HAMMERS CONSTRUCTION, INC | B= | C | 05/23/2018 | Previous items received | RICHB | RICHB | | B= | C | 5852949 |
HAMMERS CONSTRUCTION, INC | B= | P | 04/30/2018 | Temp CO: extend tco ( Expires: 5/30/2018 12:00:00 AM) | GITA | GITA | | B= | P | 5830693 |
HAMMERS CONSTRUCTION, INC | B= | P | 03/28/2018 | Temp CO: all finals are pending ( Expires: 4/27/2018 12:00:00 AM) | GITA | GITA | | B= | P | 5800786 |
HAMMERS CONSTRUCTION, INC | BSP | P | 03/27/2018 | Stamped third party observations received | RICHB | RICHB | | BSP | P | 5799657 |
HAMMERS CONSTRUCTION, INC | B= | P | 03/23/2018 | Complete pending other Finals and third party paperwork / reviewed third party documentation for all third party inspections onsite - need copy for RBD records prior to completing Permit / training with Justin L - accessibility and commercial requirements -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, JLC ELECTRIC LLC Electrical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5798158 |
HAMMERS CONSTRUCTION, INC | BSP | P | 03/23/2018 | Training with Rich - Reviewed requirements for convenience store final to include accessible elements, Egress, inspection processes, 3rd part engineering, Trash enclosures | JUSTINL | JUSTINL | | BSP | P | 5798157 |
HAMMERS CONSTRUCTION, INC | BFR | P | 03/15/2018 | grid X cloud over entry OK / met with site super and discussed need for all engineer observations including foundation, open hole, under slab insulation and welding and bolting for both the store and the canopy / also did courtesy measurements for all accessibility in both restrooms | DANE | DANE | | BFR | P | 5789619 |
JLC ELECTRIC LLC | BSP | P | 01/23/2018 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: revise panel schedules | SHELBY | SHELBY | | BSP | P | 5745627 |
HAMMERS CONSTRUCTION, INC | BFR | P | 01/16/2018 | Interior non-bearing non-rated framing OK pending other roughs / reviewed accessible elements / discussed remaining inspection requirements - will need stamped third party observations for Final | RICHB | RICHB | | BFR | P | 5738712 |
HAMMERS CONSTRUCTION, INC | BIN | P | 12/28/2017 | Exterior wall insulation inspection / R-26 at double stud wall locations OK / R-19 at all other exterior wall insulation OK / Reviewed need for all Eng for footing/foundation/ and steel / Reviewed plans on site | NICK | NICK | | BIN | P | 5724101 |
HAMMERS CONSTRUCTION, INC | BFR | P | 12/12/2017 | OK to use Third Party Observation for structural steel erection / exterior non-rated framing OK pending other Roughs / FRTW backing & blocking at parapet verified / pre-insulated box headers & jambs verified / discussed third party observations (including sub-slab insulation at refrigerated areas) / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5710589 |
HAMMERS CONSTRUCTION, INC | BFN | P | 12/12/2017 | OK to use Third Party Observation | RICHB | RICHB | | BFN | P | 5710588 |
HAMMERS CONSTRUCTION, INC | BFT | P | 12/12/2017 | OK to use Third Party Observation | RICHB | RICHB | | BFT | P | 5710576 |
HAMMERS CONSTRUCTION, INC | BSP | P | 11/27/2017 | PLAN SPLICE: (No Fee) by: DANM for Construction: Remove and replace equipment on floor plan; add structural foundation details for sculpture | DANM | DANM | | BSP | P | 5695135 |
HVAC SOLUTIONS, INC. | BSP | P | 11/27/2017 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: REVISED MEP page | JUSTINC | JUSTINC | | BSP | P | 5695080 |
GOLD RUSH PLUMBING | BSP | P | 11/27/2017 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 11-27-17 | TCRIPPEN | TCRIPPEN | | BSP | P | 5695014 |
HAMMERS CONSTRUCTION, INC | BSP | T | 10/16/2017 | PAID (REC#1468890): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Minor revisions | MICHAELA | MICHAELA | | BSP | T | 5656910 |
HAMMERS CONSTRUCTION, INC | BSP | P | 10/16/2017 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Multiple lighting and power revision. Updated panel schedules. | BERTHA | BERTHA | | BSP | P | 5656670 |
JLC ELECTRIC LLC | E= | C | 03/27/2018 | Pole lights ok / | ROB | ROB | | E= | C | 5799793 |
JLC ELECTRIC LLC | E= | P | 03/23/2018 | Electrical for store is complete--Need to check pole lights / | ROB | ROB | | E= | P | 5797447 |
