GUARINO CONSTRUCTION, LLC | B= | C | 04/19/2018 | | RICHB | RICHB | | B= | C | 5821438 |
GUARINO CONSTRUCTION, LLC | B= | P | 04/19/2018 | Remodel complete pending other Finals. Additional Inspections Required (computer generated): MIDWAY PLUMBING LLC Plumbing Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5820999 |
GUARINO CONSTRUCTION, LLC | B16 | P | 04/13/2018 | Discussed Building Final requirements with Contractor (Rich), including accessible drinking fountain and other accessible elements / plans reviewed onsite | RICHB | RICHB | | B16 | P | 5816365 |
GUARINO CONSTRUCTION, LLC | BIN | C | 03/01/2018 | Ceiling insulation has been completely replaced - exterior walls are not in scope - all insulation OK | RICHB | RICHB | | BIN | C | 5777829 |
GUARINO CONSTRUCTION, LLC | BFR | P | 03/01/2018 | NOTE - entire floor plan has changed with Splice / framing OK pending other Roughs / discussed accessible elements / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5777823 |
SPRINGS ELECTRIC | BSP | T | 01/09/2018 | PAID (REC#1475308) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: New floor plan lights and power | SHELBY | SHELBY | | BSP | T | 5733143 |
GUARINO CONSTRUCTION, LLC | BFR | P | 09/20/2017 | Interior non bearing not rated framing okay, pending other roughs. Discussed accessible elements. Will need to inspect roof ceiling insulation once above ceiling work is complete. Permit set review on site, wall is framed to bottom chord of truss where plans show framing extended to underside of roof deck. Training with Noah. | RICHB | RICHB | | BFR | P | 5631716 |
GUARINO CONSTRUCTION, LLC | BSP | T | 08/18/2017 | PAID (REC#1447448) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: changed design to now use a rtu not mini splits | DALEH | DALEH | | BSP | T | 5600764 |
GUARINO CONSTRUCTION, LLC | BSP | P | 08/18/2017 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Added RTU-1. | BERTHA | BERTHA | | BSP | P | 5600732 |
SPRINGS ELECTRIC | E= | C | 04/16/2018 | rtu 40 amp OK | CRAIGS | CRAIGS | | E= | C | 5817390 |
SPRINGS ELECTRIC | ER | C | 04/02/2018 | above ceiling OK | CRAIGS | CRAIGS | | ER | C | 5805538 |
SPRINGS ELECTRIC | ER | P | 02/26/2018 | walls ok/ | MIGUEL | MIGUEL | | ER | P | 5773910 |
SPRINGS ELECTRIC | ER | P | 02/01/2018 | Existing exterior wall recpts. ok / | ROB | ROB | | ER | P | 5754615 |
SPRINGS ELECTRIC | ESL | P | 02/01/2018 | 2 floor boxes and 2 PVC stoub loops ok / Discussed accessiblity requirements with contractor / | ROB | ROB | | ESL | P | 5754614 |
SPRINGS ELECTRIC | ER | P | 09/15/2017 | 1-Bath, Office, and switch in pation wall / | ROB | ROB | | ER | P | 5627256 |
PREMIER MECHANICAL | H= | C | 04/18/2018 | CORRECTIONS MADE | MARKB | MARKB | | H= | C | 5820814 |
PREMIER MECHANICAL | H= | P | 04/16/2018 | TAB RECEIVED | MARKB | MARKB | | H= | P | 5817350 |
PREMIER MECHANICAL | H= | P | 04/09/2018 | Final pending - Labeling RTU on Roof, completing condensate for RTU and providing a Test And Balance Report. | MARKB | MARKB | | H= | P | 5811965 |
PREMIER MECHANICAL | HD | P | 03/30/2018 | ABOVE CEILING DUCT INSTALL PER PLAN EXCEPT FOR EXTRA SUPPLY N HALL OUTSIDE BATHROOMS AND MISSING SUPPLIES IN BATHROOMS. | MARKB | MARKB | | HD | P | 5804551 |
PREMIER MECHANICAL | HD | P | 03/07/2018 | WILL NEED PLAN SPLICE FOR ADDED BATHROOM AND WALLS SUBMITTED TO PLAN REVIEW ALL DEPARTMENTS. ABOVE CEILING DUCT - MEN'S BATHROOM EXHAUST DUCT AND TERMINATION COVER AT OWN RISK | MARKB | MARKB | | HD | P | 5782974 |
PREMIER MECHANICAL | HD | P | 09/19/2017 | Bath Exhaust duct OK. Note Added: Spoke with inspector Rich about RTU placement and roof insulation - he will look on site and get back with me. | MARKB | MARKB | | HD | P | 5630738 |
MIDWAY PLUMBING LLC | P= | C | 04/18/2018 | ok. note: plans indicate all plbg fixtures (that werent on scope of work) | JOHNS | JOHNS | | P= | C | 5819970 |
MIDWAY PLUMBING LLC | PTO | C | 02/28/2018 | ok for test and design per plan. note: 3" vtr (existing) @ left baths, 2" vtr (new) @ mop sink, check water htr @ final | JOHNS | JOHNS | | PTO | C | 5776418 |
MIDWAY PLUMBING LLC | PB | C | 02/01/2018 | | JOSEPHD | JOSEPHD | | PB | C | 5754123 |
CASCADE PLUMBING & HEATING | PTO | P | 09/19/2017 | plbg contractor voided out, all notes are now for current plbg contractor. note: inspector edited these inspection notes, refer to 2/28/18 pto notes | JOHNS | JOHNS | | PTO | P | 5630180 |
CASCADE PLUMBING & HEATING | PB | C | 08/22/2017 | still need elec and mech permits attached, rest ok, corrections made | JOHNS | JOHNS | | PB | C | 5603222 |
CASCADE PLUMBING & HEATING | PB | P | 08/21/2017 | gc needs to attach all permits, need to add drinking fountain to scope, need to run the drain line for the drinking fountain as required per plans, rest ok | JOHNS | JOHNS | | PB | P | 5601633 |