AM KING CONSTRUCTION COMPANY, LLC | B= | C | 05/09/2018 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5839506 |
MEL-RO CONSTRUCTION INC | B= | P | 05/08/2018 | final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | DANE | DANE | | B= | P | 5838837 |
AM KING CONSTRUCTION COMPANY, LLC | B= | P | 05/01/2018 | final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), COMMERCIAL DESIGN ENGR LTD Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5832217 |
AM KING CONSTRUCTION COMPANY, LLC | BSP | P | 04/12/2018 | met at site trailer to discuss inspection process to get C. O. for core shell permits and need for C. O. for tenant finishes to get C. O. | DANE | DANE | | BSP | P | 5815347 |
MEL-RO CONSTRUCTION INC | BBB | P | 02/22/2018 | engineer letter of compliance received for excavation observation, foundation observation, bond beams and welding and bolting connections | DANE | DANE | | BBB | P | 5771346 |
MEL-RO CONSTRUCTION INC | BFN | C | 02/22/2018 | engineer letter of compliance received for excavation observation, foundation observation, bond beams and welding and bolting connections | DANE | DANE | | BFN | C | 5771345 |
AM KING CONSTRUCTION COMPANY, LLC | BFR | P | 02/22/2018 | engineer letter of observation received for excavation observation, foundation observation, bond beams and welding and bolting connections / this completes the BFR pending other roughs | DANE | DANE | | BFR | P | 5771343 |
AM KING CONSTRUCTION COMPANY, LLC | BIN | P | 01/26/2018 | wall insulation at north fur out walls OK | DANE | DANE | | BIN | P | 5748767 |
AM KING CONSTRUCTION COMPANY, LLC | BFR | P | 01/26/2018 | exterior wall fur out framing and insulation at north wall of all units OK pending other rough inspections / still need all engineer observations for footing foundation and bond beams and welding and bolting and open hole to complete BFT BFN and BBB and BFR inspections | DANE | DANE | | BFR | P | 5748748 |
COMMERCIAL DESIGN ENGEERING LTD | BSP | P | 01/17/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised gas meter location and revised piping layout | JUSTINC | JUSTINC | | BSP | P | 5740498 |
AM KING CONSTRUCTION COMPANY, LLC | BIN | P | 01/16/2018 | exterior thermal OK at framed walls | JEREMYA | JEREMYA | | BIN | P | 5738998 |
AM KING CONSTRUCTION COMPANY, LLC | BLA | C | 01/11/2018 | stucco lath OK | DANE | DANE | | BLA | C | 5735379 |
AM KING CONSTRUCTION COMPANY, LLC | BFR | P | 01/11/2018 | still need engineer observations for footing, foundation and bond beams and still need open hole observation and still need engineer observations for all welding and bolting at bar joists for roof and for RTU's / interior light gage framing at fur out walls OK pending other roughs / the walls that are rated for other than IBC at water/electric room have been uncovered and are framed per the plans (UL U419) | DANE | DANE | | BFR | P | 5735378 |
MEL-RO CONSTRUCTION INC | BFR | P | 12/20/2017 | Demising wall framing OK // Framing at water entry room and electric room covered with drywall and insulated. Will need to consult Commercial Inspector Swennes on whether or not to remove ALL drywall and insulation (my recommendation) from one side of the walls or not. | JEREMYA | JEREMYA | | BFR | P | 5719225 |