JLC ELECTRIC LLC | ES | P | 03/23/2018 | Commercial Service: Need to check grounding of bonding bushings in CT cabinet / | ROB | ROB | | ES | P | 5797441 |
JLC ELECTRIC LLC | ER | P | 03/14/2018 | Rough in ok for all grid/drop ceilings / | ROB | ROB | | ER | P | 5788152 |
JLC ELECTRIC LLC | ES | P | 01/24/2018 | Commercial Service: 1200 amp,4w, new commercial, ok to energize,---------------------check bonding on nipples in CT can on next trip, ufer,ok | JOHNN | JOHNN | | ES | P | 5746573 |
JLC ELECTRIC LLC | ES | P | 01/23/2018 | Commercial Service: not ready, | JOHNN | JOHNN | | ES | P | 5745048 |
JLC ELECTRIC LLC | ES | P | 01/22/2018 | Commercial Service: 1200 amp, 4w, new commercial, do not energize, ufer clamp is loose, bond supply side nipples, steel and water bond,ok | JOHNN | JOHNN | | ES | P | 5743964 |
JLC ELECTRIC LLC | EUG | P | 01/16/2018 | all site lighting, | JOHNN | JOHNN | | EUG | P | 5738120 |
JLC ELECTRIC LLC | ER | P | 01/16/2018 | all walls:need grds made up, hard lids,ok,inside and outside, | JOHNN | JOHNN | | ER | P | 5738116 |
JLC ELECTRIC LLC | ER | P | 12/26/2017 | Rough in for exterior walls ok / | ROB | ROB | | ER | P | 5722338 |
JLC ELECTRIC LLC | ESL | C | 11/02/2017 | inside building,complete | JOHNN | JOHNN | | ESL | C | 5674677 |
HVAC SOLUTIONS, INC. | H= | C | 05/16/2018 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 5846136 |
HVAC SOLUTIONS, INC. | H= | P | 03/22/2018 | PARTIAL PENDING TAB REPORT | JERRYF | JERRYF | | H= | P | 5796742 |
HUSSMANN CORPORATION | H= | C | 03/20/2018 | | JERRYF | JERRYF | | H= | C | 5793477 |
HVAC SOLUTIONS, INC. | HD | P | 03/14/2018 | NEED TRANSFER DUCT AND GRILLE COMPLETED AT OFFICE PER NOTE M15 - ALL OTHER GRILLES AND CONNECTIONS ARE COMPLETE - BY FINAL NEED THE FOLLOWING - 2 RTU'S CLAIMED ON PERMIT - TAB REPORT - LABEL EXHAUST FANS ON ROOF TO AREA'S SERVED - VERIFY SMOKE SHUTDOWN AND REMOTE INDICATORS - VERIFY CO2 MONITORS PER NOTE M22 | JERRYF | JERRYF | | HD | P | 5788235 |
HUSSMANN CORPORATION | HRP | P | 03/02/2018 | 2 PRESSURE TESTS OK AND PIPING PER PLAN FOR ALL UNDER GROUND AND ABOVE CEILING | JERRYF | JERRYF | | HRP | P | 5778990 |
HVAC SOLUTIONS, INC. | HD | P | 01/24/2018 | RTU - 2 RETURN DUCT AND EF-2 EXHAUST DUCT OK - NO GRILL BOX INSTALLED YET FOR EXHAUST EF- 2 / OK TO WRAP . STILL NEED ALL SA GRILLE TAPS. | LIDO | LIDO | | HD | P | 5747032 |
HVAC SOLUTIONS, INC. | HD | P | 01/16/2018 | NEED RTU 2 RA DUCT EXTENDED TO BOTTOM OF CEILING OR SHORTENED TO MAINTAIN FULL OPENING TO AREA - NEED EF2 DUCT EXTENDED IN HARD PIPE TO EXHAUST GRILLE BOX - STILL NEED ALL SA GRILLE TAPS- REST OF ABOVE CEILING RA / SA AND EXHAUST OK | JERRYF | JERRYF | | HD | P | 5738150 |
GOLD RUSH PLUMBING | P= | C | 03/16/2018 | OK, notes amendment pictures sent by contractor 3-19-2018. | DANR | DANR | | P= | C | 5790779 |
GOLD RUSH PLUMBING | P= | P | 03/14/2018 | Bathroom lavs and accessible drinking fountain lacking 27" knee clearance, need pex support in mechanical room and moved overhead hangers, all floor drains need trap guards, all indirect drains need grates cut at floor sinks, mop sinks need caulking, need approved cleanout plugs, hand sinks need tempering valves, water heater needs isolation valve supply side, re-inspect all. | DANR | DANR | | P= | P | 5788151 |
GOLD RUSH PLUMBING | PTO | C | 01/17/2018 | Test and design ok. Note: check mechanical room connections and equipment at final. | DANR | DANR | | PTO | C | 5739512 |
GOLD RUSH PLUMBING | PRD | P | 01/04/2018 | roof drains ok, need 3 inch overflows. | TAYLOR | TAYLOR | | PRD | P | 5728717 |
GOLD RUSH PLUMBING | PB | C | 11/03/2017 | corrections made. | TAYLOR | TAYLOR | | PB | C | 5676138 |
GOLD RUSH PLUMBING | PB | P | 10/19/2017 | still need to install water service and vents for grease interceptor, rest ok. | TAYLOR | TAYLOR | | PB | P | 5660548 |
GOLD RUSH PLUMBING | PB | P | 10/17/2017 | s- trap at sinks, need 4 inch floor drain at mech room, stand pipe exceeds 24 inches at floor sinks, install water service and vents for grease interceptor, rest ok. | TAYLOR | TAYLOR | | PB | P | 5657831 |