements in restroom and break room | JEREMYA | JEREMYA | | BFR | P | 5707499 |
COLORADO STRUCTURES INC | BSP | P | 10/26/2017 | PLAN SPLICE: (No Fee) by: MICHAELA for Construction: Remove expansion of door opening | MICHAELA | MICHAELA | | BSP | P | 5668268 |
COLORADO STRUCTURES INC | BSP | P | 10/25/2017 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: delta 2 | DALEH | DALEH | | BSP | P | 5667455 |
GDS ELECTRIC | BSP | P | 10/25/2017 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Added receptacles, revised unit number on one-line, revised panel schedule. | BERTHA | BERTHA | | BSP | P | 5667389 |
INTERSTATE MECHANICAL, INC. | BSP | T | 10/25/2017 | PAID (REC#1469637): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 10-25-2017 | TCRIPPEN | TCRIPPEN | | BSP | T | 5667344 |
GDS ELECTRIC | E= | C | 05/08/2018 | | MIGUEL | MIGUEL | | E= | C | 5838944 |
GDS ELECTRIC | E= | P | 01/05/2018 | Complete changed to partial by Dean. This to allow for another E= for fan that was installed. | CRAIGS | CRAIGS | | E= | P | 5730411 |
GDS ELECTRIC | E= | R | 01/04/2018 | gfci cant go behind the washer --- correct the panel schedule to rtu 7 not 1 | CRAIGS | CRAIGS | | E= | R | 5729271 |
GDS ELECTRIC | ER | P | 01/02/2018 | leave tiles out so I can see the low voltage is up off the grid ---- need a show window receptacle | CRAIGS | CRAIGS | | ER | P | 5726800 |
GDS ELECTRIC | ER | P | 12/08/2017 | rest room / break room walls and fished walls OK | CRAIGS | CRAIGS | | ER | P | 5707892 |
GDS ELECTRIC | ES | C | 08/21/2017 | Commercial Service: 200 amp 4/w new service --- needs meter and sealed | CRAIGS | CRAIGS | | ES | C | 5602039 |
GDS ELECTRIC | EP | C | 08/21/2017 | 200 amp 4/w -- feeders only | CRAIGS | CRAIGS | | EP | C | 5602038 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | C | 06/01/2018 | | MARKB | MARKB | | H= | C | 5862442 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 05/30/2018 | New Test And Balance accepted | MARKB | MARKB | | H= | P | 5858341 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 05/18/2018 | CONTRACTOR TO ADDRESS - EF - 2 Exhaust fan is exhausting more than 10% of what schedule is showing OVER 165 CFM NEGATIVE. STILL NEED - Smoke duct detector and remote installed. | MARKB | MARKB | | H= | P | 5848772 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 05/16/2018 | STILL NEED FOR FINAL - Duct mounted smoke detector with remote indicator installed per previous inspection notes and provide Test And Balance Report. OTHER ITEMS ADDRESSED. | MARKB | MARKB | | H= | P | 5846803 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 05/08/2018 | Return air transfers are not installed per plan. Need ceiling tiles removed to inspect supply diffusers, new exhaust and bath exhaust duct. Further research required on exhaust in return air plenum. Need access to roof, need to confirm smoke duct detector/remote indicator and provide Test and Balance report. NOTE ADDED : After discussion with mechanical contractor, dryer duct will be required to be sleeved through return air plenum. | MARKB | MARKB | | H= | P | 5839314 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 01/08/2018 | FINAL PENDING - COMPLETION OF ANY NEW ITEMS ON PLAN SPLICE, FINAL WALK AND TAB REPORT | MARKB | MARKB | | H= | P | 5731872 |
COLORADO MECHANICAL SYSTEMS, LLC | HD | P | 01/05/2018 | AFTER DISCUSSION WITH JON B.(SENIOR MECHANICAL INSPECTOR) JUSTIN C. (PLAN REVIEW) JEREMY A. (BUILDING INSPECTOR), PLAN SHOWS AN OCCUPANCY "M". PLANS NEED TO BE RESUBMITTED THROUGH ALL PLAN REVIEW DEPARTMENTS TO INCLUDE: BUILDING, ELECTRICAL, MECHANICAL AND PLUMBING TO CHANGE TO A "B" OCCUPANCY AND SHOWING USE AS HAIR CUTTING. ADDITIONAL EXHAUST AND VENTILATION ITEMS MAY BE REQUIRED. | MARKB | MARKB | | HD | P | 5730764 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | L | 01/03/2018 | No call ahead number provided, unit locked at 3:46 | MARKB | MARKB | | H= | L | 5728122 |
COLORADO MECHANICAL SYSTEMS, LLC | HD | P | 12/13/2017 | DRYER DUCT AND SUPPLY IN BREAK ROOM OK. | MARKB | MARKB | | HD | P | 5710886 |
COLORADO MECHANICAL SYSTEMS, LLC | HD | P | 12/08/2017 | ABOVE CEILING DUCT - S/R MAINS OK TO INSULATE AND INSTALLED PER PLAN. Still need dryer duct installed, supply in break room and approved duct on bath exhaust. | MARKB | MARKB | | HD | P | 5707321 |
INTERSTATE MECHANICAL, INC. | P= | C | 06/06/2018 | Corrections made. | DANR | DANR | | P= | C | 5865525 |
INTERSTATE MECHANICAL, INC. | P= | P | 01/08/2018 | pending plan revisions, see pto notes, pending plan review, see 1/5/18 mech notes, STILL NEED TO ADD 1 SINK (SHAMPOO) TO SCOPE OF WORK, NEED ROOF JACK @ VENT, CAN COMPLETE WITH UPLOADED IMAGE ONCE CORRECTIONS, REVISIONS, AND PLAN REVIEW IS COMPLETE | JOHNS | JOHNS | | P= | P | 5731287 |
INTERSTATE MECHANICAL, INC. | P= | R | 01/04/2018 | add shampoo sink to scope, leak under shampoo sink, need temperature @ shampoo sink to 110 degrees (can not use water htr has a tempering device), need vacuum breaker @ shampoo sink, need flush handle on open side @ water closet, caulk utility sink, support vertical portion of drain pan piping, cold domestic 3/4" water under sized with a total of 13.25 wsfu (this was discussed @ pto), still need to revise plans (refer to pto notes), need roof access @ next inspection, rest ok | JOHNS | JOHNS | | P= | R | 5729081 |
INTERSTATE MECHANICAL, INC. | PTO | C | 12/07/2017 | need to add shampoo sink to scope, need to revise plans to show water lines to shampoo sink and clarify ALL pipe sizing,rest ok. note: vtr (1), need to check water htr @ final, need to verify final water tie ins , (cold wsfu for total load can not feed of 3/4, need to split load or take a minimum of 3.75 wsfu off 3/4 load) | JOHNS | JOHNS | | PTO | C | 5706720 |
INTERSTATE MECHANICAL, INC. | PB | C | 08/14/2017 | need to attach all permits, rest ok for pb only | JOHNS | JOHNS | | PB | C | 5594590 |
COLORADO MECHANICAL SYSTEMS, LLC | XMS | P | 04/25/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised exhaust system for barber shop | JUSTINC | JUSTINC | | XMS | P | 5826579 |