PLASTERING SPECIALTIES, INC. | B= | C | 05/08/2018 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 5838795 |
PLASTERING SPECIALTIES, INC. | B= | P | 05/03/2018 | Indoor pool complete pending other Finals. Additional Inspections Required (computer generated): EMF ELECTRICAL CORPORATION Electrical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5834736 |
PLASTERING SPECIALTIES, INC. | BFT | C | 05/02/2018 | Third party engineering for pool on file with main hotel. Soils bearing calculations on file | JEREMYA | JEREMYA | | BFT | C | 5833473 |
THE WRIGHT GROUP, LLC | B= | P | 04/25/2018 | Need paperwork to complete BFT / all other Building inspections have been performed under Hotel permit (K60734) -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | RICHB | RICHB | | B= | P | 5827527 |
PLASTERING SPECIALTIES, INC. | BE | L | 04/25/2018 | Renewed at 4/25/2018 11:07:12 AM | BERTW | BERTW | | BE | L | 5826780 |
THE WRIGHT GROUP, LLC | BSP | T | 06/09/2017 | PAID (REC#1431021) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | BSP | T | 5826294 |
THE WRIGHT GROUP, LLC | BSP | T | 06/07/2017 | PAID (REC#1430232) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revised floor plan and structural | SHELLEY | SHELLEY | | BSP | T | 5826293 |
THE WRIGHT GROUP, LLC | BSP | T | 02/23/2017 | PAID (REC#1404840) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: revised framing details | BPHILLIPS | BPHILLIPS | | BSP | T | 5826274 |
THE WRIGHT GROUP, LLC | BSP | P | 01/25/2017 | PLAN SPLICE: (No Fee) by: DANM for Construction: Revised r-value and configuration of slab insulation | DANM | DANM | | BSP | P | 5826270 |
EMF ELECTRICAL CORPORATION | E= | C | 05/08/2018 | | JOHNN | JOHNN | | E= | C | 5838794 |
EMF ELECTRICAL CORPORATION | E= | P | 05/04/2018 | nm cable HR'S above pool panels need to be protected/boxed in, ok to upload pic, pool shut off switch is installed, other corrections made. | JOHNN | JOHNN | | E= | P | 5836043 |
EMF ELECTRICAL CORPORATION | E= | P | 05/02/2018 | splice plan:pool shut off switch not installed, need gfci cb for pool pump motor, bond clorinater motor, | JOHNN | JOHNN | | E= | P | 5833414 |
EMF ELECTRICAL CORPORATION | ER | P | 03/07/2018 | POOL: wet niche encapsulation ,ok | JOHNN | JOHNN | | ER | P | 5826565 |
EMF ELECTRICAL CORPORATION | ESL | P | 10/27/2017 | pool:deck bond, | JOHNN | JOHNN | | ESL | P | 5826613 |
EMF ELECTRICAL CORPORATION | ESL | P | 09/01/2017 | shell bonding, need tail from light | JOHNN | JOHNN | | ESL | P | 5826567 |
EMF ELECTRICAL CORPORATION | XES | T | 04/04/2018 | PAID (REC#1491752) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Multiple lighting and power revisions. Updated panel schedules. | BERTHA | BERTHA | | XES | T | 5826520 |
CONDITIONED AIR CORPORATION | XMS | T | 04/03/2018 | PAID (REC#1491367) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 4-3-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 5826519 |
CONDITIONED AIR CORPORATION | XMS | T | 02/26/2018 | PAID (REC#1485647) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised for kitchenette fans at extended suites / Minor revisions | JUSTINC | JUSTINC | | XMS | T | 5826481 |
HARLAN PLUMBING & HEATING, INC | XPS | T | 02/23/2018 | PAID (REC#1484114) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 2-23-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5826479 |