MEL-RO CONSTRUCTION INC | BFR | P | 11/03/2017 | second bay from east end not built per detail - no box header called out in detail - need to pre- insulate box header under parapet wall at 2nd bay from east end of building and inside studs are all to extend to beam above per detail 3 on page A301 / still need to install all backing for canopies - can see this backing from interior / all other exterior light gauge framing over store fronts OK / please call a follow up inspection once items for 2nd bay from east are resolved | DANE | DANE | | BFR | P | 5675747 |
MEL-RO CONSTRUCTION INC | BBB | P | 10/09/2017 | met on site with contractor and discussed OK to use engineer for bond beams and structural steel welding and bolting inspections / letter of compliance is to follow / discussed need for open hole and engineer letter of compliance for footings as well / also discussed inspection process | DANE | DANE | | BBB | P | 5648937 |
MEL-RO CONSTRUCTION INC | BFI | C | 10/09/2017 | R10 foundation insulation installed OK | DANE | DANE | | BFI | C | 5648936 |
MEL-RO CONSTRUCTION INC | BFN | P | 10/04/2017 | ok to use engineer to do inspections with observation letters and soils reports to be picked up by inspector may need drain inspections and BFI also/need ufer addressed in letters | BERTW | BERTW | | BFN | P | 5645083 |
MEL-RO CONSTRUCTION INC | BFT | P | 10/04/2017 | ok to use engineer to do inspections with observation letters and soils reports to be picked up by inspector may need drain inspections and BFI also/need ufer addressed in letters | BERTW | BERTW | | BFT | P | 5645081 |
FOSTER ELECTRIC CORPORATION | E= | C | 04/25/2018 | Final complete per splice / | ROB | ROB | | E= | C | 5827636 |
FOSTER ELECTRIC CORPORATION | E= | C | 04/25/2018 | Approved per Matt. / | ROB | ROB | | E= | C | 5826195 |
FOSTER ELECTRIC CORPORATION | E= | R | 04/17/2018 | need splice for rtu-5 that was added and sizes of all units | RANDY | RANDY | | E= | R | 5818841 |
FOSTER ELECTRIC CORPORATION | ER | C | 04/17/2018 | | RANDY | RANDY | | ER | C | 5818837 |
FOSTER ELECTRIC CORPORATION | ES | C | 04/10/2018 | Commercial Service: 600 amp service need meter set for unit 100 -200 amp and unit 110- 200 amp | BRET | BRET | | ES | C | 5812291 |
FOSTER ELECTRIC CORPORATION | EP | R | 03/28/2018 | need available fault current calculations, if series rated verify breaker and fuse ratings and install required label | BRET | BRET | | EP | R | 5801383 |
FOSTER ELECTRIC CORPORATION | E= | C | 03/14/2018 | FIRE ALARM INSPECTION: | CRAIG | CRAIG | | E= | C | 5788176 |
FOSTER ELECTRIC CORPORATION | E= | C | 03/14/2018 | FIRE ALARM INSPECTION: 16/2 fplp | CRAIG | CRAIG | | E= | C | 5788175 |
FOSTER ELECTRIC CORPORATION | ER | C | 03/14/2018 | FIRE ALARM INSPECTION: 16/2 fplp | CRAIG | CRAIG | | ER | C | 5788174 |
FOSTER ELECTRIC CORPORATION | ES | P | 02/09/2018 | Commercial Service: 600 amp., 4-wire service, and "HOUSE" meter | GARYL | GARYL | | ES | P | 5762388 |
FOSTER ELECTRIC CORPORATION | EUG | P | 01/25/2018 | this building all cassions for pole lights | GARYL | GARYL | | EUG | P | 5747818 |
FOSTER ELECTRIC CORPORATION | EUG | P | 01/24/2018 | trenching for pole lights complete, only cassions left | GARYL | GARYL | | EUG | P | 5746667 |
FOSTER ELECTRIC CORPORATION | ER | P | 01/10/2018 | south walls, interior | GARYL | GARYL | | ER | P | 5734706 |
FOSTER ELECTRIC CORPORATION | ER | P | 12/18/2017 | exterior walls, no electrical on interior walls | GARYL | GARYL | | ER | P | 5716123 |
