NUNN CONSTRUCTION, INC. | B= | C | 10/02/2018 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5982493 |
NUNN CONSTRUCTION, INC. | B= | P | 09/27/2018 | final OK pending other finals / all letters of compliance received / stamped letter of compliance for all items of discrepancy from engineer of record received. Additional Inspections Required (computer generated): HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5978212 |
NUNN CONSTRUCTION, INC. | B= | P | 09/20/2018 | still need stamped letter of observation for material testing as stated in previous inspection / state electrical and plumbing finals received / engineer letter for welding and bolting received -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5970910 |
NUNN CONSTRUCTION, INC. | BFR | P | 09/20/2018 | engineer observation for welding and bolting received / letter for material testing states discrepancies present with the 28 day compressive strength of the concrete related to the foundation and the sprayed Fire-resistive Material at the perimeter beams / will need stamped letter showing that all of these discrepancies have been corrected / still need state electrical and plumbing final inspection completion certificates | DANE | DANE | | BFR | P | 5970889 |
NUNN CONSTRUCTION, INC. | B= | P | 08/10/2018 | Still need all 3rd party observation letters for open hole, footing/foundation, bond beams, mono-coat, welding and bolting, as well as state electrical and plumbing observation certificates -- Still need to bring splices up to date -- Other items from previous inspection corrected -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), H.E.S ELEVATOR SERVICES Mechanical Final Inspection is not Completed yet, HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 5930516 |
NUNN CONSTRUCTION, INC. | BSP | P | 08/01/2018 | met on site with superintendent of construction and did courtesy walk for final / discussed accessible elements including security locks on restrooms and rails and guards / discussed egress paths and exit signs / discussed need for splice for risers at west gym / discussed need for all engineer observations for footing and foundation and open hole and bond beams and mono-coat and welding and bolting and tilt ups / also discussed phased TCO and contractor stated that it would not be needed | DANE | DANE | | BSP | P | 5921287 |
NUNN CONSTRUCTION, INC. | BFR | P | 07/27/2018 | hard lid framing over stairs to orchestra pit at north side of stage OK / discussed graspable handrails needed at both sides of stairs to stage from auditorium | DANE | DANE | | BFR | P | 5916534 |
NUNN CONSTRUCTION, INC. | BFR | P | 07/19/2018 | hard lid framing outside of entry at area A OK / cloud framing at auditorium OK / discussed need for rails and guards at stairs and ramps at sides of stage | DANE | DANE | | BFR | P | 5908477 |
NUNN CONSTRUCTION, INC. | BFR | P | 06/18/2018 | area A soffit framing and above ceiling at area C / soffit framing at area A at south wall of auditorium OK pending other roughs / above ceiling OK at all of area C pending other roughs | DANE | DANE | | BFR | P | 5877435 |
NUNN CONSTRUCTION, INC. | BLA | P | 06/18/2018 | lath at penthouse on roof OK | DANE | DANE | | BLA | P | 5877426 |
