JAG BUILDING GROUP, INC. | B= | C | 11/30/2017 | Plumbing Final Complete | MATTHEWM | MATTHEWM | | B= | C | 5699009 |
JAG BUILDING GROUP, INC. | B= | P | 11/30/2017 | . Additional Inspections Required (computer generated): FRONTIER MECHANICAL SYSTEMS INC Plumbing Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5698818 |
FRONTIER MECHANICAL SYSTEMS INC | BSP | T | 11/30/2017 | PAID (REC#1468508) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 11-30-2017 | TCRIPPEN | TCRIPPEN | | BSP | T | 5698191 |
JAG BUILDING GROUP, INC. | BSP | T | 11/29/2017 | PAID (REC#1468510) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revised patio seating and enclosure. | SHELLEY | SHELLEY | | BSP | T | 5697280 |
JAG BUILDING GROUP, INC. | B= | P | 11/21/2017 | Need to complete all other final inspections for outside entities // Remove locking device from the patio gate // No other building items -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, FRONTIER MECHANICAL SYSTEMS INC Plumbing Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5691709 |
JAG BUILDING GROUP, INC. | BFR | P | 10/13/2017 | Framing OK pending other roughs // Discussed accessibility items with GC | JEREMYA | JEREMYA | | BFR | P | 5654969 |
JAG BUILDING GROUP, INC. | BSP | P | 09/29/2017 | Dowels at all concrete cuts OK per approved plan | JEREMYA | JEREMYA | | BSP | P | 5640392 |
FOSTER ELECTRIC CORPORATION | E= | C | 11/15/2017 | EF-1 ---15 ----COOLER 1 ---20 --- FREEZER 1--- 20---- RTU1--- 100 AMPS ---------- service was existing 400 amp 4 wire 2 sets 250 kcmil aluminum | CRAIGS | CRAIGS | | E= | C | 5686828 |
FOSTER ELECTRIC CORPORATION | ER | C | 11/09/2017 | above ceiling OK ---- install a breaker lock on the pizza oven | CRAIGS | CRAIGS | | ER | C | 5681214 |
FOSTER ELECTRIC CORPORATION | ER | P | 10/18/2017 | panel wall OK | CRAIGS | CRAIGS | | ER | P | 5659981 |
FOSTER ELECTRIC CORPORATION | ER | P | 10/12/2017 | Rough in ok for ceilings and walls--Highlighted, dated and initialed on plan / Check for access to oven connection adjacent to panels at final | ROB | ROB | | ER | P | 5653470 |
FOSTER ELECTRIC CORPORATION | ESL | P | 09/21/2017 | feeder under slab OK | CRAIGS | CRAIGS | | ESL | P | 5633062 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 11/14/2017 | Corrections made. Water heater vent OK. | MARKB | MARKB | | H= | C | 5685381 |
ANYTHING HVAC, LLC. | H= | C | 11/14/2017 | OK. | LIDO | LIDO | | H= | C | 5684060 |
FRONTIER MECHANICAL SYSTEMS INC | H= | P | 11/13/2017 | NOTE # 4 PAGE M220 SHOWS PRESSURE REDUCING VALVE THAT IS NOT INSTALLED , NEED TO LABEL METER FOR ADDRESS SERVED , MISSING ACCESS PANEL FOR SHUTOFF VALVE TO OVEN .CONTRACTOR NEEDS TO ADD WATER HEATER VENT TO SCOPE OF WORK AND CALL FOR INSPECTION . | LIDO | LIDO | | H= | P | 5683134 |
ANYTHING HVAC, LLC. | H= | P | 11/12/2017 | TEST AND BALANCE REPORT RECEIVED . | LIDO | LIDO | | H= | P | 5682001 |