FOSTER ELECTRIC CORPORATION | EUG | P | 12/08/2017 | from building to isiand, from island to island | GARYL | GARYL | | EUG | P | 5707526 |
FOSTER ELECTRIC CORPORATION | EUG | P | 12/01/2017 | site lighting run 15' out of building | GARYL | GARYL | | EUG | P | 5700206 |
FOSTER ELECTRIC CORPORATION | EUG | P | 11/30/2017 | conduits going into building to panel | GARYL | GARYL | | EUG | P | 5698877 |
FOSTER ELECTRIC CORPORATION | EUG | P | 10/20/2017 | Ground rods only | GARYL | GARYL | | EUG | P | 5662399 |
FOSTER ELECTRIC CORPORATION | EUG | R | 09/27/2017 | did not go to site, wrong address called in | GARYL | GARYL | | EUG | R | 5638889 |
FOSTER ELECTRIC CORPORATION | EUG | P | 09/26/2017 | no address's, secondary's with tele line, inside of bldg to outside | GARYL | GARYL | | EUG | P | 5637558 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/13/2017 | ufer okay on this building,,,, NOTE! come in off of Chills blvd and you can drive to most of the site, come in thru Focus of the Family and you'll walk a mile | GARYL | GARYL | | ER | P | 5625002 |
FOSTER ELECTRIC CORPORATION | EUG | T | 09/11/2017 | PAID (REC#1452488): 2nd time no reb | GARYL | GARYL | | EUG | T | 5622024 |
COMMERCIAL DESIGN ENGEERING LTD | H= | C | 05/07/2018 | MECHANICAL FINAL OK. CORRECTION MADE, SEE IMAGES. | NANCY | NANCY | | H= | C | 5836967 |
COMMERCIAL DESIGN ENGEERING LTD | H= | P | 04/25/2018 | RTU-5 EXHAUST IS WITHIN TEN FEET OF RTU-7 ECONOMIZER. | NANCY | NANCY | | H= | P | 5826968 |
COMMERCIAL DESIGN ENGEERING LTD | H= | P | 04/23/2018 | Partial pending for - LADDER ACCESS TO ROOF HAS A TOE SPACING OF 3.5 INCHES CODE REQUIRES 6" MINIMUM REFER TO IMC 306.5 ( # 2 | LIDO | LIDO | | H= | P | 5823942 |
COMMERCIAL DESIGN ENGEERING LTD | H= | P | 04/18/2018 | DUCT DETECTORS AND THERMOSTATS IN UNIT 130 OK . REFER TO PREVIOUS NOTES FOR LADDER AND ACCESS TO ROOF CONCERNS . | LIDO | LIDO | | H= | P | 5820896 |
COMMERCIAL DESIGN ENGEERING LTD | H= | P | 04/17/2018 | NO ANSWER AT CALL AHEAD NUMBER. STILL NEED TO VERIFY SMOKE DETECTOR IN UNIT 130. NO ACCESS TO LADDER, SEE PREVIOUS INSPECTION NOTES REGARDING LADDER. | NANCY | NANCY | | H= | P | 5819606 |
COMMERCIAL DESIGN ENGEERING LTD | H= | P | 04/13/2018 | LADDER ACCESS TO ROOF HAS A TOE SPACING OF 3.5 INCHES CODE REQUIRES 6" MINIMUM REFER TO IMC 306.5 ( # 2 )ROOF ACCESS WILL NEED TO BE ADDRESSED BY ENGINEER / THERE IS A GRAB BAR ON THE PARAPET NOW THAT IS NOT APPROVED .STILL NEED TO ACCESS UNIT # 130 TO VERIFY DUCT DETECTORS AND THERMOSTAT UNIT FURTHEST TO THE EAST .NEED TO LABEL RTU-4 . REST OF ROOF OK / EQUIPMENT OK .GAS OK . | LIDO | LIDO | | H= | P | 5816939 |
COMMERCIAL DESIGN ENGEERING LTD | H= | L | 04/06/2018 | LOCKED AT 3:50 PM. NO ACCESS TO ROOF. | NANCY | NANCY | | H= | L | 5810723 |
COMMERCIAL DESIGN ENGEERING LTD | HC | C | 03/26/2018 | OK TO SET ALL THREE METERS AT THIS BUILDING. | NANCY | NANCY | | HC | C | 5798848 |
COMMERCIAL DESIGN ENGEERING LTD | HI | P | 01/11/2018 | WILL RELEASE METER AFTER REVISED/APPROVED PRINTS HAVE BEEN RECEIVED SHOWING NEW METER LOCATIONS AND NEW GAS INSTALL ON SITE. THREE 10 LB TESTS OK. BY FINAL LABEL ALL MEDIUM PRESSURE GAS LINES. | NANCY | NANCY | | HI | P | 5735248 |
COMMERCIAL DESIGN ENGEERING LTD | P= | C | 04/27/2018 | prv @ suite 130, see images | JOHNS | JOHNS | | P= | C | 5829002 |
