GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 12/04/2017 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 5701053 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 11/27/2017 | Complete pending Electrical / plans reviewed onsite. Additional Inspections Required (computer generated): STURGEON ELECTRIC CO INC Electrical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5694946 |
OLSON PLUMBING & HEATING COMPANY | BSP | T | 11/14/2017 | PAID (REC#1465684) ADDITIONAL PLAN REVIEW TIME: $50 From: DALEH re-routed water piping | DALEH | DALEH | | BSP | T | 5685020 |
OLSON PLUMBING & HEATING COMPANY | BSP | P | 11/14/2017 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 11-14-2017 | TCRIPPEN | TCRIPPEN | | BSP | P | 5684902 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 10/26/2017 | Above ceiling OK pending Mechanical / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5668750 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | C | 10/09/2017 | Framing for smoke partition OK - other Roughs are complete for walls / plans reviewed onsite | RICHB | RICHB | | BFR | C | 5649340 |
STURGEON ELECTRIC CO INC | E= | C | 12/04/2017 | blood draw room only phase 2 on permit l16662 | BRET | BRET | | E= | C | 5701052 |
STURGEON ELECTRIC CO INC | E= | P | 11/14/2017 | phase 1, blood draw room 3005, cancer nurses station and reception deck ok | BRET | BRET | | E= | P | 5684896 |
STURGEON ELECTRIC CO INC | ER | P | 11/13/2017 | ceiling ok room 3005 | BRET | BRET | | ER | P | 5683120 |
STURGEON ELECTRIC CO INC | E= | P | 11/13/2017 | gfci protect all receptacles within 6' of sink, add room number to panel schedule. partial blood draw room only | BRET | BRET | | E= | P | 5682808 |
STURGEON ELECTRIC CO INC | ER | P | 10/31/2017 | cancer center waiting area nurse office and deck. | BRET | BRET | | ER | P | 5672015 |
STURGEON ELECTRIC CO INC | ER | R | 10/30/2017 | incorrect call ahead number, could not locate contractor. | BRET | BRET | | ER | R | 5671071 |
STURGEON ELECTRIC CO INC | ER | P | 10/04/2017 | walls | BRET | BRET | | ER | P | 5644362 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 11/15/2017 | | JOEL | JOEL | | H= | C | 5686646 |
COLORADO SHEET METAL CO., INC. | H= | C | 11/14/2017 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 5684148 |
COLORADO SHEET METAL CO., INC. | H= | P | 10/31/2017 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5672320 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 10/23/2017 | OK - BY FINAL REVISE PLAN TO SHOW HWP PIPING AS INSTALLED | JERRYF | JERRYF | | HWP | C | 5664342 |
COLORADO SHEET METAL CO., INC. | HD | P | 10/23/2017 | OK TO WRAP - STILL NEED SMOKE DAMPER | JERRYF | JERRYF | | HD | P | 5664341 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 11/15/2017 | | JOEL | JOEL | | P= | C | 5686641 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 10/17/2017 | check waste/ vent and DHW tie in's by final, note: revise plans to show drain tie in to existing 2 inch sanitary. | TAYLOR | TAYLOR | | PTO | C | 5657539 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/06/2017 | in wall only dwv and h2o | JOEL | JOEL | | PTO | P | 5647882 |