NUNN CONSTRUCTION, INC. | BFR | P | 06/08/2018 | area A and area B hard lids / hard lids at bathrooms at area B OK / area A grid X hard lids at large bathrooms OK and framed hard lid at small bathroom OK | DANE | DANE | | BFR | P | 5869362 |
NUNN CONSTRUCTION, INC. | BLA | P | 06/08/2018 | stucco lath at north side at area B OK | DANE | DANE | | BLA | P | 5869348 |
NUNN CONSTRUCTION, INC. | BFR | P | 05/16/2018 | Interior light gage framing OK at area B // Hard lid framing OK at bathrooms in Area C | JEREMYA | JEREMYA | | BFR | P | 5846914 |
NUNN CONSTRUCTION, INC. | BIN | P | 05/09/2018 | insulation in exterior walls at area A OK | DANE | DANE | | BIN | P | 5839980 |
NUNN CONSTRUCTION, INC. | BFR | P | 05/09/2018 | interior light gauge framing at area A commons OK pending other roughs / discussed accessible elements | DANE | DANE | | BFR | P | 5839979 |
NUNN CONSTRUCTION, INC. | BIN | P | 04/24/2018 | insulation inside of exterior wall cavities at areas B and C OK | DANE | DANE | | BIN | P | 5825726 |
NUNN CONSTRUCTION, INC. | BFR | P | 04/11/2018 | exterior light gauge framing at areas A B and C OK pending other roughs / interior light gauge framing OK at area C at rooms 501 502 514 513 511 509 510 all OK pending other roughs / still need to install grab bar backing at girls restroom 514 and boys restroom 513 and still need to install hard lids at the boys and girls restrooms | DANE | DANE | | BFR | P | 5814111 |
NUNN CONSTRUCTION, INC. | BIN | P | 03/08/2018 | verified 2 layers of 2.6" continuous insulation at roof | DANE | DANE | | BIN | P | 5784143 |
NUNN CONSTRUCTION, INC. | BFR | P | 03/08/2018 | wall and roof framing at mechanical duct penthouse on roof of area A OK pending other roughs | DANE | DANE | | BFR | P | 5784136 |
NUNN CONSTRUCTION, INC. | B16 | P | 12/14/2017 | made courtesy site visit and discussed construction progress and inspection precess with site assistant superintendent | DANE | DANE | | B16 | P | 5713092 |
NUNN CONSTRUCTION, INC. | BFN | P | 09/19/2017 | OK to use engineer / letter to follow | DANE | DANE | | BFN | P | 5629604 |
NUNN CONSTRUCTION, INC. | BFT | P | 09/19/2017 | OK to use engineer / letter to follow | DANE | DANE | | BFT | P | 5629602 |
HVAC SOLUTIONS, INC. | H= | C | 10/02/2018 | MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 5982492 |
HVAC SOLUTIONS, INC. | H= | P | 09/20/2018 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. RTU-16 HAS READINGS OUTSIDE OF THE PLUS OR MINUS 10% ALLOWABLE. SPLICE IS IN FOR EF-2. | DUSTINS | DUSTINS | | H= | P | 5970792 |
SAVARIA USA INC. | HE= | C | 08/24/2018 | LIFT COMPLETE | JOHNW | JOHNW | | HE= | C | 5944674 |
HVAC SOLUTIONS, INC. | H= | P | 08/02/2018 | MECHANICAL FINAL OK PENDING REVISED/APPROVED PLAN FOR EF-2 NEW LOCATION, PROVIDE TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 5921830 |
HVAC SOLUTIONS, INC. | H= | P | 07/26/2018 | M2.1 (BDA 168) SUPPLY AND EXHAUST AIR DUCTS OK. CABINET UNIT HEATER OK. M2.4 (BDA 171) SUPPLY/RETURN AIR DUCTS OK. | DUSTINS | DUSTINS | | H= | P | 5915320 |
HVAC SOLUTIONS, INC. | H= | P | 07/20/2018 | M 2.1 ( BDA 168) SUPPLY , RETURN AND EXHAUST DUCTS OK , OK TO WRAP, FLEX AND DIFFUSERS OK. M 2.4 (BDA 171) SUPPLY AIR AND RETURN AIR OK. | DUSTINS | DUSTINS | | H= | P | 5909100 |