ANYTHING HVAC, LLC. | H= | P | 11/09/2017 | Pending for - need to review test and balance report , contractor needs to add Kitchen and bathroom exhaust fans to scope of work ,Contractor that installed water heater and vent needs to add to there scope of work and call for inspection . INTERLOCKS VERIFIED , ROOF OK, REFRIGERATION OK ,THERMOSTATS AND CENSORS IN PLACE . | LIDO | LIDO | | H= | P | 5681831 |
ANYTHING HVAC, LLC. | HRP | P | 11/08/2017 | CONDENSERS ON ROOF OK . LINE SETS FROM ROOF TO ICE MAKER / WALK IN FREEZER AND WALK IN REFRIGERATOR OK . STILL NEED TO SEE CONDENSATE LINES . | LIDO | LIDO | | HRP | P | 5680293 |
ANYTHING HVAC, LLC. | HD | P | 11/08/2017 | Contractor that installed water heater and vent will need to add to there scope of work and call for inspections , Need high temp silicone between kitchen exhaust fan and grease duct on roof and see roof equipment labeled , Add kitchen and bathroom exhaust fans to scope of work install r/a grill above walk in refrigerator for kitchen,( need test and balance report / need to verify interlocks and thermostats and censors . GREASE WRAP OK, S/A AND R/A ABOVE CEILING DUCT ROUGH AND FINAL FLEX CONNECTIONS OK , ALL EXPOSED DUCT AND TAPS OK. BATHROOM EXHAUST ABOVE HARD LIDS AND UP THROUGH ROOF AND TERMINATION OK , REMOTE INDICATOR LIGHT INSTALLED | LIDO | LIDO | | HD | P | 5680286 |
ANYTHING HVAC, LLC. | HD | P | 10/18/2017 | GREASE DUCT LIGHT TEST COMPLETE. FINISH GREASE WRAP AND CALL FOR INSPECTION | MARKB | MARKB | | HD | P | 5660124 |
ANYTHING HVAC, LLC. | HD | P | 10/17/2017 | GREASE DUCT LIGHT TEST - Have one hole at butt seam to curb 90 and 4 on hood collar, one from factory. Rest of duct complete. | MARKB | MARKB | | HD | P | 5658541 |
FRONTIER MECHANICAL SYSTEMS INC | HC | C | 10/13/2017 | adding 300k to meter | MARKB | MARKB | | HC | C | 5654990 |
FRONTIER MECHANICAL SYSTEMS INC | HI | C | 10/13/2017 | 10 PSI PRESSURE TEST OK. PIPING PER PLAN. At Final - Access panel for shutoff valve to oven. | MARKB | MARKB | | HI | C | 5654986 |
ANYTHING HVAC, LLC. | HD | P | 10/11/2017 | GREASE DUCT LIGHT TEST AT CONTRACTORS SHOP - OK FOR CURB DROP WITH 90 AND 10' STRAIGHT. DATED AND SIGNED | MARKB | MARKB | | HD | P | 5651948 |
ANYTHING HVAC, LLC. | HD | P | 10/09/2017 | ABOVE CEILING S/R DUCT AND RUN OUTS OK TO WRAP. REAR AND LEFT HOOD WALLS OK FOR COMBUSTIBLES. Still need bath exhaust. No roof penetrations at this time. No flex or diffusers | MARKB | MARKB | | HD | P | 5649504 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 11/13/2017 | plans spliced | JOHNS | JOHNS | | P= | C | 5682404 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 10/12/2017 | NEED TO CORRECT SCOPE OF WORK (currently showing 2 of everything), REVISE PLANS TO SHOW NEW RP LOCATION, rest ok. note: vtr (1) existing, trap guards through out, hammer aerestors @ following locations above ceiling pot filler, back hand sink, 3 comp sink, and lavs, need to check water htr and all back flows @ final. | JOHNS | JOHNS | | PTO | C | 5653604 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 09/28/2017 | ok for g.w and s.s test and design | JOHNS | JOHNS | | PB | C | 5639852 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 09/22/2017 | deep tie ins for s.s. and g.w. ok to cover | JOHNS | JOHNS | | PB | P | 5634026 |