GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 04/16/2020 | All other required Final inspections are complete. (This is a computer generated result) | SCOTTS | SCOTTS | | B= | C | 6542537 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/15/2020 | all phases complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | SCOTTS | SCOTTS | | B= | P | 6541961 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BE | L | 03/25/2020 | Renewed for No Fee at 3/25/2020 1:14:43 PM | JOHN | JOHN | | BE | L | 6521284 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/23/2019 | partial final for 3rd floor remodel/complete other finals/rest of 3rd floor remodel ok -- training with Tom | SCOTTS | SCOTTS | | BSP | P | 6085670 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/15/2019 | PHASE 4 Final 1st floor/Garden level -- complete other finals -- corrections from previous inspection complete | SCOTTS | SCOTTS | | BSP | P | 6079231 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/27/2018 | Above ceiling for 3rd Floor NICU Renovation OK | JEREMYA | JEREMYA | | BFR | P | 6063217 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/20/2018 | PHASE 4 Final 1st floor/Garden level -- complete other finals -- floor surface to soiled/EMS/and decontamination rooms on Garden level from parking garage not per 2009 IBC 1008.1.5/excpetion 4/more than 1/2" difference between floor level in finish differences -- provide thresholds at auto slider doors to elevator lobbies at Garden level and front door to ED -- Garden level electrical room/seal penetrations on south wall and seal blank conduit onwest wall | SCOTTS | SCOTTS | | BSP | P | 6060101 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/14/2018 | Above ceiling penetrations OK at first floor tie in to existing building | JEREMYA | JEREMYA | | BSP | P | 6052926 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/05/2018 | partial framing inspection -- 3rd floor/ 3294 door frame / 3256 and 3254 wall framing / 3250 wall and soffit framing / 3014 window infills/framing ok these areas | SCOTTS | SCOTTS | | BFR | P | 6044142 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/29/2018 | partial framing/3rd floor ---- 3217 added doorway framing -- 3217 added wall -- 3215 door infill -- 3209 added doorway framing -- 3204B hard lid -- framing ok | SCOTTS | SCOTTS | | BFR | P | 6038772 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/27/2018 | partial framing -- 1st floor south tie in framing ok -- partial fire caulking above drop ceiling/ east corridor 1st floor ok | SCOTTS | SCOTTS | | BFR | P | 6035781 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/20/2018 | partial / area 2 remodel / observed light gauge stl in-fill wall framing at rooms - 3232 - 3234 - 3236 - 3238 - 3240 vestibule - 3246 - 3250 / observed shaft wall mtl framing and 1" usg shaftliner at 1st flr infusion area - corridor 1580 (U415) / pending other rough inspections | BRIANB | BRIANB | | BSP | P | 6031333 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/20/2018 | above ceiling penetrations at 1st flr areas 9 &10 okay / corrections completed during inspection | BRIANB | BRIANB | | BFR | P | 6031323 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/13/2018 | partial frame inspection -- 1st floor G lab tie in walls and lid framing ok -- 2nd floor SPD room wall framing ok -- 3rd floor Area 1/ Area 2 unit 10-15 wall and soffit framing ok | SCOTTS | SCOTTS | | BFR | P | 6024542 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/12/2018 | Above ceiling penetrations OK at first floor, areas 6,7,8 | JEREMYA | JEREMYA | | BFR | P | 6022406 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/29/2018 | NICU patient room remodel, areas 1 & 2, wall framing OK for top of wall drywall | JEREMYA | JEREMYA | | BFR | P | 6009255 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/25/2018 | above metal panel ceiling on 1st floor ED areas 9 and 10 ok -- above grid 1st floor area 4/seal duct and hole in drywall -- 1st floor area 4/5 above grid ok -- garden level above grid at south elevator lobby and south stairwell above gird ok | SCOTTS | SCOTTS | | BFR | P | 6006560 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/16/2018 | Above ceiling penetration in ancillary rooms at garden level, north elevator lobby OK | JEREMYA | JEREMYA | | BFR | P | 5996277 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/16/2018 | Half wall framing and soffit framing at 1st floor OK // Framing in south stair tower, garden level, soffit and column OK | JEREMYA | JEREMYA | | BSP | P | 5996271 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/11/2018 | TCO PHASE 3: 2nd floor final OK throughout | JEREMYA | JEREMYA | | BSP | P | 5992772 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/05/2018 | Above ceiling penetrations at first floor areas one and two OK // Above ceiling penetrations at sterile supply area on the second floor OK | JEREMYA | JEREMYA | | BFR | P | 5987307 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/26/2018 | 1st floor area 5 above metal pan ceiling ok -- 2nd floor north and south tie in above grid ok | SCOTTS | SCOTTS | | BFR | P | 5978004 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/19/2018 | All above ceiling penetrations on second floor complete, all areas, all zones | JEREMYA | JEREMYA | | BFR | P | 5970298 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 09/13/2018 | above grid 2nd floor areas 4 and 5 sealing of penetrations now complete -- partial frame for 1st floor columns area 10 and 1st floor ED entry soffit/frame ok | SCOTTS | SCOTTS | | BSP | P | 5964920 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/11/2018 | partial above grid penetrations -- 2nd floor west corridor in front of shell sealing of penetrations ok -- 2nd floor areas 4 and 5/several electrical penetrations not sealed throughout | SCOTTS | SCOTTS | | BFR | P | 5961980 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/10/2018 | partial framing inspection -- 1st floor area 10 soffits ok/ 1st floor area 9 walls ok/1st floor feature walls corridor 1580 ok -- 2nd floor corridor 2543 transfer wall ok/ 2nd floor preaction closet 2600.1 walls ok | SCOTTS | SCOTTS | | BFR | P | 5960513 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 09/06/2018 | 2nd floor, above ceiling penetrations OK throughout | JEREMYA | JEREMYA | | BFR | P | 5956215 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/30/2018 | 1st floor: West corridor soffits OK // Area 6 behavioral health soffits and hardlids OK // Area 8, lead lined area framing OK | JEREMYA | JEREMYA | | BFR | P | 5950414 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/23/2018 | PHASED TCO: PHASE 2: 3rd floor: Sinks at restrooms in reception area encroach into the clear floor space of the toilets // Bench seat in locker room not per accessible code in ANSI book. Seat must either be mounted to the wall, or, have back support // All paper towel dispensers are set above accessible reach ranges // No other items
PHASE 2: 4th FlOOR: 4th floor OK for entire area | JEREMYA | JEREMYA | | BFR | P | 5944110 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/22/2018 | partial framing -- 2nd floor north stairwell and elevator dummy walls/2nd floor column framing north shell /2nd floor sterile dividing wall ok | SCOTTS | SCOTTS | | BFR | P | 5942883 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/15/2018 | partial frame inspection -- need to seal shower base penetrations through floor area 6 and 7 1st floor -- shaftwall 1st floor by existing ok -- area 7 framing 1st floor ok -- area 5 1st floor soffit and column framing complete -- north stairwell 1st floor soffit ok -- 2nd floor dummy wall by future OR ok -- 2nd floor west corridor column and store front framing ok | SCOTTS | SCOTTS | | BFR | P | 5935631 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/09/2018 | Soffit framing OK on 1st and 2nd floors // Shaft wall at existing hospital OK on 2nd floor. | JEREMYA | JEREMYA | | BFR | P | 5929562 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 08/02/2018 | framing soffit and column framing ok for area 5 1st floor from North stair well to the North -- framing on OR walls and shell space 2nd floor ok -- framing 2nd floor Sterile corridor column framing ok -- framing 2nd floor Area 4 for soffits ok | SCOTTS | SCOTTS | | BFR | P | 5922680 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/25/2018 | partial framing -- 1st floor ED entrance frame ok -- 3rd floor above south elevator soffit framing ok | SCOTTS | SCOTTS | | BFR | P | 5914176 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 07/24/2018 | From NW corner, 2 bays east and 2 bays south, ceiling lath in garage OK | JEREMYA | JEREMYA | | BLA | P | 5912506 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/24/2018 | Framing at 3 medicine rooms on 2nd floor OK | JEREMYA | JEREMYA | | BFR | P | 5912491 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/19/2018 | Framing in area 6 on 3rd floor OK // Framing at area 4 on 1st floor OK | JEREMYA | JEREMYA | | BFR | P | 5908663 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/13/2018 | soffit framing at elevators OK on all levels | JEREMYA | JEREMYA | | BFR | P | 5902111 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/11/2018 | 4th floor north elevator lobby wall framing OK // Wall framing at 4th floor, west stair wall OK | JEREMYA | JEREMYA | | BSP | P | 5899599 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/05/2018 | framing for garden to 4th at south elevator faces ok | SCOTTS | SCOTTS | | BFR | P | 5894428 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/05/2018 | sealing of penetrations above grid ok for 3rd floor area 9 | SCOTTS | SCOTTS | | BSP | P | 5894421 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/02/2018 | partial 1st floor framing Area 4 balance of overhead -- 1st floor area 4 endwalls/ seal electrical conduit through floor penetrations -- garden level north elevator soffit framing ok -- partial above grid fire caulking for penetrations in reception area 3rd floor ok | SCOTTS | SCOTTS | | BFR | P | 5891861 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/28/2018 | Above ceiling penetrations in south corridors, 2nd floor OK // Framing at south crridor lids, 2nd floor OK // Above ceiling penetrations and framing OK at 3rd floor wellness garden | JEREMYA | JEREMYA | | BFR | P | 5887938 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/25/2018 | Framing at 3rd floo elevator soffit OK // Above ceiling penetrations OK at 3rd floor, south tie in to existing building // Planter framing at 3rd floord courtyard, east side OK | JEREMYA | JEREMYA | | BFR | P | 5884843 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/25/2018 | Balance of ceiling framing and insulation at garden level parking // 3rd floor area 4 framing at rooms // 2nd floor OR 11 and equipment room framing OK // 1st floor framing in area 7 OK | JEREMYA | JEREMYA | | BFR | P | 5883711 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/19/2018 | Garden level lid framing and insulation from grids 5 to 8 from west end to east end ok -- 3rd floor soffit on patio in front of wellness garden ok -- Area 7 3rd floor rooms 3529-3522 above grid penetrations firecaulking ok | SCOTTS | SCOTTS | | BFR | P | 5879098 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 06/14/2018 | insulation at lid on garden level between lines 8 and 10 from west end to east end ok | SCOTTS | SCOTTS | | BIN | P | 5875230 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/14/2018 | partial framing inspection -- 1st floor rooms 1601-1619 area 2 framing ok -- garden level lid between 8 and 10 from west end to east end/framing ok | SCOTTS | SCOTTS | | BFR | P | 5875225 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/13/2018 | firecaulking for above lid at 3rd floor North horseshoe corridors ok | SCOTTS | SCOTTS | | BSP | P | 5873810 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/11/2018 | Above ceiling penetrations OK in all of Areas 4, 5 & 6 on 3rd floor // Framing OK at equipment room and OR on 2nd floor // Ceiling framing and insulation OK at garden level parking, center bays | JEREMYA | JEREMYA | | BFR | P | 5869993 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/08/2018 | 1st floor, Area 1, conduit penetrations complete @ rooms 1602-1620 OK | JEREMYA | JEREMYA | | BSP | P | 5868603 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/08/2018 | 1st floor framing at Area 4, Intake rooms 1-4 OK | JEREMYA | JEREMYA | | BFR | P | 5868602 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/04/2018 | partial framing for 1st floor exam rooms 2-20/frame ok/seal penetrations in floor,exterior wall,wall for soil room -- area 4 X4 to X6 wall frame ok on 1st floor -- wall frame for pre op 4 ok on 2nd floor | SCOTTS | SCOTTS | | BFR | P | 5864019 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/31/2018 | Interior wall framing at level 3, area 8 OK // Interior wall framing at level 1, area 4 OK // Above ceiling penetrations at level 3, east sleeping rooms OK | JEREMYA | JEREMYA | | BFR | P | 5861119 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/30/2018 | Above ceiling penetrations at 3rd floor, Area 1 sleeping rooms and Area 3 admin rooms OK | JEREMYA | JEREMYA | | BFR | P | 5858433 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/24/2018 | Priority wall framing at 1st floor, CT XRAY and control rooms OK // 2nd floor wall framing in OR 7 & 8 areas at tie in to existing build OK // 3rd floor soffit framing OK in areas 6 & 7 and in area 1 at north entry radius | JEREMYA | JEREMYA | | BFR | P | 5854178 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/21/2018 | 2nd floor, OR quarters, division wall framing OK // 3rd floor, balance of Area * framing OK | JEREMYA | JEREMYA | | BFR | P | 5850920 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/11/2018 | 1st Floor: Priority walls, Area 3, fire safing OK // Fire Sfaing at Area 2 rooms 1569-1574 OK | JEREMYA | JEREMYA | | BSP | P | 5841911 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/11/2018 | Garden Level: Ceiling framing and insulation OK at Grid lines X8-16 and XA-XC // 1st Floor: Priority walls Area 3 OK // Wall framing at Area 2 rooms 1569-1574 OK | JEREMYA | JEREMYA | | BFR | P | 5841909 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/04/2018 | Med room framing on 1st flor, areas 1 & 2 OK // Framing at milk lab on 3rd floor OK // Smoke barrier framing and top of wall OK at 4th floor | JEREMYA | JEREMYA | | BSP | P | 5836240 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/30/2018 | 1st floor firestopping at patients rooms 22-38 OK // 3rd floor firestopping for patient rooms at area 9 OK | JEREMYA | JEREMYA | | BSP | P | 5831435 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/30/2018 | 1st floor framing at patients rooms 22-38 OK // 2nd shaft liner at grid line A.7 from 13 to 16 OK // 3rd floor framing for patient rooms at area 9 OK | JEREMYA | JEREMYA | | BFR | P | 5831430 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/24/2018 | partial fire caulking inspection/horizontal penetrations in soffits at 3rd floor/wellness garden penetrations ok/ 3rd floor area 2 soffits penetrations ok | SCOTTS | SCOTTS | | BSP | P | 5825989 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/24/2018 | partial framing inspection on walls 1st floor units 1634-1638/units 1623-1631/units 1569-1574 -- framing ok -- soffit framing inspection 3rd floor wellness garden/area 2 3rd floor soffits | SCOTTS | SCOTTS | | BFR | P | 5825984 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/23/2018 | wall framing at reception OK // Wall framing at 3rd floor OK, top of wall OK | JEREMYA | JEREMYA | | BSP | P | 5823598 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/23/2018 | Wall framing at 3rd floor units OK at area 3 // 4th floor framing at area 8 OK | JEREMYA | JEREMYA | | BFR | P | 5823592 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/13/2018 | Framing for dividing walls between units 1602, 1604, 1606, 1608, 1610, 1612, 1614, 1616, 1618, 1620 and rooms 1601 & 1603 OK // Area 1 framing on 1st floor OK // Area 1, 2nd floor framing at tie-in to existing building OK // Area 5, 2nd, Balance of framing complete // Area 7, 3rd floor NICU 22-26 framing OK // Area 8, 3rd floor corridor framing OK | JEREMYA | JEREMYA | | BFR | P | 5816204 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/06/2018 | Framing at 1st floor Area 1 corridor walls OK // Area 5, 2nd floor, top out framing at crridors OK // Rooms 3527-3529 at 3rd floor framing OK // Fur out wall in 3240 reception OK | JEREMYA | JEREMYA | | BSP | P | 5810525 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/03/2018 | Framing at mech shafts on 3rd floor OK | JEREMYA | JEREMYA | | BFR | P | 5805713 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/29/2018 | area 4 wall framing ok 2nd floor | SCOTTS | SCOTTS | | BFR | P | 5803073 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/29/2018 | 3rd floor shaft fire caulking corrections ok | SCOTTS | SCOTTS | | BSP | P | 5803072 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/27/2018 | Wall framing at