COMMERCIAL DESIGN ENGEERING LTD | P= | P | 04/25/2018 | trip fee waived this time only, call ahead sent, no one on site, need to have access to prv in ceiling, need ladder or ceiling tile removed to verify prv or I CAN COMPLETE W/ UPLOADED TO NEXT INSPECTION REQUEST AS PREVIOUSLY MENTIONED | JOHNS | JOHNS | | P= | P | 5827387 |
COMMERCIAL DESIGN ENGEERING LTD | P= | P | 04/23/2018 | @ suite 130 can not see prv (due to roof tile), can complete w/ uploaded image to next inspection request, or remove ceiling tile for inspector to verify prv, rest ok for other units individual prv's | JOHNS | JOHNS | | P= | P | 5823929 |
COMMERCIAL DESIGN ENGEERING LTD | P= | L | 04/13/2018 | no one on site, call ahead sent, all doors locked | JOHNS | JOHNS | | P= | L | 5816698 |
COMMERCIAL DESIGN ENGEERING LTD | P= | P | 04/06/2018 | still need engineers letter deleting individual prv to all units, rest ok for revisions | JOHNS | JOHNS | | P= | P | 5809648 |
COMMERCIAL DESIGN ENGEERING LTD | PTO | C | 02/09/2018 | correction made for water line @ 3rd unit | JOHNS | JOHNS | | PTO | C | 5762509 |
COMMERCIAL DESIGN ENGEERING LTD | P= | P | 02/09/2018 | NEED ENGINEERS LETTER ELIMINATING INDIVIDUAL UNIT PRV'S (as indicated on plans) NEED TO REVISE PLANS TO SHOW 2" MAIN WATER @ WATER ENTRY AND WATER UNDER FOOTER UP TO 2ND TO LAST UNIT, contractor aware of dissimilar metal touching @ water lines, no wall hydrant installed as per plans, rest ok | JOHNS | JOHNS | | P= | P | 5762453 |
COMMERCIAL DESIGN ENGEERING LTD | PTO | P | 01/11/2018 | NEED ENGINEERS LETTER ELIMINATING INDIVIDUAL UNIT PRV'S (as indicated on plans), need 3rd unit water service to be inside of 3rd unit (currently in 2nd unit), rest ok. note: trap primer @ water entry f.d. | JOHNS | JOHNS | | PTO | P | 5735629 |
COMMERCIAL DESIGN ENGEERING LTD | PB | C | 12/28/2017 | ok for water entry water line | JOHNS | JOHNS | | PB | C | 5724138 |
COMMERCIAL DESIGN ENGEERING LTD | PTO | P | 12/28/2017 | NEED TO REVISE PLANS TO SHOW 2" MAIN WATER LINE @ WATER ENTRY AND WATER UNDER FOOTER UP TO 2ND TO LAST UNIT, rest ok for dwv only, still working on water, test and design per plan. note: vtr, trap primers @ water entry f.d. | JOHNS | JOHNS | | PTO | P | 5724136 |
COMMERCIAL DESIGN ENGEERING LTD | PB | P | 09/05/2017 | still need water entry inspected, need to attach elec permit, rest ok for s.s (no g.w. in this building) all unit bldg drains stubbed out of building | JOHNS | JOHNS | | PB | P | 5616080 |
COMMERCIAL DESIGN ENGEERING LTD | PB | L | 09/01/2017 | Field cancelled. | CRADE | CRADE | | PB | L | 5614109 |
FOSTER ELECTRIC CORPORATION | XES | T | 04/19/2018 | PAID (REC#1495297) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise panel schedules | SHELBY | SHELBY | | XES | T | 5822208 |
FOSTER ELECTRIC CORPORATION | XES | T | 04/13/2018 | PAID (REC#1494129): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Splice to provide new AIC and SCA information. | BERTHA | BERTHA | | XES | T | 5816944 |
COMMERCIAL DESIGN ENGEERING LTD | XPS | T | 02/13/2018 | PAID (REC#1492131) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 2-13-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5764517 |
COMMERCIAL DESIGN ENGEERING LTD | XMS | T | 02/12/2018 | PAID (REC#1492131) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised sheet M001 for revised RTU schedule and wall heater schedule | JUSTINC | JUSTINC | | XMS | T | 5762820 |