HVAC SOLUTIONS, INC. | HD | P | 07/16/2018 | M2.1 (BDA 168) SUPPLY AIR OK, OK TO WRAP. FLEX AND DIFFUSERS OK. M2.2 (BDA 169) SUPPLY/RETURN/EXHAUST AIR OK, OK TO WRAP. FLEX AND DIFFUSERS OK. M2.4 (BDA 171) SUPPLY AIR REGISTERS OK. | DUSTINS | DUSTINS | | HD | P | 5903705 |
HVAC SOLUTIONS, INC. | H= | P | 06/26/2018 | M2.3 (BDA 170) ALL FLEX AND DIFFUSERS ABOVE CEILING OK STILL NEED TO DUCT SOX IN GYMNASIUM | BENH | BENH | | H= | P | 5885518 |
HVAC SOLUTIONS, INC. | HD | P | 06/04/2018 | M2.1(BDA 168) EXHAUST AND SUPPLY ABOVE BATHROOM HARD LIDS OK STILL NEED TO SEE DIFFUSERS IN PLACE M2.2 (BDA 169) ALL EXPOSED DUCT IN THEATER/CLASSROOM OK STILL NEED TO SEE DIFFUSERS IN PLACE | BENH | BENH | | HD | P | 5863898 |
HVAC SOLUTIONS, INC. | HD | P | 05/17/2018 | M2.1(BDA 168) TRUNK LINE DOWN CORRIDOR FOR RTU-21 TO SQUARE TO ROUND OK M2.2 (BDA 169) RTU-21 ALL TRUNK LINES OK STILL NEED TO SEE LATERALS AND DIFFUSERS, RTU-20 DUCT ABOVE CEILING OK, NEED TO SEE ALL EXPOSED DUCT IN ROOM 430 | BENH | BENH | | HD | P | 5848481 |
HVAC SOLUTIONS, INC. | HD | P | 05/11/2018 | M2.1(BDA 168) RTU 18 ALL TRUNK LINE AND LATERALS OK UP TO ROOM 413 AND ROOM 404 RTU 19 ALL TRUNKLINE AND LATERALS OK NO DIFFUSERS TODAY FOR BOTH SYSTEMS | BENH | BENH | | HD | P | 5842128 |
HVAC SOLUTIONS, INC. | HD | L | 05/10/2018 | LOCKED: CONTRACTOR ON JOB SITE CALLED AND ASKED TO RESCHEDULE SINCE LATE IN THE DAY. | BENH | BENH | | HD | L | 5841624 |
HVAC SOLUTIONS, INC. | HD | P | 04/30/2018 | M2.3 (BDA 170) ALL PIPE AND SPINS IN CAFETERIA AND DOWN CORRIDOR ALL OK | BENH | BENH | | HD | P | 5831205 |
HVAC SOLUTIONS, INC. | HD | P | 04/27/2018 | M 2.4(BDA171) STAGE DUCT TRUNK LINE AND TAKE OFFS OK | BENH | BENH | | HD | P | 5830063 |
HVAC SOLUTIONS, INC. | HD | P | 04/06/2018 | CAN NOT FIND SPLICE DATED 3/21/18 SCANNED ONTO PRINT. M2.3 (BDA 170) - RTU'S 14 AND 15 SUPPLY/RETURN TRUNK LINES OK. EF-1 EXHAUST DUCTS OK. | NANCY | NANCY | | HD | P | 5809877 |
HVAC SOLUTIONS, INC. | HD | P | 04/05/2018 | M2.3 (BDA 170) - NEED REVISED/APPROVED PRINT FOR EF-2 NEW LOCATION. RTU'S 12, 13 AND 16 SUPPLY/RETURN DUCTS OK. EF-2 EXHAUST DUCT OK. | NANCY | NANCY | | HD | P | 5809495 |
HVAC SOLUTIONS, INC. | HD | P | 02/26/2018 | M2.4 ( BDA 171). RTU-17 SUPPLY/RETURN DUCTS ON OUTSIDE OF BUILDING OK, OK TO WRAP. RTU-17 IS WITHIN 10 FEET OF ROOF EDGE, SEE IFGC 306.6 (GUARDS). | NANCY | NANCY | | HD | P | 5774300 |
HVAC SOLUTIONS, INC. | HD | P | 01/29/2018 | M2.4. SUPPLY AND RETURN AIR MAINS OK EXCEPT STILL NEED TO INSTALL CLIPS ON 48 X 36 RETURN AIR IN JOIST SPACE. | NANCY | NANCY | | HD | P | 5750649 |
NUNN CONSTRUCTION, INC. | XBS | T | 08/03/2018 | PAID (REC#1523942) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Provided revised details per inspector's comments. Added fire extinguishers. Changed "stage" designation to "platform." | BPHILLIPS | BPHILLIPS | | XBS | T | 5923031 |
HVAC SOLUTIONS, INC. | XMS | P | 08/03/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised to relocate E.F from kitchen | JUSTINC | JUSTINC | | XMS | P | 5922998 |
HVAC SOLUTIONS, INC. | XMS | T | 03/21/2018 | PAID (REC#1491735) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 3-21-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 5795455 |
NUNN CONSTRUCTION, INC. | XBS | T | 03/21/2018 | PAID (REC#1491734) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Building shifted 2', changes to accommodate shift on lot. | SHELLEY | SHELLEY | | XBS | T | 5795407 |