area 5 offices on 3rd floor OK | JEREMYA | JEREMYA | | BFR | P | 5800404 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/26/2018 | Fire safing at top of wall in area 7 corridor OK | JEREMYA | JEREMYA | | BSP | P | 5798200 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/26/2018 | 3rd floor, Area 5 Patient rooms wall framing OK // Clean Supply room framing OK | JEREMYA | JEREMYA | | BFR | P | 5798199 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/19/2018 | Top of wall fire safing at 3rd floor area 8 and 2nd floor area 3 OK | JEREMYA | JEREMYA | | BSP | P | 5793078 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/19/2018 | Balance of wall framing at area 7, 3rd floor OK // 2nd floor, shaft at grid XD/13 OK once inspected for damper framing by mech inspector | JEREMYA | JEREMYA | | BFR | P | 5793076 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/16/2018 | partial framing and head wall inspection -- balance of area 3 2nd floor interior framing ok -- head walls of area 3 2nd floor ok -- area 4 interior framing on 3rd floor ok -- need detail for corner of 3587 at corner for achieving 1 hour barrier/utilities and column interrupt continuity | SCOTTS | SCOTTS | | BSP | P | 5791452 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/09/2018 | Corridor wall framing in areas 1,2 & 3 OK at 2nd floor | JEREMYA | JEREMYA | | BFR | P | 5785473 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/09/2018 | Fire safing at top of walls in areas 1,2 &3 OK at 2nd floor | JEREMYA | JEREMYA | | BSP | P | 5785468 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/02/2018 | Framing at patient rooms 3532-3536 OK // Hardlid framing at room G508 OK | JEREMYA | JEREMYA | | BFR | P | 5779254 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/02/2018 | Firestop at corridors and ancillary rooms at 2nd floor, areas 1 & 2 OK | JEREMYA | JEREMYA | | BSP | P | 5779252 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/27/2018 | Framing at patient rooms, 3rd floor, area 1 OK. Will still need to see fire caulk // Heat exchange room at garden level OK // Hard lid at garden level office OK // Wall framing at 3rd floor, corridor in area 1 OK | JEREMYA | JEREMYA | | BFR | P | 5774693 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/27/2018 | Fire stop at top of walls in corridor at priority area 1, 2nd floor OK // Expansion joint filler OK per approved listing at 3rd floor office in existing building | JEREMYA | JEREMYA | | BSP | P | 5774692 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/16/2018 | FIRE SAFING: Garden lvl, rooms G504 & G506 penetration fire caulking OK | JEREMYA | JEREMYA | | BSP | P | 5767677 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/16/2018 | WALL FRAMING: 2nd floor corridor walls at Priority area 1 OK // 3rd floor, balance of framing in Priority area 6 complete | JEREMYA | JEREMYA | | BFR | P | 5767672 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/09/2018 | Head wall fire stop at corridor wall in priority area 9 OK | JEREMYA | JEREMYA | | BSP | P | 5762410 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/09/2018 | Corridor wall framing for priority area 10 OK | JEREMYA | JEREMYA | | BFR | P | 5762409 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/02/2018 | 1st floor slab edge fire caulking X7-10 along XA | SCOTTS | SCOTTS | | BSP | P | 5756295 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/02/2018 | framing for rooms on garden level G503/G504/G505/G506/G507/G508/G509 -- fire caulk missing conduit on X6 wall in G504 -- 3rd floor rooms 3311/3312 framing | SCOTTS | SCOTTS | | BFR | P | 5756293 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/30/2018 | Framing in priority areas 1 & 9 OK // Will need to see all penetration details for items penetrating rated assemblies | JEREMYA | JEREMYA | | BFR | P | 5752438 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/30/2018 | Fire safing at top of wall in priority areas 9 & 1 OK | JEREMYA | JEREMYA | | BSP | P | 5752437 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/22/2018 | Top of wall fire safing OK at 3rd floor, Areas 6 & 7 OK | JEREMYA | JEREMYA | | BSP | P | 5743705 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/22/2018 | Wall framing, 3rd floor, areas 7 & 8 OK // Exterior wall framing at room G505 OK | JEREMYA | JEREMYA | | BFR | P | 5743690 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/17/2018 | Fire safing at top of walls in areas 7 & 8 OK | JEREMYA | JEREMYA | | BSP | P | 5740814 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/17/2018 | Wall framing at areas 7 & 8 OK | JEREMYA | JEREMYA | | BFR | P | 5740621 |
OLSON PLUMBING & HEATING COMPANY | BSP | P | 01/12/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 1-12-18 | TCRIPPEN | TCRIPPEN | | BSP | P | 5736974 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/11/2018 | fire safing at 3rd floor slab edge along west wall OK | JEREMYA | JEREMYA | | BSP | P | 5735986 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/11/2018 | wall framing at rooms 3509, 3511, 3512, 3514, 3587 & 3588 OK | JEREMYA | JEREMYA | | BFR | P | 5735985 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B16 | P | 01/10/2018 | Met on-site to review some items of concern with site arch. Jon Bock from RTA. 1. The letter in regards to the damper framing over double doors that allows the use of the "King Kong" studs will be edited to show the proper room number and re-submitted. 2. Moving forward, Mr. Bock and the structural engineer feel that each damper will be case by case and treated as such. 3. I explained that in order to quickly pay splice fees, GE would need to get a CC on file through their online account, therefore only providing access to the CC by GE personel. This will allow splice fees to be paid at time of online inspection requests. 4. Moving forward, it was requested that we do the inspections called in. If there is a splice that was submitted and approved after we have left the office, the inspection still gets done pending verification of the splice on the next business day. I have provided Mr. Bock with my contact info so if I am able to assist in any way, he can contact me. | JEREMYA | JEREMYA | | B16 | P | 5734942 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/10/2018 | Wall framing at rooms 3571, 72, 73, 74 & 75 OK pending other roughs | JEREMYA | JEREMYA | | BFR | P | 5734475 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/10/2018 | Head of wall and fire safing at Priority walls in areas 5 & 6 OK | JEREMYA | JEREMYA | | BSP | P | 5734474 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 01/05/2018 | PAID (REC#1474879) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Additional finished space - minor other revisions | MICHAELA | MICHAELA | | BSP | T | 5729816 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/29/2017 | wall framing at skylights on 3rd floor OK | JEREMYA | JEREMYA | | BFR | P | 5724768 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/29/2017 | Head of wall fire safing OK at rooms 3533, 3534, 3535 and 3536 | JEREMYA | JEREMYA | | BSP | P | 5724767 |
OLSON PLUMBING & HEATING COMPANY | BSP | T | 12/18/2017 | PAID (REC#1472088): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 12-18-2017 | TCRIPPEN | TCRIPPEN | | BSP | T | 5716081 |
STURGEON ELECTRIC CO INC | BSP | T | 12/18/2017 | PAID (REC#1472549): PLAN SPLICE FEE: $100 by: BERTHA for Electrical: See splice summary in Plan Images. | BERTHA | BERTHA | | BSP | T | 5715658 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/14/2017 | Corridor wall framing at 3rd floor, along rooms 3533, 3534, 3535 and 3536 on one side, room 3553 on other side // Fire safing installed at tops of all corridor walls OK | JEREMYA | JEREMYA | | BSP | P | 5713343 |
OLSON PLUMBING & HEATING COMPANY | BSP | P | 12/13/2017 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revisions to sheet notes, hydronic piping plans, schedules | JUSTINC | JUSTINC | | BSP | P | 5710997 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/11/2017 | framing/drywall/fire caulking for head wall in Corridor 3562A and 3552/3547 shell/top of walls for rated assemblies at both interior sides of corridor and both sides of shell 3553/3547 -- above ok per details for assemblies | SCOTTS | SCOTTS | | BSP | P | 5709440 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/11/2017 | framing for back wall of G505 ok | SCOTTS | SCOTTS | | BFR | P | 5709419 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/05/2017 | 3rd floor corridor wall framing in priority area 1 along rooms 3552, 3551, 3550, 3549, 3548, 3547, 3561, 3553 & 3569 OK | JEREMYA | JEREMYA | | BFR | P | 5704291 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 11/28/2017 | PAID (REC#1469183) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Minor revisions - revise room numbers | MICHAELA | MICHAELA | | BSP | T | 5696485 |
STURGEON ELECTRIC CO INC | E= | C | 01/25/2019 | FIRE ALARM INSPECTION: | RANDY | RANDY | | E= | C | 6089046 |
STURGEON ELECTRIC CO INC | E= | C | 01/25/2019 | | RANDY | RANDY | | E= | C | 6087902 |
STURGEON ELECTRIC CO INC | E= | P | 01/16/2019 | need updated breaker report submitted | RANDY | RANDY | | E= | P | 6080590 |
STURGEON ELECTRIC CO INC | E= | P | 01/15/2019 | need neutral phase id on panels | RANDY | RANDY | | E= | P | 6079262 |
STURGEON ELECTRIC CO INC | E= | P | 01/11/2019 | need breaker test reports----label phases on panels------still need pipe choke on lower level transformer-----need splice on panel EL4F for 125 amp breaker installed | RANDY | RANDY | | E= | P | 6076515 |
STURGEON ELECTRIC CO INC | ER | P | 01/10/2019 | no rough this inspection | RANDY | RANDY | | ER | P | 6075352 |
STURGEON ELECTRIC CO INC | E= | P | 01/10/2019 | corrections made on remodel and and 1st fl | RANDY | RANDY | | E= | P | 6075344 |
STURGEON ELECTRIC CO INC | E= | P | 01/08/2019 | 3rd fl remodel room finals | RANDY | RANDY | | E= | P | 6072414 |
STURGEON ELECTRIC CO INC | ER | P | 01/04/2019 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6069173 |
STURGEON ELECTRIC CO INC | ER | P | 01/04/2019 | 3rd fl remodel marked on plans | RANDY | RANDY | | ER | P | 6069168 |
STURGEON ELECTRIC CO INC | ER | P | 12/28/2018 | 3rd fl conference rm ceiling | RANDY | RANDY | | ER | P | 6065273 |
STURGEON ELECTRIC CO INC | ER | P | 12/27/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6064339 |
STURGEON ELECTRIC CO INC | ER | P | 12/27/2018 | level 3 remodel----ceilings, check conference room next inspection----ceilings marked and dated on plans | RANDY | RANDY | | ER | P | 6064084 |
STURGEON ELECTRIC CO INC | E= | P | 12/20/2018 | PHASE 4 1ST FL FINALS ------OK TO MOVE IN OWNER SUPPLIED EQUIPMENT | RANDY | RANDY | | E= | P | 6060275 |
STURGEON ELECTRIC CO INC | E= | P | 12/19/2018 | partial room finals 1st south areas 111,112,113---will check phases next inspection | RANDY | RANDY | | E= | P | 6058868 |
STURGEON ELECTRIC CO INC | ER | P | 12/13/2018 | FIRE ALARM INSPECTION: FA marked with electric
| RANDY | RANDY | | ER | P | 6052665 |
STURGEON ELECTRIC CO INC | ER | P | 12/13/2018 | ceilings 2nd fl marked on plans | RANDY | RANDY | | ER | P | 6052661 |
STURGEON ELECTRIC CO INC | ER | P | 12/06/2018 | NICU walls and ceilings marked on plans | RANDY | RANDY | | ER | P | 6044530 |
STURGEON ELECTRIC CO INC | ER | P | 11/29/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6038721 |
STURGEON ELECTRIC CO INC | ER | P | 11/29/2018 | Phase 5 level 3 area 3 walls in rooms, 3211,3215,3217,3201 | RANDY | RANDY | | ER | P | 6038710 |
STURGEON ELECTRIC CO INC | ER | P | 11/27/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6035694 |
STURGEON ELECTRIC CO INC | ER | P | 11/27/2018 | ceilings Phase 4 area 10 corridors 1502 & 1580 | RANDY | RANDY | | ER | P | 6035679 |
STURGEON ELECTRIC CO INC | ER | P | 11/20/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6031891 |
STURGEON ELECTRIC CO INC | ER | P | 11/20/2018 | Phase 5 walls rooms 3232,3234,3236,3238,3246,3250,3254,3256 | RANDY | RANDY | | ER | P | 6031661 |
STURGEON ELECTRIC CO INC | ER | P | 11/19/2018 | Phase 4 overhead rough level 1 rooms 1539,1541,1542,1543,1531,1518,1529,1530,1519,1528,1532,1533,1534,1535,1527,1526,1525,1516,1515,1513,1521,1522,1523,1524 | RANDY | RANDY | | ER | P | 6030173 |
STURGEON ELECTRIC CO INC | ER | P | 11/19/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6030160 |
STURGEON ELECTRIC CO INC | ER | P | 11/19/2018 | Areas 8 an 9 above ceiling | RANDY | RANDY | | ER | P | 6030152 |
STURGEON ELECTRIC CO INC | ER | P | 11/13/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6024459 |
STURGEON ELECTRIC CO INC | ER | P | 11/13/2018 | phase 4 level 1 ceilings room 1504 corridor 1580-----phase 5 3204,3202,3208,3214,3216 | RANDY | RANDY | | ER | P | 6024444 |
STURGEON ELECTRIC CO INC | E= | P | 11/12/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 6023468 |
STURGEON ELECTRIC CO INC | E= | P | 11/12/2018 | PHASE 4 FINALS-----exam rooms---staff work stations----resuscitation rooms---bathrooms and storage rooms | RANDY | RANDY | | E= | P | 6023297 |
STURGEON ELECTRIC CO INC | ER | P | 11/09/2018 | phase 4 ceilings rooms 1665,1666,1667,1668,1669,1676,1563,1568,1569,1571,1567,1566, | RANDY | RANDY | | ER | P | 6022273 |
STURGEON ELECTRIC CO INC | ER | P | 11/09/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6022263 |
STURGEON ELECTRIC CO INC | ER | P | 11/08/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6020868 |
STURGEON ELECTRIC CO INC | E= | P | 11/08/2018 | no finals on this inspection | RANDY | RANDY | | E= | P | 6020867 |
STURGEON ELECTRIC CO INC | ER | P | 11/08/2018 | south elevator pit-----walls area 2 phase 5 marked on plans | RANDY | RANDY | | ER | P | 6020863 |
STURGEON ELECTRIC CO INC | E= | P | 11/05/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 6016434 |
STURGEON ELECTRIC CO INC | E= | P | 11/05/2018 | phase 2 garden level garage vestibule | RANDY | RANDY | | E= | P | 6016433 |
STURGEON ELECTRIC CO INC | E= | P | 10/31/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 6012376 |
STURGEON ELECTRIC CO INC | E= | P | 10/31/2018 | phase 4 rooms 1602,1604,1606,1608,1610,1612,1614,1616,1647,1620-----partial on garden level | RANDY | RANDY | | E= | P | 6012370 |
STURGEON ELECTRIC CO INC | ER | P | 10/23/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 6003877 |
STURGEON ELECTRIC CO INC | ER | P | 10/23/2018 | ceiling rm 1531 | RANDY | RANDY | | ER | P | 6003863 |
STURGEON ELECTRIC CO INC | ER | P | 10/17/2018 | FIRE ALARM INSPECTION: area same as electrical dated 10-17 | BRET | BRET | | ER | P | 5997052 |
STURGEON ELECTRIC CO INC | ER | P | 10/17/2018 | ceiling 1641,1642,16,43,1644,1645,1646,1647,1647,1648,1649,1654,1655,1656.1657,,, garden level v7g,g511 | BRET | BRET | | ER | P | 5997048 |
STURGEON ELECTRIC CO INC | ER | R | 10/16/2018 | FIRE ALARM INSPECTION: AREA SAME AS ELECTRICAL. MAKE UP FIRE DAMPER ROOMS 1623 THRU 1631 | BRET | BRET | | ER | R | 5995716 |
STURGEON ELECTRIC CO INC | ER | P | 10/16/2018 | ceilings phase 4 1601,1603,1605,1605,1607,1609,1611,1613,1617,1619 EXCEPT EXAM LIGHT ceilings phase 3 1622,1624,1626.1628,1630,1632,1633,1634,1635,1661,1662 EXCEPT EXAM LIGHT MAKE UP AND OPEN J-BOX 1638. ceilings Phase 2 1623,1625,1627,1629,1631,1636,1637,1638,1659,1663,1665 EXCEPT EXAM LIGHT MAKE UP AND FIRE DAMPER BOXES NOT MADE. | BRET | BRET | | ER | P | 5995708 |
STURGEON ELECTRIC CO INC | E= | P | 10/08/2018 | ORs 2nd fl ok | RANDY | RANDY | | E= | P | 5989110 |
STURGEON ELECTRIC CO INC | ER | P | 10/04/2018 | FIRE ALARM INSPECTION: FA MARKED WITH ELECTRIC | RANDY | RANDY | | ER | P | 5986649 |
STURGEON ELECTRIC CO INC | ER | P | 10/04/2018 | CEILINGS RM 2261B---2263 | RANDY | RANDY | | ER | P | 5986561 |
STURGEON ELECTRIC CO INC | EP | P | 10/04/2018 | panel CH1F1 | RANDY | RANDY | | EP | P | 5986558 |
STURGEON ELECTRIC CO INC | ER | P | 10/03/2018 | phase 4 ceilings rooms 1602,1604,1606,1608, 1610,1612,1614,1616,1646,1618,1620 | RANDY | RANDY | | ER | P | 5985001 |
STURGEON ELECTRIC CO INC | ER | P | 10/03/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5984870 |
STURGEON ELECTRIC CO INC | EP | P | 09/27/2018 | phase 3 CL2OR7, CL20R8,TNL2G,NL2G 1 AND 2 | RANDY | RANDY | | EP | P | 5979548 |
STURGEON ELECTRIC CO INC | E= | P | 09/26/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 5978028 |
STURGEON ELECTRIC CO INC | E= | P | 09/26/2018 | 2606,2557,2562,2564,2604-----shell spaces-----phase 3 | RANDY | RANDY | | E= | P | 5978025 |
STURGEON ELECTRIC CO INC | E= | P | 09/25/2018 | FIRE ALARM INSPECTION: FA marked on plans | RANDY | RANDY | | E= | P | 5976442 |
STURGEON ELECTRIC CO INC | E= | P | 09/25/2018 | 2nd fl rooms 2518,2531,2533,2532,2521,2535,2522,2523,2537-----pacu bays 2507,2504,2543,2544,2539,2538,2538,2541,2542 | RANDY | RANDY | | E= | P | 5976430 |
STURGEON ELECTRIC CO INC | E= | P | 09/24/2018 | FIRE ALARM INSPECTION: FA marked on plans with electric | RANDY | RANDY | | E= | P | 5974508 |
STURGEON ELECTRIC CO INC | ER | P | 09/24/2018 | FIRE ALARM INSPECTION: no FA rough | RANDY | RANDY | | ER | P | 5974507 |
