MERRITT GENERAL CONTRACTORS, INC. | B= | C | 10/30/2017 | all finals now complete | DANE | DANE | | B= | C | 5670651 |
MERRITT GENERAL CONTRACTORS, INC. | B= | P | 10/30/2017 | final OK pending other finals. Additional Inspections Required (computer generated): PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5670646 |
MERRITT GENERAL CONTRACTORS, INC. | B= | P | 10/25/2017 | pending completion of plumb, elec and mech finals building okay. Additional Inspections Required (computer generated): ARTISAN PIPE SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet, RCS ELECTRIC Electrical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 5666425 |
ARTISAN PIPE SYSTEMS, INC. | BSP | T | 09/28/2017 | PAID (REC#1455988) PLAN SPLICE FEE: $50 by: DALEH for Plumbing: relocated water heater | DALEH | DALEH | | BSP | T | 5639791 |
MERRITT GENERAL CONTRACTORS, INC. | BFR | P | 09/07/2017 | framing OK pending other roiughs / discussed accessible elements | DANE | DANE | | BFR | P | 5619362 |
RCS ELECTRIC | E= | C | 10/25/2017 | | BRET | BRET | | E= | C | 5667338 |
RCS ELECTRIC | E= | P | 10/23/2017 | reception area only, relocate gfci receptacle behind water cooler. missing lights in bathroom. add light for water heater above bath lid install switch and lockable cover for sign. | BRET | BRET | | E= | P | 5664000 |
RCS ELECTRIC | ER | C | 10/17/2017 | | BRET | BRET | | ER | C | 5658122 |
RCS ELECTRIC | ER | P | 09/13/2017 | soffits and hard lids ok, disconnect for water heater must be located at access panel | BRET | BRET | | ER | P | 5624766 |
RCS ELECTRIC | ER | P | 09/06/2017 | wall ok soffit not ready if water heater above bath lid 24x30 access required | BRET | BRET | | ER | P | 5617132 |
RCS ELECTRIC | ESL | P | 08/18/2017 | 3/4" pvc for power 1" pvc and 2" pvc for data | CRAIG | CRAIG | | ESL | P | 5600463 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 10/30/2017 | MECHANICAL FINAL OK. TEST AND BALANCE REPORT RECEIVED, SEE IMAGES, | NANCY | NANCY | | H= | C | 5670617 |
ARTISAN PIPE SYSTEMS, INC. | H= | C | 10/25/2017 | GAS FINAL OK. | NANCY | NANCY | | H= | C | 5667308 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 10/25/2017 | PERMANENTLY LABEL EQUIPMENT ON ROOF WITH SUITE 120. CO2 SENSOR LOCATED WHERE? PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5667298 |
ARTISAN PIPE SYSTEMS, INC. | H= | P | 10/24/2017 | INSTALL TWO MISSING CLAMPS ON NEW GAS LINE ON ROOF. | NANCY | NANCY | | H= | P | 5665777 |
PEAK HEATING & AIR CONDITIONING, INC. | HV | C | 10/11/2017 | FURNACE VENT ABOVE CEILING ALL OK. STILL NEED TO SEE TERMINATION ON ROOF. | NANCY | NANCY | | HV | C | 5652044 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | C | 10/11/2017 | ABOVE CEILING ALL OK INCLUDING FURNACE, A/C AND CONDENSATE DRAINS. FOR FINAL STILL NEED TO SEE ROOF, INSTALL CO2 SENSOR IN RTU-1 RETURN AIR DUCT, PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | HD | C | 5652031 |
ARTISAN PIPE SYSTEMS, INC. | HC | C | 09/25/2017 | OK TO RELEASE METER PER ADDED LOAD. | LIDO | LIDO | | HC | C | 5636387 |
ARTISAN PIPE SYSTEMS, INC. | HI | C | 09/25/2017 | BY FINAL NEED UNIT # 120 ON PERMIT , ID BRANCH AT METER FOR UNIT # 120 SERVED AND FINAL CONNECTION TO FURNACE . 10 lb TEST OK. NOTE: GAS SYSTEM INSTALLED PER PLAN. | LIDO | LIDO | | HI | C | 5636386 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 09/15/2017 | ABOVE CEILING HARD LIDS AND EXPOSED MAINS AND RUN OUTS - STILL MAIN DUCT CONNECTIONS IN BACK AREA - ROOF INSPECTION - VENT - DRAINS | JERRYF | JERRYF | | HD | P | 5627861 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | L | 09/13/2017 | NO ACCESS AT 4:15 - NEED SUITE NUMBER 120 ADDED TO PERMIT | JERRYF | JERRYF | | HD | L | 5625267 |
ARTISAN PIPE SYSTEMS, INC. | P= | C | 10/24/2017 | OK, | SHANEN | SHANEN | | P= | C | 5665531 |
ARTISAN PIPE SYSTEMS, INC. | PTO | C | 09/07/2017 | dwv and water to plan . need to splice plans to show water heater placement , size and mop sink | GABE | GABE | | PTO | C | 5619294 |
ARTISAN PIPE SYSTEMS, INC. | PB | P | 08/17/2017 | DWV ON TEST , NEED TO REVISE PLANS TO SHOW CHANGES , COMBO WASTE AND VENT | GABE | GABE | | PB | P | 5598485 |