SUN CONSTRUCTION & FACILITY SERVICES, INC. | B= | C | 02/22/2019 | Remainder of framing verified / remodel complete | RICHB | RICHB | | B= | C | 6114430 |
SUN CONSTRUCTION & FACILITY SERVICES, INC. | BE | L | 02/21/2019 | Renewed at 2/21/2019 12:51:44 PM | TERRI | TERRI | | BE | L | 6113281 |
OLSON PLUMBING & HEATING COMPANY | BSP | T | 01/19/2018 | PAID (REC#1477953): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 1-19-2018 | TCRIPPEN | TCRIPPEN | | BSP | T | 5742301 |
SUN CONSTRUCTION & FACILITY SERVICES, INC. | BSP | R | 01/11/2018 | Field cancelled by Fred (via phone) | RICHB | RICHB | | BSP | R | 5735817 |
SUN CONSTRUCTION & FACILITY SERVICES, INC. | BFR | P | 10/26/2017 | Framing for Equip Room D162 OK / no rated assemblies being created or modified / still need to inspect soffit framing / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5668413 |
SUN CONSTRUCTION & FACILITY SERVICES, INC. | BIN | C | 10/26/2017 | Insulation in window infills OK / plans reviewed onsite | RICHB | RICHB | | BIN | C | 5668406 |
SUN CONSTRUCTION & FACILITY SERVICES, INC. | BIN | R | 10/25/2017 | Field cancelled by Contractor | RICHB | RICHB | | BIN | R | 5667069 |
SUN CONSTRUCTION & FACILITY SERVICES, INC. | BFR | P | 10/24/2017 | Framing & sheetrock 1-side at interior side of existing windows (see Detail 12/A9.0) OK / discussed BIN requirements & sequencing of fire riser room inspections / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5665934 |
SUN CONSTRUCTION & FACILITY SERVICES, INC. | BFR | R | 10/23/2017 | Field cancelled over the phone by Fred (Sun) | RICHB | RICHB | | BFR | R | 5664135 |
DYNALECTRIC COMPANY | E= | C | 01/12/2018 | | JOHNN | JOHNN | | E= | C | 5736515 |
FOUNDERS FIRE AND ELECTRIC LLC | E= | C | 12/29/2017 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | E= | C | 5725117 |
FOUNDERS FIRE AND ELECTRIC LLC | E= | C | 12/29/2017 | FIRE ALARM INSPECTION: FA | JOHNN | JOHNN | | E= | C | 5725108 |
FOUNDERS FIRE AND ELECTRIC LLC | ER | C | 12/29/2017 | FIRE ALARM INSPECTION: FA | JOHNN | JOHNN | | ER | C | 5725107 |
DYNALECTRIC COMPANY | EP | P | 12/27/2017 | DP1AC: needs 1000 amp cb,not 1200, bond transformers to steel, ---------------------------check hvac,AIC on cb's | JOHNN | JOHNN | | EP | P | 5723301 |
DYNALECTRIC COMPANY | ER | C | 12/27/2017 | grid | JOHNN | JOHNN | | ER | C | 5723274 |
DYNALECTRIC COMPANY | ER | P | 12/22/2017 | need 4 clips per fixture on all troffers, rest of above ceiling ,ok | JOHNN | JOHNN | | ER | P | 5721093 |
FOUNDERS FIRE AND ELECTRIC LLC | ER | P | 12/11/2017 | FIRE ALARM INSPECTION: Ceiling rough in ok / | ROB | ROB | | ER | P | 5708834 |
DYNALECTRIC COMPANY | ER | P | 12/08/2017 | under raised floor,ok | JOHNN | JOHNN | | ER | P | 5707340 |
DYNALECTRIC COMPANY | ER | P | 11/02/2017 | all walls, | JOHNN | JOHNN | | ER | P | 5674447 |
MECHONE, INC. | H= | C | 01/26/2018 | MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 5748818 |
MECHONE, INC. | HSP | P | 01/26/2018 | RFI FOR RELOCATING S-1 AND RETURN AIR AT 3PAR ON SHEET M1.01 RECEIVED AND SCANNED. RFI NEW DRAWING FOR RELOCATING S-1 AND RETURN AIR RECEIVED AND SCANNED. ENGINEER LETTER STATING NO DAMPERS REQUIRED RECEIVED AND SCANNED. SEE IMAGES | NANCY | NANCY | | HSP | P | 5748479 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 01/25/2018 | PIPING FINAL OK. | NANCY | NANCY | | H= | C | 5747640 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 01/24/2018 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | P | 5745916 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 12/05/2017 | CHILLED WATER RETURN IN SERVER RM PRESSURE TEST OK NOTE OK TO INSULATE | DAVIDH | DAVIDH | | HWP | P | 5704080 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 11/30/2017 | CHILLED SUPPLY WATER TO 3 PAR OK TO INSULATE | JERRYF | JERRYF | | HWP | P | 5698936 |
MECHONE, INC. | HD | P | 11/07/2017 | ABOVE CEILING SA RUN OK WRAP AT THE FOLLOWING DV 18 - 3 13 AND SA RUN OUTS AT VAV -3 - 1 -32 | JERRYF | JERRYF | | HD | P | 5679126 |
MECHONE, INC. | HD | P | 10/31/2017 | S-1 MEDIUM AND LOW PRESSURE SUPPLY DUCTS OK, OK TO WRAP MEDIUM PRESSURE. TRANSFER DUCT ABOVE CEILING OK. | NANCY | NANCY | | HD | P | 5672165 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 10/26/2017 | PRESSURE TEST AND PIPING OK - RAN PER PLAN - PIPING INSPECTED WAS THE FOLLOWING - CHILLED SUPPLY AND RETURN FROM ENERGY CENTER / ELECTRIC ROOM / BATTERY ROOM / DRY LAB TO WALL AT 3 PAR - HWP RETURN PIPING - ALL OK TO INSULATE | JERRYF | JERRYF | | HWP | P | 5667945 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 02/05/2018 | revised plans ok. | TAYLOR | TAYLOR | | P= | C | 5756921 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 12/11/2017 | revise plans by final. | TAYLOR | TAYLOR | | PTO | C | 5708475 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/22/2017 | revise plans to show poc to existing 3/4 dcw need to see water lines completed condensate ok, water tested up to backflow | JOSEPHD | JOSEPHD | | PTO | P | 5692634 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/24/2017 | 2 inch vent ok. | TAYLOR | TAYLOR | | PTO | P | 5665126 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 10/06/2017 | | JOEL | JOEL | | PB | C | 5648020 |