STURGEON ELECTRIC CO INC | E= | P | 09/24/2018 | 2nd floor 2563, 2552,2551, equip rm 2561, 2559,2554, OR rooms-----check gfci on normal power in OR rooms----no power in equip rm outlets | RANDY | RANDY | | E= | P | 5974501 |
STURGEON ELECTRIC CO INC | ER | P | 09/24/2018 | no rough inspection | RANDY | RANDY | | ER | P | 5974493 |
STURGEON ELECTRIC CO INC | ER | P | 09/19/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5970611 |
STURGEON ELECTRIC CO INC | ER | P | 09/19/2018 | WALLS 1509,1511,1503,1500,1501,1521,1522,1523,1524,1519 | RANDY | RANDY | | ER | P | 5970608 |
STURGEON ELECTRIC CO INC | EP | P | 09/19/2018 | panels CL1G,CL1G1,NL1G,TNL1G,TCL1G | RANDY | RANDY | | EP | P | 5970607 |
STURGEON ELECTRIC CO INC | ER | P | 09/18/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5968686 |
STURGEON ELECTRIC CO INC | ER | P | 09/17/2018 | lobby 2602, 2601 ceilings | RANDY | RANDY | | ER | P | 5967655 |
STURGEON ELECTRIC CO INC | ER | P | 09/13/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5965047 |
STURGEON ELECTRIC CO INC | ER | P | 09/13/2018 | ROOMS 1530,1521,1522,1523,1524,1515,1516,1504, CEILINGS AREA 4 AND 5, NORTH CORRIDOR | RANDY | RANDY | | ER | P | 5964934 |
STURGEON ELECTRIC CO INC | EP | P | 09/13/2018 | UPS1LF-----CL1F----CL1F1-----TCL1F | RANDY | RANDY | | EP | P | 5964932 |
STURGEON ELECTRIC CO INC | ER | P | 09/07/2018 | FIRE ALARM INSPECTION: ceilings 2nd fl----soffits 1st fl----marked on plans | RANDY | RANDY | | ER | P | 5959140 |
STURGEON ELECTRIC CO INC | ER | P | 08/30/2018 | ceilings 2563,2559,2554,2507,2518,2538,2561,2556,1675,1674,1673,1672,1671 | RANDY | RANDY | | ER | P | 5951829 |
STURGEON ELECTRIC CO INC | ER | P | 08/30/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5951827 |
STURGEON ELECTRIC CO INC | ER | P | 08/28/2018 | CT 1543 X ray 1539 changes ok | RANDY | RANDY | | ER | P | 5948810 |
STURGEON ELECTRIC CO INC | ER | P | 08/23/2018 | FIRE ALARM INSPECTION: shell space walls------OR ceiling marked on plans | RANDY | RANDY | | ER | P | 5943712 |
STURGEON ELECTRIC CO INC | ER | P | 08/23/2018 | OR ceilings 7,8,10,11----4th fl shell space | RANDY | RANDY | | ER | P | 5943351 |
STURGEON ELECTRIC CO INC | ER | P | 08/16/2018 | corridor 2570 and future OR panel marked on plans | RANDY | RANDY | | ER | P | 5937057 |
STURGEON ELECTRIC CO INC | ER | P | 08/14/2018 | 1st fl x-ray and ct walls marked on plans | RANDY | RANDY | | ER | P | 5934023 |
STURGEON ELECTRIC CO INC | ER | P | 08/14/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5933770 |
STURGEON ELECTRIC CO INC | ER | P | 08/07/2018 | FIRE ALARM INSPECTION: marked on plans | MATTHEW | MATTHEW | | ER | P | 5926709 |
STURGEON ELECTRIC CO INC | ER | P | 08/07/2018 | first floor columns and 2 hard lids area 5 marked on plans | MATTHEW | MATTHEW | | ER | P | 5926708 |
STURGEON ELECTRIC CO INC | EP | P | 08/07/2018 | panels CL2OR11 and CL2OR10 OK | MATTHEW | MATTHEW | | EP | P | 5926707 |
STURGEON ELECTRIC CO INC | E= | P | 08/02/2018 | phase 2 3rd floor room finals 3338,3553 | RANDY | RANDY | | E= | P | 5922756 |
STURGEON ELECTRIC CO INC | ER | P | 08/02/2018 | headwalls 1st floor area 3,4 marked on plans | RANDY | RANDY | | ER | P | 5922755 |
STURGEON ELECTRIC CO INC | E= | P | 08/02/2018 | FIRE ALARM INSPECTION: FA marked on plans with electric | RANDY | RANDY | | E= | P | 5922754 |
STURGEON ELECTRIC CO INC | ER | P | 08/02/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5922750 |
STURGEON ELECTRIC CO INC | E= | P | 08/02/2018 | phase 2 rooms 3562,3582,3509,3338,3600 | RANDY | RANDY | | E= | P | 5921451 |
STURGEON ELECTRIC CO INC | E= | P | 08/01/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 5921437 |
STURGEON ELECTRIC CO INC | ER | P | 08/01/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5921372 |
STURGEON ELECTRIC CO INC | ER | P | 08/01/2018 | phase 2 rooms 3562,3582,3509,3338,3600,3587 | RANDY | RANDY | | ER | P | 5921371 |
STURGEON ELECTRIC CO INC | E= | P | 07/31/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 5919961 |
STURGEON ELECTRIC CO INC | E= | P | 07/31/2018 | phase 2 rooms 3569,3571,3573,3574,3561,3600,v8-3,3565, v7-3,3507,3500,3501,3344,3342,3338,3240-1,3241,3242,3244 | RANDY | RANDY | | E= | P | 5919960 |
STURGEON ELECTRIC CO INC | ER | P | 07/31/2018 | 2 columns marked on plans | RANDY | RANDY | | ER | P | 5919959 |
STURGEON ELECTRIC CO INC | E= | P | 07/31/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 5919958 |
STURGEON ELECTRIC CO INC | ER | P | 07/31/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5919957 |
STURGEON ELECTRIC CO INC | ER | P | 07/30/2018 | FIRE ALARM INSPECTION: see electric final notes | RANDY | RANDY | | ER | P | 5918390 |
STURGEON ELECTRIC CO INC | E= | P | 07/30/2018 | inspection rescheduled | RANDY | RANDY | | E= | P | 5918389 |
STURGEON ELECTRIC CO INC | ER | P | 07/30/2018 | inspection rescheduled | RANDY | RANDY | | ER | P | 5918382 |
STURGEON ELECTRIC CO INC | E= | P | 07/27/2018 | no finals | RANDY | RANDY | | E= | P | 5916936 |
STURGEON ELECTRIC CO INC | ER | P | 07/27/2018 | no inspection | RANDY | RANDY | | ER | P | 5916928 |
STURGEON ELECTRIC CO INC | E= | P | 07/26/2018 | phase 2,rooms finals for areas 5,6,7, 3rd floor rooms 3544,3543,3542,3541,3581,3583,3584,3585,3579,3539,3540, | RANDY | RANDY | | E= | P | 5915552 |
STURGEON ELECTRIC CO INC | ER | P | 07/26/2018 | 1st floor walls area 7 2nd floor walls rooms 2544,2543 | RANDY | RANDY | | ER | P | 5915548 |
STURGEON ELECTRIC CO INC | E= | P | 07/26/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 5915536 |
STURGEON ELECTRIC CO INC | ER | P | 07/26/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5915531 |
STURGEON ELECTRIC CO INC | ER | P | 07/24/2018 | FIRE ALARM INSPECTION: no FA rough | RANDY | RANDY | | ER | P | 5912733 |
STURGEON ELECTRIC CO INC | E= | P | 07/24/2018 | no finals | RANDY | RANDY | | E= | P | 5912730 |
STURGEON ELECTRIC CO INC | EP | P | 07/24/2018 | panels NL4F, CL4F, NH4F | RANDY | RANDY | | EP | P | 5912726 |
STURGEON ELECTRIC CO INC | EP | P | 07/23/2018 | panels CH1F, NL1F, NHGF, NLGF, forth floor walls for door mags | RANDY | RANDY | | EP | P | 5911456 |
STURGEON ELECTRIC CO INC | E= | P | 07/19/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | E= | P | 5908669 |
STURGEON ELECTRIC CO INC | ER | P | 07/19/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5908668 |
STURGEON ELECTRIC CO INC | E= | P | 07/19/2018 | rooms 3531,3530,3588,3511,3512,3514----3509 needs gfcis 6' of sink | RANDY | RANDY | | E= | P | 5908666 |
STURGEON ELECTRIC CO INC | ER | P | 07/19/2018 | check for bushings in headwalls next inspection----med stations 1642,1645,1648,1655,1656----- | RANDY | RANDY | | ER | P | 5908660 |
STURGEON ELECTRIC CO INC | E= | P | 07/18/2018 | FIRE ALARM INSPECTION: see notes | RANDY | RANDY | | E= | P | 5907145 |
STURGEON ELECTRIC CO INC | ER | P | 07/18/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5907144 |
STURGEON ELECTRIC CO INC | E= | P | 07/18/2018 | see notes | RANDY | RANDY | | E= | P | 5907143 |
STURGEON ELECTRIC CO INC | ER | P | 07/18/2018 | rooms 3536,3535,3534,3533,3532,3546,3547,3548,3549,3550,3551,3568,3567,3566,3575---ups circuits not working in all rooms---room 3534 ckt cl3f-20 not working-----all rooms need handy box extension for shelf outlet by sink | RANDY | RANDY | | ER | P | 5907139 |
STURGEON ELECTRIC CO INC | E= | P | 07/16/2018 | FIRE ALARM INSPECTION: marked on plans with electric | RANDY | RANDY | | E= | P | 5904037 |
STURGEON ELECTRIC CO INC | ER | P | 07/16/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5904033 |
STURGEON ELECTRIC CO INC | E= | P | 07/16/2018 | rooms noted on rough inspection | RANDY | RANDY | | E= | P | 5904029 |
STURGEON ELECTRIC CO INC | ER | P | 07/16/2018 | finals on rooms 3601,3602,3603,3604,3605----3551,5550 ok | RANDY | RANDY | | ER | P | 5904026 |
STURGEON ELECTRIC CO INC | ER | P | 07/12/2018 | 1st floor area 6 walls---3rd floor area 8 ceilings marked on plans | RANDY | RANDY | | ER | P | 5901209 |
STURGEON ELECTRIC CO INC | ER | P | 07/12/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5901207 |
STURGEON ELECTRIC CO INC | EP | P | 07/10/2018 | looked at panels LH1F---LH4F---UPS4LDP2----AND TRANSFORMER TLL1F | RANDY | RANDY | | EP | P | 5898592 |
STURGEON ELECTRIC CO INC | EP | P | 07/09/2018 | PANEL EL2F OK PANEL CH2F OK PANELS FOR UPS2LR SEC 1 and 2 OK
NOTE : NEED #10 BETWEEN NORMAL AND EM PANEL BY FINAL | CRAIG | CRAIG | | EP | P | 5896525 |
STURGEON ELECTRIC CO INC | ER | P | 07/03/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5893079 |
STURGEON ELECTRIC CO INC | ER | P | 07/03/2018 | level 1 area 4 rooms 1621,1659,1623,1625,1627,1629,1631,1663,1664, 1665, 1636, 1637, 1638,1653---OR 10 walls+ceilings | RANDY | RANDY | | ER | P | 5893078 |
STURGEON ELECTRIC CO INC | ER | P | 07/02/2018 | FIRE ALARM INSPECTION: FA marked on electric plans | RANDY | RANDY | | ER | P | 5891484 |
STURGEON ELECTRIC CO INC | ER | P | 07/02/2018 | 3rd floor ceilings in wellness garden, receptionist area 8, nurse station, north vestibule, also looked at panel LH4F | RANDY | RANDY | | ER | P | 5891482 |
STURGEON ELECTRIC CO INC | ER | P | 06/29/2018 | FIRE ALARM INSPECTION: FA marked with electric | RANDY | RANDY | | ER | P | 5890343 |
STURGEON ELECTRIC CO INC | ER | P | 06/29/2018 | ceilings and head walls marked on plans | RANDY | RANDY | | ER | P | 5890342 |
STURGEON ELECTRIC CO INC | EP | P | 06/27/2018 | looked at panels and transformers ---- EH1F, TEL1F, NH1F, TNL1F, CL2F,TCL2F,CL2F1, tcl2f1,nh2f,tnl2f, NL2F----MARK ON PLANS NEXT INSPECTION, NEED #10 BETWEEN NORMAL AND EM PANELS | RANDY | RANDY | | EP | P | 5887899 |
STURGEON ELECTRIC CO INC | ER | P | 06/26/2018 | FIRE ALARM INSPECTION: FA marked on plans with electric | RANDY | RANDY | | ER | P | 5885873 |
STURGEON ELECTRIC CO INC | ER | P | 06/26/2018 | walls 1624,1633,1634, 1635 level 1-----overhead area 7 corridors-----marked on plans | RANDY | RANDY | | ER | P | 5885866 |
STURGEON ELECTRIC CO INC | ER | P | 06/21/2018 | FIRE ALARM INSPECTION: 1 st floor 1661, 1662, 1632, 1630, 1628,1626, 1622, 1658 for walls only 2 nd floor OR room 2560 for walls and hard lid ceiling only 3 rd floor drop ceiling in 3605, 3604, 3603, 3602, 3601, ------ hard lid for 3240 - 1 reception area | CRAIG | CRAIG | | ER | P | 5882216 |
STURGEON ELECTRIC CO INC | ER | P | 06/21/2018 | 1 st floor 1661, 1662, 1632, 1630, 1628,1626, 1622, 1658 for walls only 2 nd floor OR room 2560 for walls and hard lid ceiling only 3 rd floor drop ceiling in 3605, 3604, 3603, 3602, 3601, ------ hard lid for 3240 - 1 reception area | CRAIG | CRAIG | | ER | P | 5882204 |
STURGEON ELECTRIC CO INC | ER | P | 06/14/2018 | FIRE ALARM INSPECTION: FA marked with electric on plans | RANDY | RANDY | | ER | P | 5875109 |
STURGEON ELECTRIC CO INC | ER | P | 06/14/2018 | ceilings for rooms 3529,3528,3527,3526, 3525,3524, 3523,3501-------panel EL4F calls for 100 amp breaker 125 installed----EF4F still needs pipe choke | RANDY | RANDY | | ER | P | 5875108 |
STURGEON ELECTRIC CO INC | EP | P | 06/13/2018 | looked at EH4F and EL4F (check EH4F primary breaker size and pipe chokes on next inspection) | RANDY | RANDY | | EP | P | 5873913 |
STURGEON ELECTRIC CO INC | ER | P | 06/13/2018 | FIRE ALARM INSPECTION: not ready | RANDY | RANDY | | ER | P | 5873912 |
STURGEON ELECTRIC CO INC | ER | P | 06/13/2018 | not ready | RANDY | RANDY | | ER | P | 5873909 |
STURGEON ELECTRIC CO INC | ER | P | 06/12/2018 | UNDER RAISED FLOOR GARDEN LEVEL | RANDY | RANDY | | ER | P | 5872499 |
STURGEON ELECTRIC CO INC | EP | P | 06/12/2018 | panels CM4SD-T2----EM4SD-T2----TEL4F----TNL4F-----MARK TLL4F ON PLANS NEXT INSPECTION | RANDY | RANDY | | EP | P | 5872495 |
STURGEON ELECTRIC CO INC | ER | P | 06/08/2018 | FIRE ALARM INSPECTION: fire alarm marked with electric plans | RANDY | RANDY | | ER | P | 5869574 |
STURGEON ELECTRIC CO INC | ER | P | 06/08/2018 | hard lid Nicu lobby 3500 ok------------------ceilings 3530,3531,3537,3538,3539 ok--------walls in 1604,1604,1606,1608,1610,1612,1614,1616,1618,1620 except headwalls ok------1605 walls except headwall | RANDY | RANDY | | ER | P | 5869566 |
STURGEON ELECTRIC CO INC | EP | P | 06/07/2018 | FROM H1 GEAR TO ATS-T2E OK TO ENERGIZED FROM ATS-T2E TO EM4SD - T2 GEAR TO MAIN BREAKER OK
NOTE EXISTING GENERATOR TO FED ATS-T2E | CRAIG | CRAIG | | EP | P | 5868370 |
STURGEON ELECTRIC CO INC | ER | P | 06/07/2018 | FIRE ALARM INSPECTION: 1 FLOOR HEAD WALLS 1606, 1608, 1601, 1603, 1607, 1609 OK BACK WALLS OF HEAD WALLS 1607, 1609
2 FLOOR OR ROOM #7 FOR WALLS AND SOFFIT AND CLOSET 2554 AND EQUIPMENT ROOM 2556
3 FLOOR FOR DROP CEILINGS 3545, 3540, 3544, 3539, 3543, 3542, 3541 OK
| CRAIG | CRAIG | | ER | P | 5868368 |
STURGEON ELECTRIC CO INC | ER | P | 06/07/2018 | 1 FLOOR HEAD WALLS 1606, 1608, 1601, 1603, 1607, 1609 OK BACK WALLS OF HEAD WALLS 1607, 1609
2 FLOOR OR ROOM #7 FOR WALLS AND SOFFIT AND CLOSET 2554 AND EQUIPMENT ROOM 2556
3 FLOOR FOR DROP CEILINGS 3545, 3540, 3544, 3539, 3543, 3542, 3541 OK
| CRAIG | CRAIG | | ER | P | 5868364 |
STURGEON ELECTRIC CO INC | EP | P | 06/06/2018 | at ATS gear -------- 6 - sets of 4/w 500 mcm cu normal / 5 - sets of 4/w 400 mcm cu from generator / 5 - sets of 350 mcm cu to equipment EM4SD - T2 NEED TO MOVE CONDUCTORS TO BOTTOM OF LUGS ABOVE GEAR need to verify breaker setting for all breaker in EM4SD - TS and in EDB - T and in GENERATOR to EDB - T gear need to talk to Dean ERMS and feeder schedule for 1200 A4G from 4 sets to 5 sets ???? | CRAIG | CRAIG | | EP | P | 5867011 |
STURGEON ELECTRIC CO INC | ER | P | 06/05/2018 | FIRE ALARM INSPECTION: no fire alarm in these walls | CRAIG | CRAIG | | ER | P | 5865316 |
STURGEON ELECTRIC CO INC | ER | P | 06/05/2018 | walls for room 3564 sky lobby ok | CRAIG | CRAIG | | ER | P | 5865315 |
STURGEON ELECTRIC CO INC | ER | P | 06/01/2018 | moved existing wall 6" to the east ok | CRAIG | CRAIG | | ER | P | 5862695 |
STURGEON ELECTRIC CO INC | ER | P | 05/31/2018 | FIRE ALARM INSPECTION: no fire alarm in rooms 1620, 1618,1616,1614, 1612, 1602 and storage | CRAIG | CRAIG | | ER | P | 5860823 |
STURGEON ELECTRIC CO INC | ER | P | 05/31/2018 | rooms 1620, 1618, 1616, 1614, 1612, and storage room and 1602 exterior wall only ok | CRAIG | CRAIG | | ER | P | 5860821 |
STURGEON ELECTRIC CO INC | EP | P | 05/30/2018 | bonding jumper size for NMHCC - HT gear ok and panel CL3F1 for bond bushing | CRAIG | CRAIG | | EP | P | 5859717 |
STURGEON ELECTRIC CO INC | ER | P | 05/30/2018 | rooms 3536, 3535, 3534, 3533, 3532 for above ceiling ok | CRAIG | CRAIG | | ER | P | 5859716 |
STURGEON ELECTRIC CO INC | ER | P | 05/30/2018 | FIRE ALARM INSPECTION: rooms 3536, 3535, 3534, 3533, 3532 for above ceiling ok | CRAIG | CRAIG | | ER | P | 5859711 |
STURGEON ELECTRIC CO INC | ES | R | 05/29/2018 | Commercial Service: incorrect bonding jumper sizes in NMHCC-HT gear-------panel CL3F1 needs bond bushing----- | RANDY | RANDY | | ES | R | 5857984 |
STURGEON ELECTRIC CO INC | ER | P | 05/29/2018 | OR 8 marked on plans + panel that feeds OR | RANDY | RANDY | | ER | P | 5857973 |
STURGEON ELECTRIC CO INC | ER | P | 05/29/2018 | FIRE ALARM INSPECTION: FA in OR 8 marked on plans with electric | RANDY | RANDY | | ER | P | 5857965 |
STURGEON ELECTRIC CO INC | ER | P | 05/24/2018 | FIRE ALARM INSPECTION: fire alarm v8-3 | RANDY | RANDY | | ER | P | 5855045 |
STURGEON ELECTRIC CO INC | ER | P | 05/24/2018 | lvl 1 rooms 1602,1604,1606,1608,1610, back walls 1601,1603,1605,1607,1609,1611,1613,-------lvl 2 2557,2562,----lvl 3 v8-s nurse station lights marked on plans | RANDY | RANDY | | ER | P | 5855042 |
STURGEON ELECTRIC CO INC | ER | P | 05/22/2018 | FIRE ALARM INSPECTION: rooms 3546,3547,3548,3549,3550,3551,3566,3567,3568,3569,3571,3573,3574,3575, 3338 also looked at electric ceiling rough | RANDY | RANDY | | ER | P | 5852770 |
STURGEON ELECTRIC CO INC | EP | P | 05/22/2018 | looked at NH3F---CH3F---EL3F---EH3F----UPS3LF----TNL3G----CL3G----NL3G---NF3F---NL3F---TCL3F---TEL3F---TNL3F------3rd floor canopy can lights--- | RANDY | RANDY | | EP | P | 5851688 |
STURGEON ELECTRIC CO INC | ES | C | 05/21/2018 | Commercial Service: 1200 amp 4/w commercial service 277/480 | RANDY | RANDY | | ES | C | 5850709 |
STURGEON ELECTRIC CO INC | ER | P | 05/17/2018 | walls and one soffit third floor marked on plans and walls on second floor marked on plans | MATTHEW | MATTHEW | | ER | P | 5848065 |
STURGEON ELECTRIC CO INC | ER | P | 05/17/2018 | FIRE ALARM INSPECTION: walls on third and second floor marked on plans | MATTHEW | MATTHEW | | ER | P | 5848053 |
STURGEON ELECTRIC CO INC | ER | P | 05/10/2018 | FIRE ALARM INSPECTION: parking garage ceiling | RANDY | RANDY | | ER | P | 5841762 |
STURGEON ELECTRIC CO INC | ER | P | 05/10/2018 | parking garage ceiling ------ 3rd floor reception area marked on plans-----5 pole light trenches | RANDY | RANDY | | ER | P | 5841761 |
STURGEON ELECTRIC CO INC | ER | P | 05/08/2018 | no fire alarm looked at on this inspection | RANDY | RANDY | | ER | P | 5839246 |
STURGEON ELECTRIC CO INC | ER | P | 05/08/2018 | can lights in hallways 3rd floor marked on plans | RANDY | RANDY | | ER | P | 5839225 |
STURGEON ELECTRIC CO INC | EUG | P | 05/08/2018 | 5 pole bases | RANDY | RANDY | | EUG | P | 5839218 |
STURGEON ELECTRIC CO INC | ER | P | 05/01/2018 | rooms 3601 and 3602 marked on plans | RANDY | RANDY | | ER | P | 5832994 |
