GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 10/26/2017 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5667664 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 09/11/2017 | items corrected / final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), MECH ONE, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5621694 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 09/07/2017 | need stop on pocket door at office at south end of waiting room / sink in alternate exam room 110 from plumbing page in plans needs to be maximum 34" above the floor / training with Dakota B -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), BERWICK ELECTRIC CO Electrical Final Inspection is not Completed yet, MECH ONE, INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5618813 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/07/2017 | Training with Dane on B occupancies, type IIB construction -- Review plan reading in an interior remodel -- Reviewed door hardware requirements -- Reviewed accessibility at exam room sinks and requirements for accessible sinks | DAKOTAB | DAKOTAB | | BSP | P | 5618803 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/23/2017 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 8-23-17 | TCRIPPEN | TCRIPPEN | | BSP | P | 5604587 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/15/2017 | need to attach electric and mechanical permits and have inspections / new wall framing OK pending other roughs / exam room sink is existing | DANE | DANE | | BFR | P | 5595926 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 09/08/2017 | | GARYL | GARYL | | E= | C | 5620322 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | R | 09/07/2017 | Need a poc and ladder, remove tiles for inspection, check with job super for light(s) not wired to ceiling | GARYL | GARYL | | E= | R | 5618991 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/25/2017 | all walls-only | GARYL | GARYL | | ER | P | 5607412 |
MECHONE, INC. | H= | C | 09/13/2017 | FINAL OK. | LIDO | LIDO | | H= | C | 5624097 |
MECHONE, INC. | H= | P | 09/12/2017 | MISSING R/A GRILL IN ROOMS 110, 101 REST OK . ATTACH PICTURES TO IMAGES ON PERMIT AND RE CALL INSPECTION.. Received test and balance report. | LIDO | LIDO | | H= | P | 5623186 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 09/11/2017 | ok, correction made | JOHNS | JOHNS | | P= | C | 5621193 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 09/07/2017 | counter top needs to be 34" above floor per plans, can complete with uploaded image of counter top with tape measure showing 34" to top of counter, no site visit required. note: vtr (existing) | JOHNS | JOHNS | | P= | P | 5619219 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 08/25/2017 | DWV AND WATER OK , TO PLAN . 1 SINK IN EXAM ROOM | GABE | GABE | | PTO | C | 5607663 |