STURGEON ELECTRIC CO INC | ER | P | 05/01/2018 | FIRE ALARM INSPECTION: fire alarm marked on plans | RANDY | RANDY | | ER | P | 5832993 |
STURGEON ELECTRIC CO INC | ER | P | 04/27/2018 | Walls in room 3605 ------------ 3604 & 3603 --------- Also looked at feeders for Switch gear EH4G 7 sets of 500 kcmil cu ------ Need to see bonding for these feeders. | JOSEPH | JOSEPH | | ER | P | 5829693 |
STURGEON ELECTRIC CO INC | ER | P | 04/27/2018 | FIRE ALARM INSPECTION: Not ready --------- Notes: STURGEON POINTS OF CONTACT: Randi (303) 918 - 8293 for FA & Daniel (719) 648 - 6482 | JOSEPH | JOSEPH | | ER | P | 5829674 |
STURGEON ELECTRIC CO INC | ER | P | 04/24/2018 | dome lights for nurse call 3rd floor marked on plans and wellness area | RANDY | RANDY | | ER | P | 5825897 |
STURGEON ELECTRIC CO INC | ER | P | 04/23/2018 | level 3 area 8, anterpartum, walls rm 3605 | RANDY | RANDY | | ER | P | 5823664 |
STURGEON ELECTRIC CO INC | ER | P | 04/20/2018 | FIRE ALARM INSPECTION: fire alarm marked on plans with electrical ------level 3 reception area 8, antepartum walls rm 3605 | RANDY | RANDY | | ER | P | 5823441 |
STURGEON ELECTRIC CO INC | ER | P | 04/13/2018 | walls marked on plans | RANDY | RANDY | | ER | P | 5817160 |
STURGEON ELECTRIC CO INC | ER | P | 04/13/2018 | walls marked on plans | RANDY | RANDY | | ER | P | 5817142 |
STURGEON ELECTRIC CO INC | ER | P | 04/12/2018 | 3rd floor walls marked on plans | RANDY | RANDY | | ER | P | 5815321 |
STURGEON ELECTRIC CO INC | ER | P | 04/10/2018 | LVR room marked on plans | RANDY | RANDY | | ER | P | 5812528 |
STURGEON ELECTRIC CO INC | ER | P | 04/05/2018 | walls marked on plans | RANDY | RANDY | | ER | P | 5809453 |
STURGEON ELECTRIC CO INC | ER | P | 04/05/2018 | FIRE ALARM INSPECTION: walls marked plans | RANDY | RANDY | | ER | P | 5809452 |
STURGEON ELECTRIC CO INC | ER | P | 04/02/2018 | shaft walls 3rd floor marked on plans | RANDY | RANDY | | ER | P | 5805536 |
STURGEON ELECTRIC CO INC | ER | P | 03/29/2018 | FIRE ALARM INSPECTION: walls on 3rd floor marked on plans | RANDY | RANDY | | ER | P | 5802960 |
STURGEON ELECTRIC CO INC | ER | P | 03/22/2018 | walls marked on plans third floor-------- talked to contractor about allowing flex to poke thru's in inaccessible ceiling and short pieces of flex to lights in same ceiling on ground floor | MATTHEW | MATTHEW | | ER | P | 5796602 |
STURGEON ELECTRIC CO INC | ER | P | 03/22/2018 | FIRE ALARM INSPECTION: walls marked on plans | MATTHEW | MATTHEW | | ER | P | 5796586 |
STURGEON ELECTRIC CO INC | ER | P | 03/16/2018 | walls for 3rd floor marked on plans in trailer | RANDY | RANDY | | ER | P | 5790579 |
STURGEON ELECTRIC CO INC | ER | P | 03/16/2018 | FIRE ALARM INSPECTION: walls for 3rd floor marked on plans in trailer | RANDY | RANDY | | ER | P | 5790578 |
STURGEON ELECTRIC CO INC | ER | P | 03/09/2018 | walls in 4th fl electric and elevator rm------marked on plans | RANDY | RANDY | | ER | P | 5785022 |
STURGEON ELECTRIC CO INC | ER | P | 03/08/2018 | FIRE ALARM INSPECTION: 3 rd corridor 3507 south wall only stop at column XD ------------ walls only in rooms 3567, 3566, 3568,3569, 3571, 3572, 3573, 3574, and 3575 ok | CRAIG | CRAIG | | ER | P | 5784061 |
STURGEON ELECTRIC CO INC | ER | P | 03/08/2018 | 3 rd corridor 3507 south wall only stop at column XD ------------ walls only in rooms 3567, 3566, 3568,3569, 3571, 3572, 3573, 3574, and 3575 ok | CRAIG | CRAIG | | ER | P | 5784055 |
STURGEON ELECTRIC CO INC | ER | P | 03/02/2018 | walls and hard lids third floor NICU marked on plans | MATTHEW | MATTHEW | | ER | P | 5778719 |
STURGEON ELECTRIC CO INC | E= | P | 03/01/2018 | FIRE ALARM INSPECTION: rooms 3311 and 3313 and corridor outside these rooms ok | MATTHEW | MATTHEW | | E= | P | 5777464 |
STURGEON ELECTRIC CO INC | ER | P | 03/01/2018 | FIRE ALARM INSPECTION: walls and ceilings marked on plans third floor ok | MATTHEW | MATTHEW | | ER | P | 5777463 |
STURGEON ELECTRIC CO INC | ER | P | 03/01/2018 | walls in couplet rooms on thirdfloor and corridor walls marked on plans third floor hard lids G508 and G 507 ok boxes on columns and exterior walls garden level ok | MATTHEW | MATTHEW | | ER | P | 5777456 |
STURGEON ELECTRIC CO INC | E= | P | 03/01/2018 | rooms 3311 and 3312 and corridor outside these rooms ok | MATTHEW | MATTHEW | | E= | P | 5777451 |
STURGEON ELECTRIC CO INC | ER | L | 02/28/2018 | FIRE ALARM INSPECTION: canceled by contractor | MATTHEW | MATTHEW | | ER | L | 5776299 |
STURGEON ELECTRIC CO INC | ER | L | 02/28/2018 | canceled | MATTHEW | MATTHEW | | ER | L | 5776294 |
STURGEON ELECTRIC CO INC | ER | P | 02/21/2018 | third floor walls marked on plans | MATTHEW | MATTHEW | | ER | P | 5770301 |
STURGEON ELECTRIC CO INC | ER | P | 02/15/2018 | FIRE ALARM INSPECTION: boxes and stubs marked on plans, third floor | MATTHEW | MATTHEW | | ER | P | 5766838 |
STURGEON ELECTRIC CO INC | ER | P | 02/15/2018 | walls in dr sleeping rooms and (1) nicu marked on plans, crawl space, ambulance outlets ground floor | MATTHEW | MATTHEW | | ER | P | 5766834 |
STURGEON ELECTRIC CO INC | ER | P | 02/02/2018 | elect. rooms all floors except 2nd floor, 2 offices on the 3rd floor, data room on 1st floor, 4th floor elevator equiptment room------all marked on approved plans | MIGUEL | MIGUEL | | ER | P | 5755481 |
STURGEON ELECTRIC CO INC | ER | P | 02/01/2018 | walls marked on plans ok----- third floor | MATTHEW | MATTHEW | | ER | P | 5754476 |
STURGEON ELECTRIC CO INC | ER | P | 01/11/2018 | walls third floor marked on plans---------- I spoke with contractor about accessibility requirements-------- contractor needs to pull fire alarm permit---------------------- vertical support of 500 kcmil cu conductors is required at 50' | MATTHEW | MATTHEW | | ER | P | 5735912 |
STURGEON ELECTRIC CO INC | ER | P | 12/06/2017 | walls marked on approved plans (boxes and stubs for fire alarm; I informed elec contractor we need a fire alarm attachment) | MATTHEW | MATTHEW | | ER | P | 5705158 |
US ENGINEERING COMPANY | H= | C | 07/18/2019 | RECEIVED STAMPED ENGINEER LETTER APPROVING THE TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | C | 6267905 |
US ENGINEERING COMPANY | HSP | P | 06/18/2019 | HAD CONVERSATION WITH PROJECT ENGINEER ( BARRY STAMP) WITH THE RMH GROUP. ENGINEER WILL REVIEW TEST AND BALANCE REPORT AND PROVIDE AN ENGINEER STAMPED LETTER IF ENGINEER APPROVES THE READINGS. | LIDO | LIDO | | HSP | P | 6237365 |
US ENGINEERING COMPANY | HSP | P | 06/13/2019 | TEST AND BALANCE REPORT REVIEW FOR GARDEN LEVEL AND 1ST FLOOR: RECEIVED ENGINEER LETTER APPROVING THE OUTSIDE AIR READINGS FOR RTU-9 ( SEE IMAGES) . THE FOLLOWING STILL NEED TO BE ADDRESSED, THESE ITEMS WERE NOTED ON ( HSP) ENTY DATED 5/16/19 : VAV 1-253 SUPPLY GRILL #1, 2 ARE OUTSIDE THE 10 % PLUS OR MINUS ALLOWED. RTU-9 RETURN AIR: ALL RETURN AIR GRILLS ARE OUTSIDE THE 10 % PLUS OR MINUS ALLOWED. RTU-10 EQUIPMENT DATA FORM 2 (HEATING MODE DATA) THE OUTSIDE AIR READING IS OUTSIDE THE 10% PLUS OR MINUS ALLOWED. VAV 0-203 SUPPLY GRILL # 6, VAV 1-206 SUPPLY GRILL # 1,5,6 ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED. VAV 1-245 SUPPLY GRILL # 3, 100 CFM’S USED FOR THE REQUIRED CFM’S ON THE (TAB) REPORT, PLANS SHOW 150 FOR THE REQUIRED CFM’S. RTU-10 RETURN AIR: ROOM G502 GRILL # R5, ROOM 1641 GRILL # R49, R50, ROOM 1642 GRILL # R51, ROOM 1544 AND 1548 GRILL # R25, R24 ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED. GEF-1: ROOM 1536 GRILL # E26 - 250 CFM’S USED FOR THE REQUIRED CFM’S ON THE (TAB) REPORT, PLANS SHOW 300 FOR THE REQUIRED CFM’S. GEF-7: GRILL # 1,2,3,4,5,6,7,8,9,10,11,12 ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED. EF-1: ROOM 1609 # 1 AND 1611 # 2 ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED. NEED A REVISED TEST AND BALANCE REPORT OR AN ENGINEER STAMPED LETTER APPROVING THE READINGS FROM THE TEST AND BALANCE REPORT. (2ND FLOOR TEST AND BALANCE REPORT IS BEING REVIEWED.) | LIDO | LIDO | | HSP | P | 6229561 |
US ENGINEERING COMPANY | H= | P | 06/06/2019 | TEST AND BALANCE REPORT FOR GARDEN , 1ST AND 2ND LEVEL IS BEING REVIEWED. | LIDO | LIDO | | H= | P | 6221978 |
US ENGINEERING COMPANY | HSP | P | 05/16/2019 | TEST AND BALANCE REPORT REVIEW FOR GARDEN LEVEL AND 1ST FLOOR: RTU-9 EQUIPMENT DATA FORM 2 (HEATING MODE DATA) THE OUTSIDE AIR READING IS OUTSIDE THE 10% PLUS OR MINUS ALLOWED. VAV 1-253 SUPPLY GRILL #1, 2 ARE OUTSIDE THE 10 % PLUS OR MINUS ALLOWED. RTU-9 RETURN AIR: ALL RETURN AIR GRILLS ARE OUTSIDE THE 10 % PLUS OR MINUS ALLOWED. RTU-10 EQUIPMENT DATA FORM 2 (HEATING MODE DATA) THE OUTSIDE AIR READING IS OUTSIDE THE 10% PLUS OR MINUS ALLOWED. VAV 0-203 SUPPLY GRILL # 6, VAV 1-206 SUPPLY GRILL # 1,5,6 ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED. VAV 1-245 SUPPLY GRILL # 3, 100 CFM’S USED FOR THE REQUIRED CFM’S ON THE (TAB) REPORT, PLANS SHOW 150 FOR THE REQUIRED CFM’S. RTU-10 RETURN AIR: ROOM G502 GRILL # R5, ROOM 1641 GRILL # R49, R50, ROOM 1642 GRILL # R51, ROOM 1544 GRILL # R25, R24 ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED. GEF-1: ROOM 1536 GRILL # E26 - 250 CFM’S USED FOR THE REQUIRED CFM’S ON THE (TAB) REPORT, PLANS SHOW 300 FOR THE REQUIRED CFM’S. GEF-7: GRILL # 1,2,3,4,5,6,7,8,9,10,11,12 ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED. EF-1: ROOM 1609 # 1 AND 1611 # 2 ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED. ((NEED A REVISED TEST AND BALANCE REPORT OR AN ENGINEER STAMPED LETTER APPROVING THE READING FROM THE TEST AND BALANCE REPORT.)) | LIDO | LIDO | | HSP | P | 6202245 |
US ENGINEERING COMPANY | H= | P | 05/07/2019 | PARTIAL PENDING : NEED TO REVIEW TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6190371 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 05/07/2019 | HEAT FINAL COMPLETE. | LIDO | LIDO | | H= | C | 6190336 |
US ENGINEERING COMPANY | H= | P | 01/04/2019 | PHASE- 5 -3RD FLOOR AREA E-1 TM133 ( BDA 1697 SPLICE ) PARTIAL HEAT FINAL OK. NEED TEST AND BALANCE REPORT | LIDO | LIDO | | H= | P | 6068868 |
US ENGINEERING COMPANY | HSP | P | 01/03/2019 | 3RD FLOOR AREA E-1 TM233 -RECEIVED ENGINEER STAMPED PLAN WITH THERMOSTAT LOCATION . | LIDO | LIDO | | HSP | P | 6066997 |
US ENGINEERING COMPANY | HD | P | 12/28/2018 | PHASE- 5 -3RD FLOOR AREA E-1 TM133 ( BDA 1697 SPLICE ) MISSING THERMOSTAT IN ROOM # 3213, STILL NEED REMOTE SMOKE INDICATORS ( LED) INSTALLED . ALL SUPPLY, RETURN AND EXHAUST GRILLS AND REGISTERS INSTALLED. | LIDO | LIDO | | HD | P | 6065125 |
US ENGINEERING COMPANY | HD | P | 12/20/2018 | 3RD FLOOR TM-133 (BDA 1687 SPLICE)- NEED ENGINEERED STAMPED DETAILED PLAN FOR THERMOSTAT LOCATIONS - ALL THERMOSTATS INSTALLED EXCEPT FOR ROOM # 3211,3213. SUPPLY, RETURN, EXHAUST AIR GRILLS AND REGISTERS FINAL TIE INS OK. | LIDO | LIDO | | HD | P | 6059665 |
US ENGINEERING COMPANY | HD | P | 12/18/2018 | 4TH FLOOR TM141 / TM142 ( BDA1695/ BDA 1696) FOUR DAMPER COMPLETE / ACCESS AND LABELS COMPLETE. 3RD FLOOR REMODEL TM 133 ( BDA 1687 SUPPLY, RETURN AND EXHAUST GRILLS AND REGISTERS FINAL CONNECTIONS OK . | LIDO | LIDO | | HD | P | 6056030 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 12/13/2018 | PHASE- 6 - HEAT FINAL OK . | LIDO | LIDO | | H= | P | 6051998 |
US ENGINEERING COMPANY | H= | P | 12/13/2018 | PHASE -4 -GARDEN LEVEL PLAN PAGE TM-101 / TM-102 HEAT FINAL OK / NEED TEST AND BALANCE REPORT PROVIDE BY FINAL . PHASE-6- 2ND FLOOR PLAN PAGE TM-122 (BDA146) HEAT FINAL OK / NEED TEST AND BALANCE REPORT PROVIDE BY FINAL .
| LIDO | LIDO | | H= | P | 6051992 |
US ENGINEERING COMPANY | HD | P | 12/13/2018 | 3 RD FLOOR TM-133 (BDA1697 SPLICE ) DUCT ROUGH COMPLETE . | LIDO | LIDO | | HD | P | 6051972 |
US ENGINEERING COMPANY | HD | P | 12/10/2018 | 4th FLOOR TM141 / TM142 ( BDA 1695 SPLICE ) (BDA 1696 SPLICE )FOUR DAMPER FRAMES OK. 3RD FLOOR REMODEL TM-133 (BDA 1697 SPLICE) SUPPLY AND RETURN GRILLS AND REGISTERS FINAL CONNECTIONS OK. | LIDO | LIDO | | HD | P | 6048102 |
US ENGINEERING COMPANY | H= | P | 11/28/2018 | PHASE -4 FOR 1ST FLOOR TM-111, TM112, TM113 OK . NEED REQUESTED SPLICES AND TEST AND BALANCE REPORT BY FINAL. | LIDO | LIDO | | H= | P | 6036917 |
US ENGINEERING COMPANY | HD | P | 11/27/2018 | 1ST FLOOR TM-111, TM112, TM113, ALL SMOKE DAMPER ACCESS DOORS AND LABELS INSTALLED. ALL REMOTE SMOKE INDICATORS INSTALLED / EXCEPT FOR SHELL SPACE . | LIDO | LIDO | | HD | P | 6035543 |
US ENGINEERING COMPANY | HD | P | 11/26/2018 | 1ST FLOOR - TM-111 ( BDA1664) TM-112( BDA1456) TM-113 (BDA142) ALL SUPPLY SLOT DIFFUSERS DOWN CORRIDOR AND NORTH END OF FLOOR OK . WHAT'S NEEDED FOR PHASE -4 - ACCESS AND LABELS FOR SMOKE DAMPERS DOWN SOUTH CORRIDOR , REMOTE SMOKE INDICATORS, REQUESTED SPLICES.TEST AND BALANCE REPORT BY FINAL. | LIDO | LIDO | | HD | P | 6033716 |
US ENGINEERING COMPANY | HSP | P | 11/15/2018 | THERE IS A SPLICE TM133 ( BDA 1687) SCANNED IN FOR THE THREE FIRE DAMPERS FOR SOILED ROOM 3225 WALL / ONE DAMPER IN WALL FOR NICU ROOM # 3209. (NOT TO BE INSTALLED.) | LIDO | LIDO | | HSP | P | 6026170 |
US ENGINEERING COMPANY | HD | P | 11/14/2018 | 1ST FLOOR TM-111 ( BDA1694 SPLICE ) TWO DAMPERS COMPLETE / ACCESS AND LABELS COMPLETE. TM112 ( BDA1456) TM113 ( BDA142 ) SUPPLY , RETURN, EXHAUST, GRILLS AND REGISTERS FINAL CONNECTIONS OK . 1ST FLOOR ALL THERMOSTATS IN PLACE , ALL DAMPER ACCESS AND LABELS IN PLACE TM122 ( PHASE-6 ) ABOVE CEILING DUCT ROUGH OK/ OK TO WRAP.
| LIDO | LIDO | | HD | P | 6025525 |
US ENGINEERING COMPANY | H= | P | 11/14/2018 | ( PHASE 2-5 ) HEAT FINAL OK FOR 4TH FLOOR TM142 ( BDA1471) TM141 ( 1470 ) STILL NEED REQUESTED REVISED AND APPROVED PLANS, TEST AND BALANCE REPORT.
| LIDO | LIDO | | H= | P | 6024588 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 11/13/2018 | ALL PHASES COMPLETE EXCEPT PHASE 6. | LIDO | LIDO | | H= | P | 6024027 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 11/13/2018 | 3RD FLOOR AREA E-1 M233 ( BDA 165) HEAT WATER SUPPLY AND RETURN FINAL CONNECTION TO ALL VAV'S IN THIS AREA OK / UNDER OPERATING PRESSURE NO VISIBLE LEAKS. | LIDO | LIDO | | HWP | P | 6023989 |
US ENGINEERING COMPANY | HD | P | 11/08/2018 | 3rd FLOOR TM-133 ( BDA 1626) NEED REVISED AND APPROVED PLANS FOR ALL THE DUCT CHANGES , DUCT PENETRATIONS THROUGH DIFFERENT WALLS FROM WHAT IS SHOWN ON THE PLAN , VAV-3-331 MOVED FROM CORRIDOR INTO ROOM 3208, NEED ENGINEER TO ADDRESS THE THREE FIRE DAMPERS SHOWN ON THE PLAN FOR SOILED ROOM 3225 WALL THAT ARE NOT INSTALLED / ONE DAMPER IN WALL FOR NICU ROOM # 3209 SHOWN ON PLAN NOT INSTALLED. SUPPLY, RETURN, EXHAUST ABOVE CEILING DUCT ROUGH OK/ OK TO WRAP . 1ST FLOOR TM 212 ( BDA 1511) THERMOSTATS INSTALLED MISSING ONE IN ELECTRIC ROOM . 1ST FLOOR TM-111 ( BDA 1664) NEED REVISED AND APPROVED PLAN FOR TWO FIRE DAMPER INSTALLED IN STAIR WAY VESTIBULE , TWO DAMPER FRAMES AND ANNULAR SPACING OK . | LIDO | LIDO | | HD | P | 6020178 |
US ENGINEERING COMPANY | HD | P | 11/05/2018 | 1ST FLOOR TM113 ( BDA 142) AIR CURTAIN AC-1 OK . | LIDO | LIDO | | HD | P | 6016003 |
US ENGINEERING COMPANY | HD | P | 10/31/2018 | 1ST FLOOR TM211 ( BDA 1510) TM-212 ( BDA 1511) TM 213 ( BDA 160) THERMOSTATS INSTALLED / STILL NEED REST OF THERMOSTATS. | LIDO | LIDO | | HD | P | 6011861 |
US ENGINEERING COMPANY | HD | P | 10/25/2018 | 1ST FLOOR TM-111 ( BDA1664) /TM112 ( BDA 1456) /TM113 ( BDA 142)SUPPLY , RETURN, GRILLS AND REGISTERS FINAL CONNECTIONS OK | LIDO | LIDO | | HD | P | 6006568 |
US ENGINEERING COMPANY | HD | P | 10/17/2018 | 1ST FLOOR TM111 (BDA1664) TM112( 1456) THREE DAMPERS COMPLETE/ ELEVEN DAMPER ACCESS DOORS AND LABELS OK/ SUPPLY,RETURN,EXHAUST AIR GRILLS AND REGISTERS FINAL CONNECTIONS OK . | LIDO | LIDO | | HD | P | 5997961 |
US ENGINEERING COMPANY | HD | P | 10/09/2018 | 1st FLOOR TM-112 ( BDA1456) TM111 ( 1664) SUPPLY, RETURN, EXHAUST AIR GRILLS AND REGISTERS CONNECTIONS FINAL CONNECTIONS OK . | LIDO | LIDO | | HD | P | 5990294 |
US ENGINEERING COMPANY | H= | P | 10/09/2018 | ( PHASE- 3 ) HEAT FINAL FOR 2ND FLOOR PLAN PAGE TM-122 / TM-121 OK / STILL NEED REQUESTED REVISED AND APPROVED PLANS, TEST AND BALANCE REPORT. ( PHASE- 3 ) HEAT FINAL FOR 4TH FLOOR FOR RTU-11 PLAN PAGE TM-141 OK. | LIDO | LIDO | | H= | P | 5989267 |
US ENGINEERING COMPANY | HD | P | 10/08/2018 | GARDEN LEVEL TM101 / TM102 ALL SENSORS IN PLACE DOES THE EXHAUST FAN GEF-7 RUN CONTINUOUS ? / STILL NEED TEST AND BALANCE REPORT. 1ST FLOOR TM-112 ( BDA 1456) THREE DAMPER ACCESS DOORS AND LABELS OK . TM-111 ( BDA 1664) THREE DAMPER ACCESS DOORS AND LABELS OK . | LIDO | LIDO | | HD | P | 5988989 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 10/08/2018 | GARDEN LEVEL TM202 SNOW MELT SUPPLY AND RETURN UNDER OPERATING PRESSURE OK - NO VISIBLE LEAKS / TM 201 CUH -G-3 OK . 1ST FLOOR ALL HUMIDIFIERS UNDER OPERATING PRESSURE OK - NO VISIBLE LEAKS , CONDENSATE COOLER IN ROOM # 1545 INSTALLED STILL NEED AIR CURTAIN PLAN PAGE TM-213 (BDA160) 2ND FLOOR ALL HUMIDIFIERS UNDER OPERATING PRESSURE OK - NO VISIBLE LEAKS . TM222 ( BDA 1557) STILL NEED AUTO CLAVE FINAL CONNECTIONS / CONDENSATE DISPOSAL OK . | LIDO | LIDO | | HWP | P | 5988956 |
US ENGINEERING COMPANY | HD | P | 09/26/2018 | 1ST FLOOR TM111 ( BDA 1664) TM112 ( BDA 1456) TM113 ( BDA142) TWELVE DAMPER ACCESS DOORS AND LABELS OK . | LIDO | LIDO | | HD | P | 5978015 |
US ENGINEERING COMPANY | HD | P | 09/25/2018 | 1ST FLOOR TM111 (BDA1664) DAMPER FRAME AND DAMPER BREAK AWAY OK . 2ND FLOOR TM121 ( BDA1464) TM122 (146) ALL THERMOSTATS / REMOTE SMOKE INDICATOR LED ,PRESSURE MONITORS FOR OR ROOMS INSTALLED .( NEED TO RESEARCH IF ALL REQUESTED SPLICES HAVE BEEN RECEIVED ) | LIDO | LIDO | | HD | P | 5976070 |
US ENGINEERING COMPANY | HD | P | 09/24/2018 | 1ST FLOOR TM111 - (BDA1664) TM112- (1456) TM113 -(BDA142) SUPPLY, RETURN, EXHAUST GRILLS AND REGISTERS FINAL CONNECTION IN CORRIDORS OK. | LIDO | LIDO | | HD | P | 5974485 |
US ENGINEERING COMPANY | HD | P | 09/19/2018 | TM112 (BDA 1456) - SUPPLY/RETURN/EXHAUST ABOVE CEILING OK. TM113 (BDA 142) - SUPPLY/RETURN IN EXAM 3 OK. | NANCY | NANCY | | HD | P | 5970625 |
US ENGINEERING COMPANY | HD | P | 09/13/2018 | 3RD FLOOR TM-111 ( BDA 1664) ONE -DAMPER FRAMING IS NOT PER INSTALLATION INSTRUCTIONS . | LIDO | LIDO | | HD | P | 5964185 |
US ENGINEERING COMPANY | HD | P | 09/12/2018 | 2ND FLOOR TM122 (BDA146) TYM121 ( BDA1464) SUPPLY, RETURN, EXHAUST GRILLS AND REGISTERS- FINAL CONNECTION OK . | LIDO | LIDO | | HD | P | 5962810 |
US ENGINEERING COMPANY | HD | P | 09/11/2018 | 1ST FLOOR TM111 ( BDA1664) TM112 ( BDA1456) TM113 ( BDA142) SUPPLY , RETURN , EXHAUST GRILLS AND REGISTER FINAL CONNECTION OK. | LIDO | LIDO | | HD | P | 5962009 |
US ENGINEERING COMPANY | HD | P | 09/10/2018 | 2ND FLOOR TM121 ( BDA 1464) TM122 ( BDA 146) 7 - DAMPER ACCESS AND LABELS OK. | LIDO | LIDO | | HD | P | 5960356 |
US ENGINEERING COMPANY | HD | P | 09/05/2018 | 1ST FLOOR TM-111 ( BDA1664) SUPPLY, RETURN, EXHAUST GRILLS AND REGISTER FINAL CONNECTIONS OK . | LIDO | LIDO | | HD | P | 5955650 |
US ENGINEERING COMPANY | HD | P | 09/04/2018 | 2ND FLOOR -NEED REVISED AND APPROVED SPLICE FOR ADDED FIRE/SMOKE DAMPER IN NORTH SHAFT EXHAUST DUCT FOR GEF-1 PLAN PAGE TM-122. 2ND FLOOR NEED REVISED AND APPROVED SPLICE FOR DELETED DAMPER FOR VAV-218 PLAN PAGE TM-122. 2ND FLOOR TM121 (BDA 1464) ACCESS DOORS AND LABELS OK . STILL NEED TO SEE THE REST . 2ND FLOOR TM122 (BDA 146) MISSING SMOKE DAMPER IN ( OR ) 7 ACCESS DOORS AND LABELS OK / STILL NEED TO SEE THE REST . | LIDO | LIDO | | HD | P | 5954053 |
US ENGINEERING COMPANY | HSP | P | 08/30/2018 | MECHANICAL SCOPE OF WORK WILL NEED TO BE CORRECTED TO MATCH INSTALL . | LIDO | LIDO | | HSP | P | 5951402 |
US ENGINEERING COMPANY | HD | P | 08/30/2018 | 2ND FLOOR M121 ( BDA 1464) SUPPLY, RETURN, EXHAUST GRILLS AND REGISTERS FINAL CONNECTIONS OK . MOTORIZED DAMPERS IN OR ROOMS OK . | LIDO | LIDO | | HD | P | 5951374 |
US ENGINEERING COMPANY | H= | P | 08/28/2018 | PHASE- 2 HEAT FINAL FOR AHU-13 OK / 4TH FLOOR MECHANICAL ROOM PLAN PAGE TM-141 .STILL NEED TEST AND BALANCE REPORT . | LIDO | LIDO | | H= | P | 5948917 |
US ENGINEERING COMPANY | HD | P | 08/28/2018 | 4TH FLOOR TM141 ( BDA1470) TM142( 1471) NEED TO VERIFY ACCESS DOORS .FIRE DAMPER / FIRE -SMOKE DAMPER ACCESS DOORS AND LABELS OK .ONE DAMPER COMPLETE. | LIDO | LIDO | | HD | P | 5948435 |
US ENGINEERING COMPANY | HSP | P | 08/23/2018 | RECEIVED STAMPED ENGINEER LETTER ELIMINATING ISOLATION DAMPER FROM EXHAUST FANS .( SEE IMAGES ) | LIDO | LIDO | | HSP | P | 5943315 |
US ENGINEERING COMPANY | H= | P | 08/22/2018 | PHASE TWO HEAT FINAL FOR NORTH AND SOUTH STAIRWELL OK . | LIDO | LIDO | | H= | P | 5942506 |
US ENGINEERING COMPANY | HD | P | 08/22/2018 | 1ST FLOOR TM112 ( BDA1456) SEVEN DAMPERS COMPLETE / STILL NEED ACCESS DOORS AND LABELS . 1ST FLOOR TM112 / TM113 ( BDA1456 / BDA 142 ) SUPPLY AND RETURN GRILLS AND REGISTER FINAL CONNECTIONS OK . | LIDO | LIDO | | HD | P | 5942498 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 08/15/2018 | GARDEN LEVEL TM201 NORTH AND SOUTH STAIR WELLS CUH G-2 / CUH G-4 FINAL CONNECTION OK . 1ST FLOOR TM211( BDA1510) TM212 ( BDA1511) TM213 ( BDA160) VAV FINAL CONNECTIONS OK . UNIT HEATER FINAL CONNECTIONS IN SHELL SPACE OK / STILL NEED LABEL . | LIDO | LIDO | | HWP | P | 5935051 |
US ENGINEERING COMPANY | HD | P | 08/08/2018 | 1ST FLOOR TM111 ( BDA 1664) NEED PLAN REVISED APPROVED SPLICE SHOWING SMOKE DAMPER ELIMINATED IN WALL TO HALLWAY 1676 . 1ST FLOOR TM-113 (BDA 142) NEED PLAN REVISED APPROVED SPLICE SHOWING SMOKE DAMPER ELIMINATED IN ROOM 1601 , ABOVE CEILING SUPPLY , RETURN , EXHAUST DUCT ROUGH OK- OK TO WRAP . | LIDO | LIDO | | HD | P | 5928249 |
US ENGINEERING COMPANY | HD | P | 08/06/2018 | 2ND FLOOR TM121 (BDA 1464) TWO SMOKE DAMPERS INSTALLED / NEED ACCESS DOORS AND LABELS , ABOVE CEILING DUCT ROUGH OK - OK TO WRAP. | LIDO | LIDO | | HD | P | 5925510 |
US ENGINEERING COMPANY | HD | P | 08/02/2018 | 2ND FLOOR TM122( BDA 146) TM121( BDA1464) FOUR CABINET EXHAUST RUNS INSTALLED AND FOUR MOTORIZED DAMPERS INSTALLED PER SPLICE 6/20/18 . IN ( OR) ROOMS - SUPPLY , RETURN FINAL GRILLS AND REGISTER FINAL CONNECTIONS OK .1- SMOKE DAMPER INSTALLED . | LIDO | LIDO | | HD | P | 5922429 |
US ENGINEERING COMPANY | H= | P | 08/02/2018 | CALLED CONTRACTOR ABOUT ADDED PHASE NOTES .PHASE TWO HEAT FINAL FOR 3RD FLOOR PLAN PAGE TM131 (BDA 726) TM132 ( BDA 727) OK - NEED TEST AND BALANCE REPORT . PHASE TWO HEAT FINAL FOR 3RD FLOOR AREA E-1 PLAN PAGE TM133 ( BDA 728) COLUMN LINE (B) THROUGH (S) AND COLUMN LINE (17)THROUGH (21) - OK- NEED TEST AND BALANCE REPORT . | LIDO | LIDO | | H= | P | 5921553 |
US ENGINEERING COMPANY | HSP | P | 07/30/2018 | STAMPED ENGINEER LETTER RECEIVED REFERENCING TWIN CITY EXHAUST FANS INSTALLED ON ROOF IN PLACE OF GREENHECK AND SLIDE GATE INSTALLED IN PLACE OF MOTORIZED DAMPERS FOR THE SAME FANS . ( SEE IMAGES ) | LIDO | LIDO | | HSP | P | 5917349 |
US ENGINEERING COMPANY | HD | P | 07/26/2018 | 1st FLOOR TM112 ( BDA1456) ONE DAMPER COMPLETE , ABOVE CEILING SUPPLY, RETURN, EXHAUST DUCT ROUGH OK - OK TO WRAP .1st FLOOR TM113 ( BDA142) ABOVE CEILING SUPPLY, RETURN, EXHAUST DUCT ROUGH OK - OK TO WRAP . | LIDO | LIDO | | HD | P | 5915135 |
US ENGINEERING COMPANY | HD | P | 07/25/2018 | ROOF - TM151 ( BDA154) NEED REVISED AND APPROVED PLANS FOR DELETED GEF-3 / PLAN PAGE TM 601 ( BDA169) FAN SCHEDULE SHOWS GREENHECH TO BE INSTALLED , TWIN CITY FANS ARE INSTALLED / NEED REVISED AND APPROVED PLANS FOR THIS CHANGE . ROOF - TM151 ( BDA154) EXHAUST FANS ON ROOF INSTALL OK / WERE ARE THE MOTORIZED DAMPERS INSTALLED PER EQUIPMENT SCHEDULE TM601 NOTE 3. | LIDO | LIDO | | HD | P | 5913468 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 07/24/2018 | 4TH FLOOR TM241 ( BDA671) 60 lb TEST FOR HEAT WATER SUPPLY AND RETURN OK .HEAT WATER SUPPLY ANS RETURN FINAL CONNECTIONS TO AHU-9 OK . SECONDARY PROTECTION FOR FCU-4-5 OK . 4TH FLOOR TM242 (BDA167) CONDENSATE DISPOSAL FOR FCU-1,2,3 OK . | LIDO | LIDO | | HWP | P | 5912561 |
US ENGINEERING COMPANY | HD | P | 07/24/2018 | 4th FLOOR TM 141 (BDA 1470) AHU-9, 11, 13 OK / PLENUMS COMPLETE/ FCU-4-5 PAN AND SECONDARY PROTECTION INSTALLED .THERMOSTATS INSTALLED . 4TH FLOOR TM142 (BDA1471) AHU-10 OK/ THERMOSTATS OK / PLENUM COMPLETE . | LIDO | LIDO | | HD | P | 5912556 |
US ENGINEERING COMPANY | HD | P | 07/19/2018 | 1ST FLOOR TM-111 (BDA1664) TM-112 ( BDA1456) TM-113 ( BDA142) ABOVE CEILING SUPPLY, RETURN , EXHAUST DUCT ROUGH OK - OK TO INSULATE . | LIDO | LIDO | | HD | P | 5908172 |
US ENGINEERING COMPANY | HD | P | 07/18/2018 | 1ST FLOOR TM-111 (BDA1664) TWO FIRE/SMOKE DAMPERS COMPLETE . 1ST FLOOR TM-112 ( BDA1456) ((NEED REVISED PLAN FOR ADDED FIRE /SMOKE DAMPER TO ROOM # 1659 ))FOUR SMOKE DAMPERS COMPLETE , ONE FIRE DAMPER COMPLETE / STILL NEED ACCESS DOORS AND LABELS . FOUR SMOKE DAMPERS COMPLETE / STILL NEED ACCESS DOORS AND LABELS. ONE DAMPER FRAME AND ANNULAR SPACING OK . | LIDO | LIDO | | HD | P | 5906969 |
US ENGINEERING COMPANY | HD | P | 07/17/2018 | PHASE TWO HEAT FINAL -GARDEN LEVEL TM102 GRID LINES X7 THROUGH 5 / XB2 THROUGH B -DAMPER ACCESS DOORS AND LABELS IN PLACE ,THERMOSTATS INSTALLED. 1ST FLOOR TM112 ( BDA1456) ABOVE CEILING SUPPLY , RETURN , EXHAUST DUCT ROUGH OK- OK TO INSULATE. | LIDO | LIDO | | HD | P | 5905421 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 07/16/2018 | 4TH FLOOR TM-241 ( BDA 671) 60 LB TEST FOR HEAT WATER SUPPLY AND RETURN OK- OK TO INSULATE AND LABEL .FINAL CHILLED WATER SUPPLY AND RETURN TIE IN FOR AHU-11 OK. | LIDO | LIDO | | HWP | P | 5904100 |
US ENGINEERING COMPANY | HSP | P | 07/15/2018 | RECEIVED STAMPED ENGINEER DETAIL AND LETTER FOR THE FOLLOWING ( SEE IMAGES ) 3RD FLOOR TM133 ( BDA 1626) THERMOSTAT LOCATIONS IN ROOM # 3502, 3342, 3501A, 3240A ) | LIDO | LIDO | | HSP | P | 5902864 |
US ENGINEERING COMPANY | HD | P | 07/12/2018 | 3RD FLOOR TM133 ( BDA 1626) THERMOSTAT INSTALLED ( NEED STAMPED ENGINEER DETAL / LETTER FOR THERMOSTAT LOCATIONS NOT SHOWN ON PLANS LOCATED IN ROOM # 3502, 3342, 3501A, 3240A ) SMOKE DAMPER ACCESS DOORS AND LABEL OK . REMOTE SMOKE INDICATORS INSTALLED . NEED TEST AND BALANCE REPORT (( WILL BE LACKING FOUR SUPPLY REGISTERS BRANCHING FROM DIFFERENT PHASE- NEED CONSULT WITH SENIOR )) 3RD FLOOR TM132 REMOTE SMOKE INDICATORS INSTALLED , NEED TEST AND BALANCE REPORT | LIDO | LIDO | | HD | P | 5900955 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 07/12/2018 | FIELD CANCELED BY CONTRACTOR . | LIDO | LIDO | | HWP | P | 5900775 |
US ENGINEERING COMPANY | HD | P | 07/11/2018 | 1ST FLOOR TN-111( BDA 1664) ABOVE CEILING SUPPLY , RETURN , EXHAUST DUCT ROUGH OK - OK TO WRAP . FIVE SMOKE DAMPERS COMPLETE / STILL NEED ACCESS DOORS AND LABELS . 1ST FLOOR TM112 ( BDA 1456) ABOVE CEILING SUPPLY , RETURN , EXHAUST DUCT ROUGH OK - OK TO WRAP . | LIDO | LIDO | | HD | P | 5899475 |
US ENGINEERING COMPANY | HD | P | 07/10/2018 | 1ST FLOOR TM 111( BDA1664) TM 112 (BDA1455) SUPPLY, RETURN , EXHAUST DUCT ROUGH OK - OK TO WRAP . | LIDO | LIDO | | HD | P | 5898094 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 07/10/2018 | 1st FLOOR TM211 ( BDA1510 )/ TM212 (BDA1511) / TM213 ( BDA160) HEAT WATER SUPPLY AND RETURN OK - OK TO WRAP AND LABEL / UNDER OPERATING PRESSURE NO VISIBLE LEAKS . | LIDO | LIDO | | HWP | P | 5898091 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 07/09/2018 | 1ST FLOOR TM211( ( BDA 1510 ) TM 212 ( BDA 1511) 20 lb TEST OK FOR LOW PRESSURE STEAM AND CONDENSATE / INSTALLED PER PLAN - OK TO WRAP AND LABEL . | LIDO | LIDO | | HWP | P | 5896899 |
US ENGINEERING COMPANY | HD | P | 07/09/2018 | 1ST FLOOR TM 111 ( BDA 1664) TWO FIRE SMOKE DAMPERS COMPLETE / STILL NEED ACCESS DOORS AND LABELS. SUPPLY , RETURN , EXHAUST DUCT ROUGH OK- OK TO WRAP . 1ST FLOOR TM-112 ( BDA 1456) SUPPLY , RETURN , EXHAUST DUCT ROUGH OK- OK TO WRAP . | LIDO | LIDO | | HD | P | 5896888 |
US ENGINEERING COMPANY | HD | P | 07/05/2018 | 3RD FLOOR TM133 ( 1626)(( NEED REVISED AND APPROVED PLANS FOR TWO MOVED SMOKE DAMPERS AND ONE ELIMINATED SMOKE DAMPER .))SMOKE DAMPER ACCESS DOORS AND LABELS OK EXCEPT FOR RESP EQUIPMENT ROOM # 3503 . SUPPLY , EXHAUST , RETURN GRILLS AND REGISTER FINAL CONNECTIONS OK . VAV -3-340 OK / STILL NEED TO SEE INSIDE FAMILY LOUNGE # 3250 . STILL NEED TO SEE THERMOSTATS AND REMOTE SMOKE INDICATORS . | LIDO | LIDO | | HD | P | 5894163 |
US ENGINEERING COMPANY | HD | P | 07/02/2018 | 3RD FLOOR TM231 (BDA163) TM232( BDA 1558) THERMOSTATS COMPLETE . 3RD FLOOR TM132 ( BDA 1468) FIRE / FIRE-SMOKE / SMOKE DAMPER ACCESS DOORS AND LABELS COMPLETE . SUPPLY FINAL CONNECTIONS OK . 3RD FLOOR TM131 ( BDA 1624) SUPPLY , RETURN , EXHAUST FINAL CONNECTIONS OK . | LIDO | LIDO | | HD | P | 5891345 |
US ENGINEERING COMPANY | HD | P | 06/27/2018 | 1ST FLOOR TM111 ( BDA1664) SUPPLY , RETURN , EXHAUST ABOVE CEILING DUCT ROUGH OK - OK TO WRAP . TWO DAMPERS COMPLETE / STILL NEED ACCESS DOORS AND LABELS . 1ST FLOOR TM112 ( BDA 1456) TWO DAMPER FRAMES AT SHAFT OK . | LIDO | LIDO | | HD | P | 5887870 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 06/27/2018 | 4TH FLOOR M-241 (BDA171 CONDENSATE DISPOSAL FOR FCU-4-5 AND FCU 4-4 OK / FCU-4-5 WILL REQUIRE A PAN ( USE) IT IS LOCATED IN A ELECTRICAL ROOM . AHU -9 , AHU-11 CONDENSATE TRAPS OK . AHU -13 - CONDENSATE DISPOSAL FOR HUMIDIFIER OK .4TH FLOOR TM142 ( BDA167) 83lb TEST FOR CHILLED WATER SUPPLY AND RETURN TO FCU-4-1 OK / FINAL CONNECTIONS OK AND CONDENSATE DISPOSAL OK . | LIDO | LIDO | | HWP | P | 5887869 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 06/25/2018 | LEVEL 2 - TM 222 ( BDA 1557) AND TM221 ( BDA1556)(( NEED REVISED AND APPROVED PLANS FOR ADDED VAV 02-223 AND VAV 02-219 .))80 lb TEST FOR HEAT WATER SUPPLY AND RETURN FOR VAV'S AND HUMIDIFIERS OK / FINAL VAV AND HUMIDIFIER FINAL CONNECTIONS OK . | LIDO | LIDO | | HWP | P | 5884627 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 06/21/2018 | 4TH FLOOR TM242 ( BDA167) 83 LB TEST OK FOR CHILLED WATER SUPPLY AND RETURN / FINAL CONNECTIONS TO FCU 4-2 /4-3 OK . 4TH FLOOR TM241 ( BDA166) 83 LB TEST OK FOR CHILLED WATER SUPPLY AND RETURN / FINAL CONNECTIONS TO FCU 4-4 /4-5 AND FINAL CONNECTIONS OK. 40 LB TEST FOR HUMIDIFIER 1-2 AND LOW PRESSURE CONDENSATE OK / FINAL CONNECTIONS OK . CONDENSATE DRAIN FOR AHU-13 OK , LOW PRESSURE CONDENSATE INSTALLED PER PLAN | LIDO | LIDO | | HWP | P | 5882211 |
US ENGINEERING COMPANY | HD | P | 06/21/2018 | 1ST FLOOR TM112 ( BDA1455) TWO DAMPER BREAK AWAY CONNECTIONS INSIDE SHAFT OK, SUPPLY RETURN , EXHAUST DUCT ROUGH OK - OK TO WRAP . | LIDO | LIDO | | HD | P | 5882188 |
US ENGINEERING COMPANY | H= | P | 06/20/2018 | ((PHASE - 2 )) 3RD FLOOR TM231 (BDA 163) THERMOSTATS INSTALLED EXCEPT FOR MISSING THERMOSTAT IN ROOM ELEC -1 # 3586-1 .3RD FLOOR TM-131 (BDA 624 )SUPPLY , RETURN , EXHAUST GRD FINAL CONNECTIONS OK / Still need fire / fire smoke / smoke damper access doors and labels .remote smoke indicators (LED), test and balance report . (AHU-13 FOR THIS FLOOR OK ) | LIDO | LIDO | | H= | P | 5880166 |
US ENGINEERING COMPANY | HD | P | 06/19/2018 | (3RD FLOOR TM133 ( BDA1626) NEED REVISED AND APPROVED PLANS FOR THREE DELETED SMOKE DAMPERS IN STAFF LOCATION ROOM # 3344 / AND WHAT IS BEING DONE FOR RETURN AIR IN SAME ROOM.)1ST FLOOR TM111 ( BDA140) - SUPPLY , RETURN , EXHAUST DUCT ROUGH OK - OK TO WRAP . | LIDO | LIDO | | HD | P | 5878565 |
US ENGINEERING COMPANY | HD | P | 06/18/2018 | 1ST FLOOR TM112 (BDA1456) SUPPLY , RETURN , EXHAUST DUCT ROUGH OK - OK TO INSULATE. TWO - DAMPERS COMPLETE . TM-111 ( BDA140) SUPPLY , RETURN , EXHAUST DUCT ROUGH OK - OK TO INSULATE. | LIDO | LIDO | | HD | P | 5877829 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 06/14/2018 | 4TH FLOOR TM241 ( BDA 671)-Need revised and approved plans for Steam station / prv station for all cahnges and install for condensate pumps , heat exchanger , water heaters . 127.7 lb TEST OK FOR LOW PRESSURE STEAM / HIGH PRESSURE STEAM /LOW PRESSURE AND HIGH PRESSURE CONDENSATE OK . OK TO INSULATE AND LABEL PIPE . | LIDO | LIDO | | HWP | P | 5875203 |
US ENGINEERING COMPANY | HD | P | 06/14/2018 | 4th FLOOR TM142 ( BDA 1471) FINAL CONNECTION TO PLENUM FOR AHU-1O OK - OK TO WRAP / FCU-4-1, FCU4-2, FCU4-3 INSTALL AND DUCT OK - OK TO WRAP / Still need condensate drain pipe installed for fcu units . TM141 ( BDA 1470) AHU-9,11,13 FINAL CONNECTIONS OK - OK TO WRAP . 3RD FLOOR TM131 (BDA1624) TWO GRD FINAL CONNECTIONS OK .TM 132 ( BDA1468) ONE GRD FINAL CONNECTION OK , TM133 ( BDA 1626) SUPPLY AND RETURN GRD FINAL CONNECTION IN RECEPTION ROOM 3240-1 OK/Missing two supply grd's . 2ND FLOOR TM121 ( BDA 1463) OR-11 RETURN AIR RISER OK -OK TO WRAP. | LIDO | LIDO | | HD | P | 5875186 |
US ENGINEERING COMPANY | HD | P | 06/13/2018 | 2ND FLOOR TM121(BDA1464) SUPPLY , RETURN , EXHAUST DUCT ROUGH OK - OK TO WRAP . THREE DAMPERS COMPLETE . 3RD FLOOR TM132 ( BDA 1468) ONE DAMPER COMPLETE . | LIDO | LIDO | | HD | P | 5873248 |
US ENGINEERING COMPANY | HD | P | 06/12/2018 | 1st FLOOR TM112 ( BDA 1456) ONE DAMPER FRAME OK . 2ND FLOOR TM121 ( BDA 1464) THREE DAMPERS COMPLETE /Still need labels for access doors . | LIDO | LIDO | | HD | P | 5872042 |
US ENGINEERING COMPANY | HD | P | 06/11/2018 | 1ST FLOOR TM112 (BDA 1456) SUPPLY ,RETURN , EXHAUST DUCT ROUGH OK - OK TO WRAP . 2 - FIRE / SMOKE DAMPERS COMPLETE. 2ND FLOOR TM122 ( BDA146) TWO FIRE SMOKE DAMPERS COMPLETE , 1- FIRE DAMPER COMPLETE . | LIDO | LIDO | | HD | P | 5870489 |
US ENGINEERING COMPANY | HD | L | 06/07/2018 | 1ST FLOOR TM111 ( BDA-140 ) SUPPLY ,RETURN , EXHAUST DUCT ROUGH OK - OK TO WRAP . 1ST FLOOR TM112 ( BDA 14456) 1- FIRE DAMPER FRAME OK . GARDEN LEVEL TM102 ( BDA314) SUPPLY , RETURN , EXHAUST GRD FINAL CONNECTION OK . | LIDO | LIDO | | HD | L | 5868323 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 06/07/2018 | 2ND FLOOR TM221 ( BDA 1556) 130 lb TEST OK FOR HIGH PRESSURE STEAM AND CONDENSATE OK /PIPE INSTALLED PER PLAN OK TO INSULATE AND LABEL . VAV AND HUMIDIFIER FINAL CONNECTIONS OK .60 lb TEST OK FOR GARDEN LEVEL SNOW MELT/ MANIFOLD -5 OK | LIDO | LIDO | | HWP | P | 5868315 |
US ENGINEERING COMPANY | HD | P | 06/05/2018 | 2ND FLOOR TM121 ( BDA-1464) SUPPLY , RETURN . EXHAUST AIR DUCT ROUGH OK - OK TO WRAP . | LIDO | LIDO | | HD | P | 5865055 |
US ENGINEERING COMPANY | HD | P | 06/04/2018 | 3RD FLOOR TM131/132 ( BDA 1466/1468 )- SUPPLY, RETURN , EXHAUST GRD AND SLOT FINAL CONNECTIONS OK .2ND FLOOR TM122( BDA146) - FIRE DAMPER FRAME AT ELECTRICAL ROOM OK . | LIDO | LIDO | | HD | P | 5863613 |
US ENGINEERING COMPANY | HD | P | 05/31/2018 | 2ND FLOOR TM-121 ( BDA 1464) SUPPLY AND RETURN MAIN TRUNK LINE OK - OK TO WRAP . 2ND FLOOR TM-122 ( BDA146) -1- fire damper in wall to electrical room #2603 fame was not inspected / remove sheet rock for inspection . RETURN AIR DUCT ROUGH OK - OK TO WRAP . | LIDO | LIDO | | HD | P | 5860938 |
US ENGINEERING COMPANY | HD | P | 05/30/2018 | 3RD FLOOR PLAN TM-133 ( BDA 1626) SUPPLY AND RETURN DUCT ROUGH OK / OK TO WRAP . EIGHT SMOKE DAMPERS INSTALLED . | LIDO | LIDO | | HD | P | 5859389 |
US ENGINEERING COMPANY | HD | P | 05/24/2018 | 1ST FLOOR PLAN / TM113 ( BDA142 / 140 ) ABOVE CEILING SUPPLY AND RETURN DUCT ROUGH OK - OK TO WRAP .1- FIRE DAMPER FINALIZED - 2- FIRE / SMOKE DAMPERS FINALIZED - TWO FIRE /SMOKE DAMPERS ANGLES OK / Still need break away connections and access doors | LIDO | LIDO | | HD | P | 5855268 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 05/24/2018 | 4TH FLOOR PLAN TM 241 ( BDA 671) SEE RECORD OF TEST FOR CHILLED WATER SUPPLY AND RETURN . CHILLED WATER SUPPLY AND RETURN INSTALLED PER PLAN AND TIE INS TO AHU-9 AND 11 OK / OK TO INSULATE AND LABEL. | LIDO | LIDO | | HWP | P | 5855255 |
US ENGINEERING COMPANY | HD | P | 05/23/2018 | 2ND FLOOR PLAN TM-121 ( BDA1464) 1- FIRE/SMOKE DAMPER 20 X 16 FINALIZED . ABOVE CEILING DUCT ROUGH SUPPLY , RETURN AND EXHAUST OK- OK TO WRAP | LIDO | LIDO | | HD | P | 5853776 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 05/22/2018 | 1st FLOOR - PLAN TM211-212-213 (BDA 1510,1511,160) 80 lb TEST FOR HEAT WATER SUPPLY AND RETURN OK - HEAT WATER SUPPLY AND RETURN PIPE INSTALLED PER PLAN AND TIED INTO SHAFT PIPE -OK TO INSULATE AND LABEL .(AREA 1,2,3,4,5 ) | LIDO | LIDO | | HWP | P | 5852552 |
US ENGINEERING COMPANY | HD | P | 05/16/2018 | 1ST FLOOR PLAN TM-112)BDA1456) 4- FIRE DAMPER FRAMING AND ANNULAR SPACING OK 2ND FLOOR PLAN TM-121( BDA1464) SUPPLY MAIN TRUNK LINE DOWN CORRIDOR OK, OK TO WRAP . OR 7 AND 8 TIE INS OK / MISSING 2- MANUAL VOLUME DAMPERS AND 1- SMOKE DAMPER .2ND FLOOR PLAN TM-122 ( BDA 146) SUPPLY AND RETURN AIR DUCT ROUGH OK , OK TO WRAP AND 1- SMOKE DAMPER . | LIDO | LIDO | | HD | P | 5846707 |
US ENGINEERING COMPANY | HD | P | 05/15/2018 | 3RD FLOOR PLAN TM-133 ( BDA1626) ABOVE CEILING DUCT ROUGH SUPPLY,RETURN.EXHAUST AIR OK- OK TO WRAP .2ND FLOOR PLAN TM122/121 (BDA-144/146) RETURN AIR MAIN TRUNK LINE DOWN CORRIDOR OK- OK TO WRAP . | LIDO | LIDO | | HD | P | 5845522 |
US ENGINEERING COMPANY | HD | P | 05/10/2018 | 3RD FLOOR TM131 ( BDA1624) SUPPLY , RETURN , EXHAUST GRD FINAL CONNECTIONS OK IN ROOM # 3545;3544,3543,3542,3541,3529,3528,3527.3526,3525,3524,3523 . | LIDO | LIDO | | HD | P | 5841313 |
US ENGINEERING COMPANY | HD | P | 05/09/2018 | 1st FLOOR PLAN TM-111( BDA146) 1- FIRE/SMOKE DAMPER FRAMING AND ANNULAR SPACING OK . 2nd FLOOR PLAN TM-121 ( BDA1464) IN TWO O-R ROOMS SUPPLY AND RETURN DUCT AND RISER OK OK TO WRAP ( PLAN TM-121 -24 x 14 return air in the O-R room was changed to 16" round /the square inches do not equal the same . ) | LIDO | LIDO | | HD | P | 5839888 |
US ENGINEERING COMPANY | HD | P | 05/03/2018 | 1st FLOOR PLAN TM112/ TM113 . (BDA 142/1455) SUPPLY AND RETURN AIR OK TO WRAP . | LIDO | LIDO | | HD | P | 5835307 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 05/03/2018 | 4th FLOOR PLAN TM 241 / TM242 ( BDA 671/167) - 82.5 lb TEST OK FOR CHILLED WATER SUPPLY AND RETURN . INSTALLED PER PLAN OK TO INSULATE / TIED INTO AHU -10 AND 13 .TM 421/ TM242 ( BDA 168/ 671 ) 127.5 lb TEST OK FOR HIGH PRESSURE STEAM AND HIGH PRESSURE CONDENSATE INSTALLED PER PLAN OK TO INSULATE .TIED INTO 3RD FLOOR .Need revised and approved plans for changes to piping for HWC-3 and HWC-4 . | LIDO | LIDO | | HWP | P | 5835300 |
US ENGINEERING COMPANY | HD | P | 04/30/2018 | 1st FLOOR PLAN TM 112 ( BDA 1456 ) 3- FIRE SMOKE DAMPERS AND 1- FIRE DAMPER FRAMING AND ANNULAR SPACING OK IN ROOM 1548 . 2nd FLOOR PLAN TM121 / TM122 ( BDA 146 / 1464 ) MAIN TRUNK LINE ABOVE CEILING DUCT ROUGH OK TO WRAP AND VAV TIE INS OK . | LIDO | LIDO | | HD | P | 5831346 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 04/27/2018 | 2nd FLOOR PLAN TM222 AND TM221 ( BDA 1557 / 1556 ) 65 lb TEST OK FOR HWS AND HWR PIPE INSTALLED PER PLAN / OK TO WRAP . 3/4 INSTALL TO VAV 2-23 PER ASI -10R-3.OK TO WRAP . | LIDO | LIDO | | HWP | P | 5830027 |
US ENGINEERING COMPANY | HD | P | 04/26/2018 | 1st FLOOR PLAN TN112( BDA1456) 4 - FIRE DAMPER FRAMING NOT FRAMED PER INSTALLATION INSTRUCTIONS . 2nd FLOOR PLAM TM-121 ( BDA1461 ) 1- FIRE SDAMPER FRAMING OK . 4th FLOOR PLAN TM142 ( BDA1471) 9 - FIRE AND FIRE/ SMOKE DAMPERS FINALIZED . | LIDO | LIDO | | HD | P | 5828343 |
US ENGINEERING COMPANY | HSP | P | 04/24/2018 | All damper eliminated in rated assemblies in all areas will need to meet all code requirement's referenced to for this action . | LIDO | LIDO | | HSP | P | 5826109 |
US ENGINEERING COMPANY | HD | P | 04/24/2018 | 3rd FLOOR PLAN TM-131 ( BDA1624) ABOVE CEILING FINAL GRD CONNECTIONS FOR SUPPLY , RETURN , EXHAUST AIR IN ROOMS 3537,3538,3539,3540,3586,3579,3581,3583,3584,3585 - OK . 4th FLOOR 3- FIRE DAMPERS FINALIZED IN ROOMS 4505 &4506 . AHU-10 OUTSIDE AIR , RETURN AIR , SUPPLY AIR DUCT ROUGH OK /OK TO WRAP /TWO DUCT DETECTORS INSTALL IN THIS SYSTEM . | LIDO | LIDO | | HD | P | 5825889 |
US ENGINEERING COMPANY | HD | P | 04/23/2018 | 1st FLOOR PLAN TM111 ( BDA140) 1- FIRE/SMOKE DAMPER FRAMING AND ANNULAR SPACING ROOM #1633 OK . 1st FLOOR PLAN TM112 ( BDA1455) 1- FIRE / SMOKE DAMPER FRAMING AND ANNULAR SPACING EXAM ROOM # 1618 OK. 2nd FLOOR TM122 (BDA 1621) O/R #8 ROOM # 2555 / 2554 ABOVE CEILING DUCT ROUGH FOR SUPPLY AIR AND RETURN AIR RISERS IN WALL OK / OK TO WRAP / Missing two manual damper in room #2554 in the return air .4th FLOOR PLAN TM142 ( BDA1471) NORTH SHAFT AND ELECTRICAL ROOM 9- FIRE AND FIRE / SMOKE DAMPER ANNULAR SPACING OK . | LIDO | LIDO | | HD | P | 5824647 |
US ENGINEERING COMPANY | HD | P | 04/19/2018 | 3rd PLAN TM-131 ( BDA1466) 1- FIRE / SMOKE DAMPER FINALIZED FOR SHAFT IN ROOM # 3579 | LIDO | LIDO | | HD | P | 5822213 |
US ENGINEERING COMPANY | HRR | P | 04/19/2018 | 2 nd floor plan splice dated 1/18/18 # TM 122 North shaft south side - Need plans revised and approved to put back on plan the future 20 x 16 exhaust air fire smoke damper or show notes on this damper to be removed and reason for removal .Fire smoke damper is showing on plan dated 11/16/17 . 1ST FLOOR PLAN TM111 (BDA-140) 2- FIRE SMOKE DAMPER FRAMING AND ANNULAR SPACING OK. 2ND FLOOR TM-121 ( BDA-1464) OR # 7 ROOM # 2553 SUPPLY AND RETURN ABOVE CEILING DUCT ROUGH AND RETURN AIR DUCT IN CHASE OK .PLAN TM-122 (BDA146 ) 2-FIRE SMOKE DAMPER FRAMING AND ANNULAR SPACING OK IN NORTH SHAFT SOUTH SIDE .3rd PLAN TM-131 ( BDA1466) VAV-3-220 AND LOW PRESSURE DUCT AND RUN OUTS OK . 8- ROOMS FINAL GRD CONNECTIONS FOR SUPPLY , RETUARN AND EXHAUST AIR OK ROOM #'S 3531, 3530-2,3587,3588,3509,3511,3512,3512. | LIDO | LIDO | | HRR | P | 5821801 |
US ENGINEERING COMPANY | HD | P | 04/17/2018 | 4TH FLOOR PLAN TM-141 ( BDA1470 ) 3- FIRE DAMPER ANNULAR SPACING OK IN ROOMS 4506 AND 4505 Still need angles . PLAN TM -142 (BDA 1471) FIRE DAMPER FRAMING AND ANNULAR SPACING OK IN ROOM LVR-4501 .2ND FLOOR TM-122 (BDA 1405) FIRE SMOKE DAMPER 60 X 48 R/A BREAKAWAY CONNECTION OK - FRAMING IS NOT PER INSTALLATION INSTRUCTIONS | LIDO | LIDO | | HD | P | 5819564 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 04/17/2018 | 4th FLOOR PLAN TM - 241 AND TM 242 ( BDA 671 AND 167 ) 65 lb TEST OK FOR HWS AND HWR OK FINAL TIE INS TO AHU-13 AND AHU - 10 OK | LIDO | LIDO | | HWP | P | 5819563 |
US ENGINEERING COMPANY | HD | P | 04/16/2018 | Added to notes on 4/16/18 (LM) 2ND FLOOR TM-122 ( BDA146) 1- FIRE / SMOKE DAMPER INSPECTION PROCESS COMPLETE -ROOM LVR-# 2605 . 3RD TM131 ( BDA1466 ) 1- 1 FIRE / SMOKE DAMPER INSPECTION PROCESS COMPLETE IN MED'S ROOM # 3573 .4TH FLOOR TM141 & TM142 ( BDA1470 & 1471 ) 1 - FIRE DAMPER FINALIZED IN ELECTRICAL ROOM # 4505 . FCU 4-4 AND DUCT OK / SUPPLY AIR DUCT TIE IN TO AHU-13 OK .Fire damper framing is too small for room LVR # 4501 .PLANS MARKED AND DATED ON PLANS IN GENERAL CONTRACTORS TRAILER . | LIDO | LIDO | | HD | P | 5818250 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 04/12/2018 | 2 nd FLOOR PLAN SPLICE DATED 2/16/18 TM-221 / TM-222 ( BDA-599 AND 598 ) 60 lb TEST OK FOR HWS & HWR / 30 lb TEST OK FOR LOW PRESSURE STEAM . HWS , HWR, LOW WATER STEAM PIPE INSTALLED PER PLAN OK TO INSULATE | LIDO | LIDO | | HWP | P | 5815790 |
US ENGINEERING COMPANY | HD | P | 04/12/2018 | 2nd FLOOR PLAN TM-121 (BDA1464) 1- FIRE/SMOKE DAMPER IN SOUTH SHAFT NORTH SIDE FRAMING AND ANNULAR SPACING OK .2- FIRE DAMPER FRAMING AND ANNULAR SPACING OK .3rd FLOOR TN-131 ( BDA 1466 ) 1- FIRE / SMOKE DAMPER INSPECTION PROCESS COMPLETE CLOUDED ON PLANS GC TRAILER . ( need to consult with team on fire / smoke damper angles on south side of shaft .) 4 th FLOOR TM-142 (BDA- 1471 ) NORTH SHAFT 5- FIRE/SMOKE DAMPER INSPECTION PROCESS COMPLETE . ROUGH DUCT IN ROOM # 4501 OK / OK TO WRAP .Remove rock from wall same room to inspect fire smoke damper framing . | LIDO | LIDO | | HD | P | 5815782 |
US ENGINEERING COMPANY | HD | P | 04/09/2018 | 2nd FLOOR PLAN TM-121 ( BDA1468) 1- FIRE DAMPER FRAMING AND ANNULAR SPACING OK .3rd FLOOR PLAN TM131 ( BDA1466) SUPPLY / RETURN , EXHAUST AIR FINAL CONNECTIONS TO GRD'S IN ROOM # 3571, 3573,3574,3575 OK . 3rd FLOOR PLAN TM132 ( BDA1468) SUPPLY / RETURN AIR FINAL CONNECTIONS TO GRD'S IN ROOM # 3566, 3567, 3568, 3569 OK . | LIDO | LIDO | | HD | P | 5811746 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 04/06/2018 | 3 rd FLOOR PLAN TM 231 (BDA 163) AND SPLICE DATED 1/18/18 TM-232 ( BDA 1558) QTY -30 VAV FINAL CONNECTIONS COMPLETE / ENTIRE FLOOR - 60 lb TEST FOR HWS AND HWR FOR ENTIRE FLOOR OK . | LIDO | LIDO | | HWP | P | 5810552 |
US ENGINEERING COMPANY | HD | P | 04/05/2018 | 2nd FLOOR TM-122 ( BDA-146 ) DUCT SUPPLY AND RETURN AIR ABOVE CEILING DUCT ROUGH OK / OK TO WRAP AND TWO VAV'S INSTALLED PER PLAN . 3rd TM-131 (BDA1466)FLOOR ABOVE CEILING DUCT ROUGH OK / OK TO WRAP , SMOKE DAMPER INSTALLED - Need access door . 4th FLOOR TM-141 ( BDA1470 ) SUPPLY AIR AND RETURN AIR FOR DUCT ROUGH FOR AHU-13 AND AHU-9 OK / OK TO WRAP .FIRE / SMOKE DAMPER INSPECTION COMPLETE FOR SOUTH SHAFT CLOUDED ON PLAN IN GC TRAILER . AHU-12,13,14,15 PLENUM ROUGH TOP AND BACK OK . PLANS IN GC TRAILER MARKED AND DATED . | LIDO | LIDO | | HD | P | 5809497 |
US ENGINEERING COMPANY | HD | P | 04/04/2018 | 2nd FLOOR TM-121-TM-122 ( BDA 1464 - BDA 146 SPLICE ) ABOVE CEILING DUCT ROUGH VAV- 2-201 AND LOW PRESSURE DUCT AND MEDIUM PRESSURE MAIN TRUNK LINE OK .2nd FLOOR TM-122 ( BDA 146 SPLICE ) FIRE / SMOKE DAMPER FRAMING . ANNULAR SPACING , BREAKAWAY CONNECTION OK .3rd FLOOR TM-131 ( BDA-1466 ) SOUTH SHAFT -TWO FIRE / SMOKE DAMPER FRAMING ANNULAR SPACING , BREAK AWAY CONNECTION OK .MARKED AND DATED ON PLANS IN GC TRAILER . | LIDO | LIDO | | HD | P | 5807658 |
US ENGINEERING COMPANY | HD | P | 04/03/2018 | (Need consult in the morning with team will add to notes in the morning )2ND FLOOR - HAD CONSULT WITH FRAMING CONTRACTOR AND MECHANICAL CONTRACTOR ABOUT SHAFT FIRE / SMOKE DAMPER FRAMING ( SOUTH SHAFT AND NORTH SHAFT ) | LIDO | LIDO | | HD | P | 5806579 |
US ENGINEERING COMPANY | HD | P | 03/29/2018 | 3rd FLOOR PLAN TM-132 ( BDA- 1468) LOW PRESSURE DUCT INSTALLED FOR VAV 3-216 . 4th FLOOR PLAN TM-141 ( BDA - 1470 ) AHU-13 FIRE/SMOKE DAMPER INSPECTION COMPLETE FOR SOUTH EAST SHAFT FOR SUPPLY AND RETURN AIR . AHU-13 -FIRE/SMOKE DAMPER INSPECTION COMPLETE FOR MIDDLE SHAFT FOR SUPPLY AIR . AHU-11 AND AHU-9 OUTSIDE AIR DUCT ROUGH OK/ OK TO WRAP . FCU-4-5 AND DUCT INSTALL OK . TWO FIRE DAMPERS ANNULAR SPACING OK FOR ELEV MACH ROOM # 4506 . | LIDO | LIDO | | HD | P | 5802896 |
US ENGINEERING COMPANY | HD | P | 03/27/2018 | 3rd FLOOR TM-132 ( BDA-1468 ) SUPPLY AIR , RETURN AIR , EXHAUST AIR FINAL CONNECTIONS FOR 10 - ROOMS OK 4th FLOOR TM-141 ( BDA-1470 ) SOUTH WEST SHAFT FOR AHU-9 AND 11 , FRAMING , ANNULAR SPACING , BREAKAWAY CONNECTIONS OK / Still need angles . | LIDO | LIDO | | HD | P | 5800599 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 03/26/2018 | Added to notes 3/26/18 (LM) - ok to insulate and label .4th FLOOR TM- 244 ( BDA 357 ) 60 lb TEST OK FOR HWS AND HWR . 82.5 lb TEST OK FOR CWS AND CWR ALL PIPE INSTALLED PER PLAN . | LIDO | LIDO | | HWP | P | 5798995 |
US ENGINEERING COMPANY | HD | P | 03/26/2018 | 4th FLOOR TM-141 ( BDA1470) TWO FIRE/SMOKE DAMPER BREAKAWAY CONNECTIONS SOUTH WEST SHAFT OK - Still need to see framing, angles .SOUTH EAST SHAFT ANGLES INSTALLED FOR TWO FIRE/SMOKE DAMPERS OK . 3rd FLOOR TM-131 ( BDA 1466) ABOVE CEILING DUCT ROUGH OK / OK TO WRAP AND VAV'S OK .3rd FLOOR TM-132 ( BDA1468) ABOVE CEILING DUCT ROUGH OK AND VAV'S OK / OK TO WRAP DUCT . | LIDO | LIDO | | HD | P | 5798985 |
US ENGINEERING COMPANY | HD | P | 03/19/2018 | 4th FLOOR PLAN TM 142 ( BDA-1471 ) NORTH SHAFT 7-FIRE/SMOKE DAMPER FRAMING , ANNULAR SPACING BREAKAWAY CONNECTIONS OK / Still need angles and on six out of seven fire/smoke dampers. One of the seven has angles on inside of shaft pictures viewed and excepted- noted on plans .PLAN TM-141 ( BDA 1470 ) SOUTH EAST SHAFT 2- FIRE / SMOKE DAMPER FRAMING , ANNULAR SPACING , BREAKAWAY CONNECTIONS /Still need angles AHU - 9 OUTSIDE AIR DUCT ROUGH AND SUPPLY AIR TIE IN OK / OK TO WRAP . | LIDO | LIDO | | HD | P | 5792537 |
US ENGINEERING COMPANY | HD | P | 03/15/2018 | 3rd FLOOR PLAN TM-132 (BDA 1468) ABOVE CEILING DUCT ROUGH FOR SUPPLY AIR RETURN AIR /EXHAUST AIR / 2- SMOKE DAMPERS AND VAV TIE INS OK . FIRE/SMOKE DAMPER IN SHAFT WALL BREAKAWAY ACCESS DOOR AND LABELING OK /Still need framing and rest .4 th FLOOR FRAMING FOR STACKED FIRE/SMOKE DAMPERS IN SHAFT WALL IS NOT FRAMED PER INSTALLATION INSTRUCTIONS . MARKED AND DATED ON PLANS IN GC TRAILER . | LIDO | LIDO | | HD | P | 5790225 |
US ENGINEERING COMPANY | HD | P | 03/13/2018 | THIRD FLOOR PLAN TM-132 ( BDA-1467 ) THREE SMOKE DAMPERS INSTALLED AND ACCESS DOORS AND LABELS OK .MARKED ON PLANS IN GC TRAILER . | LIDO | LIDO | | HD | P | 5787574 |
US ENGINEERING COMPANY | HSP | P | 03/13/2018 | HAD ON SITE MEETING WITH STEVE ODONELL WITH US ENGINEERING AND STURGEON ELECTRIC ABOUT ACCESS FOR DUCT DETECTORS INSTALLED IN SHAFT LOCATION . | LIDO | LIDO | | HSP | P | 5787987 |
US ENGINEERING COMPANY | HD | P | 03/12/2018 | 4th LEVEL PLAN TM142 (BDA-1471) TWO FIRE/SMOKE DAMPER BREAKAWAY CONNECTION IN SHAFT OK / Still need framing , annular spacing , angles , access doors and labels .4th LEVEL PLAN TM141 (BDA-1470 ) ONE FIRE/SMOKE DAMPER FRAMING ,ANNULAR SPACING AND BREAKAWAY CONNECTION IN SHAFT OK /Still need angles , access doors and labels .DUCT DETECTOR IN SHAFT FOR AHU-13 INSTALLED . MARKED AND DATED ON PLANS IN GC TRAILER . | LIDO | LIDO | | HD | P | 5786232 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 03/09/2018 | 1st FLOOR TM-211 - 30 lb TEST FOR LOW PRESSURE STEAM OK , INSTALLED PR PLAN . 2nd FLOOR TM-221 - 130 lb TEST FOR HIGH PRESSURE STEAM AND CONDENSATE OK AND INSTALLED IN SHAFT PER PLAN / HWS,HWR AND LOW PRESSURE STEAM INSTALLED IN SHAFT PER PLAN . 3rd FLOOR TM-231 HWS , HWR IN SHAFT AND TIED INTO FLOOR PIPING INSTALLED PER PLAN .4th FLOOR HWS AND HWR 60 lb TEST OK . HWS,HWR,HIGH PRESSURE STEAM AND CONDENSATE , LOW PRESSURE STEAM INSTALL IN TO SHAFT PER PLAN . | LIDO | LIDO | | HWP | P | 5785109 |
US ENGINEERING COMPANY | HD | P | 03/09/2018 | 2nd FLOOR TM-121 SOUTH SHAFT FIRE/SMOKE DAMPER IN FLOOR ACCESS DOORS AND LABELS OK. TM-122 NORTH SHAFT FIRE/SMOKE DAMPER IN FLOOR ACCESS DOORS AND LABELS OK. Fire/smoke damper was installed for shaft motor on bottom this is not permitted by manufacture .3rd FLOOR TM-131 FIRE/SMOKE DAMPER SOUTH SHAFT FLOOR ACCESS DOORS AND LABELS OK. 4th FLOOR TM-142 FIRE/SMOKE DAMPER FRAMING SOUTH SIDE OF NORTH SHAFT OK / TM-141 FIRE/SMOKE DAMPER IN FLOOR ACCESS DOORS AND LABELS OK. | LIDO | LIDO | | HD | P | 5785099 |
US ENGINEERING COMPANY | HD | P | 03/08/2018 | 3rd FLOOR TM-131 ( BDA 1460 ) ROOM # 3581 SHAFT WALL FIRE / SMOKE DAMPER BREAKAWAY CONNECTION OK / NEED REST OF DAMPER INSPECTION INCLUDING FRAMING .4th FLOOR TM-141 (BDA 1464) 3 -FIRE DAMPER FRAMING OK . PLANS MARKED AND DATED IN GC TRAILER . | LIDO | LIDO | | HD | P | 5783589 |
US ENGINEERING COMPANY | HD | P | 03/07/2018 | 3 rd FLOOR PLAN TM-131 (BDA-1460) M/P , L/P, ABOVE CEILING DUCT ROUGH INSTALLED PER PLAN OK TO WRAP AND VAV'S OK, 1- FIRE DAMPER FRAMING , INSTALL , ANNUAL SPACING ANGLES AND ACCESS OK. 1- DAMPER INSTALL IN SHAFT WALL BREAKAWAY OK - Still need framing and rest of fire damper inspection when complete . 4 th FLOOR TM-142 (BDA1465) 4 FIRE/SMOKE DAMPER FRAMING IN SHAFT WALL OK AND 3 FIRE/SMOKE DAMPER IN SHAFT WALL INSTALL AND BREAKAWAY ONLY OK ,Still rest of fire damper inspection when complete and framing for 1- of these fire/smoke dampers .4TH FLOOR TM-141 (BDA 1464) DUCT ROUGH OK TO WRAP . 1- FIRE DAMPER FRAMING OK IN ELECTRIC ROOM . MARKED AND DATED ON PLANS IN GC TRAILER , | LIDO | LIDO | | HD | P | 5782609 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 03/05/2018 | SUPPLY/RETURN - HEAT/CHILLED PIPING AT 4TH FLOOR PLAN PAGES TM241 & TM242 TO HWCP UNIT'S # 9, 10, 11, 13, 14 & 15 INSTALLED PER PLAN OK TO WRAP. Still need tie in at main's and tie in's to units. 80 PSI PRESSURE TEST OK ON CHILLER PIPING 60 PSI PRESSURE TEST OK ON HEAT PIPING | MARKB | MARKB | | HWP | P | 5780259 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 03/02/2018 | 3rd FLOOR PLAN TM-231 ( BDA163) 60 lb TEST OK / PIPE INSTALLED PER PLAN / OK TO INSULATE .MARKED AND DATED ON PLANS IN GC TRAILER . | LIDO | LIDO | | HWP | P | 5779166 |
US ENGINEERING COMPANY | HD | P | 03/02/2018 | 3rd FLOOR PLAN TM-131 (BDA1460 ) - ONE FIRE DAMPER FRAMING OK . 4th FLOOR PLAN TM141 (BDA1464) S/A AND R/A DUCT ROUGH OK / S/A AND R/A FIRE DAMPER BREAK AWAY CONNECTION IN SHAFT OK still need framing ,annular spacing, angles, access doors .4th FLOOR PLAN TM142 (BDA1465) S/A AND R/A FIRE DAMPER BREAK AWAY CONNECTION IN SHAFT OK still need framing ,annular spacing, angles, access doors . MARKED AND DATED ON PLANS IN GC TRAILER. | LIDO | LIDO | | HD | P | 5779165 |
US ENGINEERING COMPANY | HD | P | 03/01/2018 | PLAN TM-121 (BDA 1450) AND PLAN TM-111 (BDA 140) - FIRE/ SMOKE DAMPER INSTALL , ANNULAR SPACING, ANGLES , BREAKAWAY , ACCESS DOORS AND SHAFT DUCT OKAY . MARKED AND DATED ON PLANS IN GC TRAILER . | LIDO | LIDO | | HD | P | 5777658 |
US ENGINEERING COMPANY | HD | P | 02/27/2018 | PLAN # TM-131 ( BDA# 1460 ) ABOVE CEILING DUCT ROUGH OKAY/ OKAY TO WRAP . VAV'S INSTALLED AND TIED IN .MARKED AND DATED ON PLANS IN GC TRAILER . | LIDO | LIDO | | HD | P | 5775566 |
US ENGINEERING COMPANY | HD | P | 02/23/2018 | Added to notes 2/26/18 duct penetration through wall for 3312 and 3311 ok .3rd FLOOR TM -132 IN EXISTING PART OF CONSTRUCTION ABOVE CEILING SUPPLY, RETURN AIR AND GRD FINAL CONNECTIONS OK ROOM # 3312 AND 3311 / Need to research wall for rating . 3rd FLOOR TM -132 - TWO FIRE DAMPER INSTALL , ANNULAR SPACING, ANGLES AND BREAK WAY CONNECTION OK . | LIDO | LIDO | | HD | P | 5773108 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 02/21/2018 | 3rd FLOOR AREA 9 PLAN TM-231 -60 lb TEST OK / NEED PLANS REVISED AND APPROVED FOR HWP PIPING INSTALLED IN ROOMS AND NOT IN CORRIDOR .Still need to see final connections to vav's . MARKED AND DATED ON PLAN TM-231 . | LIDO | LIDO | | HWP | P | 5770687 |
US ENGINEERING COMPANY | HD | P | 02/15/2018 | GARDEN LEVEL PLAN TM102 - EXHAUST FAN GEF-7 INSTALLED PER PLAN . 3rd FLOOR PLAN TM131 DUCT ROUGH OK TO WRAP AND TWO FIRE DAMPERS GAP ,ANGLES, BREAKAWAY CONNECTION AND ACCESS DOORS INSTALLED PER INSTALLATION INSTRUCTIONS .4th FLOOR PLAN TM141 AHU-13 RETURN AIR AND SUPPLY AIR INSTALLED PER PLAN OK TO WRAP . ( INSPECTION MARKED AND DATED ON PLANS .) | LIDO | LIDO | | HD | P | 5766594 |
US ENGINEERING COMPANY | HD | P | 02/14/2018 | Training with Nancy 45 minutes. 2nd FLOOR PLAN # TM121 NEED TO RESEARCH THE PIN SPACING FOR FIRE/SMOKE DAMPER ANGLES TO FLOOR . 3rd FLOOR PLAN # TM131 ROOM # 3586-2 CUT ROCK AWAY FROM FIRE DAMPER TO SEE GAP SPACING AROUND DAMPER / ABOVE CEILING DUCT ROUGH INSTALLED PER PLAN OK TO WRAP MARKED DATED ON PLAN. | LIDO | LIDO | | HD | P | 5765816 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 02/12/2018 | GARDEN LEVEL -PLAN # TM- 201 AND TM-202 FINAL CONNECTIONS TO FIN TUBES AND CIRCUIT VALVES INSTALLED ARE OK . PLAN # TM- 203 FINAL CONNECTIONS TO UH-02 AND UH-03 OK .MARKED AND DATED ON PLANS . | LIDO | LIDO | | HWP | P | 5763709 |
US ENGINEERING COMPANY | HD | P | 02/07/2018 | (GARDEN LEVEL - PLAN # TM 102 - TWO FIRE DAMPER INSTALLS , GAP, ANGLES AND BREAK AWAY CONNECTION OK - HIGHLIGHTED IN PURPLE AND DATED IN RED PEN .) ( 2 nd FLOOR PLAN # TM 121 - ONE -FIRE DAMPER FRAMING OK - HIGHLIGHTED IN PURPLE AND DATED IN RED PEN .) ( 3rd FLOOR PLAN # TM 131 DUCT ROUGH AND SHAFT DUCT OK / OK TO WRAP HIGHLIGHTED IN PURPLE AND MARKED IN RED PEN / Need to inspect fire/ smoke dampers in shaft at floor. ) (3rd FLOOR IN EXISTING PART OF BUILDING PLAN # TM 133 DUCT ROUGH OK / OK TO WRAP .) | LIDO | LIDO | | HD | P | 5759788 |
US ENGINEERING COMPANY | HD | P | 02/06/2018 | Training with Nancy . ( WENT OVER PRINTS .) | LIDO | LIDO | | HD | P | 5758161 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 02/02/2018 | THIRD FLOOR AREA ( 7 ) HWP 60 lb TEST OK / MAIN INSTALLED PER PRINT OK TO WRAP . HIGHLIGHTED IN PURPLE AND DATED IN RED PEN ON PLAN # TM- 231. | LIDO | LIDO | | HWP | P | 5755957 |
US ENGINEERING COMPANY | HD | P | 02/01/2018 | ( GARDEN LEVEL - 4 FIRE DAMPERS ANGULAR SPACE, ANGLE ,BREAKAWAY CONNECTION AND ACCESS DOOR OK / DATED AND MARKED OM PLAN # TM- 102 .) ( 2 nd FLOOR - 1 FIRE/ DAMPER FRAMING OK MARKED AND DATED IN PLAN # TM- 121.) ( 3 rd FLOOR ABOVE CEILING ROUGH DUCT INSTALL ON PLAN # TM- 131 OK / OK TO WRAP HIGH LIGHTED IN BLUE AND DATED IN RED PEN .)
| LIDO | LIDO | | HD | P | 5754621 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 01/29/2018 | THIRD FLOOR AREA 6 PLAN # TM-231 - HOT WATER PIPING ( HWP ) TWO- 60 lb TEST OK / INSTALL OK / OK TO INSULATE .HIGHLIGHTED IN GREEN AND DATED IN RED . Revise plan for 2" supply line moved out of corridor to the east . | LIDO | LIDO | | HWP | P | 5750733 |
US ENGINEERING COMPANY | HD | P | 01/26/2018 | ( GARDEN LEVEL - AREA 102 PLAN # TM - 102 FOUR FIRE / DAMPER GAP , ANGLES , BREAKAWAY AND ACCESS OK / Need to label access doors . MARKED AND DATED IN RED PEN PLAN TM-102 ) ( 3rd FLOOR PLAN # TM-132 / 2 nd FLOOR PLAN # TM-122 / 1 st FLOOR PLAN # TM-112 SHAFT DUCT OK / HIGHLIGHTED IN BLUE AND DATED IN RED PEN.) 1 st FLOOR FOUR FIRE/ SMOKE DAMPER INSTALLED FROM 1 st FLOOR TO 2nd FLOOR , GAP . ANGLES OK / MARKED AND DATED IN RED PEN . | LIDO | LIDO | | HD | P | 5749408 |
US ENGINEERING COMPANY | HD | P | 01/25/2018 | THIRD FLOOR AREA #132 PLAN # TM-132 . MEDIUM PRESSURE AND LOW PRESSURE SUPPLY AIR ABOVE CEILING DUCT ROUGH AND VAV'S OK / HIGHLIGHTED IN YELLOW AND DATED IN RED PEN . | LIDO | LIDO | | HD | P | 5748085 |
US ENGINEERING COMPANY | HD | P | 01/24/2018 | ( GARDEN LEVEL AREA AREA 102 PLAN # TM- 102 DUCT ROUGH SUPPLY AIR , RETURN AIR AND EXHAUST AIR INSTALLED PER PLAN HIGHLIGHTED IN PURPLE AND DATED IN RED PEN . Need to look at gaps around fire dampers at next inspection .) ( THIRD LEVEL AREA 132 PLAN # TM - 132 VAV'S LOW PRESSURE SUPPLY AIR DUCT AND BRANCHES OK / OK TO WRAP. HIGHLIGHTED IN PURPLE AND DATED IN RED PEN . FIRE DAMPER FRAMING , GAP AROUND DAMPER , BREAKAWAY CONNECTION OK Still need to see angle installed . MARKED AND DATED IN RED PEN ON PLAN # TM- 132 ) | LIDO | LIDO | | HD | P | 5746826 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 01/23/2018 | THIRD FLOOR AREA # 231 / AREA # 5 60 lb TEST HOT WATER PIPE TO VAV-3- 206 AND VAV- 3- 215 INSTALLED PER PLAN HIGHLIGHTED IN PLAN # TM- 231 | LIDO | LIDO | | HWP | P | 5745323 |
US ENGINEERING COMPANY | HD | P | 01/23/2018 | (Third floor area 132 Plan # TM- 132 -Need to revise plans for duct and fire damper install on different wall than what plans show for electrical room # 3563. ) | LIDO | LIDO | | HD | P | 5744436 |
US ENGINEERING COMPANY | HD | P | 01/22/2018 | ( ROOF - DOG HOUSES - DUCT ROUGH OK / OK TO WRAP IN BOTH DOG HOUSES HIGHLIGHTED IN YELLOW AND DATED IN RED ON PLAN TM- 151 .) ( FOURTH LEVEL PLAN # TM - 141 AND TM - 142 DUCT ROUGH IN THREE SHAFTS OK / OK TO WRAP HIGHLIGHTED IN YELLOW AND DATED IN RED . ) ( LEVEL 3 PLAN # TM- 131 MARKED AND DATED IN RED PEN FIRE / SMOKE DAMPER UP TO 4 th FLOOR INSTALL , GAP AND ANGLE OK / Need to see break away connections .) ( LEVEL 1 - PLAN # TM- 111 - 1- FIRE DAMPER AND TWO FIRE SMOKE DAMPER FRAMING OK / MARKED AND DATED IN RED PEN ) | LIDO | LIDO | | HD | P | 5744130 |
US ENGINEERING COMPANY | HD | P | 01/19/2018 | ( LEVEL - 1 - ONE FIRE / SMOKE DAMPER FRAMING MARKED AND DATED IN RED PEN ON PLAN # TM- 111 OK , ) ( 3 rd FLOOR AREA 132 - S/A , R/A , E/A MAINS HIGHLIGHTED IN PINK AND DATED IN RED PEN OK TO WRAP .) ( 3 rd floor area 132 Need to consult with senior inspector and building on duct penetrations through rated wall in corridor / if penetrations require protection ) | LIDO | LIDO | | HD | P | 5742968 |
US ENGINEERING COMPANY | HD | P | 01/16/2018 | 3 rd FLOOR PLAN TM-131 - FRAMING FOR TWO FIRE DAMPERS MARKED AND DATED IN RED PEN ON PAGE TM-131 . | LIDO | LIDO | | HD | P | 5738447 |
US ENGINEERING COMPANY | HSP | P | 01/11/2018 | GARDEN LEVEL AREA 102 - PLAN TM- 102 . Received engineer letter for F/D framing over door way for electrical room #G-201. ( Engineer letter is approved .) View letter in images . | LIDO | LIDO | | HSP | P | 5735169 |
US ENGINEERING COMPANY | HSP | P | 01/10/2018 | LETTER RECEIVED FOR FIRE DAMPER FRAMING ABOVE THE DOUBLE DOOR WILL NEED TO BE A BLANKET LETTER . | LIDO | LIDO | | HSP | P | 5733850 |
OLSON PLUMBING & HEATING COMPANY | HSP | P | 01/10/2018 | ( 1/10/2018 -GARDEN LEVEL Need revised hot water piping plan to match install , On the return side of fin tubes the isolation valves are not installed per plan on the return side install or revise plans .) ( 1/10/2018 - 3rd FLOOR AREA #4 revise plans to match install .) | LIDO | LIDO | | HSP | P | 5733642 |
US ENGINEERING COMPANY | HD | P | 01/09/2018 | GARDEN LEVEL PLAN TM- 102 AND TM-102 3 -MVD'S INSTALLED. 3 RD FLOOR ON PLAN TM- 131 Room # 3575 soil holding . Altered notes 1/10/18 HAD CONSULT WITH SENIOR INSPECTOR - NORTH FIRE DAMPER FRAMING OK AND SOUTH FIRE DAMPER FRAMING OK . NEED TO HIGH LIGHT PLANS ON NEXT INSPECTION | LIDO | LIDO | | HD | P | 5733629 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 01/09/2018 | (GARDEN LEVEL Need revised hot water piping plan to match install , On the return side of fin tubes the isolation valves are not installed per plan on the return side install or revise plans . GARDEN LEVEL 60 lb TEST OK . HWP OK / OK TO WRAP .) ( 3rd FLOOR AREA #4 revise plans to match install .60 lb TEST OK / OK TO WRAP .) Highlighted in orange and dated on plans TM-201 and TM-202 and TM-232 | LIDO | LIDO | | HWP | P | 5733628 |
US ENGINEERING COMPANY | HD | P | 12/28/2017 | FOURTH FLOOR AREA # 142 FIRE DAMPER FRAMING OK MARKED AND DATED IN RED PEN ON PLAN TM - 142 | LIDO | LIDO | | HD | P | 5724401 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 12/27/2017 | SPLICE FOR GARDEN LEVEL CRAWL SPACE FOR HWP SNOW MELT IS SPLICED IN PAGE TM-203 . 60 # TEST OK FOR 3 rd FLOOR AREA # 1 AND # 2 , 3rd FLOOR AREA # 2 MAIN HWP INSTALLED PER PLAN / Branch lines not installed there may be changes .HIGHLIGHTED ON PLANS TM-203 AND TM-232 | LIDO | LIDO | | HWP | P | 5723247 |
OLSON PLUMBING & HEATING COMPANY | HSP | P | 12/21/2017 | ( 12/21/17 NEED SPLICE FOR GARDEN LEVEL CRAWL SPACE FOR SNOW MELT HAS A REVISION ASI - 9 ) | LIDO | LIDO | | HSP | P | 5719596 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 12/20/2017 | GARDEN LEVEL CRAWL SPACE HAS A REVISION ASI - 9 - I WILL NEED TO SEE REVISION . AIR TEST OK FOR SNOW MELT AND HEAT PIPE TO UNIT HEATER UH-03 / INSULATE PIPE AT OWN RISK . ( 3rd FLOOR SECTION - 1 - HEAT PIPE MAIN INSTALLED PER PLAN /Still need to see air test .OK TO INSULATE . Need to see final tie ins to equipment )
| LIDO | LIDO | | HWP | P | 5719136 |
US ENGINEERING COMPANY | HD | P | 12/06/2017 | THIRD FLOOR 2- FIRE DAMPER FRAMING OK NORTH WALL AND SOUTH WALL NOTED ON PLANS TM- 132 | LIDO | LIDO | | HD | P | 5705225 |
US ENGINEERING COMPANY | HSP | P | 12/06/2017 | CALLED MECHANICAL CONTRACTOR IN REFERENCE TO LETTER RECEIVED FROM ENGINEER FOR FIRE DAMPER FRAMING ABOVE A DOUBLE DOOR IN GARDEN LEVEL PLAN TM-102 , THIS LETTER IS NOT APPROVED THE LETTER WILL NEED TO STATE THAT THE FRAMING MEETS THE INTENT OF THE MANUFACTURE FRAMING INSTRUCTIONS AND WILL NEED TO BE RE DONE AND RE SUBMITTED FOR APPROVAL . | LIDO | LIDO | | HSP | P | 5704557 |
US ENGINEERING COMPANY | HD | P | 12/04/2017 | 3 rd FLOOR AREA 132 ONE FIRE DAMPER FRAMING NORTH WALL NOTED AND DATED ON PLAN TM- 132 OK. 2 nd FLOOR AREA 122 TWO FIRE DAMPER FRAMINGS IN WALL NOTES AND DATED ON PAGE TM- 122 | LIDO | LIDO | | HD | P | 5701721 |
US ENGINEERING COMPANY | HSP | P | 11/28/2017 | ANY FIRE DAMPER AND COMBINATION FIRE SMOKE DAMPER FRAMING ABOVE A SINGLE DOOR AND A DOUBLE DOOR WAY WILL NEED TO BE FRAMED PER INSTALLATION INSTRUCTIONS IF NOT A STAMPED ENGINEER DETAILED DRAWING WILL BE REQUIRED . Called Steve Odonell Mechanical contractor and discussed this . | LIDO | LIDO | | HSP | P | 5695479 |
US ENGINEERING COMPANY | HD | P | 11/27/2017 | (GARDEN LEVEL AREA 102 PLAN # M - 102 EXHAUST DUCT FOR GEF - 7 - missing 55 x 18 end cap ,5 - 30 x 24 taps installed in the 55 x 18 exhaust duct furthest to the south plan TM -102 shows 4 ,Still need to inspect GEF - 7 when install. Missing 3- manual dampers . REST OF EXHAUST DUCT OK ) ( FIRST FLOOR AREA 112 PLAN M - 112 ELECTRIC ROOM # 1549 / FIRE DAMPER AND COMBINATION FIRE DAMPER FRAMING OK HIGH LIGHTED ORANGE ON PLANS IN OFFICE TRAILER ) | LIDO | LIDO | | HD | P | 5694519 |
US ENGINEERING COMPANY | HSP | P | 11/19/2017 | HAD CONSULT WITH SENIOR INSPECTOR . Garden level area 102 F/D framing over door way for rooms G-202 , G- 201 Is not ok this is over a double door and will require a engineered letter that shows the framing meets the intent of the framing from the installation manual . Framing over the door way for these two F/D is approved with a sufficient breakaway connection . Each Fire Damper framing and Combination Fire Smoke damper framing will be inspected as individual through out the inspection process . | LIDO | LIDO | | HSP | P | 5689677 |
US ENGINEERING COMPANY | HD | P | 11/16/2017 | 1st FLOOR AREA 112 ( 4 )COMBINATION FIRE SMOKE DAMPERS, INSTALL/ GAP / ANGELS OK IN CEILING / FLOOR BETWEEN ROOM ADP PAT TLT # 1653 AND ELEC # 1549 HIGHLIGHTED( PINK ) IN GC TRAILER PLAN # TM- 112 | LIDO | LIDO | | HD | P | 5687771 |
US ENGINEERING COMPANY | HD | P | 11/15/2017 | GARDEN LEVEL AREA 102 - PLAN TM- 102 . Need to consult in morning with senior inspector about F/D framing over door way for S-201 and G- 202 . ( FIRE DAMPER WALL FRAMING FOR ROOM S- 201 SOUTH WALL , G- 202 SUPPLY AIR SOUTH WALL , G- 202 EAST WALL AND G- 204 NORTH WALL OK .) ( COMBINATION FIRE SMOKE DAMPERS INSTALLATION / GAP / ANGLE IN CEILING FLOOR FROM GARDEN LEVEL TO 1st FLOOR OK . HIGH LIGHTED ON PLANS IN TRAILER .) | LIDO | LIDO | | HD | P | 5686477 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 01/23/2019 | 3rd floor phase 5 complete | TED | TED | | P= | C | 6085816 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 01/10/2019 | 1st floor phase 4 is complete, garden level phase 4 is complete | TED | TED | | P= | P | 6074912 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 12/19/2018 | 1st floor phase 4, trim complete for rooms and bathrooms, still need ice makers and dishwashers installed | TED | TED | | P= | P | 6057870 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 12/06/2018 | Phase 5: DWV and domestic water drawing TPL133 complete, drawings marked. | DANR | DANR | | PTO | P | 6045005 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 12/05/2018 | PHASE 5: 2 -bathrooms and break room drawings marked (TPL133). | DANR | DANR | | PTO | P | 6043745 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 12/04/2018 | PHASE 4: Units 1556 - 1566 - 1557 - 1664 need nonpositive shut off on hand held shower sprayer (2003 ANSI 608.6), unit 1567 lacking toilet wall to lav side clearance ( at 57-3/4"), unit 1566 lacking toilet wall to lav side clearance (at 57-1/4"). Units 1566 - 1568 - 1675 ok. | DANR | DANR | | P= | P | 6042708 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 12/03/2018 | Under floor acid piping ok drawing TP123 marked. | DANR | DANR | | PTO | P | 6041169 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/29/2018 | Ok for DWV inspection area E-1 Drawing TPL124 marked. | DANR | DANR | | PTO | P | 6038197 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/26/2018 | Test ok for 2" waste to S-11 sink columns H-J and 23-24 - drawing TPL124 marked. | DANR | DANR | | PTO | P | 6033783 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/13/2018 | 2nd floor SPD area 123 dwv and water in walls and ceiling | TED | TED | | PTO | P | 6023870 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/08/2018 | 3rd floor area 1 phase 5 remodel dwv and water | TED | TED | | PTO | P | 6020113 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/05/2018 | 2nd floor SPD area 123 floor sink, drain and venting in 1st floor ceiling, need letter that material used is approved for chemical drain | TED | TED | | PTO | P | 6016025 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/31/2018 | 3rd floor remodel area E-1, NICU family and procedure room dwv under floor in over hang | TED | TED | | PTO | P | 6011931 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 10/29/2018 | phase 4 garden level complete, phase 4 1st floor exam rooms south side ok | TED | TED | | P= | P | 6009006 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 10/17/2018 | 1st floor exam room sinks north side, phase 4 | TED | TED | | P= | P | 5997443 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 10/11/2018 | Phase 3: 2nd floor ice maker and 2 sterilizer rp's ok. | DANR | DANR | | P= | P | 5992257 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 09/20/2018 | 2nd floor phase 3, sinks and bathroom ok | TED | TED | | P= | P | 5971251 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/12/2018 | dwv through roof 4th floor, plan marked | TED | TED | | PTO | P | 5962875 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/11/2018 | dwv through roof 4th floor, plan marked | TED | TED | | PTO | P | 5961216 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/06/2018 | 1st floor water piping in walls and ceilings area 9 and 10 | TED | TED | | PTO | P | 5956714 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/22/2018 | 4th Floor venting through roof, area 142, plan marked | TED | TED | | PTO | P | 5942439 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/16/2018 | 1st floor ceiling dwv branch lines shell space area | TED | TED | | PTO | P | 5936204 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/15/2018 | 1st floor water in walls area 7 and 8 | TED | TED | | PTO | P | 5934731 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/08/2018 | 1st floor dwv in walls and ceiling area 10 | TED | TED | | PTO | P | 5927757 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/01/2018 | 1st floor dwv in walls and ceiling area 3 | TED | TED | | PTO | P | 5920884 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/31/2018 | 1st floor in water in walls and ceiling room 1567, 1568, 1569, 1667, ok, water mains over head area 4 ok | TED | TED | | PTO | P | 5919111 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/30/2018 | 1st floor area 4 water mains over head, water in wall room 1675 | TED | TED | | PTO | P | 5917988 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 07/26/2018 | 3rd floor phase 2 complete | TED | TED | | P= | P | 5915007 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/26/2018 | 1st floor (shell 1701 area) dwv main in ceiling and down column | TED | TED | | PTO | P | 5915004 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 07/24/2018 | 3rd floor new addition side phase 2 ok | TED | TED | | P= | P | 5912259 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 07/19/2018 | 3rd floor aera 9 | TED | TED | | P= | P | 5908197 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/18/2018 | 1st floor room 1653 water in wall and ceiling | TED | TED | | PTO | P | 5906389 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/11/2018 | 2nd floor water in walls and ceiling--area 5/ room 2541 area, 2nd floor dwv area 9 over head and down wall, 1st floor water in wall and ceiling 1655 area | TED | TED | | PTO | P | 5899253 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 07/11/2018 | 3rd floor areas 3 and 5 | TED | TED | | P= | P | 5899246 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 07/02/2018 | 3rd floor area 2 | TED | TED | | P= | P | 5891202 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/02/2018 | 1st floor water in walls area 4, dwv, 2nd floor unfinished area 3 walls and ceiling, 3rd floor unfinished area wall and ceiling between areas 1 and 2, 4th floor water line to backflow on condensate cooler | TED | TED | | PTO | P | 5891194 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/28/2018 | water pipe 1st floor area 5 over head, 1st floor area 4 in wall, partial area 5 in wall, plans marked | JOSEPHD | JOSEPHD | | PTO | P | 5888365 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/26/2018 | 1st floor dwv in wall and ceiling area 6 and 7 | TED | TED | | PTO | P | 5885651 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/21/2018 | 1st floor water in walls area 4 | TED | TED | | PTO | P | 5881300 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/14/2018 | 1st floor over head water area 2 and 5, in wall water area 3 | TED | TED | | PTO | P | 5874481 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/12/2018 | water main 4th floor, main from old building run into new addition, piping to heat exchangers and connection into new addition piping | TED | TED | | PTO | P | 5871742 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/07/2018 | 2nd floor dwv over head and in walls area 5 | TED | TED | | PTO | P | 5867551 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/05/2018 | field cancel | TED | TED | | PTO | P | 5864743 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/24/2018 | 2nd floor dwv area 4 ceiling and walls | TED | TED | | PTO | P | 5854779 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/22/2018 | 1st floor dwv in walls and ceiling area 2, water over head and in wall east side area 1 | TED | TED | | PTO | P | 5852398 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/21/2018 | water and dwv in wall and ceiling 3506 and 3338, 1st floor water in walls area 1 west side | TED | TED | | PTO | P | 5850659 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/15/2018 | L &D staff lounge 3338 sink drain in 2nd floor ceiling, 2nd floor water in walls area 1 & 2, over head and in wall dwv, meds 1645 and exam rooms 1615 through 1620 | TED | TED | | PTO | P | 5845225 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/10/2018 | water in wall and over head, dwv in wall and over head in NICU lobby and milk lab area, 3240 and 3344 area | TED | TED | | PTO | P | 5840988 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/03/2018 | 1st floor water over head west side area 1, 1st floor dwv in wall and over head north from 1646 and north from 1615, plan marked | TED | TED | | PTO | P | 5834748 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/02/2018 | dwv, pre op #3 in wall and in 2nd floor ceiling | TED | TED | | PTO | P | 5833606 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/26/2018 | 3rd floor milk lab area sink drains in 2nd floor ceiling, 3rd floor dwv and water in walls and ceilng area 9 north side, plan marked | TED | TED | | PTO | P | 5828375 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/20/2018 | 2nd floor dwv- column, over head and in wall- shaft area 2744, OR7, OR8, plan marked | TED | TED | | PTO | P | 5822532 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/18/2018 | 3rd floor rooms 3241 and 3242, dwv and water in wall and ceiling, 2nd floor overhead water mains area 4 and 5, plan marked | TED | TED | | PTO | P | 5820170 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/17/2018 | dwv mains in shaft 2, area 2614 | TED | TED | | PTO | P | 5818880 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 04/17/2018 | overflow drain in 3rd floor ceiling area 3502 | TED | TED | | PRD | P | 5818878 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/11/2018 | 2nd floor drain and vent at column xd13 and xd5, drain for 3rd floor sink in 2nd floor ceiling for pre-op #8 plan marked | TED | TED | | PTO | P | 5813876 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/09/2018 | water over head 2nd floor areas 1 and 2, plan marked, 3rd floor water in wall units 3522, 3523, 3524, 3525, plan marked | TED | TED | | PTO | P | 5811184 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/06/2018 | 3rd floor dwv in walls and ceiling units 3522, 3523, 3524, 3525, 3526 plan marked | TED | TED | | PTO | P | 5810086 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/05/2018 | area 7 in wall water piping unit 3526, 3527, 3528, 3529 | TED | TED | | PTO | P | 5808619 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/02/2018 | 3rd floor area 9 water mains over head | TED | TED | | PTO | P | 5804957 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/30/2018 | dwv 2nd floor area 3 on outside wall and in ceiling, 3rd floor dwv in wall and ceiling rooms 3529, 3528, 3527 , plan marked | TED | TED | | PTO | P | 5803650 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/28/2018 | drains in 2nd floor ceiling for rooms 3241, 3242, 3243 plan marked ( Joel and Ted discussed accessible requirements with contractor and engineer. Notified them of permanent seat requirement in transfer showers) | TED | TED | | PTO | P | 5801277 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/26/2018 | in walls and ceiling dwv and water ok plan marked area 6 | TED | TED | | PTO | P | 5798999 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 03/22/2018 | 1st floor entry canopy drains plan marked | TED | TED | | PRD | P | 5796142 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/14/2018 | water in wall 3537, 3538, 3539, 3540, and service sink, plan marked | TED | TED | | PTO | P | 5788468 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/13/2018 | 3rd floor water mains over head area 10 plan marked | TED | TED | | PTO | P | 5787341 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/09/2018 | 3rd floor dwv in south shaft 2nd floor ceiling through roof ok, dwv in walls and ceiling 3rd floor rooms 3530, 3509, 3512, 3514 plan marked | TED | TED | | PTO | P | 5785039 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/07/2018 | water in walls--3514, 3512, 3575, 3545, 3546 plan marked | TED | TED | | PTO | P | 5782273 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/05/2018 | dwv in walls and ceiling 3rd floor, rooms 3572, 3571, 3573, 3574, 3575, 3540, 3538, 3537, 3539 plan marked | TED | TED | | PTO | P | 5779822 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/02/2018 | 3rd floor water over head area 8 and 9, water in walls 3572, 3574, 3509, plan marked | TED | TED | | PTO | P | 5778576 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/27/2018 | dwv in walls and ceiling 3531 through 3536 ok, water in walls 3531 and 3536 ok, plan marked | TED | TED | | PTO | P | 5775023 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/26/2018 | dwv north shaft from 2nd floor ceiling to roof ok, plan marked | TED | TED | | PTO | P | 5773973 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/23/2018 | south towler water piping in case and in 4th floor ceiling (plan marked), in wall water area 2 (plan marked) | TED | TED | | PTO | P | 5772705 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/14/2018 | 3rd floor-- area 1 room 3552 to 3547 water in walls ok, area 6, 7, 8, overhead water ok, plan marked | TED | TED | | PTO | P | 5765631 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/09/2018 | 3rd floor area 1 dwv walls and ceiling ok | TED | TED | | PTO | P | 5762277 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/05/2018 | garden level over head elevator sump pit drains, plan marked | TED | TED | | PTO | P | 5756796 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/02/2018 | 3rd floor water piping in ceiling, area 4, 5, 6, 7, 8, | TED | TED | | PTO | P | 5755692 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/30/2018 | garden level decon shower dwv and water in ceiling and walls ok, plan marked | TED | TED | | PTO | P | 5751498 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 01/30/2018 | 4th floor south side ok, plan marked | TED | TED | | PRD | P | 5751492 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/29/2018 | garden level, decon/sand and oil tank vent area dwv ok, break room/rest room area walls and ceiling dwv and water ok, plan marked | TED | TED | | PTO | P | 5750120 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 01/24/2018 | 3rd floor south, plan marked | TED | TED | | PRD | P | 5746378 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/22/2018 | Third floor area 1 overhead water mains test OK | SHANEN | SHANEN | | PTO | P | 5744291 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/19/2018 | garden level ceiling dwv, plan marked | TED | TED | | PTO | P | 5742528 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 01/17/2018 | 2nd floor south 10'' roof drains ok | TED | TED | | PRD | P | 5739505 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 01/05/2018 | garden level storm drain, plan marked | TED | TED | | PRD | P | 5730191 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 01/04/2018 | 1st floor 10'' south side plan marked | TED | TED | | PRD | P | 5728702 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 01/03/2018 | wrong inspection called | TED | TED | | PRD | P | 5727454 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/03/2018 | water piping, 3rd floor ceiling area 4 , plan marked | TED | TED | | PTO | P | 5727449 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 12/29/2017 | 4th floor plan marked | TED | TED | | PRD | P | 5725310 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 12/20/2017 | 10'' storm drain garden level, plan marked | TED | TED | | PRD | P | 5718382 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 12/15/2017 | area E-1, existing building 3rd floor plan marked | TED | TED | | PRD | P | 5714014 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 12/14/2017 | RD piping in 3rd floor ceiling- 1 broken hanger rest ok test and design, plan marked | TED | TED | | PRD | P | 5712627 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 12/07/2017 | Test and design ok, DWV, drawings marked (TPL103) crawl space, columns XA-XE and X2-X6. | DANR | DANR | | PTO | P | 5706267 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 12/05/2017 | Test and design ok, 2nd floor 8" RD / OD by shaft 2614 and 3" RD overhead from shaft to columns B-E and 1-2, drawing TPL 122, drawings marked. | DANR | DANR | | PRD | P | 5702497 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 11/22/2017 | roof/storm drains garden level up to 2nd floor, plan marked | TED | TED | | PRD | P | 5693031 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/21/2017 | 4'' water main from connection in main hospital through hall (will continue into new wing at later date, will need insulation installed ) plan marked | TED | TED | | PTO | P | 5691740 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 11/17/2017 | level 1 area 4 plan marked | TED | TED | | PRD | P | 5688895 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 11/16/2017 | level 1 area 4 plan marked | TED | TED | | PRD | P | 5687325 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 11/13/2017 | area and roof drain piping are 4 garden level, plan marked | TED | TED | | PRD | P | 5682992 |
US ENGINEERING COMPANY | XMS | T | 12/06/2018 | PAID (REC#1561645) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 12-6-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 6044663 |
US ENGINEERING COMPANY | XMS | T | 11/08/2018 | PAID (REC#1555854) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta ASI-57 | DALEH | DALEH | | XMS | T | 6020683 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 11/05/2018 | PAID (REC#1554222) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised door hardware | LBENNETT | LBENNETT | | XBS | T | 6016235 |
US ENGINEERING COMPANY | XMS | T | 10/11/2018 | PAID (REC#1547924) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: asi-54 | DALEH | DALEH | | XMS | T | 5992376 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 07/11/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 7-11-18 | TCRIPPEN | TCRIPPEN | | XPS | P | 5898933 |
US ENGINEERING COMPANY | XMS | T | 07/11/2018 | PAID (REC#1515957) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: ASI-53 | DALEH | DALEH | | XMS | T | 5898892 |
US ENGINEERING COMPANY | XMS | P | 06/20/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | P | 5879760 |
STURGEON ELECTRIC CO INC | XES | P | 06/19/2018 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Revised TE 003, 123, 605, 606, 609. TEL 111, 112, 113. TEP 121, 122, 133 | SHELBY | SHELBY | | XES | P | 5878038 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 06/14/2018 | PAID (REC#1509306) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 6-14-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5874954 |
US ENGINEERING COMPANY | XMS | T | 05/17/2018 | PAID (REC#1501820) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 5-15-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 5848248 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 05/03/2018 | PAID (REC#1499298): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice | TCRIPPEN | TCRIPPEN | | XPS | T | 5834629 |
US ENGINEERING COMPANY | XMS | P | 04/19/2018 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: REVISED SOME ROOM NUMBERS AND MINOR LAYOUT REVISIONS | JUSTINC | JUSTINC | | XMS | P | 5821634 |
STURGEON ELECTRIC CO INC | XES | P | 04/17/2018 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Misc revisions ( hallway numbering, elevator numbering, revisions to circuit numbers on normal power etc | SHELBY | SHELBY | | XES | P | 5819617 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 04/09/2018 | PAID (REC#1493090) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Minor revisions | MICHAELA | MICHAELA | | XBS | T | 5811892 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 02/20/2018 | PAID (REC#1482902): PLAN SPLICE FEE: $62.5 by: TCRIPPEN for Plumbing: plumbing splice 2-20-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5768607 |
US ENGINEERING COMPANY | XMS | P | 02/16/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | XMS | P | 5767249 |
STURGEON ELECTRIC CO INC | XES | P | 02/13/2018 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Significant revisions to operating room boom circuiting. Assorted minor revisions to sheets TEP 111, 113, 122, 132, 133, 151, and TE 402, 402A, 602, 603, 604, 606 | SHELBY | SHELBY | | XES | P | 5764880 |
STURGEON ELECTRIC CO INC | XES | P | 01/31/2018 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: See summary of changes (in scanned documents) for all splice revisions. | BERTHA | BERTHA | | XES | P | 5753500 |
US ENGINEERING COMPANY | XMS | P | 01/30/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised layout | JUSTINC | JUSTINC | | XMS | P | 5751462 |